- EP0471798A1 EP0471798A1 EP90911041A EP90911041A EP0471798A1 EP 0471798 A1 EP0471798 A1 EP 0471798A1 EP 90911041 A EP90911041 A EP 90911041A EP 90911041 A EP90911041 A EP 90911041A EP 0471798 A1 EP0471798 A1 EP 0471798A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- crucible
- nozzle
- orifice
- interior
- alloy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/06—Continuous casting of metals, i.e. casting in indefinite lengths into moulds with travelling walls, e.g. with rolls, plates, belts, caterpillars
- B22D11/0637—Accessories therefor
- B22D11/064—Accessories therefor for supplying molten metal
Definitions
- This invention relates to a method and apparatus for rapid solidification of reactive metals and metal alloys; and more particularly, to an induction skull melting system having a nozzle through which a molten metal stream
- Rapid solidification has become an important process j L5 for production of new materials. Properties of materials produced by rapid solidification frequently exceed those of similar materials processed at slower solidification rates. The rapid solidification of materials has enhanced physical, mechanical and corrosion properties of a variety Q of alloy systems.
- Rapid solidification processes that have been developed for producing material in quantities sufficient for practical application can be broadly classified in two categories, i.e. atomization and melt spinning.
- 5 atomization processes a stream of molten metal is broken into fine droplets which cool quickly and solidify as fine powders suitable for subsequent consolidation into bulk shapes.
- Melt spinning processes which comprise chill block melt spinning and planar flow casting involve 0 directing a stream of molten alloy onto a cooled substrate so that it solidifies as a thin foil or ribbon which is used in foil or ribbon form or mechanically comminuted into powder for subsequent consolidation.
- Common to the processes of each rapid solidification category is the 5 requirement for a crucible in which the metal is melted and held in the molten state and a flow control device. or nozzle, in which the molten metal stream is formed and controlled.
- each of these processes involves the use of a cold crucible.
- the alloy is melted in a crucible composed of material having a high thermal conductivity, usually water cooled copper, so that a skull of solid alloy forms between the molten alloy and the crucible, preventing any
- 35 melting techniques have been adapted for rapid solidification of reactive alloys.
- the alloy In a cold hearth process, the alloy is melted in a copper hearth containing a hole in the bottom.
- a non-consumable tungsten arc is used to melt a pool of metal in the hearth.
- the skull over the orifice is melted through, allowing the metal to flow through the orifice, forming a metal stream.
- the flow of molten metal is controlled by the size of the orifice and the hearth is pressurized relative to the orifice exit for additional control.
- the metal stream is then either atomized or directed onto a rapidly moving water cooled substrate to form a rapidly solidified ribbon.
- Arc melting with controlled pouring from the bottom of the hearth has been frequently used to produce rapidly solidified powders by atomization and rapidly solidified ribbons by melt spinning.
- S.H. Whang "Rapidly Solidified Ti Mloys Containing Novel Additives", Journal of Metals, April, 1984, pp. 34-40.
- R.G. Rowe R.A. Amoto "Titanium Alloy Spinning” in Processing of Structure Mateirals, F.H. Froes and S.J. Savage, eds. ASM International, 1987 pp. 253-260.
- Induction power is applied to heat the metal charge.
- the slag melts and solidifies between the cold crucible wall and the hot metal, providing both thermal and electrical insulation between the crucible and the hot metal.
- the initial charge melts forming a solid skull at the crucible walls with a molten pool contained within the skull.
- the crucible is then tilted to pour the molten alloy or, alternatively, the bottom of the skull can be continuously withdrawn and cooled so as to form a continuously cast ingot of the same dimension as the inside diameter of the crucible.
- the elites et al. process has been modified by increasing the number of slits in the crucible, thereby eliminating the need for the slag.
- the modified process permits melting of up to 75 pounds of titanium or 105 pounds of zirconium. Scale-up to between 400 and 500 pounds is said to be possible, the principle limitation being the size of the power source.
- D.J. Chronister et al. "Induction Skull Melting Titanium and Other Reactive Alloys, Journal of Metals, Sept., 1986, pp. 51-54.
- the Clite et al. process offers some advantages over more conventional reactive metal melting processes, it does not address an important requirement of a molten metal delivery system for rapid solidification processing, namely, the requirement for a small, controlled molten metal stream.
- the apparatus comprises a crucible means for holding a metal charge.
- the crucible means has side walls, a top and a bottom having an orifice therein. Collectively, the side walls, top and bottom 10 define an interior of the crucible. A portion of the dimensions of the side walls and bottom is divided by longitudinal slits into at least two segments.
- a nozzle means is disposed partially within the crucible means, and extends through the orifice.
- the nozzle means comprises a "L5 first end in communication with the interior.
- a second end of the nozzle means further comprises a nozzle orifice for defining a stream of molten metal alloy.
- a cooling means is provided for cooling the top, side walls and bottom of the crucible means.
- the apparatus further 0 comprises a first induction means for inducing an alternating electrical current within the metal charge.
- a second induction means is associated with the nozzle means for inducing an electrical current therewithin.
- the apparatus has pressure control means for establishing and 5 maintaining positive pressure within the interior of the cruicible, and a quenching means including a rapidly moving chill substrate.
- a positioning means positions said crucible and nozzle means relative to the quenching means.
- the crucible nozzle and quenching means are housed 0 within an enclosure means that provides therewithin a controlled atmosphere having positive or negative pressure.
- the invention provides a process for melting and rapid solidification casting of metal alloys, 5 comprising the steps of:
- the method and apparatus of the invention provide for melting of reactive metals and their alloys in a cold wall crucible to minimize contamination from melt/crucible reactions.
- a means to form and direct in a controlled manner a stream of metal onto a rapidly moving water cooled substrate for rapid solidification is provided.
- the apparatus is capable of producing rapidly solidified materials in larger batches than those currently produced and effects rapid solidification of reactive metals in an efficient, reliable manner.
- the metal filaments or ribbons that are produced by this process are suitable for use as foils in the as-cast or annealed condition or may be comminuted into a powder 5 appointed for consolidation into bulk articles using conventional powder metallurgy techniques.
- FIG. 1 shows a schematic representation of the 5 apparatus of the invention located in a environmental chamber containing a water cooled casting wheel for the production of rapidly solidified ribbon;
- FIG. 2 shows a longitudinal cross-sectional view of the crucible and nozzle assembly employed in the apparatus o of FIG. 1 illustrating construction details and relationships between casting crucible and nozzle;
- FIG. 3 shows a bottom view of the crucible illustrating construction details
- FIG. 4 shows a detailed cross sectional view of the 5 crucible and nozzle illustrating the configuration of the metal charge during operation of the apparatus after melting but before casting has begun;
- FIG. 5 shows a detailed cross sectional view of the crucible and nozzle illustrating the configuration of the metal charge during operation of the apparatus after casting has begun.
- the apparatus shown generally at 100 comprises a crucible means shown generally at 2, for holding a metal charge.
- the crucible means 2 has side walls 3, a top 7 and a bottom 20 having an orifice 5 therein. Collectively, the side walls 3, top 7 and bottom define an interior 22 of the crucible. A portion of the dimension of the side walls 3 and bottom 20 is divided by longitudinal slits 11 into at least two segments.
- a nozzle means 9 is disposed partially within the crucible means 2, and extends through the orifice 5.
- the nozzle means 8 comprises a first end 24 in communication with the interior 22.
- a second end 26 of the nozzle means further comprises a nozzle orifice 28 for defining a stream 6 of molten metal alloy.
- a cooling means 4 is provided for cooling the top 7, side walls 3 and bottom 20 of the crucible means 2.
- the apparatus 100 further comprises a first induction means 30 for inducing an alternating electrical current within the metal charge.
- a second induction means 32 is associated with the nozzle means 8 for inducing an electrical current therewithin.
- the apparatus 100 has pressure control means 34 for establishing and maintaining positive pressure within the interior 22 of the cruciible 2, and a quenching means 36 including a rapidly moving chill substrate.
- a positioning means 10 positions the crucible and nozzle means relative to the quenching means 36.
- the crucible, nozzle and quenching means are housed within an enclosure means 1 that provides therewithin a controlled atmosphere having positive or negative pressure.
- a housing or chamber 1 that is constructed in such a manner to be gas tight.
- Chamber 1 encloses a crucible 2, a nozzle 8 and a casting substrate 36.
- Crucible 2 is preferably constructed of a metal having high thermal conductivity such as copper.
- the crucible 2 contains slits 11 part way up the sides 3 and in the bottom 20 so as to reduce the attenuation or shielding action which would be presented by an electrically continuous crucible.
- a cooling means 4 for supplying cooling water to the crucible 2 is provided.
- a water manifold which is an integral part of the crucible 2 is 5 preferred.
- An induction coil 6 is positioned around the lower, or working portion of the crucible and is connected to a conventional induction power supply (not shown) and a source of cooling water (not shown).
- the top of the crucible 2 is covered by a cap 7 j o preferably constructed from a material having high thermal and electrical conductivity, such as copper or a copper containig alloy.
- the cap is removable to allow access to interior 22 of the crucible 2 but capable of being tightly sealed to the crucible.
- the cap 7 is connected to a
- r source of cooling water contains a connection 34 through which an inert gas can be introduced in order to maintain a relative pressure difference between the crucible interior and the chamber environment.
- a casting nozzle 8 constructed from a high melting
- 2Q point material such as a ceramic or refractory metal, preferably tungsten or molybdenum, is located beneath the crucible 2.
- the nozzle 8 preferably cylindrical in shape with an outside diameter smaller than the inside diameter of the crucible 2, is open at the top 24 and positioned in
- nozzle top 24 is open to the crucible interior 22.
- the nozzle 8 is closed at the bottom 26 except for a small orifice 28.
- An induction coil 30 is located coaxially with the nozzle 8 and is connected to a conventional
- induction power supply distinct from that of the crucible 2, and a source of cooling water.
- the crucible and nozzle assembly is supported by a frame 10 which is capable of adjusting the position of the assembly relative to a rapidly moving casting substrate -. -. 36.
- the casting substrate 36 is preferably a water cooled wheel constructed from material having high thermal conductivity, such as copper or one of its alloys, and is capable of being driven so as to achieve surface speeds of between 2500 and 7500 feet per minute.
- FIGURE 2 shows a longitudinal cross section of the crucible and nozzle assembly showing construction details and the relationship between the nozzle 8 and the crucible 5 2.
- the crucible bottom 20 and side walls 3 are segmented by slits 11 which extend approximately two thirds of the way up the side walls 3. The metal is melted and held in the lower portion of the crucible 2 only and the slits 11 must extend far enough up to provide for the electrical
- Internal passages 38 are provided in each segment for cooling water. Cooling water is supplied to the internal passages 38 through a manifold 4 which is an integral part of the crucible 2.
- the crucible 2 is encased in a cylinder 40 of
- the nozzle 8 is positioned in an orifice 5 in the bottom of the crucible 2 so that it is open to the crucible interior 22.
- the nozzle 8 is electrically and thermally isolated from the crucible 2 by a series of
- insulating and clamping rings 46 which are constructed so as to allow the position of the nozzle 8 to be adjusted with respect to the crucible bottom 20.
- the nozzle 8 and clamping ring assembly 46 are fastened in place by means of a holding plate 48 which is bolted to the holding
- FIGURE 3 is a bottom view of the crucible showing details of the segmentation.
- Crucible side walls 3 are divided into segments by longitudinal slits 11. In the embodiment shown, there are 24 segments.
- bottom 20 is divided into half the number of segments of the side walls by .adial slits 50 extending nearly to the orifice 5 in the center of the bottom 20 leaving a narrow ring 52 of unsegmented material so as to provide for the structural stability of the crucible 2.
- the bottom slits 50 are extensions of alternating side wall slits 11. Cooling water passages 38 are placed such that pairs of c side wall segments and the bottom segment to which they are connected are cooled by a separate cooling loop.
- the starting material which may consist of a single pre-alloyed ingot or a master alloy with elemental -. Q alloying additions, is placed in the crucible 2 and the cap 7 is sealed to the top of the crucible. Power is then applied to the crucible induction coil 30 and the charge is heated. As heating progresses, the charge starts to melt. Molten metal in contact with the crucible freezes , -. so that a layer or skull 54 of solid alloy against the crucible walls 3 and bottom 20 is formed and maintained. The configuration of the metal charge after heating and melting to form a molten metal pool 56 and skull 54 prior to the start of casting is shown in FIGURE 4. Levitating 0 forces induced by the electrical field distort the molten metal pool 56 into the general shape shown. A skull 54 of solid metal remains in the crucible, sealing the opening at the upper end 24 of the nozzle 8.
- the crucible 2 and nozzle 8 assembly is located over a moving casting substrate 36.
- Power to the induction coil 32 surrounding the nozzle 8 is turned on heating the nozzle 8 and melting the solid skull 54 adjacent tothe upper end and 24 of the nozzle 8, allowing molten metal 56 0 to flow into the nozzle 8, through a passageway 58 in the nozzle interior and out the orifice in the nozzle bottom 26.
- the metal stream 6 exiting the nozzle 8 impinges on the moving casting substrate 36 where it is rapidly solidified into a thin filament 60.
- An inert gas is 5 supplied to the crucible 2 through a port 34 in the sealing cap 7 in order to provide a pressure sufficient to maintain a metal stream 6 suitable for formation of filament 60.
- the gas pressure is controlled during the course of the casting operation to compensate for the reduction in metal head pressure as the crucible empties.
- a crucible such as that shown in FIGURES 2 and 3 was constructed.
- the crucible had an inside diameter of 4 3/4 inches (12.065 cm), and inside height of 12 1/2 inches (31.75 cm) and contained a 1 1/2 inch (3.81 cm) diameter hole in the bottom.
- Longitudinal slits were cut in the bottom 7 1/2 inches (19.05 cm) of the crucible walls, dividing the crucible in that area into 24 segments.
- the crucible bottom was slit radially from the outside diameter to within 1/2 inch (1.27 cm) of the center hole, dividing the bottom into 12 segments.
- Passages had been cut in the side walls and bottom so that cooling water flowed from an inlet manifold located at the top of the crucible, down twelve side wall segments, in and out of the bottom segments and back up the other twelve side wall segments to the outlet manifold.
- the lower 7 1/2 inches (10.05 cm) of the crucible was encased in a 1/4 inch (0.635 cm) thick layer of castable refractory.
- An induction coil consisting of 11 turns of copper tubing and having an overall height of 6 inches (15.24 cm) was placed coaxially around the bottom portion of the crucible. Power for inductively heating and melting was supplied by a 3 kHz, 135 k solid state induction power supply.
- the crucible and coil were placed on a holding bracket and support assembly capable of horizontal and vertical movement inside of a vacuum chamber.
- the charge material consisting of approximately 10 pounds of 1 inch diameter titanium - 6% aluminum - 4% vanadium rods was placed in the crucible.
- a water cooled brass cap containing a fitting for the introduction of argon gas into the crucible interior was placed on top of the crucible and clamped down by means of clamps attached to the support bracket.
- a nozzle fabricated from tungsten having an outside diameter of 1 1/2 inches (3.81 cm), an inside diameter of 1 inch (2.54 cm) and an overall height of 1 1/2 inches (3.81 cm) was inserted into the orifice in the crucible bottom and fastened in place using a series of clamping rings and a holding plate attached to the underside of the crucible support plate.
- the charge was then heated by applying power to the induction coil. As the charge heated up and melted, molten liquid flowed until it connected the crucible walls or bottom and froze, forming a solid skull. By varying the heating rate and applied power levels, conditions were established which resulted in the entire charge being melted and contained within a solid skull. With this configuration, however, liquid metal flow through the nozzle could not be initiated.
- Example 1 The apparatus described in Example 1 was modified by the addition of a 3 turn induction coil with an overall height of 1 1/2 inches (3.81 cm) located coaxially with a nozzle similar to that of Example 1 but with a length of 3 inches (7.62 cm). Power to the coil was provided by 10 kHz, 10 kW solid state induction power supply. The general procedures outlined in Example 1 were followed except that power to the nozzle induction coil was applied at the same time that the crucible charge was being heated and melted. When heating rates and power levels were adjusted appropriately, molten metal from the crucible flowed into the nozzle and out of the orifice until the crucible was emptied except for a skull on the crucible bottom. ⁇ XAMPLE 3
- Example 1 The apparatus outlined in Example 1 and the 5 procedures outlined in Examples 1 and 2 were used to make a rapid solidification run. A pre-alloyed ingot containing approximately 65% titanium and 35% aluminum weighing approximately 10 lbs (4.53 kg) was placed in the crucible and elemental vanadium was added to make up about
- the rapidly solidified ribbon was approximately 0.17 inches (0.43 cm) wide and 0.002 inches (0.005 cm) thick.
- the composition was analyzed as 35.0% aluminum, 1.74% vanadium and 63.3% titanium.
- the charge material for these casts consisted of pre-alloyed ingots a nominal composition of 61.2% titanium, 14.1% aluminum, 19.5% niobium, 3.2% vanadium and 2.0% molybdenum. In one 3.9 kg of a 5.5 kg charge was cast and in the second, 1.5 3c kg of a 3.3 kg charge was cast, the balance of the charges remaining in the crucible as solid skull.
- the ribbons were approximately 0.002 inches (0.005 cm) thick.
- the composition of the ribbon in one cast was 13.9% Al, 19.4% Nb, 3.09% V and 1.9% Mo with the balance being titanium and in the other, 13.8% Al , 19.2% Nb, 3.19% V and 1.87% Mo with the balance being titanium. This demonstrates the reliability and repeatability of the invention.
- Ribbons prepared as in examples 3 and 4 were examined. It was found that ribbons containing interstitial impurities less than about 700 ppm 0 2 , 420 ppm 2 and 200 ppm C and having a thickness less than about 0.003 inches (0.008 cm) had significant ductility. Ductility was indicated by the capability of bending a ribbon back over upon itself without fracture.
- EXAMPLE 6 Ribbon prepared as in example 4 having a composition of 13.9% Al, 19.4% Nb, 3.09% V, 1.90% Mo with the ballance being titanium was subjected to hammer milling to produce a -35 mesh powder.
- the powder was placed in a 1 inch diameter by 6 inch long cylindrical stainless steel can, vacuum outgassed and then sealed under vacuum. The cans were then hot isostatically pressed to produced a fully dense article after the can was removed.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Continuous Casting (AREA)
- Crucibles And Fluidized-Bed Furnaces (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US34525489A | 1989-05-01 | 1989-05-01 | |
US345254 | 1989-05-01 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0471798A1 true EP0471798A1 (de) | 1992-02-26 |
EP0471798B1 EP0471798B1 (de) | 1993-06-23 |
Family
ID=23354232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP90911041A Revoked EP0471798B1 (de) | 1989-05-01 | 1990-04-30 | Induktivschmelzspinnen von reaktiven metallegierungen |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP0471798B1 (de) |
JP (1) | JP3054193B2 (de) |
DE (1) | DE69002059T2 (de) |
WO (1) | WO1990013377A1 (de) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5272718A (en) * | 1990-04-09 | 1993-12-21 | Leybold Aktiengesellschaft | Method and apparatus for forming a stream of molten material |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5060914A (en) * | 1990-07-16 | 1991-10-29 | General Electric Company | Method for control of process conditions in a continuous alloy production process |
DE4242380A1 (de) * | 1992-12-08 | 1994-06-09 | Mannesmann Ag | Verfahren und Vorrichtung zum Beschichten der Oberfläche von strangförmigem Gut |
US5515906A (en) * | 1993-01-29 | 1996-05-14 | Her Majesty In Right Of Canada As Represented By The Minister Of Energy, Mines And Resources | Pneumatic flow control of liquid metals |
CA2088401A1 (en) * | 1993-01-29 | 1994-07-30 | Her Majesty The Queen, In Right Of Canada As Represented By The Minister Of Natural Resources Canada | Pneumatic flow control of liquid metals |
DE4320766C2 (de) * | 1993-06-23 | 2002-06-27 | Ald Vacuum Techn Ag | Vorrichtung zum Einschmelzen einer festen Schicht aus elektrisch leitfähigem Material |
JP2002066698A (ja) * | 2000-08-31 | 2002-03-05 | Ulvac Japan Ltd | 金属薄帯製造装置 |
US20060291529A1 (en) * | 2005-05-26 | 2006-12-28 | Haun Robert E | Cold wall induction nozzle |
US8858697B2 (en) | 2011-10-28 | 2014-10-14 | General Electric Company | Mold compositions |
US9011205B2 (en) | 2012-02-15 | 2015-04-21 | General Electric Company | Titanium aluminide article with improved surface finish |
US8932518B2 (en) | 2012-02-29 | 2015-01-13 | General Electric Company | Mold and facecoat compositions |
US8906292B2 (en) | 2012-07-27 | 2014-12-09 | General Electric Company | Crucible and facecoat compositions |
US8708033B2 (en) | 2012-08-29 | 2014-04-29 | General Electric Company | Calcium titanate containing mold compositions and methods for casting titanium and titanium aluminide alloys |
US8992824B2 (en) | 2012-12-04 | 2015-03-31 | General Electric Company | Crucible and extrinsic facecoat compositions |
US9592548B2 (en) | 2013-01-29 | 2017-03-14 | General Electric Company | Calcium hexaluminate-containing mold and facecoat compositions and methods for casting titanium and titanium aluminide alloys |
US9511417B2 (en) | 2013-11-26 | 2016-12-06 | General Electric Company | Silicon carbide-containing mold and facecoat compositions and methods for casting titanium and titanium aluminide alloys |
US9192983B2 (en) | 2013-11-26 | 2015-11-24 | General Electric Company | Silicon carbide-containing mold and facecoat compositions and methods for casting titanium and titanium aluminide alloys |
US10391547B2 (en) | 2014-06-04 | 2019-08-27 | General Electric Company | Casting mold of grading with silicon carbide |
IT202100024227A1 (it) * | 2021-09-21 | 2023-03-21 | Antonio Alessandro Rossi | Crogiolo a freddo ad alta efficienza e metodo di realizzazione dello stesso |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2858586A (en) * | 1954-01-28 | 1958-11-04 | Joseph B Brennan | Smelting apparatus and method |
EP0055827B1 (de) * | 1980-12-29 | 1985-01-30 | Allied Corporation | Wärme abführender Schmelztiegel zum schnellen Erstarrungsvergiessen von Metallegierungen |
EP0095298A1 (de) * | 1982-05-24 | 1983-11-30 | Energy Conversion Devices, Inc. | Gussstück |
US4738713A (en) * | 1986-12-04 | 1988-04-19 | The Duriron Company, Inc. | Method for induction melting reactive metals and alloys |
-
1990
- 1990-04-30 JP JP2510445A patent/JP3054193B2/ja not_active Expired - Fee Related
- 1990-04-30 WO PCT/US1990/002387 patent/WO1990013377A1/en not_active Application Discontinuation
- 1990-04-30 DE DE90911041T patent/DE69002059T2/de not_active Expired - Fee Related
- 1990-04-30 EP EP90911041A patent/EP0471798B1/de not_active Revoked
Non-Patent Citations (1)
Title |
---|
See references of WO9013377A1 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5272718A (en) * | 1990-04-09 | 1993-12-21 | Leybold Aktiengesellschaft | Method and apparatus for forming a stream of molten material |
Also Published As
Publication number | Publication date |
---|---|
JPH04504981A (ja) | 1992-09-03 |
JP3054193B2 (ja) | 2000-06-19 |
DE69002059T2 (de) | 1993-09-30 |
EP0471798B1 (de) | 1993-06-23 |
WO1990013377A1 (en) | 1990-11-15 |
DE69002059D1 (de) | 1993-07-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0471798B1 (de) | Induktivschmelzspinnen von reaktiven metallegierungen | |
RU2280702C2 (ru) | Устройство и способ для рафинирования и литья | |
EP0194847B1 (de) | Verfahren zur Herstellung von Titanpulver | |
US5346184A (en) | Method and apparatus for rapidly solidified ingot production | |
US4190404A (en) | Method and apparatus for removing inclusion contaminants from metals and alloys | |
US5427173A (en) | Induction skull melt spinning of reactive metal alloys | |
JP2004523359A5 (de) | ||
KR100718406B1 (ko) | 주조 장치 및 주조 방법 | |
AU2002220245A1 (en) | Refining and casting apparatus and method | |
EP0907756B1 (de) | Weiterverarbeitung durch elektroschlackeumschmelzen gereinigter metalle | |
JP4762409B2 (ja) | 清浄な金属から核生成鋳造した物品 | |
EP0055827B1 (de) | Wärme abführender Schmelztiegel zum schnellen Erstarrungsvergiessen von Metallegierungen | |
EP1263997B1 (de) | Giesssysteme und verfahren mit hilfskühlung der flüssigen oberfläche der giesskörper | |
JP2002508496A (ja) | 特殊金属の溶融および鋳込み | |
JPS60255906A (ja) | 活性金属粉末の製造方法及び設備 | |
JPH03180432A (ja) | 金属の溶解方法および溶解装置 | |
JPS58188552A (ja) | 急冷凝固材の製造装置 | |
US2946105A (en) | Casting metals | |
JP4959897B2 (ja) | 液体金属の離心供給源を備える鋳造装置及び方法 | |
KR100718407B1 (ko) | 주조 장치 및 주조 방법 | |
KR20020086910A (ko) | 감압 주조 시스템 및 방법 | |
Holzgruber et al. | Method of and Installation for Electroslag Continuous Casting of Steel and Alloys | |
JPH0688146A (ja) | 電子ビームオーバーフロー溶解装置 | |
JPS6349351A (ja) | 連続鋳造装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19910917 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE FR GB |
|
17Q | First examination report despatched |
Effective date: 19921103 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE FR GB |
|
REF | Corresponds to: |
Ref document number: 69002059 Country of ref document: DE Date of ref document: 19930729 |
|
ET | Fr: translation filed | ||
RAP2 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: ALLIEDSIGNAL INC. |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
26 | Opposition filed |
Opponent name: ENDRESS + HAUSER GMBH + CO. Effective date: 19940321 |
|
PLBQ | Unpublished change to opponent data |
Free format text: ORIGINAL CODE: EPIDOS OPPO |
|
PLAB | Opposition data, opponent's data or that of the opponent's representative modified |
Free format text: ORIGINAL CODE: 0009299OPPO |
|
R26 | Opposition filed (corrected) |
Opponent name: ENDRESS + HAUSER GMBH + CO. Effective date: 19940321 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 19990315 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 19990406 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19990430 Year of fee payment: 10 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20000430 |
|
PLAW | Interlocutory decision in opposition |
Free format text: ORIGINAL CODE: EPIDOS IDOP |
|
PLAW | Interlocutory decision in opposition |
Free format text: ORIGINAL CODE: EPIDOS IDOP |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20000430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20001229 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010201 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
RDAH | Patent revoked |
Free format text: ORIGINAL CODE: EPIDOS REVO |
|
RDAG | Patent revoked |
Free format text: ORIGINAL CODE: 0009271 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: PATENT REVOKED |
|
27W | Patent revoked |
Effective date: 20010715 |