EP0475074B2 - Procedure for the installation of the landing doors of an elevator - Google Patents
Procedure for the installation of the landing doors of an elevator Download PDFInfo
- Publication number
- EP0475074B2 EP0475074B2 EP19910113219 EP91113219A EP0475074B2 EP 0475074 B2 EP0475074 B2 EP 0475074B2 EP 19910113219 EP19910113219 EP 19910113219 EP 91113219 A EP91113219 A EP 91113219A EP 0475074 B2 EP0475074 B2 EP 0475074B2
- Authority
- EP
- European Patent Office
- Prior art keywords
- modules
- door
- mounting elements
- elevator
- shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims description 16
- 238000009434 installation Methods 0.000 title claims description 14
- 230000003287 optical effect Effects 0.000 claims description 3
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B13/00—Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
- B66B13/30—Constructional features of doors or gates
- B66B13/303—Details of door panels
Definitions
- the present invention relates to a procedure for the installation of the landing doors of an elevator, as defined in the introductory part of claim 1.
- parts of the building can be taken into use before all the floors and e.g. the elevator system have been completed.
- the elevator landings On the floors in use, the elevator landings must be finished or at least the elevator shaft must be closed. In normal practice, the elevator landings can only be finished after completion of the elevator installation, which means that often the finished floors cannot be taken into use before the elevator installation has been completed. Shutting off the elevator spaces by temporary arrangements results in additional work and therefore additional costs.
- the elevator doors are installed at an early stage of the building project.
- the doors are mounted from the landing with the aid of plumb lines placed in the elevator shaft.
- the plumb lines are suspended on a console, from which they hang at appropriate distances from each other. Since the plumb lines in this procedure run across the door opening, the doors must be installed from the landing and have to be transported to the landings. The positioning of the doors and the associated adjustments are difficult to carry out because weighty modules have to be moved about.
- US-A-3,601,938 discloses a device for aligning door structures in an elevator after the elevator cabin has been installed in the elevator shaft.
- an auxiliary device is used which comprises a pivotable lever.
- the elevator cabin is stopped at each floor and the lever is turned to the top of the floor, the lever comprising several holes which designate bore holes to be made in the floor for the installation of door modules.
- the bore holes for door modules can be aligned after the cabin has been installed.
- this device requires that the elevator cabin is installed before-hand.
- this device leads not in any cases to satisfactory results, namely if the production tolerance of the mounting elements is very large or if mounting elements from different producers are used. Further inaccuracies may result from tensions in the floor and wall structures of the building which may be caused by a different water content of wall and floor structures of the building and not finished chemical reactions in the concrete of these parts.
- the object of the present invention is to achieve a simple and advantageous door installation procedure which allows the drawbacks of previous techniques to be avoided and permits quick, accurate and reliable installation of the doors.
- door modules instead of complete door modules, only the mounting elements of the door modules are installed at the first stage.
- the door modules manufactured to precise dimensions, are attached to these mounting elements as part of the normal installation routine. This makes it possible to avoid moving the heavy and unwieldy door modules.
- the door modules are out of the way, and when the doors are to be installed, the plumb lines and equivalent can be removed from the door line.
- the modules can also be easily transported via the shaft to the landings.
- the door installation work can be carried out quickly and will thus not cause prolonged disturbances in the rest of the building project.
- the door modules are so designed that they come end to end against each other when mounted in place, they form a continuous door line which is safe in respect of fire resistance.
- Fig. 1 presents a door module 1 which can be used in the installation procedure of the invention.
- the module preferably comprises the whole front wall of the elevator shaft between two floors, consisting of a frame, wall parts, doors, control panels.
- the module is manufactured to precise dimensions and is completely finished before it is brought to the shaft. It is protected with a suitable covering during transportation and building.
- the door module may also consist of the door framework only, allowing the door itself to be mounted later.
- the door module 1 is provided with holders 2 which extend in the vertical direction outside the module and are designed to be fitted into corresponding holes 14 in the adjacent door module or supporting element. According to the invention, the module is provided with lugs 3 designed to be connected to mounting elements attached to the landing structures.
- a door module comprises at least two lugs and corresponding mounting elements at the same horizontal level.
- a module may also be provided with lugs at several horizontal levels.
- a fixing base 4 for the plumb-lines 6 is mounted in the top part of the elevator shaft 10 or in a space above it, e.g. the machine room, while another fixing base 5 is mounted at the bottom of the shaft.
- the fixing bases can be placed at any level in the elevator shaft as required by the alignment operations to be performed.
- Fig. 3 shows how the fixing base is placed in the shaft as seen from above.
- plumb-lines it is also possible to use e.g. optical means of alignment. Laser sounders are commercially available.
- the positions of the mounting elements 8 on the landings 7 are determined by means of plumb lines and in accordance with the dimensions of the module. To align the mounting elements, a gauge of a suitable form is used to determine the distance between the element and the plumb line. Once the mounting element has been positioned at exactly the right place, it is permanently and reliably secured on the landing structures.
- a suitable landing structure is a load-bearing structure on top of which the actual floor is to be built. The mounting element can be secured on the cover of the structure or other suitable places.
- Fig. 4 presents a more detailed view of a mounting element designed for use in the present invention.
- the element consists of a frame part 21 which is secured on the landing structures or walls of the building.
- the frame part is provided with a slot 23 permitting the part to be moved mainly in a direction perpendicular to the door as indicated by arrows A-A.
- the frame part can be secured by means of bolts or equivalent going through the slot.
- the frame part is connected to an intermediate part 22 which is movable relative to the frame part and whose position can be adjusted mainly in the horizontal plane by moving it in a direction B-B perpendicular to the direction of adjustment of the frame part.
- a bearing element 24 Connected to the intermediate part is a bearing element 24 which is used for vertical adjustment of the position of the door module attached to the mounting element as indicated by arrows C-C.
- the mounting element is provided with the necessary tightening means with which the bearing element to be connected to the door module can be secured in the appropriate position.
- the mounting element may consist of any corresponding element permitting of the required adjustments.
- Fig. 5 illustrates the manner in which the door modules are installed.
- the plumb-line fixing base may also be ready in place for the subsequent stages of the elevator installation procedure. It can be used e.g. for the positioning of the guide rails.
- the plumb-lines have been moved aside or removed for the time required by the installation of the door modules.
- the supporting element 12 is provided with a holder 13 which fits into a corresponding hole 14 in the lower edge of the door module.
- the door module 1 manufactured to precise dimensions, is lifted onto the supporting element by means of a hoisting apparatus and attached to the mounting element so that it comes exactly to the right position.
- the door modules can be brought into the elevator shaft either via the lowest landing or by means of a crane directly into the shaft.
- the mounting elements permit later fine adjustment if necessary.
- Fig. 6 illustrates an alternative way of installing the door module.
- the supporting element 15 is mounted in the upper part of the shaft and the door modules are fixed to the mounting elements starting from the top. This is the best alternative in cases where all the door modules are installed at the same time in the whole building. In this case, too, the door modules can be brought to place via different routes.
Landscapes
- Elevator Door Apparatuses (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Description
- The present invention relates to a procedure for the installation of the landing doors of an elevator, as defined in the introductory part of
claim 1. - In some building projects, parts of the building can be taken into use before all the floors and e.g. the elevator system have been completed. On the floors in use, the elevator landings must be finished or at least the elevator shaft must be closed. In normal practice, the elevator landings can only be finished after completion of the elevator installation, which means that often the finished floors cannot be taken into use before the elevator installation has been completed. Shutting off the elevator spaces by temporary arrangements results in additional work and therefore additional costs.
- In previously known techniques (patent application FI 873385, of 4.8.1987), the elevator doors are installed at an early stage of the building project. According to the application referred to, the doors are mounted from the landing with the aid of plumb lines placed in the elevator shaft. The plumb lines are suspended on a console, from which they hang at appropriate distances from each other. Since the plumb lines in this procedure run across the door opening, the doors must be installed from the landing and have to be transported to the landings. The positioning of the doors and the associated adjustments are difficult to carry out because weighty modules have to be moved about.
- US-A-3,601,938 discloses a device for aligning door structures in an elevator after the elevator cabin has been installed in the elevator shaft. Connected to the elevator cabin an auxiliary device is used which comprises a pivotable lever. The elevator cabin is stopped at each floor and the lever is turned to the top of the floor, the lever comprising several holes which designate bore holes to be made in the floor for the installation of door modules. By this device the bore holes for door modules can be aligned after the cabin has been installed. However, on one hand this device requires that the elevator cabin is installed before-hand. On the other hand, this device leads not in any cases to satisfactory results, namely if the production tolerance of the mounting elements is very large or if mounting elements from different producers are used. Further inaccuracies may result from tensions in the floor and wall structures of the building which may be caused by a different water content of wall and floor structures of the building and not finished chemical reactions in the concrete of these parts.
- From the Instruction Manual "Design SC" of the Company Roux Combaluzier Schindler it is known to install landing doors of an elevator on mounting elements which have been previously mounted at the landings.
- The object of the present invention is to achieve a simple and advantageous door installation procedure which allows the drawbacks of previous techniques to be avoided and permits quick, accurate and reliable installation of the doors.
- The features characteristic of the invention are as presented in
claim 1. - Instead of complete door modules, only the mounting elements of the door modules are installed at the first stage. The door modules, manufactured to precise dimensions, are attached to these mounting elements as part of the normal installation routine. This makes it possible to avoid moving the heavy and unwieldy door modules. During the alignment stage, the door modules are out of the way, and when the doors are to be installed, the plumb lines and equivalent can be removed from the door line. The modules can also be easily transported via the shaft to the landings.
- The door installation work can be carried out quickly and will thus not cause prolonged disturbances in the rest of the building project. As the door modules are so designed that they come end to end against each other when mounted in place, they form a continuous door line which is safe in respect of fire resistance.
- In the following, the invention is described in detail by referring to the drawings attached, in which
- Fig. 1 presents a door module which can be used in the procedure of the invention.
- Fig. 2 presents an elevator shaft in which the door modules are to be mounted,
- Fig. 3 shows how the plumb-line fixing base is placed in the elevator shaft as seen from above,
- Fig. 4 presents a mounting element usable in the procedure of the invention,
- Fig. 5 illustrates the installation of the door modules, and
- Fig. 6 shows another way of installing the door module.
-
- Fig. 1 presents a
door module 1 which can be used in the installation procedure of the invention. The module preferably comprises the whole front wall of the elevator shaft between two floors, consisting of a frame, wall parts, doors, control panels. The module is manufactured to precise dimensions and is completely finished before it is brought to the shaft. It is protected with a suitable covering during transportation and building. The door module may also consist of the door framework only, allowing the door itself to be mounted later. - The
door module 1 is provided withholders 2 which extend in the vertical direction outside the module and are designed to be fitted intocorresponding holes 14 in the adjacent door module or supporting element. According to the invention, the module is provided withlugs 3 designed to be connected to mounting elements attached to the landing structures. A door module comprises at least two lugs and corresponding mounting elements at the same horizontal level. A module may also be provided with lugs at several horizontal levels. - As shown in Fig. 2, a
fixing base 4 for the plumb-lines 6 is mounted in the top part of theelevator shaft 10 or in a space above it, e.g. the machine room, while anotherfixing base 5 is mounted at the bottom of the shaft. The fixing bases can be placed at any level in the elevator shaft as required by the alignment operations to be performed. Fig. 3 shows how the fixing base is placed in the shaft as seen from above. Instead of plumb-lines, it is also possible to use e.g. optical means of alignment. Laser sounders are commercially available. - The positions of the
mounting elements 8 on thelandings 7 are determined by means of plumb lines and in accordance with the dimensions of the module. To align the mounting elements, a gauge of a suitable form is used to determine the distance between the element and the plumb line. Once the mounting element has been positioned at exactly the right place, it is permanently and reliably secured on the landing structures. A suitable landing structure is a load-bearing structure on top of which the actual floor is to be built. The mounting element can be secured on the cover of the structure or other suitable places. - Fig. 4 presents a more detailed view of a mounting element designed for use in the present invention. The element consists of a
frame part 21 which is secured on the landing structures or walls of the building. The frame part is provided with aslot 23 permitting the part to be moved mainly in a direction perpendicular to the door as indicated by arrows A-A. The frame part can be secured by means of bolts or equivalent going through the slot. The frame part is connected to anintermediate part 22 which is movable relative to the frame part and whose position can be adjusted mainly in the horizontal plane by moving it in a direction B-B perpendicular to the direction of adjustment of the frame part. Connected to the intermediate part is abearing element 24 which is used for vertical adjustment of the position of the door module attached to the mounting element as indicated by arrows C-C. The mounting element is provided with the necessary tightening means with which the bearing element to be connected to the door module can be secured in the appropriate position. In principle, the mounting element may consist of any corresponding element permitting of the required adjustments. - Fig. 5 illustrates the manner in which the door modules are installed. At this stage of the procedure, the
mounting elements 8 have already been installed on the landings. The plumb-line fixing base may also be ready in place for the subsequent stages of the elevator installation procedure. It can be used e.g. for the positioning of the guide rails. The plumb-lines have been moved aside or removed for the time required by the installation of the door modules. Mounted in the lower part of the shaft, below the lowest landing, is a supportingelement 12, which is attached in the same way as the door modules to mounting elements or to the shaft wall. The supportingelement 12 is provided with aholder 13 which fits into a correspondinghole 14 in the lower edge of the door module. Thedoor module 1, manufactured to precise dimensions, is lifted onto the supporting element by means of a hoisting apparatus and attached to the mounting element so that it comes exactly to the right position. The door modules can be brought into the elevator shaft either via the lowest landing or by means of a crane directly into the shaft. The mounting elements permit later fine adjustment if necessary. - Fig. 6 illustrates an alternative way of installing the door module. In this case, the supporting
element 15 is mounted in the upper part of the shaft and the door modules are fixed to the mounting elements starting from the top. This is the best alternative in cases where all the door modules are installed at the same time in the whole building. In this case, too, the door modules can be brought to place via different routes. - In the above, the invention has been described in detail. The presentation is not to be regarded as limiting the invention, but the sphere of protection of the invention is determined in the way defined by the claims. For example, the procedure of the invention can be used at a later stage of construction, although in that case it is not possible to make full use of all the advantages provided by it.
Claims (7)
- Procedure for the installation of the landing doors of an elevator, wherein aligning means are used, comprising at least one plumb line and/or optical means being fixed to the elevator shaft structure, and wherein the alignment is performed using an auxiliary device for determining a distance from the position indicated by the aligning means (6),
characterized in that
mounting elements (8) for door modules (1) are aligned by the use of the aligning means (4-6) and the auxiliary device, which mounting elements (8) are secured to landing structures (7) before the door modules (1) are fixed to the mounting elements (8), and thata) below the lowest floor a supporting element (12) for the door module is provided, that the module (1) of the lowest floor is attached with its lower part to said supporting element (12) and that the other modules (1) are attached with their lower part to an adjacent lower door module (1) and that all modules are fixed with their upper part to one of said mounting elements (8), orb) in the upper part of the shaft a supporting element (15) for the door module is provided, and that the uppermost module (1) is attached with its upper part to said supporting element (15) and that the other modules (1) are attached with their upper part to an adjacent upper door module (1) and that all modules are fixed with their lower part to one of said mounting elements (8). - Procedure according to claim 1, characterized in that the final position of the door module (1) is fine-adjusted by means of the mounting elements (8) if necessary.
- Procedure according to claim 1 or 2, characterized in that mutually corresponding mounting elements (8) placed at different levels are mutually aligned.
- Procedure according to any one of claims 1 - 3, characterized in that the modules (1) are brought into the shaft (10) via the lowest landing and lifted into place by means of a hoisting apparatus (17).
- Procedure according to any one of claims 1 - 3, characterized in that the modules (1) are brought into the shaft via the top opening, in which case they can be moved directly to their proper places with a hoisting apparatus (17).
- Procedure according to one of the preceding claims,
characterized in
that the plumb-line (6) is attached to fixing bases (4, 5) in the lower part of the elevator shaft and above the level at which the door module is being installed. - Procedure according to one of the preceding claims,
characterized in
that the optical device is placed in the lower part of the shaft.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI904554A FI86625C (en) | 1990-09-14 | 1990-09-14 | Procedure for the installation of floor plan doors for elevator |
FI904554 | 1990-09-14 |
Publications (3)
Publication Number | Publication Date |
---|---|
EP0475074A1 EP0475074A1 (en) | 1992-03-18 |
EP0475074B1 EP0475074B1 (en) | 1996-05-01 |
EP0475074B2 true EP0475074B2 (en) | 2000-01-12 |
Family
ID=8531072
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19910113219 Expired - Lifetime EP0475074B2 (en) | 1990-09-14 | 1991-08-06 | Procedure for the installation of the landing doors of an elevator |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP0475074B2 (en) |
DE (1) | DE69119167T3 (en) |
ES (1) | ES2086441T5 (en) |
FI (1) | FI86625C (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0606508B1 (en) * | 1993-01-14 | 1999-04-07 | Inventio Ag | Method and apparatus for elevator hoistway door installation |
WO2000032509A1 (en) | 1998-11-13 | 2000-06-08 | Kone Corporation | Elevator landing door structure |
JP2001058783A (en) * | 1999-07-12 | 2001-03-06 | Inventio Ag | Elevator facility with elevator shaft door |
EP3759041B1 (en) * | 2018-02-28 | 2024-10-16 | KONE Corporation | Elevator landing door assembly and its installation method |
DE102019212052A1 (en) * | 2019-08-12 | 2021-02-18 | Thyssenkrupp Elevator Innovation And Operations Ag | Elevator system with offset compensation element and method for modernizing an elevator system |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3741351A (en) * | 1971-03-05 | 1973-06-26 | Westinghouse Electric Corp | Integrated elevator construction |
US3771268A (en) * | 1972-08-30 | 1973-11-13 | C Loomis | Pre-assembled unitarily-insertable hanger-attached elevator shaft entrance construction |
US4099599A (en) * | 1977-02-01 | 1978-07-11 | Westinghouse Electric Corp. | Method and apparatus for fastening a door panel to a door operator mounted on an elevator car |
FR2603876B1 (en) * | 1986-09-11 | 1991-01-18 | Otis Elevator Co | PROCESS FOR THE INSTALLATION OF ELEVATOR DOORS |
-
1990
- 1990-09-14 FI FI904554A patent/FI86625C/en not_active IP Right Cessation
-
1991
- 1991-08-06 ES ES91113219T patent/ES2086441T5/en not_active Expired - Lifetime
- 1991-08-06 DE DE1991619167 patent/DE69119167T3/en not_active Expired - Lifetime
- 1991-08-06 EP EP19910113219 patent/EP0475074B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
EP0475074B1 (en) | 1996-05-01 |
DE69119167T3 (en) | 2001-02-08 |
FI904554A (en) | 1992-03-15 |
FI86625B (en) | 1992-06-15 |
DE69119167T2 (en) | 1996-10-02 |
FI904554A0 (en) | 1990-09-14 |
ES2086441T3 (en) | 1996-07-01 |
FI86625C (en) | 1992-09-25 |
DE69119167D1 (en) | 1996-06-05 |
EP0475074A1 (en) | 1992-03-18 |
ES2086441T5 (en) | 2000-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7559409B2 (en) | Procedure and apparatus for the installation of an elevator | |
CN1102909C (en) | Procedure and apparatus for installation of an elevator | |
CN1033571C (en) | Elevator hoistway working platform | |
EP3766820B1 (en) | A method and an arrangement for elevator guide rail installation | |
US4819403A (en) | Method for installing elevator doors | |
US20060054419A1 (en) | Elevator entrance sill structure and installation method | |
AU2009335005B2 (en) | Elevator hoistway installation guide systems, methods and templates | |
EP0475074B2 (en) | Procedure for the installation of the landing doors of an elevator | |
CN111232808A (en) | Transverse installation method of prefabricated modular elevator | |
EP0646537B1 (en) | Procedure for installing an elevator machine room | |
JP2001322776A (en) | Template for centering guide rail of elevator and method of centering guide rail of elevator | |
JPH08133623A (en) | Template device, main ruler member and plumb line fixture for elevator installation | |
JPH06293481A (en) | Construction method for centering lower part for installing elevator | |
JP2625309B2 (en) | Unit building | |
JPH05186160A (en) | Elevator centering device | |
JPH073142B2 (en) | Elevator hall entrance / exit device | |
JP2003252547A (en) | Measurement apparatus for elevator shaft | |
JPH05147859A (en) | Centering device for elevator erection | |
JPH0672660A (en) | Construction method for installing elevator | |
JPH0470233B2 (en) | ||
JPH05155572A (en) | Installation of elevator hanger case | |
JPH0229590B2 (en) | ||
JPH01176794A (en) | Assembling device for entrance parts of lift |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE ES FR GB IT SE |
|
17P | Request for examination filed |
Effective date: 19920914 |
|
17Q | First examination report despatched |
Effective date: 19940218 |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE ES FR GB IT SE |
|
REF | Corresponds to: |
Ref document number: 69119167 Country of ref document: DE Date of ref document: 19960605 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2086441 Country of ref document: ES Kind code of ref document: T3 |
|
ITF | It: translation for a ep patent filed | ||
ET | Fr: translation filed | ||
PLAV | Examination of admissibility of opposition |
Free format text: ORIGINAL CODE: EPIDOS OPEX |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
PLAV | Examination of admissibility of opposition |
Free format text: ORIGINAL CODE: EPIDOS OPEX |
|
PLBF | Reply of patent proprietor to notice(s) of opposition |
Free format text: ORIGINAL CODE: EPIDOS OBSO |
|
26 | Opposition filed |
Opponent name: INVENTIO AG Effective date: 19970129 |
|
PLBF | Reply of patent proprietor to notice(s) of opposition |
Free format text: ORIGINAL CODE: EPIDOS OBSO |
|
PLAW | Interlocutory decision in opposition |
Free format text: ORIGINAL CODE: EPIDOS IDOP |
|
PLAW | Interlocutory decision in opposition |
Free format text: ORIGINAL CODE: EPIDOS IDOP |
|
PUAH | Patent maintained in amended form |
Free format text: ORIGINAL CODE: 0009272 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: PATENT MAINTAINED AS AMENDED |
|
27A | Patent maintained in amended form |
Effective date: 20000112 |
|
AK | Designated contracting states |
Kind code of ref document: B2 Designated state(s): DE ES FR GB IT SE |
|
ET3 | Fr: translation filed ** decision concerning opposition | ||
REG | Reference to a national code |
Ref country code: ES Ref legal event code: DC2A Kind code of ref document: T5 Effective date: 20000223 |
|
ITF | It: translation for a ep patent filed | ||
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: CA Ref country code: FR Ref legal event code: TP |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20040719 Year of fee payment: 14 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050807 |
|
EUG | Se: european patent has lapsed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20100823 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20100826 Year of fee payment: 20 Ref country code: FR Payment date: 20100901 Year of fee payment: 20 Ref country code: DE Payment date: 20100823 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20100819 Year of fee payment: 20 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R071 Ref document number: 69119167 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R071 Ref document number: 69119167 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: PE20 Expiry date: 20110805 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20110805 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20110807 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20130725 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20110807 |