EP0835984A2 EP97116218A EP97116218A EP0835984A2 EP 0835984 A2 EP0835984 A2 EP 0835984A2 EP 97116218 A EP97116218 A EP 97116218A EP 97116218 A EP97116218 A EP 97116218A EP 0835984 A2 EP0835984 A2 EP 0835984A2
Authority
EP
European Patent Office
Prior art keywords
sectional area
face
cutting wheel
compressed air
upper cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP97116218A
Other languages
German (de)
French (fr)
Other versions
EP0835984B1 (en
EP0835984A3 (en
Inventor
Hans Günther Dr.-Ing. Gabener
Fred Dipl.-Ing. Gutberlet
Karl Heinz Dipl.-Ing. Melzer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hochtief AG
Original Assignee
Hochtief AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hochtief AG filed Critical Hochtief AG
Publication of EP0835984A2 publication Critical patent/EP0835984A2/en
Publication of EP0835984A3 publication Critical patent/EP0835984A3/en
Application granted granted Critical
Publication of EP0835984B1 publication Critical patent/EP0835984B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0642Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end
    • E21D9/065Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end with devices for provisionally supporting the front face
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
    • E21D9/0875Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a movable support arm carrying cutting tools for attacking the front face, e.g. a bucket
    • E21D9/0879Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a movable support arm carrying cutting tools for attacking the front face, e.g. a bucket the shield being provided with devices for lining the tunnel, e.g. shuttering

Definitions

  • the invention relates to a method for replacing in a hydro shield with a material discharge opening Cutting wheel supporting fluid supporting the face by compressed air, with the support fluid initially in an upper cross-sectional area with simultaneous Replacement is released by compressed air, then in the upper one Cross-sectional area of the working face with a support material is applied and then also in the lower cross-sectional area the supporting fluid through compressed air is replaced.
  • the invention has for its object the method of to make it easier and safer at the outset.
  • the invention teaches in one Procedure of the type mentioned that after draining the support fluid in the upper cross-sectional area the material discharge openings on the face opposite side are mechanically closed and by Retracting the cutting wheel between the face and Cutting wheel a space is formed that subsequently the space in the upper cross-sectional area with buoyant fired clay balls that is then filled in the lower cross-sectional area Compressed air replaced and the remaining part of the space is filled with the clay balls, and that at least finally the clay ball layer in the space by advancing the cutting wheel against the face is pressed.
  • the buoyant burned Clay balls preferably have a diameter of 5 to 10 mm, they are commercially available in the form of BigPacks. These clay balls are expediently through feed openings in the cutting wheel with compressed air from 5 to 7 bar in blown the gap.
  • the pressing of the clay balls against the face by advancing the cutting wheel, the if necessary accompanied by turning the cutting wheel can be, is preferably also immediately after Filling in the upper cross-sectional area Part of the space performed. If necessary, can it is also recommended to use the gap between the cutting wheel and Shield jacket of the hydroshield with an inflatable Seal the hose seal.
  • a hydroshield in which a shield jacket 1 through a baffle 2 and a Pressure wall 3, a working chamber 4 is formed in which so-called closed cutting wheel 5, i.e. one up on Material discharge openings 6 essentially closed Cutting wheel 5 works (see FIG. 2).
  • the working chamber 4 is during jacking with supporting fluid supporting the face filled, the pressure of which is between a baffle 2 and pressure wall 3 located compressed air cushion 7 is controlled. That through the material discharge openings 6 Extracted soil material is in the lower area of the Working chamber 4 discharged with the support liquid, fresh Support fluid is in the upper area of the working chamber 4th fed.
  • this will be the normal support fluid against a thickened support fluid in the form an appropriately prepared bentonite suspension.
  • this support fluid is initially in an upper cross-sectional area, e.g. the upper half of the cross-section, with simultaneous replacement by compressed air drained. Since the support fluid is thickened, remains on the face 8 a 3 to 5 cm thick Layer.
  • the material discharge openings 6 are now open the back of the cutting wheel 5 mechanically closed, with those in the lower cross-sectional area Material discharge openings 6 previously by turning the cutting wheel 5 are brought into the upper cross-sectional area.
  • cover plates 9 which may be interposed a rubber seal 10 or a rubber frame in welded guide rails 11 inserted on the cutting wheel 5 and secured with wooden wedges 12 (cf. Fig.3).
  • the cutting wheel 5 becomes one piece retracted so that between the face and cutting wheel a space 13 of 15 to 30 cm depth is created.
  • the cutting wheel 5 can also be retracted before or during Closing the material discharge openings 6 performed will.
  • a line 14 is connected to a feed opening 15 connected in the cutting wheel 5; this feed opening 15 can also be from a partially closed material discharge opening 6 be formed.
  • Line 14 leads to a spraying machine 16 in a trailer 17, via the Fired clay balls float with compressed air of 5 to 7 bar 18 with a diameter of 5 to 10 mm in the upper part of the space 13 until it is filled be blown in; the clay balls 18 are the injection molding machine 16 supplied in the form of BigPacks 19. Then the cutting wheel 5 is rotated a little and against the Face 8 advanced, with a space in the space 13 Mixture of thickened support fluid, undamaged Clay balls and clay parts of broken clay balls are created.
  • the clay balls 18 can after pumping and Approaching the hydroshield at least partially separated and be used again later.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)
  • Silicates, Zeolites, And Molecular Sieves (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The support fluid is evacuated in an upper cross-sectional area of the work face with simultaneous replacement with compressed air. Then in the upper cross-sectional area a support material is applied to the work face and finally also in the lower cross-sectional area the support surface is replaced by compressed air. A work chamber (4) is formed in a shield cover (1) by a dip wall (2) and a pressure wall (3). A closed cutting wheel (5) is operated in the work chamber. The work chamber is normally filled with fluid supporting the work face, the pressure of which is controlled by a compressed air cushion (7) between the two walls.

Description

Die Erfindung betrifft ein Verfahren zum Ersetzen von in einem Hydroschild mit einem Materialaustragsöffnungen aufweisenden Schneidrad die Ortsbrust stützender Stützflüssigkeit durch Druckluft, wobei die Stützflüssigkeit zunächst in einem oberen Querschnittsbereich bei gleichzeitigem Ersatz durch Druckluft abgelassen wird, danach im oberen Querschnittsbereich die Ortsbrust mit einem Stützmaterial beaufschlagt wird und anschließend auch im unteren Querschnittsbereich die Stützflüssigkeit durch Druckluft ersetzt wird.The invention relates to a method for replacing in a hydro shield with a material discharge opening Cutting wheel supporting fluid supporting the face by compressed air, with the support fluid initially in an upper cross-sectional area with simultaneous Replacement is released by compressed air, then in the upper one Cross-sectional area of the working face with a support material is applied and then also in the lower cross-sectional area the supporting fluid through compressed air is replaced.

Verfahren der genannten Art benötigt man zur Durchführung von Wartungsarbeiten und Beseitigung von Hindernissen in der Arbeitskammer des Hydroschildes.Methods of the type mentioned are required for implementation of maintenance work and removal of obstacles in the working chamber of the hydraulic shield.

Bei einem bekannten Verfahren dieser Art (DE 44 09 049 C1) wird nach dem Ablassen der Stützflüssigkeit im oberen Querschnittsbereich zwischen dem oberen und dem unteren Querschnittsbereich eine im wesentlichen horizontale, dichte Abtrennung eingebracht und anschließend der oberhalb der Abtrennung liegende obere Querschnittsbereich mit einem Festbestandteile enthaltenden Stützmaterial in Form von Kunstboden derart kraftschlüssig verfüllt, daß es im oberen Abbaukammer die erforderliche statische Stützfunktion übernehmen kann. Genutzt wird hiermit die Kenntnis, daß die Sicherheit gegen Ausbläser bei der Durchführung von Wartungsarbeiten in der Arbeitskammer erheblich verbessert werden kann, wenn eine Druckluftstützung ausschließlich im unteren Querschnittsbereich der Arbeitskammer durchgeführt wird. Das beschriebene Verfahren ist aber verhältnismäßig zeit- und kostenaufwendig, gleiches gilt auch für den späteren Ausbau vor Wiederaufnahme des Vortriebbetriebes. Außerdem ergeben sich gewisse Probleme hinsichtlich der Verdichtung des Kunstbodens und dessen Formschlüssigkeit mit dem Schildmantel und der Ortsbrust. Schwierig wird es auch, wenn mit einem Wasserandrang von der Ortsbrust her zu rechnen ist.In a known method of this type (DE 44 09 049 C1) is in the upper after draining the support fluid Cross-sectional area between the upper and lower Cross-sectional area a substantially horizontal, tight separation introduced and then the above the upper cross-sectional area with a Support material containing solid components in the form of Artificial floor filled so forcefully that it is in the upper Extraction chamber perform the required static support function can. The knowledge is hereby used that the Security against blowouts when performing Maintenance work in the work chamber is significantly improved can be, if a compressed air support exclusively in the lower cross-sectional area of the working chamber becomes. However, the procedure described is proportional time and cost consuming, the same applies to the later expansion before resumption of tunneling operations. There are also certain problems with the Compaction of the artificial floor and its form fit with the shield coat and the face. It will be difficult even if there is a rush of water from the face to calculate.

Bekannt ist es zwar auch (DE 42 25 121 A1), bei einem Vortrieb mit einem Hydroschild die Stützflüssigkeit in dem hinter dem Schneidrad liegenden Bereich der Arbeitskammer durch schwimmfähige kugelförmige Füllkörper, insbesondere aus Kunststoff, zu ersetzen. Diese Füllkörper sollen beim Vortrieb permanent in der Arbeitskammer verbleiben und weisen deshalb solche Abmessungen auf, daß sie erheblich größer sind als die normale Korngröße des als Abraum anfallenden und abzufördernden Bodenmaterials. Mit dem eingangs geschilderten Verfahren zum Ersetzen der Stützflüssigkeit durch Druckluft, um die Arbeitskammer begehen zu können, haben diese Maßnahmen nichts zu tun.It is also known (DE 42 25 121 A1) when driving with a hydroshield the support fluid in the area of the working chamber behind the cutting wheel due to buoyant spherical packing, in particular plastic, to replace. These packing elements are said to Propulsion remain permanently in the working chamber and therefore have such dimensions that they are considerable are larger than the normal grain size of the overburden accumulating and removed soil material. With the initially described method for replacing the support fluid by compressed air to commit to the work chamber To be able to, these measures have nothing to do.

Der Erfindung liegt die Aufgabe zugrunde, das Verfahren der eingangs genannten Art einfacher und sicherer zu gestalten.The invention has for its object the method of to make it easier and safer at the outset.

Zur Lösung dieser Aufgabe lehrt die Erfindung bei einem Verfahren der eingangs genannten Art, daß nach dem Ablassen der im oberen Querschnittsbereich befindlichen Stützflüssigkeit die Materialaustragsöffnungen auf der der Ortsbrust abgewandten Seite mechanisch verschlossen werden und durch Zurückfahren des Schneidrades zwischen Ortsbrust und Schneidrad ein Zwischenraum gebildet wird, daß anschließend der Zwischenraum im oberen Querschnittsbereich mit schwimmfähigen gebrannten Tonkugeln verfüllt wird, daß danach auch im unteren Querschnittsbereich die Stützflüssigkeit durch Druckluft ersetzt und der verbliebene Teil des Zwischenraumes mit den Tonkugeln verfüllt wird, und daß zumindest abschließend die im Zwischenraum befindliche Tonkugelschicht durch Vorrücken des Schneidrades gegen die Ortsbrust gedrückt wird.To achieve this object, the invention teaches in one Procedure of the type mentioned that after draining the support fluid in the upper cross-sectional area the material discharge openings on the face opposite side are mechanically closed and by Retracting the cutting wheel between the face and Cutting wheel a space is formed that subsequently the space in the upper cross-sectional area with buoyant fired clay balls that is then filled in the lower cross-sectional area Compressed air replaced and the remaining part of the space is filled with the clay balls, and that at least finally the clay ball layer in the space by advancing the cutting wheel against the face is pressed.

Im Zuge des erfindungsgemäßen Verfahrens wird beim Einbringen der Tonkugeln in den Zwischenraum ein Teil der an der Ortsbrust noch anhaftenden Stützflüssigkeit zwischen die Tonkugeln verdrängt; diese Verdrängung von Stützflüssigkeit wird beim Andrücken der Tonkugeln durch das Schneidrad fortgeführt, wobei einige Tonkugeln auch zerbrechen. Im Ergebnis entsteht jedenfalls eine gas- und wasserundurchlässige Schicht zwischen Ortsbrust und Schneidrad, die die Ortsbrust wie ein plastischer Pfropfen verschließt. Der gebildete Pfropfen ist so dicht, daß letztendlich der Luftdruck in der Arbeitskammer auf Normaldruck abgesenkt werden kann, so daß die für Arbeiten unter Druckluft bestehenden strengen Auflagen zur Arbeitssicherheit umgangen werden können.In the course of the method according to the invention, when introducing the clay balls in the space part of the the supporting fluid still adhering to the face between the clay balls displaced; this displacement of support fluid is when pressing the clay balls through the Cutting wheel continued, some clay balls too break. In any case, the result is a gas and waterproof layer between face and Cutting wheel that grafted the working face like a plastic one closes. The plug formed is so tight that ultimately the air pressure in the working chamber to normal pressure can be lowered so that for working under Compressed air existing strict requirements for occupational safety can be avoided.

Im einzelnen sind mehrere Ausgestaltungsmöglichkeiten für das erfindungsgemäße Verfahren gegeben. So werden die Materialaustragsöffnungen, die nach dem Ablassen der im oberen Querschnittsbereich befindlichen Stützflüssigkeit im unteren Querschnittsbereich liegen, vorzugsweise durch Drehen des Schneidrades in den oberen Querschnittsbereich gebracht und dort verschlossen. Zur weiteren Verbesserung der Dichtwirkung der gebildeten pfropfenartigen Dichtschicht kann es sich empfehlen, die im Normalbetrieb des Hydroschildes eingesetzte Stützflüssigkeit vor dem Ablassen gegen eine eingedickte Stützflüssigkeit auszutauschen. Eine andere oder zusätzliche Möglichkeit besteht insoweit darin, daß eine hochsteife Dickschicht insbesondere von 3 bis 5 cm auf die Ortsbrust aufgespritzt wird. Als eingedickte Stützflüssigkeit bzw. hochsteife Dickschicht wird vorzugsweise eine entsprechend angemachte Bentonitsuspension eingesetzt. Für den Zwischenraum hat sich eine Tiefe von 15 bis 30 cm als optimal herausgestellt. Die schwimmfähigen gebrannten Tonkugeln haben vorzugsweise einen Durchmesser von 5 bis 10 mm, sie sind in Form von BigPacks handelsüblich. Zweckmäßigerweise werden diese Tonkugeln durch Zuführöffnungen im Schneidrad mit Druckluft von 5 bis 7 bar in den Zwischenraum eingeblasen. Das Andrücken der Tonkugeln gegen die Ortsbrust durch Vorrücken des Schneidrades, das gegebenenfalls von einem Drehen des Schneidrades begleitet sein kann, wird vorzugsweise auch unmittelbar nach dem Verfüllen des im oberen Querschnittsbereichs liegenden Teils des Zwischenraumes durchgeführt. Im Bedarfsfalle kann es sich auch empfehlen, den Spalt zwischen Schneidrad und Schildmantel des Hydroschildes mit einer aufblasbaren Schlauchdichtung abzudichten.There are several design options for given the inventive method. So they will Material discharge openings that after draining the in support fluid located in the upper cross-sectional area lower cross-sectional area, preferably through Turn the cutting wheel in the upper cross-sectional area brought and locked there. For further improvement the sealing effect of the plug-like sealing layer formed it can be recommended that the normal operation of the Hydroshield support fluid used before draining exchanged for a thickened support fluid. A another or additional possibility is to that a highly rigid thick layer in particular from 3 to 5 cm is sprayed onto the face. As a thickened support fluid or highly rigid thick film is preferred an appropriately prepared bentonite suspension is used. For the gap there is a depth of 15 to 30 cm was found to be optimal. The buoyant burned Clay balls preferably have a diameter of 5 to 10 mm, they are commercially available in the form of BigPacks. These clay balls are expediently through feed openings in the cutting wheel with compressed air from 5 to 7 bar in blown the gap. The pressing of the clay balls against the face by advancing the cutting wheel, the if necessary accompanied by turning the cutting wheel can be, is preferably also immediately after Filling in the upper cross-sectional area Part of the space performed. If necessary, can it is also recommended to use the gap between the cutting wheel and Shield jacket of the hydroshield with an inflatable Seal the hose seal.

Im folgenden wird die Erfindung anhand einer Zeichnung näher erläutert; es zeigen in schematischer Darstellung

Fig. 1
einen Hydroschild mit für das erfindungsgemäße Verfahren wesentlichen Teilen,
Fig. 2
eine Rückansicht des Schneidrades des Hydroschildes nach Fig. 1,
Fig. 3
einen Schnitt A-B durch den Gegenstand der Fig. 2, und
Fig. 4
ein vergrößertes Detail C des Gegenstandes der Fig. 1.
The invention is explained in more detail below with reference to a drawing; it show in a schematic representation
Fig. 1
a hydroshield with parts essential for the method according to the invention,
Fig. 2
2 shows a rear view of the cutting wheel of the hydraulic shield according to FIG. 1,
Fig. 3
a section AB through the subject of Fig. 2, and
Fig. 4
an enlarged detail C of the object of FIG. 1st

In der Fig. 1 erkennt man einen Hydroschild, bei dem in einem Schildmantel 1 durch eine Tauchwand 2 und eine Druckwand 3 eine Arbeitskammer 4 gebildet ist, in der ein sogenanntes geschlossenes Schneidrad 5, d.h. ein bis auf Materialaustragsöffnungen 6 im wesentlichen geschlossenes Schneidrad 5 arbeitet (vgl. Fig. 2). Die Arbeitskammer 4 ist beim Vortrieb mit die Ortsbrust stützender Stützflüssigkeit gefüllt, deren Druck über ein zwischen Tauchwand 2 und Druckwand 3 befindliches Druckluftpolster 7 gesteuert wird. Das durch die Materialaustragsöffnungen 6 hereingewonnene Bodenmaterial wird im unteren Bereich der Arbeitskammer 4 mit der Stützflüssigkeit abgeführt, frische Stützflüssigkeit wird im oberen Bereich der Arbeitskammer 4 zugeführt.In Fig. 1 you can see a hydroshield, in which a shield jacket 1 through a baffle 2 and a Pressure wall 3, a working chamber 4 is formed in which so-called closed cutting wheel 5, i.e. one up on Material discharge openings 6 essentially closed Cutting wheel 5 works (see FIG. 2). The working chamber 4 is during jacking with supporting fluid supporting the face filled, the pressure of which is between a baffle 2 and pressure wall 3 located compressed air cushion 7 is controlled. That through the material discharge openings 6 Extracted soil material is in the lower area of the Working chamber 4 discharged with the support liquid, fresh Support fluid is in the upper area of the working chamber 4th fed.

Sollen nun in der Arbeitskammer 4 Wartungsarbeiten durchgeführt oder Hindernisse beseitigt werden, ist die Stützflüssigkeit gegen Druckluft auszutauschen, damit die Arbeitskammer 4 durch eine Schleuse begangen werden kann. Maintenance work should now be carried out in the work chamber 4 or obstacles are removed is the support fluid exchanged for compressed air so that the Working chamber 4 can be entered through a lock.

Im einzelnen wird hierzu zunächst die normale Stützflüssigkeit gegen eine angedickte Stützflüssigkeit in Form einer entsprechend angemachten Bentonitsuspension ausgetauscht. Danach wird diese Stützflüssigkeit zunächst in einem oberen Querschnittsbereich, z.B. der oberen Querschnittshälfte, bei gleichzeitigem Ersatz durch Druckluft abgelassen. Da die Stützflüssigkeit angedickt ist, verbleibt auf der Ortsbrust 8 eine etwa 3 bis 5 cm starke Schicht. Nunmehr werden die Materialaustragsöffnungen 6 auf der Rückseite des Schneidrades 5 mechanisch verschlossen, wobei die im unteren Querschnittsbereich liegenden Materialaustragsöffnungen 6 zuvor durch Drehen des Schneidrades 5 in den oberen Querschnittsbereich gebracht werden. Zum mechanischen Verschließen der Materialaustragsöffnungen 6 dienen Abdeckbleche 9, die gegebenenfalls unter Zwischenschaltung einer Gummidichtung 10 oder eines Gummirahmens in angeschweißte Führungsschienen 11 am Schneidrad 5 eingeschoben und mit Holzkeilen 12 gesichert werden (vgl. Fig.3). Anschließend wird das Schneidrad 5 ein Stück zurückgefahren, so daß zwischen Ortsbrust und Schneidrad ein Zwischenraum 13 von 15 bis 30 cm Tiefe entsteht. Das Zurückfahren des Schneidrades 5 kann auch vor oder beim Verschließen der Materialaustragsöffnungen 6 durchgeführt werden. Alsdann wird eine Leitung 14 an eine Zuführöffnung 15 im Schneidrad 5 angeschlossen; diese Zuführöffnung 15 kann auch von einer nur teilweise geschlossenen Materialaustragöffnung 6 gebildet sein. Die Leitung 14 führt zu einer Spritzmaschine 16 in einem Nachläufer 17, über die mit Druckluft von 5 bis 7 bar schwimmfähige gebrannte Tonkugeln 18 mit einem Durchmesser von 5 bis 10 mm in den oberen Teil des Zwischenraumes 13 bis zu dessen Füllung eingeblasen werden; die Tonkugeln 18 werden der Spritzmaschine 16 in Form von BigPacks 19 zugeführt. Alsdann wird das Schneidrad 5 ein wenig gedreht und gegen die Ortsbrust 8 vorgeschoben, wobei im Zwischenraum 13 ein Gemenge aus angedickter Stützflüssigkeit, unbeschädigten Tonkugeln und Tonteilen zerborstener Tonkugeln entsteht.In detail, this will be the normal support fluid against a thickened support fluid in the form an appropriately prepared bentonite suspension. After that, this support fluid is initially in an upper cross-sectional area, e.g. the upper half of the cross-section, with simultaneous replacement by compressed air drained. Since the support fluid is thickened, remains on the face 8 a 3 to 5 cm thick Layer. The material discharge openings 6 are now open the back of the cutting wheel 5 mechanically closed, with those in the lower cross-sectional area Material discharge openings 6 previously by turning the cutting wheel 5 are brought into the upper cross-sectional area. For mechanically closing the material discharge openings 6 serve cover plates 9, which may be interposed a rubber seal 10 or a rubber frame in welded guide rails 11 inserted on the cutting wheel 5 and secured with wooden wedges 12 (cf. Fig.3). Then the cutting wheel 5 becomes one piece retracted so that between the face and cutting wheel a space 13 of 15 to 30 cm depth is created. The The cutting wheel 5 can also be retracted before or during Closing the material discharge openings 6 performed will. Then a line 14 is connected to a feed opening 15 connected in the cutting wheel 5; this feed opening 15 can also be from a partially closed material discharge opening 6 be formed. Line 14 leads to a spraying machine 16 in a trailer 17, via the Fired clay balls float with compressed air of 5 to 7 bar 18 with a diameter of 5 to 10 mm in the upper part of the space 13 until it is filled be blown in; the clay balls 18 are the injection molding machine 16 supplied in the form of BigPacks 19. Then the cutting wheel 5 is rotated a little and against the Face 8 advanced, with a space in the space 13 Mixture of thickened support fluid, undamaged Clay balls and clay parts of broken clay balls are created.

Anschließend wird auch im unteren Querschnittsbereich die Stützflüssigkeit durch Druckluft ersetzt und der verbliebene Teil des Zwischenraumes 13 mit den Tonkugeln 18 verfüllt, woraufhin das Schneidrad 5 erneut ein wenig gedreht und vorgeschoben wird. Zwischen Ortsbrust 8 und Schneidrad 5 befindet sich nun ein gas- und flüssigkeitsdichter Pfropfen 20, der zumeist sogar eine Absenkung des Luftdrucks auf Normaldruck in der Arbeitskammer 4 erlaubt. Im Bedarfsfalle hilft es, wenn der Spalt 21 zwischen Schneidrad 5 und Schildmantel 1 mit einer aufblasbaren Schlauchdichtung 22 abgedichtet wird (vgl. Fig. 4).Subsequently, the Support fluid replaced by compressed air and the remaining one Part of the space 13 with the clay balls 18th filled, whereupon the cutting wheel 5 again a little is rotated and advanced. Between face 8 and Cutting wheel 5 is now a gas and liquid-tight Grafting 20, which is usually even a lowering the air pressure to normal pressure in the working chamber 4 allowed. If necessary, it helps if the gap 21 between cutting wheel 5 and shield casing 1 with an inflatable Hose seal 22 is sealed (see Fig. 4).

Nach Durchführung der gewünschten Arbeiten in der Arbeitskammer 4 wird der Arbeitszustand der Arbeitskammer 4 und des Schneidrades 5 in umgekehrter Reihenfolge wieder hergestellt. Die Tonkugeln 18 können nach Abpumpen und Anfahren des Hydroschildes zumindest teilweise separiert und später erneut verwendet werden.After performing the desired work in the Working chamber 4 becomes the working state of working chamber 4 and the cutting wheel 5 in reverse order produced. The clay balls 18 can after pumping and Approaching the hydroshield at least partially separated and be used again later.

Claims (11)

Verfahren zum Ersetzen von in einem Hydroschild mit einem Materialaustragsöffnungen aufweisenden Schneidrad die Ortsbrust stützender Stützflüssigkeit durch Druckluft, wobei die Stützflüssigkeit zunächst in einem oberen Querschnittsbereich bei gleichzeitigem Ersatz durch Druckluft abgelassen wird, danach im oberen Querschnittsbereich die Ortsbrust mit einem Stützmaterial beaufschlagt wird und anschließend auch im unteren Querschnittsbereich die Stützflüssigkeit durch Druckluft ersetzt wird, dadurch gekennzeichnet, daß nach dem Ablassen der im oberen Querschnittsbereich befindlichen Stützflüssigkeit die Materialaustragsöffnungen auf der der Ortsbrust abgewandten Seite mechanisch verschlossen werden und durch Zurückfahren des Schneidrades zwischen Ortsbrust und Schneidrad ein Zwischenraum gebildet wird, daß anschließend der Zwischenraum im oberen Querschnittsbereich mit schwimmfähigen gebrannten Tonkugeln verfüllt wird, daß danach auch im unteren Querschnittsbereich die Stützflüssigkeit durch Druckluft ersetzt und der verbliebene Teil des Zwischenraumes mit den Tonkugeln verfüllt wird, und daß zumindest abschließend die im Zwischenraum befindliche Tonkugelschicht durch Vorrücken des Schneidrades gegen die Ortsbrust gedrückt wird.Method for replacing support fluid supporting the face with a cutting wheel in a hydraulic shield with a material discharge opening, the support fluid being discharged first in an upper cross-sectional area with simultaneous replacement by compressed air, then the support is applied to the face in the upper cross-sectional area and then also in the lower cross-sectional area the supporting fluid is replaced by compressed air, characterized in that after the supporting fluid located in the upper cross-sectional area has been drained off, the material discharge openings on the side facing away from the face face are mechanically closed and a space is formed by moving the cutting wheel back between the face face and the cutting wheel, so that the Intermediate space in the upper cross-sectional area is filled with buoyant fired clay balls that afterwards also in the lower cross-sectional area d The supporting fluid is replaced by compressed air and the remaining part of the space is filled with the clay balls, and that at least finally the clay ball layer in the space is pressed against the face by advancing the cutting wheel. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Materialaustragsöffnungen, die nach dem Ablassen der im oberen Querschnittsbereich befindlichen Stützflüssigkeit im unteren Querschnittsbereich liegen, durch Drehen des Schneidrades in den oberen Querschnittsbereich gebracht und dort verschlossen werden.A method according to claim 1, characterized in that the material discharge openings, which after the drainage of the in support fluid located in the upper cross-sectional area lower cross-sectional area, by turning the Brought cutting wheel in the upper cross-sectional area and be locked there. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die im Normalbetrieb des Hydroschildes eingesetzte Stützflüssigkeit vor dem Ablassen gegen eine angedickte Stützflüssigkeit ausgetauscht wird.A method according to claim 1 or 2, characterized in that that used in normal operation of the hydroshield Support fluid before draining against a thickened one Support fluid is exchanged. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß vor dem jeweiligen Einbringen der Tonkugeln eine hochsteife Dickschicht auf die Ortsbrust aufgespritzt wird.Method according to one of claims 1 to 3, characterized characterized in that before the respective introduction of the clay balls a highly rigid thick film is sprayed onto the face becomes. Verfahren nach Anspruch 4, dadurch gekennzeichnet, daß die hochsteife Dickschicht in einer Dicke von 3 bis 5 cm aufgebracht wird.A method according to claim 4, characterized in that the highly rigid thick layer with a thickness of 3 to 5 cm is applied. Verfahren nach einem der Ansprüche 3 bis 5, dadurch gekennzeichnet, daß als angedickte Stützflüssigkeit und hochsteife Dickschicht eine Bentonitsuspension eingesetzt wird.Method according to one of claims 3 to 5, characterized characterized in that as a thickened support fluid and high-rigidity thick film a bentonite suspension is used becomes. Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, daß der Zwischenraum mit einer Tiefe von 15 bis 30 cm gebildet wird.Method according to one of claims 1 to 6, characterized characterized in that the space with a depth of 15 up to 30 cm is formed. Verfahren nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, daß die Tonkugeln mit einem Durchmesser von 5 bis 10 mm eingesetzt werden. Method according to one of claims 1 to 7, characterized characterized in that the clay balls with a diameter of 5 to 10 mm can be used. Verfahren nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, daß die Tonkugeln durch Zufuhröffnungen im Schneidrad mit Druckluft von 5 bis 7 bar in den Zwischenraum eingeblasen werden.Method according to one of claims 1 to 8, characterized characterized in that the clay balls through feed openings in the Cutting wheel with compressed air of 5 to 7 bar in the space be blown in. Verfahren nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, daß die Tonkugeln unmittelbar nach dem Verfüllen des im oberen Querschnittsbereich liegenden Teils des Zwischenraumes durch Vorrücken des Schneidrades gegen die Ortsbrust gedrückt werden.Method according to one of claims 1 to 9, characterized characterized in that the clay balls immediately after the Filling the part in the upper cross-sectional area the gap by advancing the cutting wheel against the face is pressed. Verfahren nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, daß der Spalt zwischen Schneidrad und Schildmantel des Hydroschildes mit einer aufblasbaren Schlauchdichtung abgedichtet wird.Method according to one of claims 1 to 10, characterized characterized in that the gap between the cutting wheel and Shield jacket of the hydroshield with an inflatable Hose seal is sealed.
EP97116218A 1996-10-12 1997-09-18 Method to substitute the supporting liquid by compressed air in an hydro-shield Expired - Lifetime EP0835984B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19642093 1996-10-12
DE19642093A DE19642093C1 (en) 1996-10-12 1996-10-12 Replacing support fluid for work face with compressed air

Publications (3)

Publication Number Publication Date
EP0835984A2 true EP0835984A2 (en) 1998-04-15
EP0835984A3 EP0835984A3 (en) 1998-08-19
EP0835984B1 EP0835984B1 (en) 2003-05-14

Family

ID=7808542

Family Applications (1)

Application Number Title Priority Date Filing Date
EP97116218A Expired - Lifetime EP0835984B1 (en) 1996-10-12 1997-09-18 Method to substitute the supporting liquid by compressed air in an hydro-shield

Country Status (2)

Country Link
EP (1) EP0835984B1 (en)
DE (1) DE19642093C1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2846727B1 (en) * 2002-10-30 2005-02-18 Claude Bresso SEAL JOINT ARRANGEMENT FOR TWO ARTICULATED PIECES

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4225121A1 (en) 1992-07-30 1994-02-03 Westfalia Becorit Ind Tech Method of supporting tunnel face during shield driving excavation - involves bulkhead with high level shuttered opening and vertical partition next to face forming air pocket in between
DE4409049C1 (en) 1994-03-17 1995-03-30 Hochtief Ag Hoch Tiefbauten Method of replacing the supporting liquid by compressed air and use of a hydraulic shield for carrying out the method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2227083C3 (en) * 1972-06-03 1981-07-30 Wayss & Freytag Ag, 6000 Frankfurt Shield for mechanical tunneling with a liquid-supported face
JPH04277292A (en) * 1991-03-01 1992-10-02 Takenaka Komuten Co Ltd Replacing method for bit in shield tunneling method
DE4118907C1 (en) * 1991-06-08 1992-06-11 Wayss & Freytag Ag, 6000 Frankfurt, De

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4225121A1 (en) 1992-07-30 1994-02-03 Westfalia Becorit Ind Tech Method of supporting tunnel face during shield driving excavation - involves bulkhead with high level shuttered opening and vertical partition next to face forming air pocket in between
DE4409049C1 (en) 1994-03-17 1995-03-30 Hochtief Ag Hoch Tiefbauten Method of replacing the supporting liquid by compressed air and use of a hydraulic shield for carrying out the method

Also Published As

Publication number Publication date
EP0835984B1 (en) 2003-05-14
DE19642093C1 (en) 1997-10-02
EP0835984A3 (en) 1998-08-19

Similar Documents

Publication Publication Date Title
EP0413693B1 (en) Reinforced concrete construction for road tunnels
DE2244084B1 (en) AIR PUMP STORAGE PLANT FOR POWER PLANTS
DE2158764A1 (en) Method for producing an underground wall
DE2240091C2 (en) Concreting process in connection with the jacking shield or cutting shoe supported on the in-situ concrete and equipment for carrying out the process
DE2460033A1 (en) METHOD AND DEVICE FOR CARRYING OUT THE PROCEDURE FOR CONCRETING TUNNELS
DE2006256C2 (en) Method and device for connecting a cell which is movable under water and which contains atmospheric pressure to a cell which is stationary on the sea floor
DE4225838C2 (en) Shield jacking device
EP0835984B1 (en) Method to substitute the supporting liquid by compressed air in an hydro-shield
DE2651149C3 (en) Sealing process when producing tunnel gates by means of shield jacking devices and device for carrying out the process
DE2544834C3 (en) Device for sinking shafts in unstable rock
DE4409049C1 (en) Method of replacing the supporting liquid by compressed air and use of a hydraulic shield for carrying out the method
DE3720080C2 (en)
DE19604525C2 (en) High-lying waterproofing sole with construction pit enclosure
DE3621496C2 (en)
DE1934170A1 (en) Removal of mineral oil impregnant from - vicinity of bore holes
DE2801616B2 (en) Method for driving routes or tunnels in water-bearing floating floors using a compressed air propulsion shield
DE3336153C2 (en) Hollow body that can be filled with building material
EP0250606A1 (en) Method and apparatus for the posterior mounting of construction elements on an extended floor in the soil at drift mining operations
DE3424545C2 (en)
DE3610118A1 (en) Method of placing concrete in formwork for constructing a tunnel lining in cast-in-situ concrete, and devices for carrying out the method
DE69810753T2 (en) Process for consolidating natural or restored stone blocks
DE19751335C1 (en) Method of forming injected concrete building foundations
DE10258300A1 (en) Process for stabilizing disused mining shafts filled with filling material comprises introducing a bore from above into the filling material column and inserting a radially expandable packer arrangement into the bore
DE3545207A1 (en) METHOD AND DEVICE FOR PUTING A WATERPROOF LAYER INTO THE GROUND
DE3936801C1 (en) Method of driving tunnel - involves forming chamber by bulkhead in which milling disc operates to cut face and loosen earth

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): BE ES FR GB IT NL

AX Request for extension of the european patent

Free format text: AL;LT;LV;RO;SI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;RO;SI

17P Request for examination filed

Effective date: 19980718

AKX Designation fees paid

Free format text: BE ES FR GB IT NL

RBV Designated contracting states (corrected)

Designated state(s): BE ES FR GB IT NL

REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Designated state(s): BE ES FR GB IT NL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

Effective date: 20030514

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030514

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030825

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030930

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

BERE Be: lapsed

Owner name: *HOCHTIEF A.G. VORM. GEBR. HELFMANN

Effective date: 20030930

26N No opposition filed

Effective date: 20040217

EN Fr: translation not filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20040913

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20040921

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050918

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060401

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20050918

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20060401