EP0467375A1 - Blast furnace pulverized coal injection drying apparatus - Google Patents

Blast furnace pulverized coal injection drying apparatus Download PDF

Info

Publication number
EP0467375A1
EP0467375A1 EP91112059A EP91112059A EP0467375A1 EP 0467375 A1 EP0467375 A1 EP 0467375A1 EP 91112059 A EP91112059 A EP 91112059A EP 91112059 A EP91112059 A EP 91112059A EP 0467375 A1 EP0467375 A1 EP 0467375A1
Authority
EP
European Patent Office
Prior art keywords
gas
blast furnace
pulverized coal
drying
hot gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP91112059A
Other languages
German (de)
French (fr)
Inventor
Iwao c/o Tokyo Main Office Asada
Takahisa c/o Denka Cons & Eng. Co. Ltd Honma
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Denka Consultant and Engineering Co Ltd
Original Assignee
Denka Consultant and Engineering Co Ltd
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denka Consultant and Engineering Co Ltd, Kawasaki Steel Corp filed Critical Denka Consultant and Engineering Co Ltd
Publication of EP0467375A1 publication Critical patent/EP0467375A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • C21B5/001Injecting additional fuel or reducing agents
    • C21B5/003Injection of pulverulent coal

Definitions

  • the present invention relates to a blast furnace pulverized coal injection (PCI) drying apparatus, more specifically to a blast furnace PCI drying apparatus employing and circulating a drying gas of a ground drying mill of the blast furnace PCI drying apparatus and having the circulating gas route equipped with a dehumidifying apparatus.
  • PCI pulverized coal injection
  • Fig. 2 shows a flow sheet of a blasting apparatus for blasting pulverized coal into a blast furnace.
  • Wet coal is fed through metallurgical coal bunker 101 and feed bin 102 into ground drying mill 103, where the wet coal is ground and dried in hot blast to be made into dried pulverized coal.
  • the dried pulverized coal is then transported together with exhaust gas.
  • the drying gas of the ground drying mill is fed, after adding inert gas 107 as a cooling gas for temperature control to the exhaust gas generated by allowing B gas (blast furnace gas) 105a and/or C gas (coke oven gas) 105 to burn with combustion air 106.
  • the drying gas is exhausted from ground drying mill 103 accompanying ground and dried pulverized coal, by drying wet coal in ground drying mill 103.
  • the pulverized coal transported together with the gas is collected with cyclone 111 and bag filter 112, and is stored in pulverized coal storage hopper 113 of the blast furnace PCI apparatus.
  • the exhaust gas separated from the pulverized coal is released from stack 120.
  • the pulverized coal stored in pulverized coal storage hopper 113 is transferred through intermediate tank 114 to injection tank 115. After pressurized by pressure gas 116, the pulverized coal is transferred through pulverized coal feed pipe 118 by carrier gas 117, and is then injected from a tuyere pipe into blast furnace 119.
  • the hot gas generated in hot gas generating furnace 104 is required to cool the hot gas generated in hot gas generating furnace 104 for generation of the gas to be introduced into ground drying mill 103 of wet coal, the hot gas being for drying wet coal, so that a gas of a lower temperature is mixed together.
  • the gas for cooling hot gas of a higher temperature should be inert gas scarcely containing oxygen, in order to prevent coal dust explosion of pulverized coal.
  • inert gas nitrogen gas, combustion exhaust gas and the like are used.
  • the problem concerning the use of nitrogen gas as inert gas for hot gas generating furnaces is an exceedingly high cost of its operation.
  • the use of the exhaust gas after combustion is generally accompanied by the problems that the operation of the combustion apparatus is influential and the layout of a transporting piping route of the exhaust gas is difficult.
  • the circulation of the exhaust gas of a blast furnace PCI drying apparatus causes the increase in the water content in the circulating gas, so the exhaust gas cannot be used constantly.
  • a dehumidifying apparatus is placed on the route where the exhaust gas from a blast furnace PCI drying apparatus is circulated, and the exhaust gas after water is removed therefrom with the dehumidifying apparatus is used as inert gas.
  • the object of the present invention is to provide an apparatus capable of collecting and circulating exhaust gas from an exhaust gas line of a blast furnace PCI drying apparatus with a fan and removing the water in the circulating gas in order that the resulting circulating gas can be used as inert gas for a hot gas generating furnace.
  • the present invention is a blast furnace PCI drying apparatus equipped with a hot gas generating furnace and a ground drying mill for grinding and drying wet coal by introducing the gas generated in a hot gas generating furnace, wherein a branch pipe is placed on a pipe of the exhaust gas after grinding and drying in a pulverized coal ground drying mill and is then linked with a dehumidifying apparatus, and the outlet pipe of the dehumidifying apparatus is connected with the outlet side of the hot gas generating furnace.
  • the outlet side of the hot gas generating furnace means any part of the intermediate route to cool and introduce the gas generated from the hot gas generating furnace into the ground drying mill; in other words, it means that the vicinity of the outlet of the hot gas generating furnace, the intermediate route of the pipe from the hot gas generating furnace to the ground drying mill, and further the vicinity of the inlet of the ground drying mill may be satisfactory.
  • dehumidifying apparatus means an apparatus which can remove water from the exhaust gas from the ground drying mill, but is not necessarily an apparatus which decreases the relative humidity of the exhaust gas.
  • the dehumidifying apparatus may be satisfactorily composed of a scrubber performing the removal of the powder in the exhaust gas and the removal of the water in the exhaust gas by cooling the exhaust gas, on spraying water over the exhaust gas.
  • the present invention is the most characteristic in that in case that a branch pipe is placed in the exhaust gas line of a blast furnace PCI drying apparatus to circulate and use the exhaust gas, a dehumidifying apparatus is placed on the route of the branch pipe to prevent moisture increase in the circulating gas and to enable routine use of the exhaust gas as the circulating gas of the ground drying mill.
  • the increase in water concentration due to the circulation method is suppressed by the decrease in dew point and dewatering with a scrubber, while temperature control is achieved by the circulating gas employing hot gas from the hot gas generating furnace as inert gas.
  • Fig. 1 shows the flow sheet of the example of the present invention.
  • Wet coal 1 as the raw material of a blast furnace PCI is fed into ground drying mill 3.
  • B gas (blast furnace gas) 5a and/or C gas (coke oven gas) 5 are burned with combustion air 6 to generate hot gas, which is then controlled of its temperature with cooling gas to be fed as hot blast into ground drying mill 3.
  • the wet coal is dried and grinded in the ground drying mill while being ground, which is transported together with hot gas from exhaust pipe 7.
  • Dried pulverized coal is collected in bag filter 42, and is stored in pulverized coal storage hopper 43.
  • the exhaust gas separated from pulverized coal is released from stack 20.
  • branch pipe 21 for branching a part or the entire part of the exhaust gas of the blast furnace PCI drying apparatus from exhaust gas line 7, and the exhaust gas is aspirated with fan 22 and is introduced into dehumidifying apparatus 23.
  • dehumidifying apparatus 23 the water in the raw material wet coal introduced in ground drying mill 3 is removed.
  • the gas exhausted from the dehumidifying apparatus 23 is introduced through outlet pipe 24 of the dehumidifying apparatus to the outlet side of hot gas generating furnace 4, to control the temperature of hot gas being fed from hot gas generating furnace 4.
  • the exhaust gas of the blast furnace PCI drying apparatus is circulated as inert gas inside the blast furnace PCI drying apparatus.
  • spray nozzle 25 and filling matter 26 are provided inside the scrubber, to cool the exhaust gas. By this cooling, excess water content in the exhaust gas is removed.
  • the water after cooling the exhaust gas is fed to cooling tower 32, by means of hot water line 30 and hot water pump 31.
  • the water cooled in cooling tower is stored in water pit 33, and is circulated to the spray nozzle through aspiration line 29 and cooling water pipe 27, by means of cooling water pump 28.
  • the water content of wet coal is about 1,500 kg/h, while the saturated water content of the gas at the scrubber inlet is about 22,500 kg/h and the saturated water content of the gas at the scrubber outlet is about 11,700 kg/h. Therefore, the scrubber has sufficient potential of drying wet coal, and the potential of the cooling tower is sufficiently high enough to remove the water content in wet coal.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacture Of Iron (AREA)
  • Drying Of Solid Materials (AREA)
  • Solid Fuels And Fuel-Associated Substances (AREA)

Abstract

5The present invention relates to a blast furnace pulverized coal injection drying apparatus, comprising a hot gas generating furnace (4) and a ground drying mill (3) into which the gas generated in the hot gas generating furnace is introduced to grind and dry wet coal, wherein a branch pipe is placed on the exhaust gas pipe (7) of the ground drying mill (3) and is linked with the branch pipe with a dehumidifying apparatus (23), and the outlet pipe (24) of the dehumidifying apparatus (23) is connected with the outlet side of the hot gas generating furnace (4), whereby a high operational cost due to conventional use of nitrogen gas is reduced.

Description

    BACKGROUND OF INVENTION 1. Field of Invention
  • The present invention relates to a blast furnace pulverized coal injection (PCI) drying apparatus, more specifically to a blast furnace PCI drying apparatus employing and circulating a drying gas of a ground drying mill of the blast furnace PCI drying apparatus and having the circulating gas route equipped with a dehumidifying apparatus.
  • 2. Prior Art
  • Fig. 2 shows a flow sheet of a blasting apparatus for blasting pulverized coal into a blast furnace.
  • Wet coal is fed through metallurgical coal bunker 101 and feed bin 102 into ground drying mill 103, where the wet coal is ground and dried in hot blast to be made into dried pulverized coal. The dried pulverized coal is then transported together with exhaust gas.
  • The drying gas of the ground drying mill is fed, after adding inert gas 107 as a cooling gas for temperature control to the exhaust gas generated by allowing B gas (blast furnace gas) 105a and/or C gas (coke oven gas) 105 to burn with combustion air 106. The drying gas is exhausted from ground drying mill 103 accompanying ground and dried pulverized coal, by drying wet coal in ground drying mill 103. The pulverized coal transported together with the gas is collected with cyclone 111 and bag filter 112, and is stored in pulverized coal storage hopper 113 of the blast furnace PCI apparatus. The exhaust gas separated from the pulverized coal is released from stack 120.
  • The pulverized coal stored in pulverized coal storage hopper 113 is transferred through intermediate tank 114 to injection tank 115. After pressurized by pressure gas 116, the pulverized coal is transferred through pulverized coal feed pipe 118 by carrier gas 117, and is then injected from a tuyere pipe into blast furnace 119.
  • As has been described above, because of the high temperature, it is required to cool the hot gas generated in hot gas generating furnace 104 for generation of the gas to be introduced into ground drying mill 103 of wet coal, the hot gas being for drying wet coal, so that a gas of a lower temperature is mixed together. The gas for cooling hot gas of a higher temperature should be inert gas scarcely containing oxygen, in order to prevent coal dust explosion of pulverized coal. As such inert gas, nitrogen gas, combustion exhaust gas and the like are used.
  • There is the technique that a part or the entire part of the exhaust gas exhausted from stack 120 of blast furnace PCI drying apparatus is introduced into a hot gas generating furnace by being circulated as inert gas by means of a fan, but such technique has been just applied to the initial or final stage of operation of the blast furnace PCI apparatus, because the water content in the circulating gas increases.
  • The problem concerning the use of nitrogen gas as inert gas for hot gas generating furnaces is an exceedingly high cost of its operation. On the other hand, the use of the exhaust gas after combustion is generally accompanied by the problems that the operation of the combustion apparatus is influential and the layout of a transporting piping route of the exhaust gas is difficult. The circulation of the exhaust gas of a blast furnace PCI drying apparatus causes the increase in the water content in the circulating gas, so the exhaust gas cannot be used constantly.
  • In order to solve these problems, in accordance with the present invention, a dehumidifying apparatus is placed on the route where the exhaust gas from a blast furnace PCI drying apparatus is circulated, and the exhaust gas after water is removed therefrom with the dehumidifying apparatus is used as inert gas.
  • SUMMARY OF THE INVENTION
  • The object of the present invention is to provide an apparatus capable of collecting and circulating exhaust gas from an exhaust gas line of a blast furnace PCI drying apparatus with a fan and removing the water in the circulating gas in order that the resulting circulating gas can be used as inert gas for a hot gas generating furnace.
  • The present invention is a blast furnace PCI drying apparatus equipped with a hot gas generating furnace and a ground drying mill for grinding and drying wet coal by introducing the gas generated in a hot gas generating furnace, wherein a branch pipe is placed on a pipe of the exhaust gas after grinding and drying in a pulverized coal ground drying mill and is then linked with a dehumidifying apparatus, and the outlet pipe of the dehumidifying apparatus is connected with the outlet side of the hot gas generating furnace.
  • The outlet side of the hot gas generating furnace, referred to herein, means any part of the intermediate route to cool and introduce the gas generated from the hot gas generating furnace into the ground drying mill; in other words, it means that the vicinity of the outlet of the hot gas generating furnace, the intermediate route of the pipe from the hot gas generating furnace to the ground drying mill, and further the vicinity of the inlet of the ground drying mill may be satisfactory.
  • The term dehumidifying apparatus described above means an apparatus which can remove water from the exhaust gas from the ground drying mill, but is not necessarily an apparatus which decreases the relative humidity of the exhaust gas.
  • The dehumidifying apparatus may be satisfactorily composed of a scrubber performing the removal of the powder in the exhaust gas and the removal of the water in the exhaust gas by cooling the exhaust gas, on spraying water over the exhaust gas.
  • The present invention is the most characteristic in that in case that a branch pipe is placed in the exhaust gas line of a blast furnace PCI drying apparatus to circulate and use the exhaust gas, a dehumidifying apparatus is placed on the route of the branch pipe to prevent moisture increase in the circulating gas and to enable routine use of the exhaust gas as the circulating gas of the ground drying mill.
  • According to the present invention, self-completion is achieved in a blast furnace PCI drying apparatus, without bringing inert gas from other places.
  • That is, the increase in water concentration due to the circulation method is suppressed by the decrease in dew point and dewatering with a scrubber, while temperature control is achieved by the circulating gas employing hot gas from the hot gas generating furnace as inert gas.
  • Brief Description of Drawings
    • Fig. 1 is the flow sheet of the example of the present invention, and Fig. 2 is the flow sheet of the blast furnace PCI apparatus.
    Description of Preferred Embodiments
  • Fig. 1 shows the flow sheet of the example of the present invention. Wet coal 1 as the raw material of a blast furnace PCI is fed into ground drying mill 3. In hot gas generating furnace 4, B gas (blast furnace gas) 5a and/or C gas (coke oven gas) 5 are burned with combustion air 6 to generate hot gas, which is then controlled of its temperature with cooling gas to be fed as hot blast into ground drying mill 3. The wet coal is dried and grinded in the ground drying mill while being ground, which is transported together with hot gas from exhaust pipe 7. Dried pulverized coal is collected in bag filter 42, and is stored in pulverized coal storage hopper 43. The exhaust gas separated from pulverized coal is released from stack 20.
  • There is placed branch pipe 21 for branching a part or the entire part of the exhaust gas of the blast furnace PCI drying apparatus from exhaust gas line 7, and the exhaust gas is aspirated with fan 22 and is introduced into dehumidifying apparatus 23. In the dehumidifying apparatus 23, the water in the raw material wet coal introduced in ground drying mill 3 is removed. The gas exhausted from the dehumidifying apparatus 23 is introduced through outlet pipe 24 of the dehumidifying apparatus to the outlet side of hot gas generating furnace 4, to control the temperature of hot gas being fed from hot gas generating furnace 4.
  • Thus, the exhaust gas of the blast furnace PCI drying apparatus is circulated as inert gas inside the blast furnace PCI drying apparatus.
  • In case that scrubber is used as dehumidifying apparatus 23, spray nozzle 25 and filling matter 26 are provided inside the scrubber, to cool the exhaust gas. By this cooling, excess water content in the exhaust gas is removed. The water after cooling the exhaust gas is fed to cooling tower 32, by means of hot water line 30 and hot water pump 31. The water cooled in cooling tower is stored in water pit 33, and is circulated to the spray nozzle through aspiration line 29 and cooling water pipe 27, by means of cooling water pump 28.
  • One example of material balance in case of using the apparatus of Example is shown in Table 1.
  • The water content of wet coal is about 1,500 kg/h, while the saturated water content of the gas at the scrubber inlet is about 22,500 kg/h and the saturated water content of the gas at the scrubber outlet is about 11,700 kg/h. Therefore, the scrubber has sufficient potential of drying wet coal, and the potential of the cooling tower is sufficiently high enough to remove the water content in wet coal.
    Figure imgb0001

Claims (5)

1. A blast furnace pulverized coal injection drying apparatus, comprising a hot gas generating furnace and a ground drying mill into which the gas generated in the hot gas generating furnace is introduced to grind and dry wet coal, wherein a branch pipe is placed on an exhaust gas pipe of the ground drying mill and is linked with a dehumidifying apparatus, and the outlet pipe of the dehumidifying apparatus is connected with the outlet side of the hot gas generating furnace.
2. The blast furnace pulverized coal injection drying apparatus according to claim 1, wherein the outlet pipe of the dehumidifying apparatus is connected to the vicinity of the outlet of the hot gas generating furnace.
3. The blast furnace pulverized coal injection drying apparatus according to claim 1, wherein the outlet pipe of the dehumidifying apparatus is connected to the intermediate route of the pipe introducing the gas generated in the hot gas generating furnace into the ground drying mill.
4. The blast furnace pulverized coal injection drying apparatus according to claim 1, wherein the outlet pipe of the dehumidifying apparatus is connected to the vicinity of the inlet of the ground drying mill, where the gas generated in the hot gas generating furnace is introduced.
5. The blast furnace pulverized coal injection drying apparatus according to claim 1, wherein the dehumidifying apparatus is a scrubber.
EP91112059A 1990-07-20 1991-07-18 Blast furnace pulverized coal injection drying apparatus Withdrawn EP0467375A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP190745/90 1990-07-20
JP2190745A JPH0742491B2 (en) 1990-07-20 1990-07-20 Blast furnace blowing pulverized coal dryer

Publications (1)

Publication Number Publication Date
EP0467375A1 true EP0467375A1 (en) 1992-01-22

Family

ID=16263047

Family Applications (1)

Application Number Title Priority Date Filing Date
EP91112059A Withdrawn EP0467375A1 (en) 1990-07-20 1991-07-18 Blast furnace pulverized coal injection drying apparatus

Country Status (6)

Country Link
EP (1) EP0467375A1 (en)
JP (1) JPH0742491B2 (en)
AU (1) AU8047191A (en)
BR (1) BR9103105A (en)
CA (1) CA2047416A1 (en)
ZA (1) ZA915501B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0618302A1 (en) * 1993-03-29 1994-10-05 The Boc Group Plc Metallurgical processes and appartus
LU91450B1 (en) * 2008-06-02 2009-12-03 Wurth Paul Sa Method for producing pulverized coal
LU91451B1 (en) * 2008-06-02 2009-12-03 Wurth Paul Sa Method for producing pulverized coal
CN109733757A (en) * 2019-01-18 2019-05-10 华电电力科学研究院有限公司 A kind of pulverized coal bin fills furnace cigarette explosion-protection equipment and explosion-proof method

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100862774B1 (en) * 2002-08-06 2008-10-13 주식회사 포스코 Pulverixed coal manufacturing apparatus
CN105651035A (en) * 2016-02-29 2016-06-08 成都绿迪科技有限公司 Peat drying device
JP7474049B2 (en) * 2019-12-26 2024-04-24 川崎重工業株式会社 Coal Crushing System
CN113457814A (en) * 2021-06-22 2021-10-01 镇江市蓝火环保能源有限公司 Coal powder treatment method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3306238A (en) * 1965-05-20 1967-02-28 Armco Steel Corp Fuel injection system for blast furnaces
FR2531724A1 (en) * 1982-08-10 1984-02-17 Kobe Steel Ltd DEVICE FOR MILLING, DRYING AND TRANSPORTING A BROKEN FUEL FOR A HIGH STOVE

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61111946U (en) * 1984-12-26 1986-07-15
JPS62123217A (en) * 1985-11-22 1987-06-04 Sumitomo Metal Ind Ltd Drying of pulverized coal for blasting into blast furnace

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3306238A (en) * 1965-05-20 1967-02-28 Armco Steel Corp Fuel injection system for blast furnaces
FR2531724A1 (en) * 1982-08-10 1984-02-17 Kobe Steel Ltd DEVICE FOR MILLING, DRYING AND TRANSPORTING A BROKEN FUEL FOR A HIGH STOVE

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0618302A1 (en) * 1993-03-29 1994-10-05 The Boc Group Plc Metallurgical processes and appartus
LU91450B1 (en) * 2008-06-02 2009-12-03 Wurth Paul Sa Method for producing pulverized coal
LU91451B1 (en) * 2008-06-02 2009-12-03 Wurth Paul Sa Method for producing pulverized coal
WO2009147151A1 (en) * 2008-06-02 2009-12-10 Paul Wurth S.A. Method for producing pulverized coal
WO2009147153A1 (en) * 2008-06-02 2009-12-10 Paul Wurth S.A. Method for producing pulverized coal
CN102046758A (en) * 2008-06-02 2011-05-04 保尔伍斯股份有限公司 Method for producing pulverized coal
CN102046759A (en) * 2008-06-02 2011-05-04 保尔伍斯股份有限公司 Method for producing pulverized coal
US20110192079A1 (en) * 2008-06-02 2011-08-11 Paul Wurth S.A. Method for producing pulverized coal
RU2501839C2 (en) * 2008-06-02 2013-12-20 Поль Вурт С.А. Method of making pulverised coal
RU2502780C2 (en) * 2008-06-02 2013-12-27 Поль Вурт С.А. Method of making pulverised coal
AU2009253965B2 (en) * 2008-06-02 2014-12-04 Paul Wurth S.A. Method for producing pulverized coal
TWI466993B (en) * 2008-06-02 2015-01-01 Wurth Paul Sa Method for producing pulverized coal
TWI475105B (en) * 2008-06-02 2015-03-01 Wurth Paul Sa Method for producing pulverized coal
CN102046759B (en) * 2008-06-02 2015-09-16 保尔伍斯股份有限公司 Produce the method for fine coal
US10059885B2 (en) 2008-06-02 2018-08-28 Paul Wurth S.A. Method for producing pulverized coal
CN109733757A (en) * 2019-01-18 2019-05-10 华电电力科学研究院有限公司 A kind of pulverized coal bin fills furnace cigarette explosion-protection equipment and explosion-proof method

Also Published As

Publication number Publication date
AU8047191A (en) 1992-01-23
JPH0742491B2 (en) 1995-05-10
CA2047416A1 (en) 1992-01-21
BR9103105A (en) 1992-05-05
JPH0480307A (en) 1992-03-13
ZA915501B (en) 1992-04-29

Similar Documents

Publication Publication Date Title
US4120645A (en) System for handling high sulfur materials
AU2006201957B2 (en) Process and plant for producing char and fuel gas
US8905336B2 (en) Method for comminution of mill feed
KR102045781B1 (en) Grinding and Drying Plant
EP0467375A1 (en) Blast furnace pulverized coal injection drying apparatus
CN102425940A (en) Device and method for preparing and transporting lime rotary kiln pulverized coal
US4008074A (en) Method for melting sponge iron
US4436589A (en) Method of pretreating coal for coking plant
KR20150097779A (en) A method and apparatus for supplying blast to a blast furnace
JP3322338B2 (en) Charcoal and activated carbon production equipment
US4860536A (en) Power plant with drying means for fuel
JPH0133522B2 (en)
JPH0961059A (en) Device for drying iron manufacturing raw material
CN202328315U (en) Device for preparing and transporting lime rotary kiln coal powders
JPH0539515A (en) Apparatus for injecting fine coal in blast furnace
US4247366A (en) Method of operating a coal predrying and heating plant in connection with a coking plant
JP2871259B2 (en) Ash transporter for pressurized fluidized bed boiler
US3168254A (en) Method for preparing the fuel component of agglomerator-feed mix
JPH0551939U (en) Collecting pulverized coal processing equipment for conditioning coal equipment
JPS56142318A (en) Method of blowing pulverized coal into furnace
JP2554135B2 (en) Method and apparatus for recirculating byproduct gas in coke dry fire extinguishing equipment
JPS6323140B2 (en)
JPH043806A (en) Pulverized coal supplying device
JP3243147B2 (en) Deashing method in pretreatment of coke oven charging coal.
JPS62267404A (en) Method for conveying pulverized coal to be blown in to blast furnace

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): ES

17P Request for examination filed

Effective date: 19920214

17Q First examination report despatched

Effective date: 19920907

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19940226