EP0616862B1 - A process for manufacturing radiator elements for central heating plants - Google Patents

A process for manufacturing radiator elements for central heating plants Download PDF

Info

Publication number
EP0616862B1
EP0616862B1 EP93830392A EP93830392A EP0616862B1 EP 0616862 B1 EP0616862 B1 EP 0616862B1 EP 93830392 A EP93830392 A EP 93830392A EP 93830392 A EP93830392 A EP 93830392A EP 0616862 B1 EP0616862 B1 EP 0616862B1
Authority
EP
European Patent Office
Prior art keywords
hole
deep
phase
radiator
shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP93830392A
Other languages
German (de)
French (fr)
Other versions
EP0616862A1 (en
Inventor
Giancarlo Vezzani
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FARAL SpA
Original Assignee
FARAL SpA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FARAL SpA filed Critical FARAL SpA
Publication of EP0616862A1 publication Critical patent/EP0616862A1/en
Application granted granted Critical
Publication of EP0616862B1 publication Critical patent/EP0616862B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D53/00Making other particular articles
    • B21D53/02Making other particular articles heat exchangers or parts thereof, e.g. radiators, condensers fins, headers

Definitions

  • the invention relates to a process for manufacturing radiator elements for central heating plants.
  • the invention relates to internally hollow radiator elements provided with holes for passage of a thermal carrier fluid, which elements are usually connected one to another by means of nipples situated at the passage fluid holes.
  • radiator elements are constructed by means of substantially two process categories, the first of which envisages casting processes, normally using cast iron or aluminium alloys, while the second envisages sheet metal (usually steel) pressing to produce a half-shell, which is subsequently welded, usually flash-welded, to an identical half-shell.
  • the present invention belongs to the second above category.
  • radiators using two different types of radiator element.
  • the first type is an intermediate radiator element, comprising a head-piece obtained by welding together two half-shells. Pipes are welded, usually flash-welded, to the head pieces. By varying the length of the pipes radiator elements of different heights can be obtained.
  • the second type has an end element consisting in an intermediate element on one side of which internally-threaded pipe-couplings are welded, usually at the fluid passage holes.
  • Figure 5 shows a part of a half-shell of the second type of radiator, comprising a pipe-coupling.
  • the pipe-couplings are provided with coupling nipples for a connection of the radiator to a thermal-carrier fluid distribution plant, or for its connection to another end radiator element.
  • the complete radiator is made up of an assembly of the above elements. Assembly is generally performed by spot-welding at the fluid passage holes.
  • radiator elements are made which have four threaded pipe-couplings, two for each side of the element, which are welded at the fluid passage holes.
  • the assembly of the radiator in this case comprises the use of nipples to connect each radiator element to the another.
  • a drawback of the radiators made with the above known processes is that stocking the elements necessary for the construction of the radiators is costly, since different types of elements are used as well as different types of components for the elements.
  • a further drawback is that the assembly of a radiator requires a high number of welding operations.
  • a principal aim of the present invention is to eliminate the above-mentioned drawbacks by providing a process which enables the work times and operations necessary for the construction of radiator elements of the above-described type to be reduced.
  • An advantage of the present invention is that it simplifies stocking as well as reducing the costs attached to it, by using a limited number of modular components.
  • a further advantage is that it requires only a limited number of welding operations to realise a complete radiator.
  • a half-shell 19 is shown for radiator elements constructed according to a known process, done by means of deep-drawing a unit of sheet metal provided with an initial hole.
  • the half-shell 19 exhibits a hole 18, through which a thermal-carrier fluid will flow between two consecutive radiator elements.
  • the diameter of the through-hole 18 is the same as that of the initial hole in the sheet metal unit presented for deep-drawing.
  • the pipe-coupling 17 is separately made and welded to the half-shell 19 after the said half-shell 19 has been deep-drawn.
  • 1 denotes a half-shell obtained according to the present process, comprising a through-hole 8, a threaded cylindrical element 9 coaxial to the through-hole 8, an edge 10 and three half-columns 11.
  • the half-shell 1 is made through a process comprising the three following phases.
  • An initial hole 7 is obtained on a flat unit of sheet metal 6 realised by means of, for example, shearing or metal-beating.
  • the holed sheet metal 6 is then deep-drawn to form a half-shell 1.
  • a bending operation is also performed, towards the inside of the half-shell 1, to plastically deform an annular crown 5 which surrounds the initial hole 7, and thus to give rise to a cylindrical element 9.
  • the through-hole 8 is made on the initial hole 7 by plastically deforming the material surrounding the hole 7 during the course of the deep-drawing.
  • the hole 7 has a smaller diameter than that of the through-hole 8.
  • the height of the annular crown 5 is about the same as the difference between the diameter of the through-hole 8 and the diameter of the initial hole 7.
  • the internal surface of the cylindrical element 9 is subsequently threaded by rolling.
  • FIG 4 a stage of the deep-drawing phase, according to the invention, is schematically represented, in which the unit of sheet metal 6, positioned between an upper half-die 2 and a lower half-die 3 is bent and wound about the half-dies until it takes on their shape.
  • the upper half-die 2 exhibits a shaped body 4 which acts on the unit of sheet metal 6 coaxially to the initial hole 7, plastically deforming the annular crown 5 as described in precedence.
  • the initial hole 7 might be obtained directly at the drawing press by specially shaping the tools.
  • the shape and the size of the sheet metal 6 unit must be chosen very carefully, because of the deformations they will be subjected to during the drawing process in order to obtain a product having the desired shape characteristics.
  • the thread-making phase can be performed, if so desired, by shaving rather than rolling. Rolling has the advantage of strengthening the thread.
  • a radiator element is made by bringing two half-shells 1 together along their respective edges 10 and welding them.
  • the welding phase is performed by means of the TIG process.
  • a plurality of such elements arranged consecutively one to another and connected by means of nipples, constitutes a whole radiator body.
  • a frontal gasket is interposed between two consecutive radiator elements, at a junction zone.
  • the TIG process ensures the best guarantee of quality constancy of the joint. Also, it helps to avoid a subsequent finishing and cleaning phase of the welding bead, since there is no flash line. Obviously alternative welding methods can be used.
  • the radiator element undergoes an anticorrosion treatment. This permits, in the construction of radiators obtained from sheet metal, of considerably increasing the average life of the radiators in comparison to non-treated ones of a similar metal thickness.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
  • Heating, Cooling, Or Curing Plastics Or The Like In General (AREA)
  • Surface Heating Bodies (AREA)
  • Variable-Direction Aerials And Aerial Arrays (AREA)
  • Resistance Heating (AREA)

Abstract

The invention relates to a process for manufacturing radiator elements for central heating plants, comprising a deep-drawing phase in which a half-shell (1) is formed, provided with a cylindrical element (9) coaxial to a through-hole (8) and a thread-making phase of the internal surface of the said cylindrical element (9). <IMAGE>

Description

The invention relates to a process for manufacturing radiator elements for central heating plants.
In particular, the invention relates to internally hollow radiator elements provided with holes for passage of a thermal carrier fluid, which elements are usually connected one to another by means of nipples situated at the passage fluid holes.
At present radiator elements are constructed by means of substantially two process categories, the first of which envisages casting processes, normally using cast iron or aluminium alloys, while the second envisages sheet metal (usually steel) pressing to produce a half-shell, which is subsequently welded, usually flash-welded, to an identical half-shell. The present invention belongs to the second above category.
Some known processes construct radiators using two different types of radiator element. The first type is an intermediate radiator element, comprising a head-piece obtained by welding together two half-shells. Pipes are welded, usually flash-welded, to the head pieces. By varying the length of the pipes radiator elements of different heights can be obtained.
The second type has an end element consisting in an intermediate element on one side of which internally-threaded pipe-couplings are welded, usually at the fluid passage holes.
Figure 5 shows a part of a half-shell of the second type of radiator, comprising a pipe-coupling. The pipe-couplings are provided with coupling nipples for a connection of the radiator to a thermal-carrier fluid distribution plant, or for its connection to another end radiator element.
The complete radiator is made up of an assembly of the above elements. Assembly is generally performed by spot-welding at the fluid passage holes.
Other processes exist in which radiator elements are made which have four threaded pipe-couplings, two for each side of the element, which are welded at the fluid passage holes. The assembly of the radiator in this case comprises the use of nipples to connect each radiator element to the another.
A drawback of the radiators made with the above known processes is that stocking the elements necessary for the construction of the radiators is costly, since different types of elements are used as well as different types of components for the elements.
A further drawback is that the assembly of a radiator requires a high number of welding operations.
A principal aim of the present invention is to eliminate the above-mentioned drawbacks by providing a process which enables the work times and operations necessary for the construction of radiator elements of the above-described type to be reduced.
An advantage of the present invention is that it simplifies stocking as well as reducing the costs attached to it, by using a limited number of modular components.
A further advantage is that it requires only a limited number of welding operations to realise a complete radiator.
These aims and advantages and others besides are all attained by the invention of the present application, as it is characterised in the claims,
Further advantages of the present invention will better emerge from the detailed description that follows, of an embodiment of the invention, herein illustrated purely in the form of an example in the accompanying figures, in which:
  • figure 1 is a schematic partial plan view of a half-shell obtained with the inventive process;
  • figure 2 is a sectioned schematic partial lateral view from below of figure 1;
  • figure 3 is a schematic partial plan view of a unit of sheet metal obtained from a first phase of the process and destined to the subsequent phases of the said process;
  • figure 4 is a schematic sectioned plan view in vertical elevation of the deep-drawing phase of the process;
  • figure 5 is a schematic sectioned partial view of a product made according to a known procedure.
In figure 5 a half-shell 19 is shown for radiator elements constructed according to a known process, done by means of deep-drawing a unit of sheet metal provided with an initial hole.
The half-shell 19 exhibits a hole 18, through which a thermal-carrier fluid will flow between two consecutive radiator elements.
The diameter of the through-hole 18 is the same as that of the initial hole in the sheet metal unit presented for deep-drawing.
A pipe-coupling 17, internally threaded and arranged internally of the half-shell 19 and coaxially to the through-hole 18, is provided for screw-coupling to a nipple.
The pipe-coupling 17 is separately made and welded to the half-shell 19 after the said half-shell 19 has been deep-drawn. With reference to figures 1 and 2, 1 denotes a half-shell obtained according to the present process, comprising a through-hole 8, a threaded cylindrical element 9 coaxial to the through-hole 8, an edge 10 and three half-columns 11.
The half-shell 1 is made through a process comprising the three following phases.
An initial hole 7 is obtained on a flat unit of sheet metal 6 realised by means of, for example, shearing or metal-beating.
The holed sheet metal 6 is then deep-drawn to form a half-shell 1. During the drawing a bending operation is also performed, towards the inside of the half-shell 1, to plastically deform an annular crown 5 which surrounds the initial hole 7, and thus to give rise to a cylindrical element 9.
In Figure 3, where an interrupted plan view of the already-holed unit of sheet metal 6 is shown, the annular crown 5 is represented by a broken line.
The through-hole 8 is made on the initial hole 7 by plastically deforming the material surrounding the hole 7 during the course of the deep-drawing.
The hole 7 has a smaller diameter than that of the through-hole 8.
The height of the annular crown 5 is about the same as the difference between the diameter of the through-hole 8 and the diameter of the initial hole 7. The internal surface of the cylindrical element 9 is subsequently threaded by rolling.
In figure 4 a stage of the deep-drawing phase, according to the invention, is schematically represented, in which the unit of sheet metal 6, positioned between an upper half-die 2 and a lower half-die 3 is bent and wound about the half-dies until it takes on their shape.
The upper half-die 2 exhibits a shaped body 4 which acts on the unit of sheet metal 6 coaxially to the initial hole 7, plastically deforming the annular crown 5 as described in precedence.
Obviously different tools might be chosen, both in terms of shape and arrangement. For example, the initial hole 7 might be obtained directly at the drawing press by specially shaping the tools.
The shape and the size of the sheet metal 6 unit must be chosen very carefully, because of the deformations they will be subjected to during the drawing process in order to obtain a product having the desired shape characteristics.
The thread-making phase can be performed, if so desired, by shaving rather than rolling. Rolling has the advantage of strengthening the thread.
A radiator element is made by bringing two half-shells 1 together along their respective edges 10 and welding them. The welding phase is performed by means of the TIG process.
Thus an element is obtained which is internally hollow and provided with two through-holes 8 for passage of the thermal carrier fluid from one radiator element to the adjacent ones.
A plurality of such elements, arranged consecutively one to another and connected by means of nipples, constitutes a whole radiator body.
To ensure a good seal, a frontal gasket is interposed between two consecutive radiator elements, at a junction zone.
The TIG process ensures the best guarantee of quality constancy of the joint. Also, it helps to avoid a subsequent finishing and cleaning phase of the welding bead, since there is no flash line. Obviously alternative welding methods can be used. The radiator element undergoes an anticorrosion treatment. This permits, in the construction of radiators obtained from sheet metal, of considerably increasing the average life of the radiators in comparison to non-treated ones of a similar metal thickness.

Claims (5)

  1. A process for making radiator elements for central heating plants, comprising the following phases:
    making an initial hole (7) in a unit of sheet metal (6) having predetermined size and shape;
    a deep-drawing of the holed sheet metal unit (6) wherein the said unit is plastically deformed between two half-dies of a drawing press to form a half-shell (1) provided with a through hole (8) made on the initial hole (7) previously obtained:
    bringing together and welding together two half-shells (1) to obtain an internally hollow single internally hollow radiator element;
    characterised in that:
    the initial hole (7) has a smaller diameter than the through hole (8); during the deep-drawing of the holed sheet (6) to form the half-shell (1) an annular crown (5) is formed having a height which is about equal to a difference between the through hole (8) diameter and the initial hole (7) diameter;
    subsequently during the deep-drawing phase, the two half-dies (2, 3) of the drawing press act for bending the annular crown (5) forming thus a cylindrical element (9) which is coaxial to the through hole (8);
    after the deep-drawing phase, there is a thread-making phase on an internal surface of the cylindrical element (9).
  2. A process as in claim 1, characterised in that the initial hole (7) is obtained directly at the drawing press.
  3. A process as in claim 1 or 2, characterised in that the threading phase is performed by a rolling technique.
  4. A process as in any one of the previous claims, characterised in that the welding is performed by a TIG process.
  5. A process as in any one of the previous claims, characterised in that a surface of the radiator element (1) undergoes an anti-corrosion treatment.
EP93830392A 1993-03-26 1993-09-27 A process for manufacturing radiator elements for central heating plants Expired - Lifetime EP0616862B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ITMO930043A IT1263530B (en) 1993-03-26 1993-03-26 METHOD FOR MAKING RADIATOR ELEMENTS FOR HEATING SYSTEMS
ITMO930043 1993-03-26

Publications (2)

Publication Number Publication Date
EP0616862A1 EP0616862A1 (en) 1994-09-28
EP0616862B1 true EP0616862B1 (en) 1998-04-29

Family

ID=11385399

Family Applications (1)

Application Number Title Priority Date Filing Date
EP93830392A Expired - Lifetime EP0616862B1 (en) 1993-03-26 1993-09-27 A process for manufacturing radiator elements for central heating plants

Country Status (4)

Country Link
EP (1) EP0616862B1 (en)
AT (1) ATE165538T1 (en)
DE (1) DE69318284T2 (en)
IT (1) IT1263530B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITMI20020391A1 (en) * 2002-02-27 2003-08-27 Ercos S P A PROCESS FOR THE THREADING OF DRAWN INLETS PARTICULARLY FOR THE PRODUCTION OF RADIATOR AND SIMILAR ELEMENTS
CN110625333B (en) * 2019-08-10 2021-05-14 无锡胜鼎智能科技有限公司 Processing method of new energy rear end cover

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2021960A (en) * 1929-02-15 1935-11-26 Andrew A Kramer Method of making expansion domes for tanks
CH396361A (en) * 1963-09-19 1965-07-31 Sala Silvio Sheet metal radiator for radiator heating systems and procedure for its manufacture
CA921772A (en) * 1971-03-29 1973-02-27 C. Haddon Roger Method of forming heat exchanger fin collars
US4109501A (en) * 1974-09-11 1978-08-29 Hidaka Engineering Co., Ltd. Method for the production of heat exchanger fins

Also Published As

Publication number Publication date
DE69318284T2 (en) 1998-11-05
ITMO930043A0 (en) 1993-03-26
ITMO930043A1 (en) 1994-09-26
IT1263530B (en) 1996-08-05
ATE165538T1 (en) 1998-05-15
DE69318284D1 (en) 1998-06-04
EP0616862A1 (en) 1994-09-28

Similar Documents

Publication Publication Date Title
US4761982A (en) Method and apparatus for forming a heat exchanger turbulator and tube
US4663812A (en) Method of manufacture of manifolds
EP0457978B1 (en) Method for joining heat exchanger tubes with headers
US3857151A (en) Method of making a radiator core
JPS61173096A (en) Manifold and manufacture thereof
US7234335B2 (en) Method for producing a head element for heaters
US6065317A (en) Apparatus and procedure for manufacturing metallic hollow bodies with structural bulges
US4856824A (en) Method of manufacture of manifolds and manifold provided by such method
EP0616862B1 (en) A process for manufacturing radiator elements for central heating plants
US3258068A (en) Shell and tube heat exchanger
US5209093A (en) Apparatus for superplastic forming of large cylindrical structures
US1850049A (en) Pipe fitting and method of making the same
GB1374915A (en) Formation of nuts
US3648509A (en) Formed gas meter conduit
RU2635491C1 (en) Method for manufacturing tee-pieces (versions)
US4101065A (en) Method of manufacturing multilayer convex collared covers and bottoms for pressure vessels
EP0039599B1 (en) Integral end closure and hub for a ball valve body
US540314A (en) drury
EP0323456B1 (en) Process and apparatus for the cold shaping of pipes or fittings, and articles thus obtained
CN1033374C (en) Method for making yoke of hose connector
EP0175743B1 (en) Method of manufacturing hairpin configured tubes
US1931161A (en) Method of making tubular articles
US653902A (en) Apparatus for forming welded rings.
US6176013B1 (en) Method for fabricating a seamless H.V.A.C. trunk line adaptor
US3225423A (en) Junction pieces for tube elements

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE FR GB LI NL

17P Request for examination filed

Effective date: 19950310

17Q First examination report despatched

Effective date: 19961015

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE FR GB LI NL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19980429

Ref country code: LI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19980429

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19980429

Ref country code: CH

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19980429

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19980429

REF Corresponds to:

Ref document number: 165538

Country of ref document: AT

Date of ref document: 19980515

Kind code of ref document: T

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 69318284

Country of ref document: DE

Date of ref document: 19980604

EN Fr: translation not filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980927

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19980927

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20021002

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20021129

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030930

BERE Be: lapsed

Owner name: *FARAL S.P.A.

Effective date: 20030930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040401