EP0839752A1 - Platform for a construction elevator - Google Patents

Platform for a construction elevator Download PDF

Info

Publication number
EP0839752A1
EP0839752A1 EP97890192A EP97890192A EP0839752A1 EP 0839752 A1 EP0839752 A1 EP 0839752A1 EP 97890192 A EP97890192 A EP 97890192A EP 97890192 A EP97890192 A EP 97890192A EP 0839752 A1 EP0839752 A1 EP 0839752A1
Authority
EP
European Patent Office
Prior art keywords
loading ramp
loading
ramp
linkage
conveyor basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP97890192A
Other languages
German (de)
French (fr)
Other versions
EP0839752B1 (en
Inventor
Wolfgang Türmer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABG Allgemeine Baumaschinen GmbH
Original Assignee
ABG Allgemeine Baumaschinen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABG Allgemeine Baumaschinen GmbH filed Critical ABG Allgemeine Baumaschinen GmbH
Priority to AT97890192T priority Critical patent/ATE267764T1/en
Publication of EP0839752A1 publication Critical patent/EP0839752A1/en
Application granted granted Critical
Publication of EP0839752B1 publication Critical patent/EP0839752B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • B66B9/16Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure
    • B66B9/187Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure with a liftway specially adapted for temporary connection to a building or other structure

Definitions

  • the invention relates to a conveyor basket for a construction elevator with a loading opening formed between two side parts; with one in the field of Loading opening hinged to the bottom of the basket, which consists of a swung-up, lockable closed position in a folded outward Loading position is pivotable, and with hinged mounted on the side parts, side protection panels connected to the loading ramp via a linkage for the loading ramp.
  • the loading ramp of the conveyor basket of a construction hoist serves, among other things, between the basket floor and a scaffold or structure to bridge the resulting gap.
  • the one folded outwards lies Loading ramp with its free end on the scaffolding or structure, see above that the conveyor basket can be loaded and unloaded via this loading ramp.
  • Side protection of the unfolded loading ramp serves as side protection panels, the side parts of the conveyor cage that delimit the loading opening are stored and advantageously coupled to the loading ramp via a linkage to the side protection panels with the folding of the loading ramp inevitably exhibited.
  • the invention is therefore based on the object of avoiding these deficiencies and with a conveyor basket for a construction elevator of the type described above simple constructive means so that a simple adjustment of the side protection panels to the one to be bridged by the loading ramp Gap width is ensured.
  • the invention solves this problem in that the side shields are slidably mounted along the side parts and that the linkage between the loading ramp and the side protection panels to the swivel axis of the Loading ramp has parallel articulation axes.
  • the movability of the side protection panels along the side parts of the Conveyor basket advantageously allows the side shields to be adjusted to the gap width to be bridged over the respective displacement length the side protection panels. Because of the parallel to the pivot axis of the loading ramp Linkage axes of the boom between the loading ramp and the movable stored side shields result in a simple, little wear-resistant and robust construction.
  • the sliding length of the side protection panels depends on the articulation points of the boom and can therefore also via these articulation points according to the respective requirements can be set.
  • the linkage can consist of one between each the two side protection panels and the loading ramp Handlebars exist, optionally with a different radial distance from the Swivel axis of the loading ramp is articulated on this.
  • the loading ramp does not swivel up from the folded loading position in the closed position in the area of its overlying free edge of Hand must be grasped, can on the loading ramp via a pulley guided in the upper edge area of a side part, with a handle on Attack the free end of the traction device with whose help the loading ramp taking advantage of advantageous lifting conditions while taking it with you the side protection panels can be swiveled up.
  • the conveyor basket shown has a basket base 1, of which side parts 2, which leave a loading opening 3 on one side of the basket.
  • This loading opening 3 is articulated a loading ramp 4, the pivot axis with 5 is designated.
  • the loading ramp 4 is equipped with a lock 6 which 5 consists of a socket pin 7, which is in a recess 8 of the side parts 2 engages and against the force of a closing spring 9 the recess 8 can be pulled out, by means of a Cable 10.
  • the side shields 12 are pushed out over the rods 14, around a side protection for those with their free edge on a scaffold or Building 20 to get rest loading dock 4.
  • the swinging up of the Loading ramp 4 in the closed position can be by means of a traction device 21, for example a rope, be relieved, which attacks the loading ramp 4 and a Deflection roller 22 is guided in the upper region of a side part 2, so that with Using the handle 23 provided at the free end of the traction means 21 Loading ramp 4 can be pivoted into the closed position without it in Area of the edge resting on the scaffold or structure 20 by hand to have to record.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Transportation (AREA)
  • Automation & Control Theory (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The cage (3) has a loading ramp (4) mounted in its floor (1). The ramp can pivot between a locked raised position and a lowered position leading down from the cage. The ramp has side guards (12) mounted to the cage's side wall (2) on bearings and connected to the ramp via a linkage (14). The guards can slide backwards and forwards with respect to the walls. The linkage contains articulated joint axles (17,18) parallel to the ramp's pivot axle (5).

Description

Die Erfindung bezieht sich auf einen Förderkorb für einen Bauaufzug mit einer zwischen zwei Seitenteilen gebildeten Ladeöffnung; mit einer im Bereich der Ladeöffnung am Korbboden angelenkten Laderampe, die aus einer hochgeschwenkten, verriegelbaren Schließstellung in eine nach außen abgeklappte Ladestellung verschwenkbar ist, und mit an den Seitenteilen ausstellbar gelagerten, mit der Laderampe über ein Gestänge verbundenen Seitenschutzblenden für die Laderampe.The invention relates to a conveyor basket for a construction elevator with a loading opening formed between two side parts; with one in the field of Loading opening hinged to the bottom of the basket, which consists of a swung-up, lockable closed position in a folded outward Loading position is pivotable, and with hinged mounted on the side parts, side protection panels connected to the loading ramp via a linkage for the loading ramp.

Die Laderampe des Förderkorbes eines Bauaufzuges dient unter anderem dazu, den sich zwischen dem Korbboden und einem Gerüst oder einem Bauwerk ergebenden Spalt zu überbrücken. Zu diesem Zweck liegt die nach außen abgeklappte Laderampe mit ihrem freien Ende auf dem Gerüst oder Bauwerk auf, so daß der Förderkorb über diese Laderampe be- und entladen werden kann. Zur seitlichen Absicherung der ausgeklappten Laderampe dienen Seitenschutzblenden, die an den die Ladeöffnung begrenzenden Seitenteilen des Förderkorbes gelagert sind und vorteilhaft mit der Laderampe über ein Gestänge gekuppelt werden, um die Seitenschutzblenden mit dem Abklappen der Laderampe zwangsläufig auszustellen. Bei einer bekannten Konstruktion dieser Art (DE 295 01 886 U1) sind die Seitenschutzblenden als die Ladeöffnung verschließende Türflügel ausgebildet, die mit der Laderampe über ein kardanisch angelenktes Gestänge antriebsverbunden sind, um beim Öffnen der Türflügel die Laderampe abzuklappen. Nachteilig bei diesem bekannten Förderkorb ist, daß die durch die ausschwenkbaren Türflügel gebildeten Seitenschutzblenden nicht an die jeweils zu überbrückende Spaltweite angepaßt werden können. Außerdem sind die Türflügel bereits weitgehend zu öffnen, bevor die Laderampe ausgeklappt werden kann, so daß sich ungünstige Stellwege für das Gestänge ergeben, das wegen der Kardananlenkungen vergleichsweise aufwendig ausgebildet werden muß.The loading ramp of the conveyor basket of a construction hoist serves, among other things, between the basket floor and a scaffold or structure to bridge the resulting gap. For this purpose, the one folded outwards lies Loading ramp with its free end on the scaffolding or structure, see above that the conveyor basket can be loaded and unloaded via this loading ramp. For Side protection of the unfolded loading ramp serves as side protection panels, the side parts of the conveyor cage that delimit the loading opening are stored and advantageously coupled to the loading ramp via a linkage to the side protection panels with the folding of the loading ramp inevitably exhibited. In a known construction of this type (DE 295 01 886 U1) are the side protection covers that close the loading opening Door wing formed, which is hinged to the loading ramp via a gimbal Linkages are drive-connected to the loading ramp when the door is opened fold down. A disadvantage of this known conveyor basket is that the swing-out door panels formed side shields not to the respective gap width to be bridged can be adjusted. Besides, they are The door leaves can already be largely opened before the loading ramp is unfolded can be, so that there are unfavorable travel paths for the linkage, the because of the cardan linkages are comparatively complex got to.

Der Erfindung liegt somit die Aufgabe zugrunde, diese Mängel zu vermeiden und einen Förderkorb für einen Bauaufzug der eingangs geschilderten Art mit einfachen konstruktiven Mitteln so auszugestalten, daß eine einfache Anpassung der Seitenschutzblenden an die durch die Laderampe jeweils zu überbrückende Spaltweite sichergestellt wird.The invention is therefore based on the object of avoiding these deficiencies and with a conveyor basket for a construction elevator of the type described above simple constructive means so that a simple adjustment of the side protection panels to the one to be bridged by the loading ramp Gap width is ensured.

Die Erfindung löst die gestellte Aufgabe dadurch, daß die Seitenschutzblenden entlang der Seitenteile verschiebbar gelagert sind und daß das Gestänge zwischen der Laderampe und den Seitenschutzblenden zur Schwenkachse der Laderampe parallele Anlenkachsen aufweist.The invention solves this problem in that the side shields are slidably mounted along the side parts and that the linkage between the loading ramp and the side protection panels to the swivel axis of the Loading ramp has parallel articulation axes.

Die Verschiebbarkeit der Seitenschutzblenden entlang der Seitenteile des Förderkorbes erlaubt in vorteilhafter Art eine Angleichung der Seitenschutzblenden an die zu überbrückende Spaltweite über die jeweilige Verschiebelänge der Seitenschutzblenden. Wegen der zur Schwenkachse der Laderampe parallelen Anlenkachsen des Gestänges zwischen der Laderampe und den verschiebbar gelagerten Seitenschutzblenden ergibt sich eine einfache, wenig verschleißanfällige und robuste Konstruktion. Die Verschiebelänge der Seitenschutzblenden hängt von den Anlenkstellen des Gestänges ab und kann daher auch über diese Anlenkstellen den jeweiligen Anforderungen entsprechend eingestellt werden. Zu diesem Zweck kann das Gestänge aus je einem zwischen den beiden Seitenschutzblenden und der Laderampe vorgesehenen Lenker bestehen, der wahlweise mit unterschiedlichem radialen Abstand von der Schwenkachse der Laderampe an dieser anlenkbar ist. Da vor allem der radiale Abstand des Lenkerangriffes an der Laderampe von deren Schwenkachse die Verschiebelänge der Seitenschutzblenden beim Abklappen der Laderampe bestimmt, ist durch eine solche Verstellung des Lenkerangriffes eine ausreichende Anpassung der Verschiebelänge der Seitenschutzblenden an die zu überbrückende Spaltweite sichergestellt. Damit bei einer solchen Anpassung nicht die eingeschobene Ausgangsstellung der Seitenschutzblenden verändert wird, ist zugleich mit der Anlenkung die wirksame Lenkerlänge zu verstellen. Der die Anlenkung des Lenkers bildenden Teil der Laderampe und die Lenker können hiefür entsprechende Lochreihen aufweisen, die wahlweise über eine steckbare Anlenkachse verbunden werden.The movability of the side protection panels along the side parts of the Conveyor basket advantageously allows the side shields to be adjusted to the gap width to be bridged over the respective displacement length the side protection panels. Because of the parallel to the pivot axis of the loading ramp Linkage axes of the boom between the loading ramp and the movable stored side shields result in a simple, little wear-resistant and robust construction. The sliding length of the side protection panels depends on the articulation points of the boom and can therefore also via these articulation points according to the respective requirements can be set. For this purpose, the linkage can consist of one between each the two side protection panels and the loading ramp Handlebars exist, optionally with a different radial distance from the Swivel axis of the loading ramp is articulated on this. Especially the radial one Distance of the handlebar attack on the loading ramp from its swivel axis Sliding length of the side protection panels when the loading ramp is folded down is determined by such adjustment of the handlebar attack is sufficient Adjustment of the shifting length of the side protection panels to the one to be bridged Gap width ensured. Not with such an adjustment the inserted starting position of the side protection panels is changed, the effective handlebar length must be adjusted at the same time as the linkage. The the Linkage of the handlebar forming part of the loading ramp and the handlebars can for this have corresponding rows of holes, optionally via a pluggable Articulation axis are connected.

Besonders einfache Konstruktionsverhältnisse ergeben sich in diesem Zusammenhang, wenn die Lenker jeweils an einem mit der Laderampe drehfest verbundenen Schwenkarm angreifen, der gegenüber der Laderampe einen Winkel einschließen kann, um einen günstigen Gestängeverlauf sicherzustellen. Das Gestänge soll ja weder in der Schließstellung der Laderampe noch in deren abgeklappten Ladestellung störend vorragen. Sind die Seitenschutzblenden auf der Außenseite der Seitenteile verschiebbar gelagert. wobei das Gestänge in der eingeschobenen Verschiebestellung der Seitenschutzblenden zwischen diesen und den benachbarten Seitenteilen verläuft. so ergibt sich eine platzsparende Bauweise, die den Laderaum des Förderkorbes nicht beeinträchtigt. Außerdem wird das Gestänge bei geschlossener Laderampe zwischen den Seitenschutzblenden und den Seitenteilen des Förderkorbes geschützt aufgenommen.In this context, particularly simple design relationships result, when the handlebars are rotatably attached to the loading ramp Attack connected swivel arm, one opposite the loading ramp Can include angles to ensure a favorable linkage. The linkage should not be in the closed position of the loading ramp or in its protruding folded loading position disturbing. Are the side shields on slidably mounted on the outside of the side parts. the linkage in the inserted sliding position of the side protection panels between this and the adjacent side panels. this results in a space-saving Construction that does not affect the loading space of the conveyor basket. In addition, the boom is between the Protective side shields and the side parts of the conveyor basket.

Damit die Laderampe nicht zum Hochschwenken aus der abgeklappten Ladestellung in die Schließstellung im Bereich ihres aufliegenden freien Randes von Hand aus erfaßt werden muß, kann an der Laderampe ein über eine Umlenkrolle im oberen Randbereich eines Seitenteiles geführtes, mit einem Handgriff am Freien Ende versehenes Zugmittel angreifen, mit dessen Hilfe die Laderampe unter Ausnutzung vorteilhafter Hebeverhältnisse unter gleichzeitiger Mitnahme der Seitenschutzblenden hochgeschwenkt werden kann.So that the loading ramp does not swivel up from the folded loading position in the closed position in the area of its overlying free edge of Hand must be grasped, can on the loading ramp via a pulley guided in the upper edge area of a side part, with a handle on Attack the free end of the traction device with whose help the loading ramp taking advantage of advantageous lifting conditions while taking it with you the side protection panels can be swiveled up.

In der Zeichnung ist der Erfindungsgegenstand beispielsweise dargestellt. Es zeigen

  • Fig. 1 einen erfindungsgemäßen Förderkorb in einer vereinfachten Seitenansicht,
  • Fig. 2 diesen Förderkorb in einer Draufsicht,
  • Fig. 3 eine Ansicht des Förderkorbes in Richtung der von der Laderampe verschlossenen Ladeöffnung,
  • Fig.4 den Förderkorb ausschnittsweise im Bereich der in die Ladestellung abgeklappten Laderampe in einer Seitenansicht in einem größeren Maßstab,
  • Fig. 5 eine Seitenschutzblende auf einer Seite des Förderkorbes in einem Vertikalschnitt in einem größeren Maßstab und
  • Fig. 6 den Förderkorb ausschnittsweise in einer Seitenansicht bei abgenommener Seitenschutzblende in einem größeren Maßstab.
  • The subject matter of the invention is shown in the drawing, for example. Show it
  • 1 a conveyor basket according to the invention in a simplified side view,
  • 2 this conveyor basket in a plan view,
  • 3 is a view of the conveyor basket in the direction of the loading opening closed by the loading ramp,
  • 4 shows the side of the conveyor basket in the area of the loading ramp folded down into the loading position on a larger scale,
  • Fig. 5 is a side shield on one side of the conveyor basket in a vertical section on a larger scale and
  • Fig. 6 shows the conveyor basket in a side view with the side protection panel removed on a larger scale.
  • Der dargestellte Förderkorb weist einen Korbboden 1 auf, von dem Seitenteile 2 aufragen, die auf einer Korbseite eine Ladeöffnung 3 freilassen. Im Bereich dieser Ladeöffnung 3 ist eine Laderampe 4 angelenkt, deren Schwenkachse mit 5 bezeichnet ist. Die Laderampe 4 ist mit einer Verriegelung 6 ausgestattet, die gemäß der Fig. 5 aus einem Steckbolzen 7 besteht, der in eine Rastausnehmung 8 der Seitenteile 2 eingreift und gegen die Kraft einer Schließfeder 9 aus der Rastausnehmung 8 herausgezogen werden kann, und zwar mittels eines Seilzuges 10.The conveyor basket shown has a basket base 1, of which side parts 2, which leave a loading opening 3 on one side of the basket. In the area This loading opening 3 is articulated a loading ramp 4, the pivot axis with 5 is designated. The loading ramp 4 is equipped with a lock 6 which 5 consists of a socket pin 7, which is in a recess 8 of the side parts 2 engages and against the force of a closing spring 9 the recess 8 can be pulled out, by means of a Cable 10.

    An der Außenseite der die Ladeöffnung 3 begrenzenden Seitenteile 2 sind oben und unten Verschiebeführungen 11 für Seitenschutzblenden 12 vorgesehen. In diese in Form von Schienen ausgeführte Verschiebeführungen 11 greifen Laufrollen 13 der Seitenschutzblenden 12 ein, die mit der Laderampe 4 über je ein Gestänge 14 antriebsverbunden sind. Die Gestänge 14 bestehen jeweils aus einem drehfest an der Laderampe 4 befestigten Schwenkarm 15, an dem ein Lenker 16 angelenkt ist. Die als Steckachse ausgebildete Anlenkachse ist mit 17 bezeichnet. Der Lenker 16 selbst greift über eine Anlenkachse 18 an der Innenseite der zugehörigen Seitenschutzblende 12 an. Die Anordnung ist dabei so getroffen, daß sowohl der Schwenkarm 15 als auch der Lenker 16 bei geschlossener Laderampe 4 zwischen den Seitenteilen 2 und den Seitenschutzblenden 12 zu liegen kommen. Entsprechend der Fig. 4 sind der Lenker 16 und der Schwenkarm 15 mit je einer Lochreihe 19 zur wahlweisen Aufnahme der Anlenkachse 17 versehen, so daß durch ein Versetzen der Anlenkachse 17 das Übersetzungsverhältnis des Gestänges 14 und damit die Verschiebelänge der Seitenschutzblenden 12 beim Abschwenken der Laderampe 4 verändert werden. Je kleiner der Radialabstand der Anlenkachse 17 des Lenkers 16 an dem Schwenkarm 15 von der Schwenkachse 5 der Laderampe 4 ist, umso geringer ist die Verschiebelänge.On the outside of the side parts 2 delimiting the loading opening 3 are at the top and at the bottom sliding guides 11 for side shields 12 are provided. In these grip guides 11 in the form of rails engage Rollers 13 of the side shields 12, each with the loading ramp 4 a linkage 14 are drive-connected. The rods 14 each consist of a rotationally fixed to the loading ramp 4 swivel arm 15, on the one Handlebar 16 is articulated. The articulation axis designed as a thru axle is 17 designated. The handlebar 16 itself engages over a pivot axis 18 on the On the inside of the associated side shield 12. The arrangement is there made so that both the pivot arm 15 and the handlebar 16 at closed loading ramp 4 between the side parts 2 and the side protection panels 12 come to rest. 4, the handlebars 16 and the swivel arm 15, each with a row of holes 19 for optional accommodation of the Articulation axis 17 provided so that by displacing the articulation axis 17 Gear ratio of the linkage 14 and thus the displacement length of the Side protection panels 12 can be changed when pivoting the loading ramp 4. The smaller the radial distance of the articulation axis 17 of the link 16 on the Swivel arm 15 of the swivel axis 5 of the loading ramp 4 is all the less is the shift length.

    Wird die Laderampe 4 in ihrer geschlossenen Stellung durch ein Betätigen des Seilzuges 10 entriegelt und in die Ladestellung nach der Fig. 4 abgeschwenkt, so werden über die Gestänge 14 die Seitenschutzblenden 12 ausgeschoben, um einen Seitenschutz für die mit ihrem freien Rand auf einem Gerüst oder Bauwerk 20 aufruhende Laderampe 4 zu erhalten. Das Hochschwenken der Laderampe 4 in die Schließstellung kann durch ein Zugmittel 21, beispielsweise ein Seil, erleichtert werden, das an der Laderampe 4 angreift und über eine Umlenkrolle 22 im oberen Bereich eines Seitenteiles 2 geführt wird, so daß mit Hilfe des am freien Ende des Zugmittels 21 vorgesehenen Handgriffes 23 die Laderampe 4 in die Schließstellung hochgeschwenkt werden kann, ohne sie im Bereich des auf dem Gerüst oder Bauwerk 20 aufliegenden Randes von Hand erfassen zu müssen.If the loading ramp 4 in its closed position by pressing the Cable 10 unlocked and pivoted into the loading position according to FIG. 4, the side shields 12 are pushed out over the rods 14, around a side protection for those with their free edge on a scaffold or Building 20 to get rest loading dock 4. The swinging up of the Loading ramp 4 in the closed position can be by means of a traction device 21, for example a rope, be relieved, which attacks the loading ramp 4 and a Deflection roller 22 is guided in the upper region of a side part 2, so that with Using the handle 23 provided at the free end of the traction means 21 Loading ramp 4 can be pivoted into the closed position without it in Area of the edge resting on the scaffold or structure 20 by hand to have to record.

    Claims (5)

    Förderkorb für einen Bauaufzug mit einer zwischen zwei Seitenteilen (2) gebildeten Ladeöffnung (3), mit einer im Bereich der Ladeöffnung (3) am Korbboden (1) angelenkten Laderampe (4), die aus einer hochgeschwenkten, verriegelbaren Schließstellung in eine nach außen abgeklappte Ladestellung verschwenkbar ist, und mit an den Seitenteilen (2) ausstellbar gelagerten, mit der Laderampe (4) über ein Gestänge (14) verbundenen Seitenschutzblenden (12) für die Laderampe, dadurch gekennzeichnet, daß die Seitenschutzblenden (12) entlang der Seitenteile (2) verschiebbar gelagert sind und daß das Gestänge (14) zwischen der Laderampe (4) und den Seitenschutzblenden (12) zur Schwenkachse (5) der Laderampe (4) parallele Anlenkachsen (17, 18) aufweist.Conveyor basket for a construction elevator with one between two side parts (2) formed loading opening (3), with one in the area of the loading opening (3) on the basket bottom (1) hinged loading ramp (4), which consists of a swiveled, lockable The closed position can be pivoted into a loading position folded outwards is, and with hinged on the side parts (2), with the Loading ramp (4) via side rails (12) connected via a linkage (14) for the loading ramp, characterized in that the side protection panels (12) are slidably mounted along the side parts (2) and that the linkage (14) between the loading ramp (4) and the side protection panels (12) Pivot axis (5) of the loading ramp (4) has parallel articulation axes (17, 18). Förderkorb nach Anspruch 1, dadurch gekennzeichnet, daß das Gestänge (14) aus je einem zwischen den beiden Seitenschutzblenden (12) und der Laderampe (4) vorgesehenen Lenker (16) besteht, der wahlweise mit unterschiedlichem radialen Abstand von der Schwenkachse (5) der Laderampe (4) an dieser anlenkbar ist.Conveyor basket according to claim 1, characterized in that the linkage (14) from one between the two side shields (12) and the Loading ramp (4) provided handlebars (16), optionally with different radial distance from the swivel axis (5) of the loading ramp (4) this is articulated. Förderkorb nach den Ansprüchen 1 und 2, dadurch gekennzeichnet, daß die Lenker (16) jeweils an einem mit der Laderampe (4) drehfest verbundenen Schwenkarm (15) angreifen. Conveyor basket according to claims 1 and 2, characterized in that the handlebars (16) are each connected in a rotationally fixed manner to the loading ramp (4) Grip the swivel arm (15). Förderkorb nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß die Seitenschutzblenden (12) auf der Außenseite der Seitenteile (2) verschiebbar gelagert sind, und daß das Gestänge (14) in der eingeschobenen Verschiebestellung der Seitenschutzblenden (12) zwischen diesen und den benachbarten Seitenteilen (2) verläuft.Conveyor basket according to one of claims 1 to 3, characterized in that the side shields (12) on the outside of the side parts (2) can be moved are stored, and that the linkage (14) in the inserted Sliding position of the side protection panels (12) between these and adjacent side parts (2) runs. Förderkorb nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß an der Laderampe (4) ein über eine Umlenkrolle (22) im oberen Randbereich eines Seitenteiles (2) geführtes, mit einem Handgriff (23) am Freien Ende versehenes Zugmittel (21) angreift.Conveyor basket according to one of claims 1 to 4, characterized in that that on the loading ramp (4) via a deflection roller (22) in the upper edge area a side part (2) guided, with a handle (23) at the free end provided traction means (21) attacks.
    EP97890192A 1996-10-30 1997-09-23 Platform for a construction elevator Expired - Lifetime EP0839752B1 (en)

    Priority Applications (1)

    Application Number Priority Date Filing Date Title
    AT97890192T ATE267764T1 (en) 1996-10-30 1997-09-23 CONVEYOR BASKET FOR A CONSTRUCTION ELEVATOR

    Applications Claiming Priority (3)

    Application Number Priority Date Filing Date Title
    AT636/96 1996-10-30
    AT63696U 1996-10-30
    AT0063696U AT2314U1 (en) 1996-10-30 1996-10-30 CONVEYOR BASKET FOR A CONSTRUCTION LIFT

    Publications (2)

    Publication Number Publication Date
    EP0839752A1 true EP0839752A1 (en) 1998-05-06
    EP0839752B1 EP0839752B1 (en) 2004-05-26

    Family

    ID=3495840

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP97890192A Expired - Lifetime EP0839752B1 (en) 1996-10-30 1997-09-23 Platform for a construction elevator

    Country Status (3)

    Country Link
    EP (1) EP0839752B1 (en)
    AT (2) AT2314U1 (en)
    DE (1) DE59711663D1 (en)

    Citations (4)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    FR1113257A (en) * 1954-11-02 1956-03-26 A Lodige Dipl Ing Forklift
    EP0649811A2 (en) * 1993-10-25 1995-04-26 ALOYS ZEPPENFELD GMBH & CO. KG Mounting-walkway for building lifts
    DE29501886U1 (en) * 1995-02-06 1996-06-05 Geda-Dechentreiter Maschinenbau GmbH, 86663 Asbach-Bäumenheim Conveyor basket for a construction elevator
    EP0739851A2 (en) * 1995-03-31 1996-10-30 ALOYS ZEPPENFELD GMBH & CO. KG Construction lift

    Patent Citations (4)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    FR1113257A (en) * 1954-11-02 1956-03-26 A Lodige Dipl Ing Forklift
    EP0649811A2 (en) * 1993-10-25 1995-04-26 ALOYS ZEPPENFELD GMBH & CO. KG Mounting-walkway for building lifts
    DE29501886U1 (en) * 1995-02-06 1996-06-05 Geda-Dechentreiter Maschinenbau GmbH, 86663 Asbach-Bäumenheim Conveyor basket for a construction elevator
    EP0739851A2 (en) * 1995-03-31 1996-10-30 ALOYS ZEPPENFELD GMBH & CO. KG Construction lift

    Non-Patent Citations (1)

    * Cited by examiner, † Cited by third party
    Title
    HILTI DEUTSCHLAND GMBH.: "DUBELTECHNIK. TECHNISCHE UNTERLAGEN DER FIRMA HILTI.", vol. ED. 15, 1 January 1956, MUNCHEN, HILTI., DE, XP002015773, 016522 *

    Also Published As

    Publication number Publication date
    AT2314U1 (en) 1998-08-25
    EP0839752B1 (en) 2004-05-26
    ATE267764T1 (en) 2004-06-15
    DE59711663D1 (en) 2004-07-01

    Similar Documents

    Publication Publication Date Title
    EP2744962B1 (en) Sliding folding door system
    DE3310317C2 (en) Walk console with a door
    EP1884438A2 (en) Wheeled container for piece goods
    DE1136091B (en) Retractable attic stairs with articulated scissors
    DE2736459C3 (en) Vehicle roof with a roof opening that can be closed by a cover
    EP0839752A1 (en) Platform for a construction elevator
    DE3020064A1 (en) DEVICE FOR LOCKING THE SWIVELING CORNER POSTS OF LOADING PLATFORMS (FOLDING FLATS)
    EP1245715A2 (en) Clothes drying rack
    DE3437848C2 (en)
    EP0079476B1 (en) Swivelling stairway, in particular for vehicles
    DE2649849C3 (en) Floor hatch with collapsible ladder
    DE4033691A1 (en) Opening sidewall for box van - has upper section with hinge and slide mechanism over roof of van
    DE3723706C2 (en) Loading wagons
    DE2631453C2 (en) Fitting for roof windows
    DE1784311C3 (en) Work basket that is articulated to the upper end of an extension ladder, a telescopic or articulated mast
    DE202008010622U1 (en) Handrail for work platforms and aerial work platforms with a folding mechanism for raising or lowering
    DE3909187C2 (en)
    EP0319665A2 (en) Container
    EP0116722B1 (en) Device for the simultaneous opening or closing of an under and an upper part of a side-board
    DE202021000913U1 (en) Vehicle side wall with either a foldable or swiveling side wall element
    DE102004022474B4 (en) Shaft with hinged lid
    DE610867C (en) Window with vertically movable wings suspended from counterweight cords
    DE2846905C3 (en) Facade access device for buildings with building parts separated by storeys
    DE3643408C2 (en)
    DE3502583A1 (en) Lifting platform with multiple telescopic jib

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT DE FR GB IT NL SE

    17P Request for examination filed

    Effective date: 19980916

    AKX Designation fees paid

    Free format text: AT DE FR GB IT NL SE

    RBV Designated contracting states (corrected)

    Designated state(s): AT DE FR GB IT NL SE

    17Q First examination report despatched

    Effective date: 20010528

    GRAH Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOS IGRA

    GRAH Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOS IGRA

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): AT DE FR GB IT NL SE

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: IT

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

    Effective date: 20040526

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040526

    Ref country code: FR

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20040526

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: FG4D

    Free format text: NOT ENGLISH

    REF Corresponds to:

    Ref document number: 59711663

    Country of ref document: DE

    Date of ref document: 20040701

    Kind code of ref document: P

    REG Reference to a national code

    Ref country code: SE

    Ref legal event code: TRGR

    GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]

    Effective date: 20040526

    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    26N No opposition filed

    Effective date: 20050301

    EN Fr: translation not filed
    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: NL

    Payment date: 20080930

    Year of fee payment: 12

    Ref country code: AT

    Payment date: 20080930

    Year of fee payment: 12

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DE

    Payment date: 20080930

    Year of fee payment: 12

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: SE

    Payment date: 20080930

    Year of fee payment: 12

    REG Reference to a national code

    Ref country code: NL

    Ref legal event code: V1

    Effective date: 20100401

    EUG Se: european patent has lapsed
    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: AT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20090923

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: NL

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100401

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100401

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: SE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20090924