EP0815325A1 - Improvements in and relating to steel rails and methods of producing the same - Google Patents

Improvements in and relating to steel rails and methods of producing the same

Info

Publication number
EP0815325A1
EP0815325A1 EP96904198A EP96904198A EP0815325A1 EP 0815325 A1 EP0815325 A1 EP 0815325A1 EP 96904198 A EP96904198 A EP 96904198A EP 96904198 A EP96904198 A EP 96904198A EP 0815325 A1 EP0815325 A1 EP 0815325A1
Authority
EP
European Patent Office
Prior art keywords
rail
weld
foot
peening
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP96904198A
Other languages
German (de)
French (fr)
Other versions
EP0815325B1 (en
Inventor
Vijay Jerath
John Anthony Chapman
David James Price
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Corus UK Ltd
Original Assignee
British Steel PLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by British Steel PLC filed Critical British Steel PLC
Publication of EP0815325A1 publication Critical patent/EP0815325A1/en
Application granted granted Critical
Publication of EP0815325B1 publication Critical patent/EP0815325B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B31/00Working rails, sleepers, baseplates, or the like, in or on the line; Machines, tools, or auxiliary devices specially designed therefor
    • E01B31/02Working rail or other metal track components on the spot
    • E01B31/12Removing metal from rails, rail joints, or baseplates, e.g. for deburring welds, reconditioning worn rails
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B11/00Rail joints
    • E01B11/44Non-dismountable rail joints; Welded joints
    • E01B11/46General methods for making gapless tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B11/00Rail joints
    • E01B11/44Non-dismountable rail joints; Welded joints
    • E01B11/50Joints made by electric welding

Definitions

  • This invention relates to steel rails and to methods of producing the same. More especially, the invention relates to the production of high integrity long welded steel rails.
  • railway tracks have traditionally comprised a plurality of rails connected together by bolts and fish plates. In use, such tracks have proved to be noisy, uneven and require considerable maintenance. More recently, individual rails have been welded together in continuous lengths thereby enabling higher train speeds to be achieved at relatively low noise and vibration levels. The welds between adjoining individual rails have, however, previously been subject to occasional bending fatigue failures from the foot of the rail caused inter alia by positive tensile loading stresses experienced by the rail foot during service.
  • One object of the present invention is to provide a high integrity long welded steel rail which exhibits a bending fatigue life commensurate with that of non-welded rail and an overall improved residual stress pattern across the weld HAZ profile. Another object is to provide a welded steel rail in which the bending fatigue strength of each weld is at least equal to if not greater than the fatigue strength of the parent rails joined by that weld. A further object is to produce a welded steel rail in which the presence of the welds is not apparent from a visual inspection (that is to say an invisibly welded rail). A further object is to provide a method or methods of manufacturing welded steel rail by which the objectives set out above can be achieved.
  • a long welded rail is a length of the order of 100m to 300m or longer.
  • a steel rail which comprises a plurality of individual rails welded together with any resulting excess material removed from the rail by a stripping process in which the weld site at the foot of each rail is subjected to grinding.
  • Each weld site may be coated with a corrosion inhibiting material.
  • a corrosion inhibiting material may be applied to the rail foot and/or the rail web and/or the rail head.
  • the coating may, of course, alternatively be applied to the entire weld site.
  • Welding may be by flash butt welding. Other welding processes may however be employed.
  • the present invention provides a method of producing a welded steel rail which comprises the steps of welding individual rails together, removing any resulting excess material from the weld sites and subsequently subjecting the weld sites to natural air and/or independent forced cooling and grinding or other surface material technique and/or peening.
  • As-rolled rail grades such as 700 and 900 achieve weld HAZ hardness levels similar to those of the parent rails following natural air cooling of the welds in still air. These rails following welding are, therefore, not normally subjected to accelerated cooling. It has, however, been found advantageous to increase the hardness/strength, in particular, of the welded rail foot by accelerated cooling with a view to improving the bending fatigue strength of the welded rail.
  • Accelerated cooling may be achieved by applying air, air mist or water under pressure independently to the head and/or the web and/or the foot of the rail at each weld site.
  • forced cooling is applied through the appropriate phase transformation temperature range, eg austenite to pearlite, austenite to bainite or austenite to martensite.
  • cooling is initiated at a temperature within the high temperature austenite phase of the steel and stopped at a temperature deemed suitable for the completion of a given phase transformation. Accelerated cooling may typically be effected for a period of between 30 and 120 seconds.
  • Forced cooling may be effected by either individual hoods or nozzles positioned above and to the sides of the head of the rail, opposite each web of the rail, and below the foot surface of the rail, each independent hood or nozzle being supplied with air, air mist or water under pressure from a common or a different source.
  • cooling may be effected to, for example, only the rail head,foot or web, or to the entire rail.
  • Fine grinding or surface material removal by another technique of the welded regions may be applied to the head and/or the underside of the rail foot -and/or to the web of the rail.
  • Invisibly welding of a rail entails, however, grinding or other surface material removal all around the rail profile after welding of the individual rails together.
  • Robotic material removal techniques may be employed. Surface material removal may be effected either cold or at a temperature below the austenite temperature of the steel from which the rail is produced. Sensors may be provided to ensure that the required material removal depth and surface finish are achieved.
  • Peening may, for example, be by a shot or a hammer peening process and may be applied to the underside of the foot of the rail and/or to the head and/or web of the rail or to the entire welded or unwelded (ie parent rail) rail profile.
  • Peening may be achieved by directing a peening medium under pressure independently to the foot and/or head and/or web of the rail at each weld site.
  • the depth of the residual compressive stress layer may be, for example, between 0.75mm and 1mm and the compressive stresses achieved may be, for example, of the order of 60% to 80% of the yield strength of the rail material in compression.
  • Peening is generally carried out at a temperature below the stress relieving temperature of the steel from which the rail is produced, typically below 250 ⁇ C.
  • Figure 1 is a transverse section taken through a steel rail and shows substantially typical fatigue initiation sites in the foot of the rail associated with bending fatigue failures.
  • FIGS. 2 and 3 are side views of accelerated cooling apparatus in accordance with the present invention.
  • Figure 4 graphically illustrates the effect of forced cooling on flash butt weld HAZ hardness of fully pearlitic plain carbon rails
  • Figure 5 graphically illustrates the generation of residual stress in a shot peened steel after surface grinding and showing beneficial compressive stress produced following fine grinding
  • Figure 6 is a side view of peening apparatus in accordance with the invention
  • Figure 7 graphically illustrates induced compressive surface stresses and tensile stresses in a shot peened steel material
  • Figure 8 graphically illustrates longitudinal residual stress distributions in a roller straightened steel rail, a flash butt welded rail and a ground and shot peened welded rail;
  • Figure 9 graphically compares bending fatigue strengths of a parent rail, a normal production weld, a weld ground all around, a weld ground all around and shot peened and a normal production weld after shot peening.
  • the welded rail illustrated in Figure 1 has a head 1, a web 2 and a foot 3.
  • Typical bending fatigue initiation sites in the illustrated welded rail are indicated by reference numbers 4, 5 and 6. As will be seen, all of these fatigue initiation sites are located in the foot region of the rail. Of the sites illustrated, site 4 located in the base of the foot 3 is found to be the most prevalent, and is generally caused by maximum tensile stresses occasioned by the bending forces generated during service.
  • This objective is currently achieved by flash butt welding (otherwise called electrical resistance welding) individual steel rails together, stripping the resulting flash from the weld sites and then subjecting the weld sites to one, more than one or indeed all of the process steps of natural air or forced cooling, fine grinding and peening.
  • Flash butt welding is a process in which the rail ends to be joined together are held between water cooled copper grips, which act as both clamps and electrodes.
  • the first stage in the flash butt welding sequence is generally termed the “Burn-Off” or the “Pre-flashing” stage. During this stage, the rail ends are separated slightly and arcing/flashing is initiated between them in order to square up the rail ends. "Burn-Off" times are typically between 5 and 10 seconds, with l-5mm of platten movement.
  • the next stage in the welding sequence is the preheating sta / e.
  • the main aim of the preheating stage is to heat the rail ends to a sufficient temperature so that flashing initiates easily, and a suitable temperature gradient is achieved in the rail ends, prior to the onset of the final flashing sequence.
  • Preheating is generally achieved by bringing the rail ends into contact, and allowing a high current to flow across the rail ends. The rail ends are brought together and allowed to heat by means of resistance heating.
  • the movable platten of the welding machine is accelerated so that the rail ends are butted together either under a constant platten speed or under impact loading of up to 600 kN.
  • the load is calculated to give a pressure at the weld interface of approximately 50-60 N/mm 2 , to ensure adequate weld consolidation.
  • the welding current is generally supplied during the initial part of the forging operation to avoid oxidation at the weld interface.
  • a typical forging distance of between 12 and 20 mm is generally employed.
  • the molten and soft steel is forced out of the weld joint. This extruded material, generally termed "flash" is then removed quickly by means of an automatic weld upset removal tool.
  • flash butt welding is that good quality welds requiring no external weld metal can be produced in a relatively short period of time, typically within 45 to 90 seconds.
  • Accelerated forced cooling is a process for rapidly and controllably reducing the temperature of a product.
  • the weld sites for example, of heat treated, plain carbon pearlitic rail are cooled through the austenite to pearlite transformation temperature range (typically from 700°C to 500°C) at, for example, at up to 7°C/second.
  • Enhanced cooling of the weld sites at the correct rate produces weld HAZ hardness levels which match those of the parent plain carbon heat treated rail.
  • the effect of different forced cooling rates on HAZ hardness can be seen from Figure 4.
  • the effect of independent forced air cooling of the welded rail head, web and foot weld sites is effected with a view to increasing the hardness and wear resistance of the rail head, to improve the rolling contact fatigue life of the welded rail head and bending fatigue strength of the rail foot, and to improve the overall residual stress pattern across the weld HAZ profile.
  • As-rolled rail grades such as 700 and 900 achieve weld HAZ hardness levels similar to those of the parent rails following natural air cooling of the welds in still air. These rails following welding are, therefore, not normally subjected to accelerated cooling. It has, however, been found advantageous to increase the hardness/strength, in particular, of the welded rail foot by accelerated cooling with a view to improving the bending fatigue strength of the welded rail.
  • Cooling medium is air and in Figure 3 water.
  • cooling hoods As shown in Figure 2, cooling hoods
  • hoods 8 to a source of air under pressure are positioned above and to each side of the rail head, alongside each rail web and below the rail foot.
  • the arrangement is such that one or more (or indeed all) of the hoods may be connected to direct cooling air under pressure onto the adjoining rail surface.
  • the flow of air through the conduits is individually controlled by means of valves positioned, for example, within the conduits.
  • water is supplied under pressure via nozzle 11 to a manifold 12. Cooling water is selectively projected onto the head, web and/or foot of the rail by nozzles 14.
  • Surface grinding of the welded rail head is carried out as a routine production procedure to match the profile of the parent rail.
  • surface material removal from the rail head may be carried out by another technique.
  • Additional surface grinding (or surface material removed by another technique) to the web and foot of the rail may be effected in the present invention with a view to rendering the weld invisible to the eye.
  • Beneficial grinding (or other method of surface material removal) of the weld sites may be effected to reduce the number of potential fatigue initiation sites, eg surface pitting and by removing all traces of weld flash and decarburized layer from each weld site, particularly that from the rail foot which experiences tensile loading stresses during service.
  • Surface material removal for example, by grinding may be carried out by use of a robotic grinder which automatically fine grinds selected parts or each entire weld site of the rail.
  • Grinding may be effected either cold or at a temperature below the austenite temperature of the rail, typically 700°C. Sensors may be provided to ensure that the required grinding depth and surface finish are achieved.
  • FIG. 5 A graph illustrating the generation of residual stress in a 4340 steel after surface grinding is shown in Figure 5. The beneficial compressive stress introduced by fine grinding is to be noted.
  • fine grinding or other surface material removal technique particularly of the base of the welded rail foot also enables a full in-line automatic non ⁇ destructive testing (NDT) and/or additional alternative manual inspection of the welded rail to be carried out.
  • NDT non ⁇ destructive testing
  • the rail head, web and foot can readily be ultrasonically tested to a required specification
  • the rail foot base can be eddy current tested, and the flatness of the rail running surface and the rail head sides can be inspected.
  • manual ultrasonic inspection of each weld site for transverse defects can be effected with considerable ease.
  • Peening may be effected by, for example, a shot or hammer peening process.
  • Shot peening is a cold working process in which the surface of a part is bombarded with small spherical media called shot. Each piece of shot striking the material acts as a tiny peening hammer, imparting to the surface a small indentation or dimple.
  • the surface fibres of the material In order for the dimple to be created, the surface fibres of the material must be yielded in tension. Below the surface, the fibres try to restore the surface to its original shape, thereby producing below the dimple, a hemisphere of cold-worked material highly stressed in compression. Overlapping dimples develop an even layer of metal in residual compressive stress. It is known that a compressively stressed zone increases the initiation time required for a crack to form for a given applied tensile stress range.
  • Shot peening apparatus for use, for example, with the invention is schematically illustrated in Figure 6.
  • This apparatus comprises a plurality of nozzles 15 positioned above, below and to the sides of the rail.
  • Each nozzle is mounted on a frame 16 and is connected to receive a source of gas under pressure and shot.
  • Each nozzle can be independently controlled whereby the head, web and foot of the rail can be together or selectively peened.
  • peening is effected to welded rail and/or unwelded rail, i.e. parent rail, thereby creating compressive stresses which act to minimise the onset of crack initiation during service.
  • shot peening to the specification MI - S-13165C was applied to the rails in the present invention.
  • This peening process employed a shot size of 1.375mm (MI 550) at an intensity of 0.012-0.014C.
  • MI 550 1.375mm
  • a range of shot sizes and intensity levels can, nevertheless, be employed to obtain beneficial compressive stresses.
  • Typical compressive stresses achieved by the process are, for example, of the order of 60 to 80% of the yield strength of the rail material in compression.
  • the depth of the residual compressive layer produced by peening is, for example, typically between 0.75mm and 1.0mm. Peening is generally effected at a temperature below the stress relieving temperature of the steel from which the rail is produced, typically below 250°C.
  • Figure 7 of the drawings The effect of induced compressive and tensile stresses in a shot peened material with no external load is illustrated in Figure 7 of the drawings and Figure 8 graphically illustrates longitudinal residual stress distribution in a conventional rail, a weld and a shot peened weld.

Abstract

A steel rail comprising a plurality of individual rails welded together with any resulting excess material removed from the rail by a stripping process. The weld sites of the rail may be subjected to natural air and/or independent accelerated cooling and grinding or other surface material removal technique and/or peening process.

Description

Improvements in and relating to Steel Rails and Methods of Producing the same
This invention relates to steel rails and to methods of producing the same. More especially, the invention relates to the production of high integrity long welded steel rails.
Railway tracks have traditionally comprised a plurality of rails connected together by bolts and fish plates. In use, such tracks have proved to be noisy, uneven and require considerable maintenance. More recently, individual rails have been welded together in continuous lengths thereby enabling higher train speeds to be achieved at relatively low noise and vibration levels. The welds between adjoining individual rails have, however, previously been subject to occasional bending fatigue failures from the foot of the rail caused inter alia by positive tensile loading stresses experienced by the rail foot during service.
One object of the present invention is to provide a high integrity long welded steel rail which exhibits a bending fatigue life commensurate with that of non-welded rail and an overall improved residual stress pattern across the weld HAZ profile. Another object is to provide a welded steel rail in which the bending fatigue strength of each weld is at least equal to if not greater than the fatigue strength of the parent rails joined by that weld. A further object is to produce a welded steel rail in which the presence of the welds is not apparent from a visual inspection (that is to say an invisibly welded rail). A further object is to provide a method or methods of manufacturing welded steel rail by which the objectives set out above can be achieved.
Typically a long welded rail is a length of the order of 100m to 300m or longer.
According to the present invention in one aspect there is provided a steel rail which comprises a plurality of individual rails welded together with any resulting excess material removed from the rail by a stripping process in which the weld site at the foot of each rail is subjected to grinding.
Each weld site may be coated with a corrosion inhibiting material. Such coating may be applied to the rail foot and/or the rail web and/or the rail head. The coating may, of course, alternatively be applied to the entire weld site.
Welding may be by flash butt welding. Other welding processes may however be employed.
In another aspect, the present invention provides a method of producing a welded steel rail which comprises the steps of welding individual rails together, removing any resulting excess material from the weld sites and subsequently subjecting the weld sites to natural air and/or independent forced cooling and grinding or other surface material technique and/or peening.
As-rolled rail grades such as 700 and 900 (BS11 Normal quality and Grade A/AREA) achieve weld HAZ hardness levels similar to those of the parent rails following natural air cooling of the welds in still air. These rails following welding are, therefore, not normally subjected to accelerated cooling. It has, however, been found advantageous to increase the hardness/strength, in particular, of the welded rail foot by accelerated cooling with a view to improving the bending fatigue strength of the welded rail.
Accelerated cooling may be achieved by applying air, air mist or water under pressure independently to the head and/or the web and/or the foot of the rail at each weld site. Typically, forced cooling is applied through the appropriate phase transformation temperature range, eg austenite to pearlite, austenite to bainite or austenite to martensite. Typically cooling is initiated at a temperature within the high temperature austenite phase of the steel and stopped at a temperature deemed suitable for the completion of a given phase transformation. Accelerated cooling may typically be effected for a period of between 30 and 120 seconds. Forced cooling may be effected by either individual hoods or nozzles positioned above and to the sides of the head of the rail, opposite each web of the rail, and below the foot surface of the rail, each independent hood or nozzle being supplied with air, air mist or water under pressure from a common or a different source. Thus cooling may be effected to, for example, only the rail head,foot or web, or to the entire rail.
Fine grinding or surface material removal by another technique of the welded regions may be applied to the head and/or the underside of the rail foot -and/or to the web of the rail. Invisibly welding of a rail entails, however, grinding or other surface material removal all around the rail profile after welding of the individual rails together.
Robotic material removal techniques may be employed. Surface material removal may be effected either cold or at a temperature below the austenite temperature of the steel from which the rail is produced. Sensors may be provided to ensure that the required material removal depth and surface finish are achieved.
Peening may, for example, be by a shot or a hammer peening process and may be applied to the underside of the foot of the rail and/or to the head and/or web of the rail or to the entire welded or unwelded (ie parent rail) rail profile.
Peening may be achieved by directing a peening medium under pressure independently to the foot and/or head and/or web of the rail at each weld site. The depth of the residual compressive stress layer may be, for example, between 0.75mm and 1mm and the compressive stresses achieved may be, for example, of the order of 60% to 80% of the yield strength of the rail material in compression. Peening is generally carried out at a temperature below the stress relieving temperature of the steel from which the rail is produced, typically below 250βC.
The invention will now be described by way of example with reference to the accompanying diagrammatic drawings in which:-
Figure 1 is a transverse section taken through a steel rail and shows substantially typical fatigue initiation sites in the foot of the rail associated with bending fatigue failures.;
Figures 2 and 3 are side views of accelerated cooling apparatus in accordance with the present invention;
Figure 4 graphically illustrates the effect of forced cooling on flash butt weld HAZ hardness of fully pearlitic plain carbon rails;
Figure 5 graphically illustrates the generation of residual stress in a shot peened steel after surface grinding and showing beneficial compressive stress produced following fine grinding; Figure 6 is a side view of peening apparatus in accordance with the invention;
Figure 7 graphically illustrates induced compressive surface stresses and tensile stresses in a shot peened steel material;
Figure 8 graphically illustrates longitudinal residual stress distributions in a roller straightened steel rail, a flash butt welded rail and a ground and shot peened welded rail; and
Figure 9 graphically compares bending fatigue strengths of a parent rail, a normal production weld, a weld ground all around, a weld ground all around and shot peened and a normal production weld after shot peening.
The welded rail illustrated in Figure 1 has a head 1, a web 2 and a foot 3. Typical bending fatigue initiation sites in the illustrated welded rail are indicated by reference numbers 4, 5 and 6. As will be seen, all of these fatigue initiation sites are located in the foot region of the rail. Of the sites illustrated, site 4 located in the base of the foot 3 is found to be the most prevalent, and is generally caused by maximum tensile stresses occasioned by the bending forces generated during service.
As mentioned previously, it is an object of this invention to provide a high integrity long welded steel rail having bending fatigue life and wear performance at least as good, if not better than, those of rails manufactured currently. This objective is currently achieved by flash butt welding (otherwise called electrical resistance welding) individual steel rails together, stripping the resulting flash from the weld sites and then subjecting the weld sites to one, more than one or indeed all of the process steps of natural air or forced cooling, fine grinding and peening. These process steps will now be discussed in more detail.
Flash butt welding is a process in which the rail ends to be joined together are held between water cooled copper grips, which act as both clamps and electrodes. The first stage in the flash butt welding sequence is generally termed the "Burn-Off" or the "Pre-flashing" stage. During this stage, the rail ends are separated slightly and arcing/flashing is initiated between them in order to square up the rail ends. "Burn-Off" times are typically between 5 and 10 seconds, with l-5mm of platten movement. The next stage in the welding sequence is the preheating sta/e. The main aim of the preheating stage is to heat the rail ends to a sufficient temperature so that flashing initiates easily, and a suitable temperature gradient is achieved in the rail ends, prior to the onset of the final flashing sequence. Preheating is generally achieved by bringing the rail ends into contact, and allowing a high current to flow across the rail ends. The rail ends are brought together and allowed to heat by means of resistance heating.
In between each preheating cycle a short period of flashing is generally allowed to occur in order to maintain rail end squareness. This is followed by the final "flashing" stage. During this stage the rail interfaces become molten, and the correct conditions for the final upset or the forging stroke are achieved. The moving head of the welding machine during this stage is accelerated parabolically, with the resultant increase in the frequency and number of flashing ruptures or arcs across the weld interface. This ensures that the oxygen content at the weld interface is reduced sufficiently to give a semi- protective atmosphere. The primary purpose of the final flashing stage is to generate enough heat to produce a plastic zone that permits adequate upsetting. A total flashing distance of between 9 and 15 mm, over a period of 5 to 10 seconds, is typically employed for rails. Immediately following the final flashing stage, the movable platten of the welding machine is accelerated so that the rail ends are butted together either under a constant platten speed or under impact loading of up to 600 kN. The load is calculated to give a pressure at the weld interface of approximately 50-60 N/mm2, to ensure adequate weld consolidation. The welding current is generally supplied during the initial part of the forging operation to avoid oxidation at the weld interface. During welding of rails, a typical forging distance of between 12 and 20 mm is generally employed. Following the completion of the forging stroke, the molten and soft steel is forced out of the weld joint. This extruded material, generally termed "flash" is then removed quickly by means of an automatic weld upset removal tool.
One recognised advantage of flash butt welding is that good quality welds requiring no external weld metal can be produced in a relatively short period of time, typically within 45 to 90 seconds.
Other welding techniques may be employed, e.g. squeeze welding.
Accelerated forced cooling is a process for rapidly and controllably reducing the temperature of a product. When used in the context of the present invention, the weld sites, for example, of heat treated, plain carbon pearlitic rail are cooled through the austenite to pearlite transformation temperature range (typically from 700°C to 500°C) at, for example, at up to 7°C/second. Enhanced cooling of the weld sites at the correct rate produces weld HAZ hardness levels which match those of the parent plain carbon heat treated rail. The effect of different forced cooling rates on HAZ hardness can be seen from Figure 4. Thus, the effect of independent forced air cooling of the welded rail head, web and foot weld sites is effected with a view to increasing the hardness and wear resistance of the rail head, to improve the rolling contact fatigue life of the welded rail head and bending fatigue strength of the rail foot, and to improve the overall residual stress pattern across the weld HAZ profile.
As-rolled rail grades such as 700 and 900 (BS11 Normal quality and Grade A/AREA) achieve weld HAZ hardness levels similar to those of the parent rails following natural air cooling of the welds in still air. These rails following welding are, therefore, not normally subjected to accelerated cooling. It has, however, been found advantageous to increase the hardness/strength, in particular, of the welded rail foot by accelerated cooling with a view to improving the bending fatigue strength of the welded rail.
Apparatus for effecting forced cooling is illustrated in Figures 2 and 3. In Figure 2 the cooling medium is air and in Figure 3 water. As shown in Figure 2, cooling hoods
7 supported within a frame 9 and each connected by conduits
8 to a source of air under pressure are positioned above and to each side of the rail head, alongside each rail web and below the rail foot. The arrangement is such that one or more (or indeed all) of the hoods may be connected to direct cooling air under pressure onto the adjoining rail surface. The flow of air through the conduits is individually controlled by means of valves positioned, for example, within the conduits.
In the arrangement illustrated in Figure 3, water is supplied under pressure via nozzle 11 to a manifold 12. Cooling water is selectively projected onto the head, web and/or foot of the rail by nozzles 14.
The effect of forced cooling on HAZ hardness of fully pearlitic plain carbon rails is illustrated graphically in Figure 4.
Surface grinding of the welded rail head is carried out as a routine production procedure to match the profile of the parent rail. Alternatively, surface material removal from the rail head may be carried out by another technique. Additional surface grinding (or surface material removed by another technique) to the web and foot of the rail may be effected in the present invention with a view to rendering the weld invisible to the eye. Beneficial grinding (or other method of surface material removal) of the weld sites may be effected to reduce the number of potential fatigue initiation sites, eg surface pitting and by removing all traces of weld flash and decarburized layer from each weld site, particularly that from the rail foot which experiences tensile loading stresses during service.
Surface material removal, for example, by grinding may be carried out by use of a robotic grinder which automatically fine grinds selected parts or each entire weld site of the rail.
Grinding may be effected either cold or at a temperature below the austenite temperature of the rail, typically 700°C. Sensors may be provided to ensure that the required grinding depth and surface finish are achieved.
A graph illustrating the generation of residual stress in a 4340 steel after surface grinding is shown in Figure 5. The beneficial compressive stress introduced by fine grinding is to be noted.
In addition fine grinding or other surface material removal technique particularly of the base of the welded rail foot also enables a full in-line automatic non¬ destructive testing (NDT) and/or additional alternative manual inspection of the welded rail to be carried out. Thus, the rail head, web and foot can readily be ultrasonically tested to a required specification, the rail foot base can be eddy current tested, and the flatness of the rail running surface and the rail head sides can be inspected. Also, manual ultrasonic inspection of each weld site for transverse defects can be effected with considerable ease.
Peening may be effected by, for example, a shot or hammer peening process.
Shot peening is a cold working process in which the surface of a part is bombarded with small spherical media called shot. Each piece of shot striking the material acts as a tiny peening hammer, imparting to the surface a small indentation or dimple. In order for the dimple to be created, the surface fibres of the material must be yielded in tension. Below the surface, the fibres try to restore the surface to its original shape, thereby producing below the dimple, a hemisphere of cold-worked material highly stressed in compression. Overlapping dimples develop an even layer of metal in residual compressive stress. It is known that a compressively stressed zone increases the initiation time required for a crack to form for a given applied tensile stress range. Since nearly all fatigue and stress corrosion failures originate at the surface of a part, compressive stresses induced by shot peening provide considerable increases in part life. The maximum compressive residual stress produced at or under the surface of a part by shot peening is at least as great as half the yield strength of the material being peened. Many materials will also increase in surface hardness due to the cold working effect of shot peening.
Shot peening apparatus for use, for example, with the invention is schematically illustrated in Figure 6. This apparatus comprises a plurality of nozzles 15 positioned above, below and to the sides of the rail. Each nozzle is mounted on a frame 16 and is connected to receive a source of gas under pressure and shot. Each nozzle can be independently controlled whereby the head, web and foot of the rail can be together or selectively peened.
Benefits obtained by shot peening are the result of the effect of the compressive stress and the cold working induced. In the present invention, peening is effected to welded rail and/or unwelded rail, i.e. parent rail, thereby creating compressive stresses which act to minimise the onset of crack initiation during service.
In one example, shot peening to the specification MI - S-13165C was applied to the rails in the present invention. This peening process employed a shot size of 1.375mm (MI 550) at an intensity of 0.012-0.014C. A range of shot sizes and intensity levels can, nevertheless, be employed to obtain beneficial compressive stresses.
Typical compressive stresses achieved by the process are, for example, of the order of 60 to 80% of the yield strength of the rail material in compression. The depth of the residual compressive layer produced by peening is, for example, typically between 0.75mm and 1.0mm. Peening is generally effected at a temperature below the stress relieving temperature of the steel from which the rail is produced, typically below 250°C.
The effect of induced compressive and tensile stresses in a shot peened material with no external load is illustrated in Figure 7 of the drawings and Figure 8 graphically illustrates longitudinal residual stress distribution in a conventional rail, a weld and a shot peened weld.
A comparison of the results of 4-point bend fatigue testing of conventional rails and welded rails in accordance with the present invention can be seen from Figure 9. This Figure shows that the high integrity welds produced in accordance with this invention and labelled "3" "4" and "5" possess bending fatigue strength levels significantly in excess of that of the parent or unwelded rail labelled "1".
Bending fatigue data for as-rolled welded rails which have been either ground or ground and shot peened have been found to be at least as good as, if not better than, those of the parent rails. These rails have shown similar overall trends to those observed in the case of mill heat treated rails (MHT) as exemplified in Figure 9.
The techniques mentioned above concerning the production of high integrity invisible welds may also be applied readily to all grades of as-rolled and heat treated pearlitic rails and to any other additional rail grades developed in the future.
In addition, the techniques mentioned above may be applied readily to the bainitic and martensitic steels disclosed in our co-pending patent applications 950097.1 and 9313060.
It will be appreciated that the foregoing is merely exemplary of rails in accordance with the invention and that modifications can readily be made thereto without departing from the true scope of the invention.

Claims

1. A steel rail which comprises a plurality of individual rails welded together with any resulting excess material removed from the rail by a stripping process in which the weld site at the foot of each rail is subjected to grinding.
2. A rail as claimed in claim 1 wherein the weld sites are cooled.
3. A rail as claimed in claim 2 wherein the weld sites are subjected to natural air cooling.
4. A rail as claimed in claim 2 wherein the weld sites are subjected to independent accelerated cooling.
5. A rail as claimed in any one of claims 1 to 4 wherein the entire weld sites are subjected to grinding.
6. A rail as claimed in any one of the preceding claims wherein the weld sites are subjected to peening.
7. A rail as claimed in any one of the preceding claims wherein each weld site is coated with a corrosion inhibiting material.
8. A rail as claimed in claim 7 wherein the coating is applied to the rail foot and/or the rail web and/or the rail head.
9. A method of producing a welded steel rail which comprises the steps of welding individual rails together, removing any resulting excess material from the weld sites and subsequently subjecting the weld sites to natural air and/or independent forced cooling and grinding or other surface material technique and/or peening.
10. A method as claimed in claim 9 wherein accelerated cooling is achieved by applying air, air mist or water under pressure independently to the head and/or the web and/or the foot of the rail at each weld site.
11. A method as claimed in claim 10 wherein accelerated cooling is effected for a period of between 30 and 120 seconds.
12. A method as claimed in claim 10 or claim 11 wherein forced cooling is effected by directly cooling medium through nozzles positioned above and to the sides of the head of the rail, opposite each web of the rail, and below the foot surface of the rail.
13. A method as claimed in any one of claims 9 to 12 wherein peening medium is applied to the underside of the foot of the rail and/or to the head and/or web of the rail.
14. A method as claimed in claim 13 wherein peening is achieved by directing a peening medium under pressure independently to the foot and/or head and/or web of the rail at each weld site.
15. A method as claimed in claim 13 or claim 14 wherein the depth of the residual compressive stress layer achieved is between 0.75mm and 1mm and the compressive stresses achieved are between 60% to 80% of the yield strength of the rail material in compression.
16. A rail as claimed in any one of claims 13 to 15 wherein peening is carried out at a temperature below the stress relieving temperature of the steel from which the rail is produced.
17. A steel rail substantially as herein described and as described with reference to Figures 2 and 3 or Figure 5 of the accompanying drawings.
18. A method of producing steel rail substantially as herein described and as described with reference to Figures 2 and 3 or Figure 5 of the accompanying drawings.
EP96904198A 1995-03-20 1996-03-01 Improvements in and relating to steel rails and methods of producing the same Expired - Lifetime EP0815325B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
GB9505567 1995-03-20
GB9505567A GB2299044B (en) 1995-03-20 1995-03-20 Improvements in and relating to steel rails and methods of producing the same
PCT/GB1996/000458 WO1996029469A1 (en) 1995-03-20 1996-03-01 Improvements in and relating to steel rails and methods of producing the same

Publications (2)

Publication Number Publication Date
EP0815325A1 true EP0815325A1 (en) 1998-01-07
EP0815325B1 EP0815325B1 (en) 2002-07-31

Family

ID=10771488

Family Applications (1)

Application Number Title Priority Date Filing Date
EP96904198A Expired - Lifetime EP0815325B1 (en) 1995-03-20 1996-03-01 Improvements in and relating to steel rails and methods of producing the same

Country Status (8)

Country Link
EP (1) EP0815325B1 (en)
AT (1) ATE221596T1 (en)
AU (1) AU4838796A (en)
CA (1) CA2215941A1 (en)
DE (1) DE69622698D1 (en)
GB (1) GB2299044B (en)
WO (1) WO1996029469A1 (en)
ZA (1) ZA961892B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2785917A4 (en) * 2011-11-29 2015-12-16 Cf & I Steel Lp Method and apparatus for treatment of a rail weld
CN112475821A (en) * 2020-11-13 2021-03-12 攀钢集团攀枝花钢铁研究院有限公司 Low-web residual tensile stress steel rail and preparation method thereof

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2403174B (en) * 2003-06-26 2006-11-15 Corus Uk Ltd Steel rails
AT6941U3 (en) 2004-02-23 2005-03-25 Plasser Bahnbaumasch Franz WELDING UNIT FOR WELDING TWO RAILS OF A TRACK AND METHOD
CA2756855C (en) * 2009-03-30 2013-11-19 Nippon Steel Corporation Method of cooling rail weld zone, device for cooling rail weld zone, and rail weld joint
WO2011052562A1 (en) 2009-10-30 2011-05-05 新日本製鐵株式会社 Flash-butt welding method for rail steel
RU2681046C1 (en) * 2017-02-07 2019-03-01 Общество С Ограниченной Ответственностью Научно-Производственное Предприятие "Томская Электронная Компания" (Ооо Нпп "Тэк") Method of manufacturing rail lashes and complex for implementing method
RU2020113320A (en) 2017-09-29 2021-10-29 Сиэфэндай Стил Эл.Пи., Ди/Би/Эй Евраз Роки Маунтин Стил METHOD FOR CONNECTING STEEL RAILS WITH ADJUSTABLE WELDING HEAT SUPPLY
CN108304647B (en) * 2018-01-30 2021-04-09 太原科技大学 Method for evaluating characteristic service life of metal structure of casting crane based on rail joint defects
AT521312B1 (en) * 2018-06-01 2021-10-15 Linsinger Maschb Gesellschaft M B H Device for non-abrasive hardening of rail head surfaces

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB494175A (en) * 1936-04-22 1938-10-21 Martial Jules Bal Improvements in the heat treatment of rail weldings
FR841129A (en) * 1938-01-13 1939-05-10 Device for heat treatment of rail welds
US2231014A (en) * 1938-12-03 1941-02-11 Union Carbide & Carbon Res Lab Welding process and apparatus
GB1471596A (en) * 1974-04-22 1977-04-27 London Transport Executive Method and means for profile finishing welded rails and the like
SU613868A1 (en) * 1975-10-08 1978-07-05 Ордена Ленина И Трудового Красного Знамени Институт Электросварки Имени Е.О.Патона Hydraulic system of article-clamping mechanism of vice-type resistance butt welder
GB1525643A (en) * 1976-02-26 1978-09-20 Nippon Densetsu Kogyo Co Ltd Method of assembling a composite electric conductor rail
FR2642087B1 (en) * 1989-01-23 1993-05-14 Unimetall Sa PROCESS FOR TREATING THE SURFACE LAYER OF RAILS OR TRACK APPARATUS

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO9629469A1 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2785917A4 (en) * 2011-11-29 2015-12-16 Cf & I Steel Lp Method and apparatus for treatment of a rail weld
CN112475821A (en) * 2020-11-13 2021-03-12 攀钢集团攀枝花钢铁研究院有限公司 Low-web residual tensile stress steel rail and preparation method thereof

Also Published As

Publication number Publication date
GB2299044A (en) 1996-09-25
EP0815325B1 (en) 2002-07-31
ZA961892B (en) 1996-09-12
GB9505567D0 (en) 1995-05-03
WO1996029469A1 (en) 1996-09-26
DE69622698D1 (en) 2002-09-05
CA2215941A1 (en) 1996-09-26
ATE221596T1 (en) 2002-08-15
GB2299044B (en) 1998-09-30
AU4838796A (en) 1996-10-08

Similar Documents

Publication Publication Date Title
RU2485187C2 (en) Cooling method of rail welding zone, cooling device for rail welding zone, and weld joint of rail
US6171415B1 (en) Ultrasonic impact methods for treatment of welded structures
JP4757955B2 (en) Rail welding section cooling device and cooling method
RU2162486C2 (en) Method for heat treatment of steel rail
JP5531845B2 (en) Post-heat treatment method near the flash butt weld
EP0815325B1 (en) Improvements in and relating to steel rails and methods of producing the same
CN111659973B (en) U76CrRE heat treatment steel rail gas pressure welding method
EP2845913A1 (en) Method and device for production of heat treated welded rail for rail transport and rail produced therewith
JP2010188382A (en) Method of cooling weld zone of rail
WO2005001204A1 (en) Steel rails
CN113618193B (en) 75kg/m hypereutectoid steel rail and gas pressure welding method thereof and welding part
EP3186402B1 (en) Method and device for production of heat treated welded rail for rail transport and rail produced therewith
CN113618194A (en) 60kg/m hypereutectoid steel rail air pressure welding method and device
SU1563920A1 (en) Method of resistance butt welding of rails
KR100482222B1 (en) A Method of Flash Butt Welding for High Carbon Steel
Illés et al. Post-treatment of welding joints of high strength steels II.: Improving residual stress condition–Overview
JP4408170B2 (en) Rail with excellent wear resistance and method for manufacturing the same
CN116770048A (en) Fixed flash welding and joint heat treatment method for rare earth high-strength heat-treated steel rail
JPS6364499B2 (en)
JPH08155642A (en) Cladding by welding repair method of hot die
Nitschke‐Pagel et al. Fatigue strength improvement of welded aluminium alloys by different post weld treatment methods
CN117020374A (en) High-hardness 75N390 HB-level steel rail fixing flash welding and joint heat treatment method
CN116833539A (en) Mobile gas pressure welding and joint heat treatment process for Nb and RE containing pearlitic steel rail
CN117259944A (en) Post-welding cooling method for heterogeneous steel rail flash welding head
CN116329724A (en) High-speed rail fixing flash welding and joint heat treatment method for plateau area

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19971013

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: BRITISH STEEL LIMITED

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: BRITISH STEEL LIMITED

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: CORUS UK LIMITED

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

17Q First examination report despatched

Effective date: 20010711

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: CORUS UK LIMITED

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020731

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20020731

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020731

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020731

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020731

Ref country code: CH

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020731

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020731

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020731

REF Corresponds to:

Ref document number: 221596

Country of ref document: AT

Date of ref document: 20020815

Kind code of ref document: T

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 69622698

Country of ref document: DE

Date of ref document: 20020905

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20021031

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20021031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20021101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20021113

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030130

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030301

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030301

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030303

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030331

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20030506

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20031001

GBPC Gb: european patent ceased through non-payment of renewal fee
NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20031001

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A