EP0580926A1 - Sealing joint in diaphragms formed by concrete panels cast in situ and a process for building said diaphragms - Google Patents

Sealing joint in diaphragms formed by concrete panels cast in situ and a process for building said diaphragms Download PDF

Info

Publication number
EP0580926A1
EP0580926A1 EP92830431A EP92830431A EP0580926A1 EP 0580926 A1 EP0580926 A1 EP 0580926A1 EP 92830431 A EP92830431 A EP 92830431A EP 92830431 A EP92830431 A EP 92830431A EP 0580926 A1 EP0580926 A1 EP 0580926A1
Authority
EP
European Patent Office
Prior art keywords
joint
excavation
members
joint members
panels
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP92830431A
Other languages
German (de)
French (fr)
Inventor
Adelchi Miatello
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ing Giovanni Rodio & C Impresa Costruzioni Speciali SpA
Original Assignee
Ing Giovanni Rodio & C Impresa Costruzioni Speciali SpA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ing Giovanni Rodio & C Impresa Costruzioni Speciali SpA filed Critical Ing Giovanni Rodio & C Impresa Costruzioni Speciali SpA
Priority to EP92830431A priority Critical patent/EP0580926A1/en
Publication of EP0580926A1 publication Critical patent/EP0580926A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/185Bulkheads or similar walls made solely of concrete in situ with flexible joint members between sections
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops

Definitions

  • the invention relates to a sealing joint which is located in buried walls formed by concrete panels and a to process for building such walls.
  • Such walls are known in the art as diaphragms and are used particularly in the operations preceding the foundation works in case there are required works to support the soil and/or for hydraulic partitions.
  • the excavation, and therefore the building of the whole wall can be carried out according to two different techniques: either through successive excavations, that is by digging a first excavation, casting the concrete thereinto, then digging a second excavation adjacent to the former one and casting the concrete thereinto and so on; or by means of alternating excavations, that is digging a first series of excavations arranged along the same direction and spaced among them, and forming in situ a series of primary or main panels therein, and then digging a second series of excavations in the intermediate sections, in which secondary or connecting panels are formed in situ.
  • sealing joints also known as water-stop devices, which are sheets (or septa) of an elastically deformable material located internally to the walls and extending for the whole height thereof and transversally to the line of junction between adjoining panels and astride this line.
  • the water-stop device is positioned transversally to the direction of water penetration, thus ensuring a hydraulic seal.
  • Such guide tube comprises a steel structure like a beam in the whole length of which there are fixed, at half of their width and perpendicularly to the "beam", a number of sheets of rubber or similar material, i.e. the above mentioned water-stop devices. After the concrete has been cast, such sheets remain half-embedded along their major axis in the so formed panel; the other half is fixed in the guide tube and is released with the removal of the guide tube, thus protruding for its whole length from the lateral face of the panel.
  • the free half is embedded into this latter and realizes a waterproof device between the two panels that seals the so obtained junction.
  • the known prior art further includes another process which is the object of DE-A-3 430 789 to ZÜBLIN.
  • connection members being provided in correspondence of the junction line between the panels and being made up by parts having circular cross sections inserted one into the other.
  • the new structure of the joint does not allow for the coesistence of a metal reinforcement that is necessary whenever panels of reinforced concrete are to be used.
  • the method uses the known self-hardening muds for coping with the problem of joining together waterproof membranes in the excavation of a plastic diaphragm.
  • the object of the present invention is to overcome the above mentioned drawbacks of the prior art by providing a joint and a process as above defined that are suitable for panels of reinforced concrete, that allow for firmly positioning the water-stop device within the concrete diaphragm and further allow for a perfectly vertical extraction of the guide tubes when these latter are provided for.
  • the invention concerns a sealing joint (or water-stop joint) between two adjoining panels in a diaphragm, with the joint being located at an intermediate position between said two panels and transversally with respect to their junction line, said joint comprising two separate members of an elastically deformable material wherein the first joint member is housed at least partially within said first panel, and the second joint member is housed at least partially within said second panel, characterized in that said joint members occupy only the outmost portion of the respective panel, that the first joint member is provided with means for being connected to a related support structure, and that the joint members have portions that are sealingly engageable with one another.
  • a further object of the present invention is a process for building two adjacent panels in a diaphragm, the panels being equipped with at least one sealing joint of the above described type, characterized in that it comprises:
  • Fig. 1 is a view of the first member 1 of a joint according to the invention and comprising a flat portion 2 and a circular hollow portion 3.
  • the circular portion 3 is interrupted by a slot 4 extending for the whole length of the joint.
  • the second member 5 of the joint has exactly the same shape of the first member and provides a hollow circular portion 3' that can be either expandable or solid and a flat portion 2' radially extending from the former one, as illustrated in Fig. 2.
  • the only differences between the two members concern the longitudinal slot and the size of the circular portion. Such differences are due to the fact that the two members of the joint 1 are to be axially connected together as illustrated in Fig. 3, with the circular portion of the second joint member received within the hollow circular portion 3 of the first one.
  • Tranverse ribs 6 are provided on the flat portions in the joint members for a better grip of the concrete.
  • Fig. 4 shows a first embodiment of a support structure of the joint.
  • the above illustrated problems of the prior art techniques are due to the necessity of removing the guide tube.
  • the problem has been solved by renouncing to the guide tube and creating a joint support means that remains fixed to the reinforcement within the concrete even after the complete setting of this latter.
  • Such joint support means comprises a series of reticular meshes or loops 7 equally spaced along the height of the joint and hinged at 8 to the reinforcement 9 of the panel 10.
  • the outer shaped portion of the first joint member is engaged by an extractable tubular member or core 13.
  • Fig. 5 shows a second embodiment of the support structure of the joint. It comprises a usual guide tube 11 having a special shape that allows to overcome the problems encountered in the prior art. More precisely it is a conventional guide tube having a different connection system with the water-stop device taking into account that the water-stop device is designed as formed by two separate members. More precisely, in the case of a water-stop device designed as the one illustrated in Fig. 3, i.e. provided with a hollow inner shaped portion 3, the guide tube provides a cylindrical "projection" or core adapted for engaging the inside of said hollow shaped portion in such a way as to be axially slidable.
  • extractable supports or cores the number of such cylindrical “projections” 13, hereinafter called extractable supports or cores, depends upon the number of water-stop devices which they are to engage with.
  • Fig. 6 illustrates the process for building two adjoining panels 10 and 12 by using the joint support structure shown in Fig. 4.
  • the first step provides for the anchoring of the first member of each water-stop device 1 to the metal reinforcement 9 of the panel through the meshes 7 (step A).
  • this step it is further provided to engage the shaped outer parts of the first joint members with extractable cores 13.
  • such reinforcement including the water-stop device, is inserted into the properly prepared excavation.
  • step B the joint can be retained from above thanks to connecting hinges 8 between the joint and the reinforcement, so as to reduce its dimensions during the step in which it is inserted into the excavation up to its disappearance in the cage size; then, when the reinforcement 9 reaches the bottom of the excavation, the joint is released until it comes into contact with the inner wall of the excavation.
  • step C the casting of the concrete is carried out and thereafter the adjoining excavation is accomplished (step D).
  • step D the inner core 13 is extracted from each first joint member 1 (step E) to allow for the insertion of the second joint member 5 (step F).
  • step G concrete is cast (step G) and after its setting, a sealing of the two joint members (step H) is accomplished by injecting an expandable material, e.g. a cement mixture or mortar, into the tubular central hollow core of the second joint member.
  • the sealing can be obtained by injecting a bonding agent into the gap separating the outer face of the second joint member from the inner face of the first joint member.
  • the second joint member can have a solid central core.
  • Fig. 7 illustrates the process for building two adjoining panels in accordance with the embodiment of joint support structure shown in fig. 5.
  • step (A) the first joint member 1 is fitted onto the shaped core projection 13 of the guide tube 11; then (step B) the whole structure is inserted into a suitably prepared excavation 10.
  • step C the guide tube can be vertically extracted (step D), of course before the concrete setting has been completed; the particular connection between the guide tube 11 and the water-stop device 1 allows the vertical extraction of the guide tube without altering the attitude of the water-stop device within the cast panel.
  • the first member 1 is then sealingly coupled to the second member 5 of the joint, in a way similar to step H of the previously disclosed process, either by deforming or bonding the inner seat. Also in this respect there applies what has been mentioned above with reference to step H of Fig. 6.
  • Fig. 8 better illustrates which portions of the water-stop device are inserted into the excavations according to whether the alternating excavation technique (8A) or the consecutive excavation technique (8B) is used. Namely in the first case each excavation and therefore each primary panel carries the first joint members at both ends, whereas the secondary panels carry second joint members at their ends.
  • each excavation carries the second joint member at the connection end with the preceding panel, and the first joint member at the end to be connected with the subsequent panel.
  • the joint support structures shown in Figures 4 and 5 respectively can be modified for carrying not a single joint but more joints so as to further improve the waterproof characteristic in some particular situation.

Abstract

A sealing joint in diaphragms formed by concrete panels cast in situ particularly useful for the preliminary operations of foundation works. The joint comprises two separate members (1) that can be sealingly coupled and occupy only the outmost portion of the associated adjoining panels (10) so that the connection members are located in correspondence of the junction surface between two adjoining panels. The first joint member is located into the excavation through a supporting and positioning structure (7). It is further disclosed a process by which said panels with such joints can be built.

Description

  • The invention relates to a sealing joint which is located in buried walls formed by concrete panels and a to process for building such walls. Such walls are known in the art as diaphragms and are used particularly in the operations preceding the foundation works in case there are required works to support the soil and/or for hydraulic partitions.
  • To prevent altering the statics of the soil, it is not possible to dig a single excavation which is as long as the wall to be built in; thus it is preferred to carry out the excavation in a number of steps and to build the wall by means of single panels having a length comprised between 2 and 6 meters, located adjacent one after the other with their minor edges in contact. Depending on the situations one can use either precast panels or panels of reinforced concrete that are built in situ by casting concrete after a reinforcement has been placed in the excavation. More precisely the excavation, and therefore the building of the whole wall can be carried out according to two different techniques: either through successive excavations, that is by digging a first excavation, casting the concrete thereinto, then digging a second excavation adjacent to the former one and casting the concrete thereinto and so on; or by means of alternating excavations, that is digging a first series of excavations arranged along the same direction and spaced among them, and forming in situ a series of primary or main panels therein, and then digging a second series of excavations in the intermediate sections, in which secondary or connecting panels are formed in situ.
  • Of course the technique of building the whole wall through a number of concrete panels requires that an appreciable continuity of the structure has to be achieved. For obtaining a perfect connection between two adjoining panels there is used a so called guide tube or forming tube which is located at the end of the excavation, in correspondence with the junction surface of the panel connection, before casting the concrete. After casting the concrete, the tube is removed, preferably before the concrete has completely set. Thus the removal of the guide tube leaves a smooth contact surface that will be the junction or connection surface of the adjoining panel. Of course, in case diaphragms are used as a protection against water infiltration, there is further to solve the problem of sealing or rendering waterproof the wall at the discontinuities, i.e. at the panel connections. In order to achieve such sealing there are used so called sealing joints, also known as water-stop devices, which are sheets (or septa) of an elastically deformable material located internally to the walls and extending for the whole height thereof and transversally to the line of junction between adjoining panels and astride this line. The water-stop device is positioned transversally to the direction of water penetration, thus ensuring a hydraulic seal.
  • However the insertion of the water-stop device in the junction zone between two adjoining panels is a delicate operation interfering with the digging operations and the casting of concrete when the panels are built in situ.
  • To solve this problem recourse is presently made to the already mentioned guide tube or shoulder-tube, positioned at the end of the excavation which, in addition to ensure the surface regularity of the junction as already pointed out, accomplishes the task of inserting and positioning the water-stop device. In some cases it has a shape such as to provide a guide surface for the bucket digging the adjoining excavation so that these latter result in being even as much as possible.
  • Nevertheless there is a serious technical problem arising from the removal of the guide tube, especially in respect of the particular type of connection that is possible with the water-stop devices actually on the market. More precisely, during the setting of the concrete there is a time interval in which the guide tube can be easily removed along a vertical direction without damaging the stability of the water-stop device within the diaphragm.
  • However this is not possible with the water-stop devices and guide tubes of conventional design due to the particular type of connection between such two members, requiring the removal of the guide tube after a lateral detachment thereof, i.e. only after the excavation for the adjoining panel has been digged. Thus the optimum curing time before the tube extraction cannot be controlled, but rather it depends on the time required for excavating the trench for the adjoining panel which time can be quite long sometimes. Therefore the concrete will be well set over the water-stop device inserted therein with a strong adherence on the guide tube that renders difficult the tube removal.
  • Presently the most widespread process for realizing a sealing joint is that known as "Bachy process" or "CWS joint".
  • In such a process the guide tube is left in place till the end of the escavation for the adjoining panel. Such guide tube comprises a steel structure like a beam in the whole length of which there are fixed, at half of their width and perpendicularly to the "beam", a number of sheets of rubber or similar material, i.e. the above mentioned water-stop devices. After the concrete has been cast, such sheets remain half-embedded along their major axis in the so formed panel; the other half is fixed in the guide tube and is released with the removal of the guide tube, thus protruding for its whole length from the lateral face of the panel.
  • When casting the secondary panel, the free half is embedded into this latter and realizes a waterproof device between the two panels that seals the so obtained junction.
  • The above illustrated "Bachy" method has the severe drawback of the guide tube being left in place until the end of the excavation for the adjoining panel, for being later extracted after a lateral detachment using the space formed by such adjoining excavation. These operations are complex to be performed, require long times and imply the risk of damaging the joint.
  • The known prior art further includes another process which is the object of DE-A-3 430 789 to ZÜBLIN.
  • This document discloses a joint with components extending for the whole length of the associated panel, the connection members being provided in correspondence of the junction line between the panels and being made up by parts having circular cross sections inserted one into the other.
  • This way the joint components form a continuous barrier, internal and parallel to the whole diaphragm. Since the joint is provided not only in proximity of the junction surfaces as in the "BACHY" process, for example, there is no longer required a supporting and positioning structure of the joint, since this latter acts as a self-supporting structure within the excavation. This way all the above illustrated problems due to the presence of the guide tube would be overcome.
  • However this method too has some disadvantages.
  • Firstly the new structure of the joint does not allow for the coesistence of a metal reinforcement that is necessary whenever panels of reinforced concrete are to be used.
  • Namely the method uses the known self-hardening muds for coping with the problem of joining together waterproof membranes in the excavation of a plastic diaphragm.
  • Moreover the the process for building the wall requires that the outermost portion of the joint lowered into a first excavation or trench be exposed to the contact with the bucket digging the adjoining trench, with the risk of breaking the joint. Finally in another step of the process it becomes quite difficult and of questionable effectiveness to carry out the full emptying of the inner connecting member immersed in a "fluid supporting the excavation". Namely the fluid pressure acting on the outer walls of the connecting members, appears such as to create infiltrations, particularly at high depths.
  • The object of the present invention is to overcome the above mentioned drawbacks of the prior art by providing a joint and a process as above defined that are suitable for panels of reinforced concrete, that allow for firmly positioning the water-stop device within the concrete diaphragm and further allow for a perfectly vertical extraction of the guide tubes when these latter are provided for.
  • More precisely the invention concerns a sealing joint (or water-stop joint) between two adjoining panels in a diaphragm, with the joint being located at an intermediate position between said two panels and transversally with respect to their junction line, said joint comprising two separate members of an elastically deformable material wherein the first joint member is housed at least partially within said first panel, and the second joint member is housed at least partially within said second panel, characterized in that said joint members occupy only the outmost portion of the respective panel, that the first joint member is provided with means for being connected to a related support structure, and that the joint members have portions that are sealingly engageable with one another.
  • A further object of the present invention is a process for building two adjacent panels in a diaphragm, the panels being equipped with at least one sealing joint of the above described type, characterized in that it comprises:
    • connecting one or more first joint members to said support structure;
    • positioning said first joint members and the respective support structure within the excavation of a first panel;
    • casting concrete or other suitable material into said excavation;
    • preparing the excavation for a second panel adjacent to the first one;
    • inserting and connecting the second joint members into the first members of each joint;
    • casting concrete or other suitable material into said second excavation; and
    • applying means adapted to realize a waterproof seal between said joint members.
  • The characteristics of the invention will be better understood from the following description relating to a non limiting example and with reference to the attached drawings in which:
    • Fig. 1 is a top view of the first member of a joint in accordance with a preferred embodiment of the invention;
    • Fig. 2 is a top view of the second member of the joint shown in Fig. 1;
    • Fig. 3 is a top view in an enlarged scale of the joint of the Figures 1 and 2;
    • Fig. 4 is a top view of a first embodiment of a joint supporting structure;
    • Fig. 5 is a top view of a second embodiment of a joint supporting structure;
    • Fig. 6 illustrates a process for building two adjoining panels using a structure such as the one shown in Fig. 4;
    • Fig. 7 illustrates a process for building two adjacent panels using a structure such as the one shown in Fig. 5; and
    • Fig. 8 is a top view of two diaphragms made according to two different techniques.
  • Fig. 1 is a view of the first member 1 of a joint according to the invention and comprising a flat portion 2 and a circular hollow portion 3. The circular portion 3 is interrupted by a slot 4 extending for the whole length of the joint.
  • The second member 5 of the joint has exactly the same shape of the first member and provides a hollow circular portion 3' that can be either expandable or solid and a flat portion 2' radially extending from the former one, as illustrated in Fig. 2. The only differences between the two members concern the longitudinal slot and the size of the circular portion. Such differences are due to the fact that the two members of the joint 1 are to be axially connected together as illustrated in Fig. 3, with the circular portion of the second joint member received within the hollow circular portion 3 of the first one.
  • Tranverse ribs 6 are provided on the flat portions in the joint members for a better grip of the concrete.
  • Fig. 4 shows a first embodiment of a support structure of the joint. The above illustrated problems of the prior art techniques are due to the necessity of removing the guide tube. According to this embodiment of the invention, the problem has been solved by renouncing to the guide tube and creating a joint support means that remains fixed to the reinforcement within the concrete even after the complete setting of this latter. Such joint support means comprises a series of reticular meshes or loops 7 equally spaced along the height of the joint and hinged at 8 to the reinforcement 9 of the panel 10. The outer shaped portion of the first joint member is engaged by an extractable tubular member or core 13.
  • Fig. 5 shows a second embodiment of the support structure of the joint. It comprises a usual guide tube 11 having a special shape that allows to overcome the problems encountered in the prior art. More precisely it is a conventional guide tube having a different connection system with the water-stop device taking into account that the water-stop device is designed as formed by two separate members. More precisely, in the case of a water-stop device designed as the one illustrated in Fig. 3, i.e. provided with a hollow inner shaped portion 3, the guide tube provides a cylindrical "projection" or core adapted for engaging the inside of said hollow shaped portion in such a way as to be axially slidable.
  • Of course the number of such cylindrical "projections" 13, hereinafter called extractable supports or cores, depends upon the number of water-stop devices which they are to engage with.
  • Fig. 6 illustrates the process for building two adjoining panels 10 and 12 by using the joint support structure shown in Fig. 4.
  • The first step provides for the anchoring of the first member of each water-stop device 1 to the metal reinforcement 9 of the panel through the meshes 7 (step A). In this step it is further provided to engage the shaped outer parts of the first joint members with extractable cores 13. Then such reinforcement, including the water-stop device, is inserted into the properly prepared excavation. As shown in step B, the joint can be retained from above thanks to connecting hinges 8 between the joint and the reinforcement, so as to reduce its dimensions during the step in which it is inserted into the excavation up to its disappearance in the cage size; then, when the reinforcement 9 reaches the bottom of the excavation, the joint is released until it comes into contact with the inner wall of the excavation. Later (step C) the casting of the concrete is carried out and thereafter the adjoining excavation is accomplished (step D). At this point the inner core 13 is extracted from each first joint member 1 (step E) to allow for the insertion of the second joint member 5 (step F). After the reinforcement 9' has been inserted into the second excavation 12 too, concrete is cast (step G) and after its setting, a sealing of the two joint members (step H) is accomplished by injecting an expandable material, e.g. a cement mixture or mortar, into the tubular central hollow core of the second joint member. As an alternative, the sealing can be obtained by injecting a bonding agent into the gap separating the outer face of the second joint member from the inner face of the first joint member. In this case the second joint member can have a solid central core.
  • Fig. 7 illustrates the process for building two adjoining panels in accordance with the embodiment of joint support structure shown in fig. 5.
  • In the first step (A) the first joint member 1 is fitted onto the shaped core projection 13 of the guide tube 11; then (step B) the whole structure is inserted into a suitably prepared excavation 10. After the casting step (step C), the guide tube can be vertically extracted (step D), of course before the concrete setting has been completed; the particular connection between the guide tube 11 and the water-stop device 1 allows the vertical extraction of the guide tube without altering the attitude of the water-stop device within the cast panel.
  • Unavoidably the vertical extraction of the guide tube releases also the circular hollow portion 3 of the first joint member; this requires that an extractable core 13' is inserted into the outer shaped portion (step E) to prevent that during the excavation of the adjoining panel (step F) debris can obstruct the cavity of the first joint member. Then the second joint member 5 will be inserted into such cavity (step H) after that said extractable core 13' has been removed (step G). After the introduction of the second joint member, the reinforcement 9' is lowered into the second excavation 12 (step I) and concrete is cast (step L).
  • The first member 1 is then sealingly coupled to the second member 5 of the joint, in a way similar to step H of the previously disclosed process, either by deforming or bonding the inner seat. Also in this respect there applies what has been mentioned above with reference to step H of Fig. 6.
  • Fig. 8 better illustrates which portions of the water-stop device are inserted into the excavations according to whether the alternating excavation technique (8A) or the consecutive excavation technique (8B) is used. Namely in the first case each excavation and therefore each primary panel carries the first joint members at both ends, whereas the secondary panels carry second joint members at their ends.
  • In the second case each excavation carries the second joint member at the connection end with the preceding panel, and the first joint member at the end to be connected with the subsequent panel.
  • It is clear that suitable modifications, additions or replacements of some components with other accomplishing an equivalent function are possible in the above described embodiments without departing from the scope of the invention.
  • As an example, the joint support structures shown in Figures 4 and 5 respectively, can be modified for carrying not a single joint but more joints so as to further improve the waterproof characteristic in some particular situation.

Claims (13)

  1. A sealing joint between two adjoining panels in a diaphragm, with the joint being located at an intermediate position between said two panels and transversally with respect to their junction line, said joint comprising two separate members of an elastically deformable material wherein the first joint member is housed at least partially within said first panel, and the second joint member is housed at least partially within said second panel, characterized in that said joint members occupy only the outmost portion of the respective panels, that the first joint member is provided with means for being connected to a respective support structure, and that the joint members have portions that are sealingly engageable with each other.
  2. A sealing joint as claimed in claim 1, wherein both said joint members are formed by a first longitudinal portion and a second connecting portion with the other member, characterized in that each of said connecting portions of the first and second joint members comprises complementarily shaped parts that are engageable together.
  3. A sealing joint as claimed in claim 2, wherein the shaped parts have substantially circular configurations and sizes such as to be insertable one into the other, the outer shaped part having at least one slot for the passage of the longitudinal portion connected to the inner shaped part which is closed, characterized in that the inner shaped part is either hollow or solid.
  4. A process for building two adjacent panels in a diaphragm, the panels being equipped with at least one sealing joint according to one of the preceding claims, characterized in that it comprises:
    - connecting one or more first joint members to said support structure;
    - positioning said first joint members and the respective support structure within the excavation of a first panel;
    - casting concrete or other suitable material into said excavation;
    - preparing the excavation for a second panel adjacent to the first one;
    - inserting and connecting the second joint members into the first members of each joint;
    - casting concrete or other suitable material into said second excavation; and
    - applying means adapted to perform a waterproof seal between said joint members.
  5. A process as claimed in claim 4, characterized in that it further comprises the additional steps of: inserting an extractable inner core into the outer shaped part of the first joint members before preparing the second excavation; and extracting said core(s) before inserting and connecting the second joint members.
  6. A process as claimed in claim 4, characterized in that the step of performing a seal between the joint members comprises the introduction of an expanding material into the inner hollow shaped part of the second joint members.
  7. A process as claimed in claim 6, characterized in that said expanding material is a cement mixture or mortar.
  8. A process as claimed in claim 4, characterized in that the step of performing a seal between the joint members comprises applying an adhesive agent in the interface between the inner and outer shaped parts of the members of each joint.
  9. A process as claimed in claim 4, characterized in that said support structure has an end connected with one or more first joint members and can swing within the excavation, in that said structure is retained in a position in which said first joint members are kept far from the excavation wall, and in that the structure is released until the joint members contact said wall at the end of the insertion into the excavation.
  10. A process as claimed in claim 4, for building adjoining panels, characterized in that said support structure, at one end of which one or more first joint members are connected, is inserted as a rigid block into the excavation, and in that after said casting concrete step into said first excavation, the structure is extracted along a substantially vertical direction, together with one or more extractable supports or cores belonging to it.
  11. A support structure for a joint according to one or more of claims 1 to 3 for carrying out the process according to claim 9, characterized in that it comprises a plurality of meshes hinged to the metal reinforcement of said first panel, to which meshes one or more first joint members are connected.
  12. A support structure for a joint according to one or more of claims 1 to 3 for carrying out the process according to claim 10, characterized in that it comprises a guide tube to which one or more extractable supports or cores are connected, said supports or cores being inserted into the outer shaped part of each of said first joint members.
  13. A waterproof diaphragm wall formed by a plurality of adjoining panels, characterized in that it is built by means of a process according to any of claims 4 to 10 and using the sealing joints according to one or more of claims 1 to 3.
EP92830431A 1992-07-31 1992-07-31 Sealing joint in diaphragms formed by concrete panels cast in situ and a process for building said diaphragms Withdrawn EP0580926A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP92830431A EP0580926A1 (en) 1992-07-31 1992-07-31 Sealing joint in diaphragms formed by concrete panels cast in situ and a process for building said diaphragms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP92830431A EP0580926A1 (en) 1992-07-31 1992-07-31 Sealing joint in diaphragms formed by concrete panels cast in situ and a process for building said diaphragms

Publications (1)

Publication Number Publication Date
EP0580926A1 true EP0580926A1 (en) 1994-02-02

Family

ID=8212153

Family Applications (1)

Application Number Title Priority Date Filing Date
EP92830431A Withdrawn EP0580926A1 (en) 1992-07-31 1992-07-31 Sealing joint in diaphragms formed by concrete panels cast in situ and a process for building said diaphragms

Country Status (1)

Country Link
EP (1) EP0580926A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997040233A1 (en) * 1996-04-19 1997-10-30 Compagnie Du Sol Continuously reinforced diaphragm wall, method of construction and formwork therefor
GB2325262A (en) * 1997-05-12 1998-11-18 Kvaerner Cementation Found Ltd Hydrophilic waterbar for diaphragm wall joints
EP1803853A1 (en) * 2006-01-03 2007-07-04 Eurogeo srl Method for creation underground diaphragm walls carried out with control and adjustment of the vertical positions and diaphragm wall so manufactured
WO2013007968A2 (en) 2011-07-14 2013-01-17 Coupland John William Diaphragm wall apparatus and methods
EP3006626A1 (en) * 2014-10-08 2016-04-13 I.CO.P Spa Stop-end pipe for the construction of concrete diaphragm walls
CN110055952A (en) * 2019-03-14 2019-07-26 姚燕明 A kind of underground continuous wall connector structure and its construction method
US10988911B2 (en) 2017-04-26 2021-04-27 Ccmj Systems Ltd Diaphragm walls
US11225769B2 (en) 2018-02-15 2022-01-18 Ccmj Systems Ltd Shear key former apparatus and method(s)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2349102A1 (en) * 1973-09-29 1975-04-24 Goodrich Europ Jointing strip and location for concrete constructions - consists of two sections with profiled ends and anchoring projection
FR2517717A1 (en) * 1981-12-09 1983-06-10 Soletanche Reinforcing framework for cast underground panel - has end members which cooperate with framework of adjacent panel section
DE3404074A1 (en) * 1984-02-06 1985-08-08 Dyckerhoff & Widmann AG, 8000 München Method of making a concrete trench wall
DE3430789A1 (en) * 1984-08-22 1986-03-06 Ed. Züblin AG, 7000 Stuttgart Method of placing and connecting diaphragms in trench walls and apparatus for carrying out the method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2349102A1 (en) * 1973-09-29 1975-04-24 Goodrich Europ Jointing strip and location for concrete constructions - consists of two sections with profiled ends and anchoring projection
FR2517717A1 (en) * 1981-12-09 1983-06-10 Soletanche Reinforcing framework for cast underground panel - has end members which cooperate with framework of adjacent panel section
DE3404074A1 (en) * 1984-02-06 1985-08-08 Dyckerhoff & Widmann AG, 8000 München Method of making a concrete trench wall
DE3430789A1 (en) * 1984-08-22 1986-03-06 Ed. Züblin AG, 7000 Stuttgart Method of placing and connecting diaphragms in trench walls and apparatus for carrying out the method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997040233A1 (en) * 1996-04-19 1997-10-30 Compagnie Du Sol Continuously reinforced diaphragm wall, method of construction and formwork therefor
US6052963A (en) * 1996-04-19 2000-04-25 Compagnie Du Sol Continuously reinforced diaphragm wall, method of construction and formwork therefor
GB2325262A (en) * 1997-05-12 1998-11-18 Kvaerner Cementation Found Ltd Hydrophilic waterbar for diaphragm wall joints
WO1998051867A1 (en) * 1997-05-12 1998-11-19 Kvaerner Cementation Foundations Limited Hydrophilic waterbar for diaphragm wall joints
GB2325262B (en) * 1997-05-12 2001-05-02 Kvaerner Cementation Found Ltd Hydrophilic waterbar for diaphragm wall joints
US6276106B1 (en) 1997-05-12 2001-08-21 Kvaerner Cementation Fondations Limited Hydrophilic waterbar for diaphragm wall joints
EP1803853A1 (en) * 2006-01-03 2007-07-04 Eurogeo srl Method for creation underground diaphragm walls carried out with control and adjustment of the vertical positions and diaphragm wall so manufactured
WO2013007968A2 (en) 2011-07-14 2013-01-17 Coupland John William Diaphragm wall apparatus and methods
US9371623B2 (en) 2011-07-14 2016-06-21 Ccmj Systems Ltd Diaphragm wall apparatus and methods
EP3006626A1 (en) * 2014-10-08 2016-04-13 I.CO.P Spa Stop-end pipe for the construction of concrete diaphragm walls
US10988911B2 (en) 2017-04-26 2021-04-27 Ccmj Systems Ltd Diaphragm walls
US11225769B2 (en) 2018-02-15 2022-01-18 Ccmj Systems Ltd Shear key former apparatus and method(s)
CN110055952A (en) * 2019-03-14 2019-07-26 姚燕明 A kind of underground continuous wall connector structure and its construction method

Similar Documents

Publication Publication Date Title
US4005582A (en) Method of constructing underground concrete walls and reinforcement cage therefor
US4582453A (en) Method and apparatus for in situ forming underground panelized concrete walls with improved joint structure
EP0580926A1 (en) Sealing joint in diaphragms formed by concrete panels cast in situ and a process for building said diaphragms
GB2264739A (en) Diaphragm wall with liquid tight joints
EP0981672B1 (en) Hydrophilic waterbar for diaphragm wall joints
US6164873A (en) Double-wing deformable stop-end pipe for forming the joining surfaces of concrete-cast wall elements
JPH04357293A (en) Flexible pipe and executing method thereof
JP3194192B2 (en) Open shield method
CN106284303A (en) Prefabricated ground-connecting-wall that a kind of band angle steel joint is spacing and construction method thereof
JPH05132941A (en) Open shield method and concrete segment used therefor
JPH09158174A (en) Water stopping mechanism and method between case bodies of underground continuous wall
EP0393032A1 (en) Reinforcement for continuously-cast concrete walls
CN109763518A (en) A kind of construction method of basement post-pouring zone
JPS6117696A (en) Construction of underground head
JP2565452B2 (en) Construction method of self-supporting retaining wall
CN216238557U (en) Foundation pit supporting structure of steel pipe pile and concrete prefabricated section
JPS6248011B2 (en)
EP0736665A2 (en) Construction of holes and tunnels having support walls
JP3509066B2 (en) Pipe burial method
JPH07127051A (en) Construction and erecting method for reinforcement cage for continuous underground wall execution
JPS61196016A (en) Joining method for cut-off sheet
JPS61257529A (en) Underground continuous wall construction work
CN117344789A (en) Construction method of tunnel on artificial island and modularized tunnel structure
JPH07100937B2 (en) Construction method of joint part in continuous underground wall method
JPH0641952A (en) Construction method for continuous underground wall

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE GB LI NL

17P Request for examination filed

Effective date: 19940727

17Q First examination report despatched

Effective date: 19960311

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19960723