EP0221141A1 - Method and apparatus for melting and conveying plasticated material - Google Patents

Method and apparatus for melting and conveying plasticated material

Info

Publication number
EP0221141A1
EP0221141A1 EP86903023A EP86903023A EP0221141A1 EP 0221141 A1 EP0221141 A1 EP 0221141A1 EP 86903023 A EP86903023 A EP 86903023A EP 86903023 A EP86903023 A EP 86903023A EP 0221141 A1 EP0221141 A1 EP 0221141A1
Authority
EP
European Patent Office
Prior art keywords
flight
channel
shaft
section
diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP86903023A
Other languages
German (de)
French (fr)
Inventor
Robert F. Dray
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP0221141A1 publication Critical patent/EP0221141A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B7/00Mixing; Kneading
    • B29B7/30Mixing; Kneading continuous, with mechanical mixing or kneading devices
    • B29B7/34Mixing; Kneading continuous, with mechanical mixing or kneading devices with movable mixing or kneading devices
    • B29B7/38Mixing; Kneading continuous, with mechanical mixing or kneading devices with movable mixing or kneading devices rotary
    • B29B7/40Mixing; Kneading continuous, with mechanical mixing or kneading devices with movable mixing or kneading devices rotary with single shaft
    • B29B7/42Mixing; Kneading continuous, with mechanical mixing or kneading devices with movable mixing or kneading devices rotary with single shaft with screw or helix
    • B29B7/428Parts or accessories, e.g. casings, feeding or discharging means
    • B29B7/429Screws
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/25Component parts, details or accessories; Auxiliary operations
    • B29C48/36Means for plasticising or homogenising the moulding material or forcing it through the nozzle or die
    • B29C48/50Details of extruders
    • B29C48/505Screws
    • B29C48/64Screws with two or more threads
    • B29C48/65Screws with two or more threads neighbouring threads or channels having different configurations, e.g. one thread being lower than its neighbouring thread
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/03Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor characterised by the shape of the extruded material at extrusion

Definitions

  • This invention relates to a method and apparatus for melting and conveying plasticated material.
  • this invention relates to a ⁇ r method and apparatus for melting and conveying plasticated
  • the apparatus includes a barrel having a cylindrical bore therethrough, a shaft rotatable in said bore which has a substantially circular cross-section, the shaft and bore
  • the shaft is provided with a helical first channel means integral with the shaft for conveying said plasticated material in a downstream direction through the feed section, the tran-
  • a helical second channel means for producing an initial melt film is provided integral with the shaft for rapidly subjecting the material in the second channel means to high initial shear rates to form a melted film of plasti-
  • the second channel means terminates at a point of beginning of the transition section whereupon the - first channel means has a step through the transition sec ⁇ tion which step disappears before a point of beginning of
  • a well established melt film at the surface of the 35 bore provides the necessary difference between the coef- ficient of friction between the bore and shaft or root of the screw so that effective conveying and pressure genera ⁇ tion can be acheived. Until the melt film is properly established, efficient melting cannot be obtained in a con- ventional extruder having a smooth bore.
  • melt film is normally not formed until several turns of the flight from the beginning of the feed section, since the cold pellets of material must be heated at their surfaces to their respective melting point by either an external heat source on the barrel or by shearing of the pellets against the bore by the rotating flight. This process is at best unstable and can be disturbed by changes in the bulk density or the viscosity of the material or downstream pressure changes.
  • screw designs include an auxilliary channel located in the vicinity of the transition section.
  • This auxilliary channel is separated from a main channel by an auxilliary flight or "barrier" which is fre ⁇ quently undercut from the main flight diameter and acts as a restrictive orifice.
  • the pellets of solid material are exposed to high shear rates as they cross the barrier and should be substantially melted as they enter the auxilliary channel. Examples of this type of design may be seen in the patents to Geyer, U.S. Patent No. 3,375,549; and Dray et al, U.S. Patent No. 3,650,652.
  • the melt film in these examples is continuously drained off into the auxilliary channel located in the transition section to permit the exposure of more of the unmelted material in the main chan ⁇ nel to shearing stresses presented by the auxilliary flight and existing within the main channel.
  • these designs depend upon a traditional solids conveying or feed section which must be carefully designed to establish a stable melt film.
  • Barrier type designs may exhibit a reduced capacity to convey in a transition section since the volume of the primary channel is continuously reduced. Difficulties are sometimes encountered because the auxilliary flight is in essence a restrictive orifice, and the melting resulting from the high shear rates across the barrier is highly sen ⁇ sitive to changes in the bulk density and viscosity of the material being processed. The end result may be unstable melting and surging.
  • the shear rates to which the material is subjected may be too low with resulting reduction in melting and efficiency. Conversly, if the primary channel were to be too shallow, the shear rate may reach unacceptably high values causing the melt to be overheated.
  • Another object of the invention is to provide an independent formation of a stable melt film in the vicinity of the beginning of the feed section of the screw.
  • Yet another object of the invention is to improve melting in a single screw extruder by increasing the shear rate in the transition section of the screw without reducing the capacity of the transition section or producing excessi ⁇ vely high temperatures in the material.
  • Still another object of the invention is to provide a method and apparatus for melting and conveying plasticated material which will not subject the material to unusually high temperatures within a channel which might cause degra ⁇ dation of the material.
  • Another object of the invention is to provide in a screw design the ability to increase the conveying capacity of a feed section by increasing its pitch or lead and its depth.
  • Another object of the invention is to provide a capa- bility for controlling the thickness of sheet material being processed in sheet extrusion by increasing or decreasing the initial temperature of the external heaters in the vicinity of the feed section, rather than by increasing or decreasing the rotational speed of the screw.
  • the pre ⁇ sent invention provides a method and apparatus as disclosed for melting and conveying plasticated materials, which includes a barrel having a cylindrical bore therethrough.
  • a shaft which is rotatable within the bore is provided with a first helical flight which defines a feed section, a metering section, and a transition section.
  • a second heli ⁇ cal flight commences at a point of beginning of the feed section and extends to the beginning of the transition sec ⁇ tion.
  • the first and second flights define a pair of channels in the feed section, which are disclosed as parallel in the preferred embodiment.
  • One of the channels is shallower than the other channel which is identified as a first channel, in order to form a melt film in the second channel at a location very near to the inlet end of the apparatus.
  • the early formation of the melt film "wets" the bore of the barrel and provides for the efficient conveying of the material in the deeper channel.
  • the second flight and the second channel terminate at the end of the feed section, whereafter the channel is defined by the first flight and the shaft of the screw.
  • the channel in the transition sec ⁇ tion is provided with two unequal adjacent diameters within the channel which define a helical step, the smaller diameter being oriented downstream from the larger diameter.
  • a helical land formed by the larger diameter provides high shear rates and a large amount of melted material downstream toward the end of the transition section.
  • the smaller diameter remains substantially equal to its diameter in the feed section, and continues well into the transition sec ⁇ tion. Toward the end of the transition section the smaller diameter, gradually increases to the diameter of the shaft at the beginning of the metering section.
  • the diameter of the land gradually decreases through the transition section so as to likewise become equal to the shaft diameter at the point of beginning of the metering section.
  • the step disap ⁇ pears at such point due to the equivalence of the shaft and land diameters.
  • melted material in the vicinity of the land and solid material in the vicinity of the shaft diameter are commingled which reduces the overall melt temperature as the heat of the melted material is transferred by conduction to the remaining unmelted material which allows " higher screw rota ⁇ tional speeds and greater outputs.
  • Figure 1 is a view of an extruder embodying the invention.
  • Figure 2A is a detail view of a portion of the apparatus involved in a feed section of the preferred embo- di ent of the invention.
  • Figure 2B is a detail view of a portion of the apparatus involved in a transition section of the preferred embodiment.
  • Figure 3A is a section taken along line 3A-3A of Figure 2A.
  • Figure 3B is a section taken along line 3B-3B of Figure 2B.
  • Figure 4A is a section taken through a channel of an extruder screw representing the prior art not otherwise illustrated.
  • Figure 4B is a section similar to Figure 3A showing the formation of a melt film in a second channel of the pre ⁇ ferred embodiment.
  • Figure 4C is a section similar to Figure 3B showing melting taking place in a transition section of the pre ⁇ ferred embodiment.
  • Figure 5A is a view of an "unwrapped" or developed channel of a screw having a configuration similar to that disclosed herein showing a second channel becoming narrower.
  • Figure 5B is another view of an unwrapped or deve ⁇ loped channel showing a first channel becoming narrower.
  • Figure 1 depicts a portion of a plasticizing extruder indicated generally by reference numeral 7.
  • Barrel 11 is generally cylindrical and is provided with cylindrical bore 13 therethrough, which has an axis for rotation 8.
  • Screw 31 includes shaft 39 and is rotatable about axis 8 within bore 13, shaft 39 has a diameter 41 which varies along axis 8 in a downstream direc ⁇ tion indicated generally by reference numeral 2B.
  • Extruder 7 also has inlet end 16 in proximity to hopper 6 and outlet end 21 in proximity to outlet 23 where the melted material is ultimately discharged.
  • pellets of plasticated material indicated generally by reference numeral 44, which are con- tained in hopper 6, are conveyed in a downstream direction as indicated by reference numeral 28, due to first helical flight 76 and second helical flight 91, both of which com ⁇ mence at beginning point 103 of feed section 106 and have flight diameter 92.
  • flight diameter 92 is slightly less than the diameter of bore 13.
  • the diameter of second flight 91 may be made smaller or "undercut" from the diameter of first flight 86.
  • first flight 76 has a pitch (sometimes referred to as a lead) which is greater than the flight diameter 92.
  • first flight 76 has pushing side 81, and trailing side 84, pushing side 81 being oriented downstream from trailing side 84.
  • Second flight 91 is downstream from first flight 76 and has pushing side 94 and trailing side 97, pushing side 94 being downstream from trailing side 97. It is important to note that first flight 76 and second flight 91 both commence at beginning point 103 of feed section 106, as do first channel 56 and second channel 68.
  • First flight 76 and second flight 91 are shown on Figure 1 as being parallel, however, as will be discussed hereinafter, first flight 76 and second flight 91 need not be, depending upon the type of material being processed and if additional compaction is required for very low density material, for example.
  • Screw 31 may be seen in Figure 1 to be divided into feed section 106 for solids conveying, which section is located in proxi ⁇ mity to inlet end 16, metering section 112 for pumping the melted material, which section is located downstream from feed section 106 in proximity to outlet end 21 and outlet 23, and transition section 109, which is located between feed section 106 and metering section 112.
  • Trailing side 84 of first flight 76, shaft 39 and pushing side 94 of second flight 91 define first channel 56, which is approximately rectangular in cross section.
  • plasticated material 44 is conveyed in downstream direction 28 sequentially through feed section 106, transition section 109 and metering section 112 and outlet 23.
  • screw 31 may have more than one stage and may include multiple feed metering sections and further be provided with a venting section, mixing devices or multiple flights depending on the characteristics of the material to be pro ⁇ Listed.
  • first channel 56 has a first channel depth 116 as measured radially bet ⁇ ween flight diameter 92 and and shaft diameter 41, which first channel depth 116 is greater than second channel depth 122, which is measured radially between flight diameter 92 and land diameter 71.
  • First flight 76 and second flight 91 are continuous throughout feed section 106.
  • Second flight 91 and second channel 68 terminate at a point where feed section 106 ends and transition section 109 commences.
  • first channel depth 116 remains constant while second channel depth 122 becomes shallower in downstream direction 28 throughout feed section 106, as will be further illustrated in an example of an actual con ⁇ figuration for screw 31.
  • second flight 91 and second channel 68 have terminated at a point of beginning 108 of transition section 109.
  • First flight 76 continues throughout transition section 109 and first chan ⁇ nel 56 is therein defined by shaft 39, pushing side 81 and trailing side 84 of first flight 76.
  • shaft diameter 41 and land diameter 71 continues in transition section 109.
  • Shaft diameter 41 is downstream from and adjacent to land diameter 71, and form a step 126 between shaft diameter 41 and land diameter 71, throughout transition section 109.
  • shaft diameter 41 may be seen first remaining at its former diameter as in feed section 106 for a predetermined distance 113 along transition section 109 in a downstream direction 28 and then increasing gradually as it aproaches point of termination 111 of transition section 109 while land diameter 71 gradually decreases until at a point of ter- mination 111 of transition section 109 which is also the commencement of metering section 112, shaft diameter 41 and land diameter 71 become substantially equal, whereupon step 126 disappears.
  • Predetermined distance 113 depends upon the particular melting characteristics of material 44, but as will be shown in a typical application, it may extend approximately 78% of the length of transition section 109.
  • step 126 is also helical and has a pitch which may or may not be equal to the pitch of first flight 76.
  • the pitch of first flight 76 in transition sec- tion 109 is reduced so as to be approximately equal to the nominal flight diameter 92 of screw 31.
  • first flight 76 could have a pitch approximately equal to flight diameter 92 in a transition section 109, a reduc ⁇ tion from the pitch in feed section 106 as discussed above.
  • the pitch of the first flight 76 may be reduced because the increased volume is no longer needed.
  • Step 126 may be pro- vided with a pitch which is identical to the pitch of first flight 76, in which case step 126 and first flight 76 will be parallel and land width 73 will remain constant throughout transition section 109.
  • step 126 may have a pitch greater than the pitch of first flight 76, in which case land width 73 will increase throughout tran ⁇ sition section 109 and step 126 will approach trailing side 84 of first flight 76 or conversely step 126 may have a pitch which becomes less than the pitch of first flight 76 in transition section 109, in which case land width 73 will decrease throughout transition section 109.
  • step 126 having a pitch larger than the pitch of first flight 76 so that land width 73 increases throughout transition section 109, while simultaneously step 126 has disappeared in a smooth fairing at the point of termination 111 of transition section 109, due to the increasing of shaft diameter 41 and the decreasing of land diameter 71.
  • First channel 56 has a depth 116 which is uniform at point of termination 111 of transition section 109.
  • Metering section 112 is disclosed as having a uniform shaft diameter 41.
  • First flight 76 continues into metering section 112 and is shown together with a third flight designated by reference numeral 133.
  • Third flight 133 begins approximately at a point where step 126 terminates and is parallel to first flight 76.
  • third flight 133 is not critical to the operation of the invention but provides two parallel sets at flights in metering section 112 for improved mixing and pumping of types of materials.
  • Length of continuation of feed section shaft diameter 41 into transition section 109 in a downstream direction 28 is approximately 78% of the length of transition section
  • first channel depth 116 in feed section 106 is approximately 13% of flight diameter 92; second channel depth 122 in feed section 106 decreases from 11.1% to 1.1% of the flight diameter 92 in downstream direction 28; shaft diameter 41 increases through transition section 109 in a down ⁇ stream direction 28 by approximately 21%; land diameter 71 decreases through transition section 109 in downstream direction 28 by approxi ⁇ mately 9.1%; pitch in feed section 106 (first flight 76 and second flight 91) is 1.222 times flight diameter 92; pitch of first flight 76 in transition section 109 is equal to the first diameter 92; pitch of step 126 in transition section 109 is 1.034 times flight diameter 92; and pitch of first flight 76 and third flight 133 in metering section 112 is equal to flight diameter 92.
  • first flight 76 and second flight 91 in feed section 106 are larger than would normally be expected.
  • first channel depth 116 is greater than that which would normally be encountered.
  • Figure 5A shows feed section 106, in schematic form for purposes of clarity, having first channel 56 and second channel 68
  • first channel 56 may be seen as having a constant width 117 whereas second channel 68 has a width 123 which decreases in downstream direction 28.
  • width 117 of first channel 56 narrows while width 123 of second channel remains constant in downstream direction 28.
  • width 123 of second channel 68 might be narrowed by increasing width 128 of first flight 76 such that pushing side 81 of first flight 76 approaches trailing side 97 of second flight 91, thus narrowing second channel 69.
  • width 117 of first channel 56 might be narrowed by increasing width 128 of first flight 76 such that trailing side 84 of first flight 76 approaches pushing side 94 of second flight 91. Conversely, width 131 of second flight 91 might be increased to accomplish a similar * effect.
  • first channel width 117 or second channel width 123 is narrowed, material 44 in the respective channel is compacted without any appreciable increase in the shear rate, as would normally occur if com ⁇ paction were attempted by way of decreasing first channel depth 116 in feed section 106. Due to the larger than nor ⁇ mal initial pitch of first flight 76 and second flight 91, there is an ample margin for the narrowing of either first channel width 117 or second channel width 123 and yet still maintain an adequate volume in either.
  • first channel 56 and second channel 68 may be specifically configured to enhance the melting and con- veying of a particular material.
  • second channel 68 Since, as may be seen in Figure 3A, second channel 68 has a very shallow depth 122, it immediately subjects material 44 to high shear rates very early in feed section 106, with the result that a melt film is established in close proximity to inlet end 16 of screw 31. Meanwhile, the material 44 in first channel 56 is subjected to lower shear rates since first channel depth 116 is greater than second channel depth 122 and less melting of material 44 takes place. A depiction of this may be seen in Figure 4B, which shows the material 44 in second channel 68 nearly melted while the material in first channel 56 is conveyed down ⁇ stream in unmelted form. By way of contrast.
  • Figure 4A shows a section of channel at an equivalent location along a screw similar to screw 31 which contains mostly solid material with some melt film beginning to form, which would normally be 4 to 5 turns of the flight downstream from the inlet end 16.
  • the melt film immediately forming in second channel 68 can "wet" bore 13 and is much more stable than the melt film formed in a conventional feed section.
  • the difference in the coefficients of friction between bore 13 and shaft 39 is well established and the conveying of material 44 in first channel 56 is much more efficient due to the earlier forming of the melted film of material 44.
  • This early formation of a melt film in second channel 68 may be seen to be indepen ⁇ dent of solids conveying in first channel 56.
  • second flight 31 and second channel 68 terminate at the end of feed section 106 and the beginning of tran ⁇ sition section 109.
  • the melt film has been well established and is quite stable, thus permitting effi ⁇ cient solids conveying.
  • second channel 68 has "emptied" into first channel 56 which is now defined by first flight 76, shaft 39 and land 67 and first channel 56 has in addition step 126 between shaft diameter 41 and land diameter 71.
  • Land diameter 71 provides a narrower and shallower area for the maximum production of melt film.
  • shaft diameter 41 remains substan- tially the same as in feed section 106 or possibly shaft diameter 41 may be initially reduced in transition section 109.
  • Step 126 is able to permit the gradual controlled intermixing of material at two different temperatures within first channel 56, since as step 126 disappears, the unmelted and melted material is commingled throughout transition section 109 in first channel 56.
  • Metering section 112 which may be provided with third flight 133 in conjunction with first flight 76 pumps the melted material through outlet 23 and a die which, although not illustrated, may be provided at outlet end 21.
  • a transition section which increases melting rates, thus enhancing the melting taking place in the main channel. Due to the commingling of the melted and solid material well into the transiton section, melt temperatures remain within acceptable limits for the prevention of the degradation of the material. The capacity of the transition section is not reduced due to the increase of pitch of the feed section which is able to convey solid material at a greater rate without the danger of "surging", since melting is already well developed in an auxilliary channel in the feed section.
  • the initial melt film is formed independently in the second channel at the beginning of the feed section, the differential between the frictional coefficients of the bore and the shaft or "root" of the screw are well established, and the feed section is much less sensitive to a shortened residence time of the material in the feed sec ⁇ tion if the pitch of the flight were to be increased.
  • the pitch of the flight may be increased without loss of mechanical advantage; and further, the first channel depth in a feed section can be increased without detriment to melting occurring in the first channel.
  • the characteristics and design of the feed section of the screw is less dependent upon the physi- cal and thermal characteristics of the material.
  • the melt film can be established in a second channel for a wide variety of materials since it is independent of what is occurring in the first or main channel. If there should appear an increase in downstream pressure, the melt film in the second channel is not as readily disturbed as in the prior art. In fact it has been observed that such pressure increases serve to assist the entire melting process by further compacting the yet unmelted material in the vicinity of the step in the transition section, thus permitting improved heat transfer from the melted material as the two commingle toward the end of the transition section.
  • melt film is formed in the second channel as an independent event, it can likewise be controlled by independent means.
  • barrel heaters are used in the vicinity of the feed section to assist the formation of a melt film. It has been observed that by increasing the initial temperatures in the feed zone by increasing the heat imput from the heaters, melt formation in the second channel is increased. This, in turn, provides an improved "wetting" of the bore together with more melted material to commingle with the yet unmelted material in the transition section, resulting in an increase in output, sometimes measured in the art as the variable "pounds per hour per revolutions per minute" or "lbs./hr./rpm".
  • heater temperature may be used to vary output which permits a greater degree of control without producing adverse changes in bulk density, pressure or viscosity or without allowing slight fluctuations of these variables, if they do occur, to adversely effect the quality of the extru ⁇ ders output.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Extrusion Moulding Of Plastics Or The Like (AREA)
  • Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)

Abstract

Un procédé et un appareil de fusion et de transport de matériaux plastifiés fonctionnement en développant indépendamment une pellicule initiale de matériau fondu, nécessaire pour que le transport approprié du matériau puisse se faire. L'appareil comprend un cylindre (11) traversé d'un alésage cylidrique (13) et un arbre (39) rotatif dans cet alésage ayant une section transversale sensiblement circulaire. L'arbre (39) et l'alésage (13) définissent une section d'alimentation (106), une section de dosage (112) et une section de transition (109) située entre les sections d'alimentation et de dosage. L'arbre est muni d'un premier élément à canal hélicoïdal (56) formé intégralement avec l'arbre (39) pour transporter le matériau plastifié d'amont en aval (28) à travers la section d'alimentation (106), la section de transition (109) et la section de dosage (112) lorsque l'arbre (39) est mis en rotation. Un deuxième élément à canal hélicoïdal (68) pour produire une pellicule initiale de matériau fondu est formé intégralement avec l'arbre (39) pour soumettre le matériau dans le deuxième élément à canal (68) à des vitesses initiales élevées de cisaillement afin de former rapidement une pellicule fondue de matériau plastifié à proximité d'un emplacement au début (103) de la section d'alimentation (106). Le deuxième élément à canal (68) finit à un emplacement au début (108) de la section de transition (109). Dans la section de transition (109) le premier élément à canal (56) comprend un retrait (126) qui disparaît avant le début (111) de la section de dosage.A method and apparatus for melting and transporting plasticized materials operates by independently developing an initial film of molten material, necessary for proper transport of the material to take place. The apparatus comprises a cylinder (11) traversed by a cylindrical bore (13) and a rotary shaft (39) in this bore having a substantially circular cross section. The shaft (39) and the bore (13) define a feed section (106), a metering section (112) and a transition section (109) located between the feed and metering sections. The shaft is provided with a first helical channel element (56) formed integrally with the shaft (39) for transporting the plasticized material from upstream to downstream (28) through the feed section (106), the transition section (109) and the metering section (112) when the shaft (39) is rotated. A second helical channel member (68) for producing an initial film of molten material is integrally formed with the shaft (39) to subject the material in the second channel member (68) to high initial shear rates to form quickly a melted film of plasticized material near a location at the start (103) of the feed section (106). The second channel element (68) ends at a location at the start (108) of the transition section (109). In the transition section (109) the first channel element (56) includes a recess (126) which disappears before the start (111) of the metering section.

Description

METHOD AND APPARATUS FOR MELTING AND CONVEYING PLASTICATED MATERIAL
This invention relates to a method and apparatus for melting and conveying plasticated material.
More specifically, this invention relates to a {■r method and apparatus for melting and conveying plasticated
5 materials by independently developing an initial melt film which is necessary for a proper conveying of the material. The apparatus includes a barrel having a cylindrical bore therethrough, a shaft rotatable in said bore which has a substantially circular cross-section, the shaft and bore
10 defining a feed section, a metering section and a transition section between the feed and metering sections. The shaft is provided with a helical first channel means integral with the shaft for conveying said plasticated material in a downstream direction through the feed section, the tran-
15 sition section, and the metering section when the shaft is rotated. A helical second channel means for producing an initial melt film is provided integral with the shaft for rapidly subjecting the material in the second channel means to high initial shear rates to form a melted film of plasti-
20 cated material in proximity to a point of commencement of the feed section. The second channel means terminates at a point of beginning of the transition section whereupon the - first channel means has a step through the transition sec¬ tion which step disappears before a point of beginning of
25 the metering section.
DESCRIPTION OF THE PRIOR ART
The prior art of melting and conveying plasticated materials by an extruder screw rotating in a barrel is well documented. Traditionally, solid material is conveyed in a 30 helical screw channel which channel gradually becomes shallower so as to expose the material to the interior sur¬ face of a bore in an extruder barrel, which is usually heated.
A well established melt film at the surface of the 35 bore provides the necessary difference between the coef- ficient of friction between the bore and shaft or root of the screw so that effective conveying and pressure genera¬ tion can be acheived. Until the melt film is properly established, efficient melting cannot be obtained in a con- ventional extruder having a smooth bore.
In a screw having a conventional feed section, a melt film is normally not formed until several turns of the flight from the beginning of the feed section, since the cold pellets of material must be heated at their surfaces to their respective melting point by either an external heat source on the barrel or by shearing of the pellets against the bore by the rotating flight. This process is at best unstable and can be disturbed by changes in the bulk density or the viscosity of the material or downstream pressure changes.
If the relationship and configuration of the section depths and lengths of the feed, transition and metering sec¬ tions is not correct for the particular material being pro¬ cessed, the initial friction may be lost and the newly-formed melt film will not be stable. In that event, the conveying of solid material will stop, whereupon the solids will merely rotate with the screw and will not be conveyed downstream. Proper conveying will not occur again until the melt film is reestablished. This phenomenon is frequently referred to as "surging", and it has an obvious detrimental effect upon the quality and quantity of the material being processed. However, once a stable melt film is established, proper conveying and melting can efficiently take place. To prevent this surging phenomenon, barrels which have grooves in the bore in the vicinity of the feed section were developed to prevent rotation of the solids and encourage conveying.
However, these grooved barrels exhibit drawbacks such as increased torque requirements and reduced operating speeds.
In addition, several screw designs include an auxilliary channel located in the vicinity of the transition section. This auxilliary channel is separated from a main channel by an auxilliary flight or "barrier" which is fre¬ quently undercut from the main flight diameter and acts as a restrictive orifice. The pellets of solid material are exposed to high shear rates as they cross the barrier and should be substantially melted as they enter the auxilliary channel. Examples of this type of design may be seen in the patents to Geyer, U.S. Patent No. 3,375,549; and Dray et al, U.S. Patent No. 3,650,652. The melt film in these examples is continuously drained off into the auxilliary channel located in the transition section to permit the exposure of more of the unmelted material in the main chan¬ nel to shearing stresses presented by the auxilliary flight and existing within the main channel. However, these designs depend upon a traditional solids conveying or feed section which must be carefully designed to establish a stable melt film.
Barrier type designs may exhibit a reduced capacity to convey in a transition section since the volume of the primary channel is continuously reduced. Difficulties are sometimes encountered because the auxilliary flight is in essence a restrictive orifice, and the melting resulting from the high shear rates across the barrier is highly sen¬ sitive to changes in the bulk density and viscosity of the material being processed. The end result may be unstable melting and surging. In a manner similar to conventional screws, if the main or primary channel in a feed section of a barrier design were to be too deep, the shear rates to which the material is subjected may be too low with resulting reduction in melting and efficiency. Conversly, if the primary channel were to be too shallow, the shear rate may reach unacceptably high values causing the melt to be overheated.
These drawbacks in the prior art also cause uncer- tainty in the extrusion of sheet material. Those skilled in the art will be familiar with attempts to control the thickness or gauge of the extruded material by increasing or decreasing the rotational speed of the screw. This is dif- ficult because changes in the rotational speed of screw result in a change in the shear rate which in turn changes the viscosity of the melted material which produce pressure gradients within the screw channel. Thus, the thickness of the sheet becomes a function of several variables all of which change with the rotational speed of the screw and result in great difficulty in attempting to control sheet thickness by rotational speed alone.
Those skilled in the art will also recognize that these same variables must be taken into account in the con¬ figuration of the feed, transition and metering sections of a screw. Because bulk density and viscosity determine these configurations, and internal pressures developed within a screw channel cause these to vary unexpectedly, screw designs are quite specific to the type of material being processed. As an example, in a conventional design repre¬ sentative of the prior art, the appearance of a higher downstream pressure typically produces an increase in the shear rate until the viscosity of the material decreases to a point at which conveying can continue without any further decrease in the viscosity. This, however, increases the melt temperature even presupposing that the resulting fluc¬ tuations in these variables do not exceed the design capabi¬ lities of the screw which, of course, would all but prevent normal melting. These effects are only aggravated by changes in the physical and thermal properties of the material being processed.
The invention to be described more fully hereinafter remedies the shortcomings of the prior art and in addition, provides features and advantages not appearing therein.
It is, therefore, a primary object of the invention to provide a method and apparatus for melting and conveying plasticated material by encouraging the immediate formation of a melt film in close proximity to the inlet end of a screw, independently from feed section conveying and pressure build up.
Another object of the invention is to provide an independent formation of a stable melt film in the vicinity of the beginning of the feed section of the screw.
Yet another object of the invention is to improve melting in a single screw extruder by increasing the shear rate in the transition section of the screw without reducing the capacity of the transition section or producing excessi¬ vely high temperatures in the material.
Still another object of the invention is to provide a method and apparatus for melting and conveying plasticated material which will not subject the material to unusually high temperatures within a channel which might cause degra¬ dation of the material.
Another object of the invention is to provide in a screw design the ability to increase the conveying capacity of a feed section by increasing its pitch or lead and its depth.
Yet another object of the invention is to provide a screw configuration which is less sensitive to the physical and thermal characteristics of the material being processed and is able to process a variety of materials. Still another object of the invention is to decrease the overall melt temperature during extrusion at high and low die pressures with materials exhibiting both high and low viscosities.
Another object of the invention is to provide a capa- bility for controlling the thickness of sheet material being processed in sheet extrusion by increasing or decreasing the initial temperature of the external heaters in the vicinity of the feed section, rather than by increasing or decreasing the rotational speed of the screw.
SUMMARY OF THE INVENTION
In the attaining of the foregoing objects, the pre¬ sent invention provides a method and apparatus as disclosed for melting and conveying plasticated materials, which includes a barrel having a cylindrical bore therethrough. A shaft which is rotatable within the bore is provided with a first helical flight which defines a feed section, a metering section, and a transition section. A second heli¬ cal flight commences at a point of beginning of the feed section and extends to the beginning of the transition sec¬ tion. In the preferred embodiment the first and second flights define a pair of channels in the feed section, which are disclosed as parallel in the preferred embodiment. One of the channels, identified herein as a second channel, is shallower than the other channel which is identified as a first channel, in order to form a melt film in the second channel at a location very near to the inlet end of the apparatus. The early formation of the melt film "wets" the bore of the barrel and provides for the efficient conveying of the material in the deeper channel.
In the preferred embodiment, the second flight and the second channel terminate at the end of the feed section, whereafter the channel is defined by the first flight and the shaft of the screw. The channel in the transition sec¬ tion is provided with two unequal adjacent diameters within the channel which define a helical step, the smaller diameter being oriented downstream from the larger diameter. A helical land formed by the larger diameter provides high shear rates and a large amount of melted material downstream toward the end of the transition section. The smaller diameter remains substantially equal to its diameter in the feed section, and continues well into the transition sec¬ tion. Toward the end of the transition section the smaller diameter, gradually increases to the diameter of the shaft at the beginning of the metering section. The diameter of the land gradually decreases through the transition section so as to likewise become equal to the shaft diameter at the point of beginning of the metering section. The step disap¬ pears at such point due to the equivalence of the shaft and land diameters. Throughout the transition section, melted material in the vicinity of the land and solid material in the vicinity of the shaft diameter are commingled which reduces the overall melt temperature as the heat of the melted material is transferred by conduction to the remaining unmelted material which allows "higher screw rota¬ tional speeds and greater outputs. DESCRIPTION OF THE DRAWINGS
Other objects and advantages of the present invention will become apparent from the ensuing description and the illustrative embodiment thereof, in the course of which, reference is made to the accompanying drawings in which:
Figure 1 is a view of an extruder embodying the invention.
Figure 2A is a detail view of a portion of the apparatus involved in a feed section of the preferred embo- di ent of the invention.
Figure 2B is a detail view of a portion of the apparatus involved in a transition section of the preferred embodiment.
Figure 3A is a section taken along line 3A-3A of Figure 2A.
Figure 3B is a section taken along line 3B-3B of Figure 2B.
Figure 4A is a section taken through a channel of an extruder screw representing the prior art not otherwise illustrated.
Figure 4B is a section similar to Figure 3A showing the formation of a melt film in a second channel of the pre¬ ferred embodiment.
Figure 4C is a section similar to Figure 3B showing melting taking place in a transition section of the pre¬ ferred embodiment.
Figure 5A is a view of an "unwrapped" or developed channel of a screw having a configuration similar to that disclosed herein showing a second channel becoming narrower.
Figure 5B is another view of an unwrapped or deve¬ loped channel showing a first channel becoming narrower.
DESCRIPTION OF THE PREFERRED EMBODIMENT
Reference is now made to Figure 1, which depicts a portion of a plasticizing extruder indicated generally by reference numeral 7. For purposes of illustration and clarity, the drive mechanism which is normally connected to driveshaft 36 and likewise, the barrel heaters, which nor¬ mally are attached to barrel 11 throughout feed section 106, have been omitted. Barrel 11 is generally cylindrical and is provided with cylindrical bore 13 therethrough, which has an axis for rotation 8. Screw 31 includes shaft 39 and is rotatable about axis 8 within bore 13, shaft 39 has a diameter 41 which varies along axis 8 in a downstream direc¬ tion indicated generally by reference numeral 2B. Extruder 7 also has inlet end 16 in proximity to hopper 6 and outlet end 21 in proximity to outlet 23 where the melted material is ultimately discharged. When driveshaft 36 and screw 31 are rotated within bore 13, pellets of plasticated material, indicated generally by reference numeral 44, which are con- tained in hopper 6, are conveyed in a downstream direction as indicated by reference numeral 28, due to first helical flight 76 and second helical flight 91, both of which com¬ mence at beginning point 103 of feed section 106 and have flight diameter 92. In practice, flight diameter 92 is slightly less than the diameter of bore 13. If desired for a particular application, the diameter of second flight 91 may be made smaller or "undercut" from the diameter of first flight 86. In the preferred embodiment of the invention, first flight 76 has a pitch (sometimes referred to as a lead) which is greater than the flight diameter 92. For example, if the nominal flight diameter 92 is 4- inches, an appropriate initial pitch of first flight 76 might be 5-V_ inches. This permits a larger channel width which in turn permits the conveying of a greater amount of material. Referring now to Figure 1, Figure 2A and Figure 3A, first flight 76 has pushing side 81, and trailing side 84, pushing side 81 being oriented downstream from trailing side 84. Second flight 91 is downstream from first flight 76 and has pushing side 94 and trailing side 97, pushing side 94 being downstream from trailing side 97. It is important to note that first flight 76 and second flight 91 both commence at beginning point 103 of feed section 106, as do first channel 56 and second channel 68. First flight 76 and second flight 91 are shown on Figure 1 as being parallel, however, as will be discussed hereinafter, first flight 76 and second flight 91 need not be, depending upon the type of material being processed and if additional compaction is required for very low density material, for example. Screw 31 may be seen in Figure 1 to be divided into feed section 106 for solids conveying, which section is located in proxi¬ mity to inlet end 16, metering section 112 for pumping the melted material, which section is located downstream from feed section 106 in proximity to outlet end 21 and outlet 23, and transition section 109, which is located between feed section 106 and metering section 112.
Trailing side 84 of first flight 76, shaft 39 and pushing side 94 of second flight 91 define first channel 56, which is approximately rectangular in cross section. Upon rotation of screw 31, plasticated material 44 is conveyed in downstream direction 28 sequentially through feed section 106, transition section 109 and metering section 112 and outlet 23. Although the preferred embodiment discloses what is commonly referred to as a single stage screw having a feed section, a transition section and a metering section, it should be apparent to those skilled in the art that screw 31 may have more than one stage and may include multiple feed metering sections and further be provided with a venting section, mixing devices or multiple flights depending on the characteristics of the material to be pro¬ cessed.
Still referring to Figures 1, 2A, 2B and 3A, land 67 is provided between first flight 76 and second flight 91, such that a second channel 68 is defined by pushing side 81 of first flight 76, trailing side 97 of second flight 91 and land 67. As may be seen in Figure 2A and 3A, first channel 56 has a first channel depth 116 as measured radially bet¬ ween flight diameter 92 and and shaft diameter 41, which first channel depth 116 is greater than second channel depth 122, which is measured radially between flight diameter 92 and land diameter 71. First flight 76 and second flight 91 are continuous throughout feed section 106. Second flight 91 and second channel 68 terminate at a point where feed section 106 ends and transition section 109 commences. In the preferred embodiment, first channel depth 116 remains constant while second channel depth 122 becomes shallower in downstream direction 28 throughout feed section 106, as will be further illustrated in an example of an actual con¬ figuration for screw 31.
Referring now to Figures 1, 2B and 3B, second flight 91 and second channel 68 have terminated at a point of beginning 108 of transition section 109. First flight 76 continues throughout transition section 109 and first chan¬ nel 56 is therein defined by shaft 39, pushing side 81 and trailing side 84 of first flight 76. However, a difference between shaft diameter 41 and land diameter 71 continues in transition section 109. Shaft diameter 41 is downstream from and adjacent to land diameter 71, and form a step 126 between shaft diameter 41 and land diameter 71, throughout transition section 109. In the preferred embodiment, shaft diameter 41 may be seen first remaining at its former diameter as in feed section 106 for a predetermined distance 113 along transition section 109 in a downstream direction 28 and then increasing gradually as it aproaches point of termination 111 of transition section 109 while land diameter 71 gradually decreases until at a point of ter- mination 111 of transition section 109 which is also the commencement of metering section 112, shaft diameter 41 and land diameter 71 become substantially equal, whereupon step 126 disappears. Predetermined distance 113 depends upon the particular melting characteristics of material 44, but as will be shown in a typical application, it may extend approximately 78% of the length of transition section 109.
It is apparant that step 126 is also helical and has a pitch which may or may not be equal to the pitch of first flight 76. The pitch of first flight 76 in transition sec- tion 109, in the preferred embodiment, is reduced so as to be approximately equal to the nominal flight diameter 92 of screw 31. Thus, for a screw having a given flight diameter 92, first flight 76 could have a pitch approximately equal to flight diameter 92 in a transition section 109, a reduc¬ tion from the pitch in feed section 106 as discussed above. The pitch of the first flight 76 may be reduced because the increased volume is no longer needed. Step 126 may be pro- vided with a pitch which is identical to the pitch of first flight 76, in which case step 126 and first flight 76 will be parallel and land width 73 will remain constant throughout transition section 109. Alternatively, step 126 may have a pitch greater than the pitch of first flight 76, in which case land width 73 will increase throughout tran¬ sition section 109 and step 126 will approach trailing side 84 of first flight 76 or conversely step 126 may have a pitch which becomes less than the pitch of first flight 76 in transition section 109, in which case land width 73 will decrease throughout transition section 109. The exact con¬ figuration of land width 73 will depend on the shear rate desired in the vicinty of land 67 and also on the melting characteristics of plasticated material 44. Figure 1 discloses step 126 having a pitch larger than the pitch of first flight 76 so that land width 73 increases throughout transition section 109, while simultaneously step 126 has disappeared in a smooth fairing at the point of termination 111 of transition section 109, due to the increasing of shaft diameter 41 and the decreasing of land diameter 71. First channel 56 has a depth 116 which is uniform at point of termination 111 of transition section 109.
Metering section 112 is disclosed as having a uniform shaft diameter 41. First flight 76 continues into metering section 112 and is shown together with a third flight designated by reference numeral 133. Third flight 133 begins approximately at a point where step 126 terminates and is parallel to first flight 76. Those skilled in the art will recognize that third flight 133 is not critical to the operation of the invention but provides two parallel sets at flights in metering section 112 for improved mixing and pumping of types of materials.
By way of an illustrative example of a screw embodying the above characteristics, the following con- figuration was successfully used on a 24:1 L/D single stage screw. For purposes of clarity, only those characteristics directly illustrating the invention disclosed herein will be described.
Length of continuation of feed section shaft diameter 41 into transition section 109 in a downstream direction 28 is approximately 78% of the length of transition section
109 as measured from the point of beginning 108 of transition section 109; first channel depth 116 in feed section 106 is approximately 13% of flight diameter 92; second channel depth 122 in feed section 106 decreases from 11.1% to 1.1% of the flight diameter 92 in downstream direction 28; shaft diameter 41 increases through transition section 109 in a down¬ stream direction 28 by approximately 21%; land diameter 71 decreases through transition section 109 in downstream direction 28 by approxi¬ mately 9.1%; pitch in feed section 106 (first flight 76 and second flight 91) is 1.222 times flight diameter 92; pitch of first flight 76 in transition section 109 is equal to the first diameter 92; pitch of step 126 in transition section 109 is 1.034 times flight diameter 92; and pitch of first flight 76 and third flight 133 in metering section 112 is equal to flight diameter 92.
Those skilled in the art will notice that the pitch of first flight 76 and second flight 91 in feed section 106 is larger than would normally be expected. In addition, first channel depth 116 is greater than that which would normally be encountered.
It is sometimes desirable to vary the width 117 of first channel 56 or the width 123 second channel 68, again, depending on the type of material being processed, as may be seen by reference to Figures 5A and 5B, which are developed or "unwrapped" channels of a screw emboding the features discussed.
Specifically, Figure 5A shows feed section 106, in schematic form for purposes of clarity, having first channel 56 and second channel 68, first channel 56 may be seen as having a constant width 117 whereas second channel 68 has a width 123 which decreases in downstream direction 28. Conversely, as may be seen by reference to Figure 5B, width 117 of first channel 56 narrows while width 123 of second channel remains constant in downstream direction 28. As an example, width 123 of second channel 68 might be narrowed by increasing width 128 of first flight 76 such that pushing side 81 of first flight 76 approaches trailing side 97 of second flight 91, thus narrowing second channel 69. Alternatively, width 117 of first channel 56 might be narrowed by increasing width 128 of first flight 76 such that trailing side 84 of first flight 76 approaches pushing side 94 of second flight 91. Conversely, width 131 of second flight 91 might be increased to accomplish a similar* effect.
This type of a configuration is quite useful as an aid to the compaction of very low density or "fluff- materials such as regrind. As first channel width 117 or second channel width 123 is narrowed, material 44 in the respective channel is compacted without any appreciable increase in the shear rate, as would normally occur if com¬ paction were attempted by way of decreasing first channel depth 116 in feed section 106. Due to the larger than nor¬ mal initial pitch of first flight 76 and second flight 91, there is an ample margin for the narrowing of either first channel width 117 or second channel width 123 and yet still maintain an adequate volume in either. It should be appre¬ ciated that in addition to varying of either of the channel widths, the relationship of the depths of first channel depth 116 and second channel depth 122, discussed above, may be varied so that first channel 56 and second channel 68 may be specifically configured to enhance the melting and con- veying of a particular material.
OPERATION
Operation of the device is best understood by ini¬ tially referring to Figure 1. As screw 31 is rotated by way of driveshaft 36 inside bore 13 of barrel 11, material 44, which is contained in solid form in hopper 6, enters first channel 56 and second channel 68 at beginning point 103 of feed section 106. As discussed above, the prior art provi¬ des an auxilliary channel used to drain off the melt film formed in a main channel in a transition section. In the present invention, however, second channel 68 itself forms the initial melt film in proximity to beginning point 103 of feed section 106.
Since, as may be seen in Figure 3A, second channel 68 has a very shallow depth 122, it immediately subjects material 44 to high shear rates very early in feed section 106, with the result that a melt film is established in close proximity to inlet end 16 of screw 31. Meanwhile, the material 44 in first channel 56 is subjected to lower shear rates since first channel depth 116 is greater than second channel depth 122 and less melting of material 44 takes place. A depiction of this may be seen in Figure 4B, which shows the material 44 in second channel 68 nearly melted while the material in first channel 56 is conveyed down¬ stream in unmelted form. By way of contrast. Figure 4A shows a section of channel at an equivalent location along a screw similar to screw 31 which contains mostly solid material with some melt film beginning to form, which would normally be 4 to 5 turns of the flight downstream from the inlet end 16. Returning to Figure 4B, as screw 31 rotates, the melt film immediately forming in second channel 68 can "wet" bore 13 and is much more stable than the melt film formed in a conventional feed section. The difference in the coefficients of friction between bore 13 and shaft 39 is well established and the conveying of material 44 in first channel 56 is much more efficient due to the earlier forming of the melted film of material 44. This early formation of a melt film in second channel 68 may be seen to be indepen¬ dent of solids conveying in first channel 56.
As the material 44 continues to move in a downstream direction, second flight 31 and second channel 68 terminate at the end of feed section 106 and the beginning of tran¬ sition section 109. By this point, the melt film has been well established and is quite stable, thus permitting effi¬ cient solids conveying. Referring now to Figures 2B and 4C second channel 68 has "emptied" into first channel 56 which is now defined by first flight 76, shaft 39 and land 67 and first channel 56 has in addition step 126 between shaft diameter 41 and land diameter 71. Land diameter 71 provides a narrower and shallower area for the maximum production of melt film. Meanwhile, shaft diameter 41 remains substan- tially the same as in feed section 106 or possibly shaft diameter 41 may be initially reduced in transition section 109. This has the effect of extending feed section 106 well into transition section 109 for distance 113 so as to pro¬ vide a large amount of cooler unmelted material 44 toward the point of termination 111 of transition section 109, which can commingle with the melted material in the vicinity of land 67. This reduces the overall melt temperature of the material as the melted material in the vicinity of land 67 transfers its heat to the unmelted material in the vici- nity of shaft 39 by conduction in leaving transition section 109 and progressing through metering section 112. Step 126 is able to permit the gradual controlled intermixing of material at two different temperatures within first channel 56, since as step 126 disappears, the unmelted and melted material is commingled throughout transition section 109 in first channel 56.
Metering section 112, which may be provided with third flight 133 in conjunction with first flight 76 pumps the melted material through outlet 23 and a die which, although not illustrated, may be provided at outlet end 21. Thus, it may be seen from the foregoing description that there is provided a method and apparatus for melting and conveying plasticated material by encouraging the inde¬ pendent formation of a melt film in the vicinity of the beginning of the feed section. The melt film formed in a second channel is stable and is able to "wet" the bore of the extruder barrel which greatly improves the conveying of solid material.
In addition, a transition section is provided which increases melting rates, thus enhancing the melting taking place in the main channel. Due to the commingling of the melted and solid material well into the transiton section, melt temperatures remain within acceptable limits for the prevention of the degradation of the material. The capacity of the transition section is not reduced due to the increase of pitch of the feed section which is able to convey solid material at a greater rate without the danger of "surging", since melting is already well developed in an auxilliary channel in the feed section.
Because the initial melt film is formed independently in the second channel at the beginning of the feed section, the differential between the frictional coefficients of the bore and the shaft or "root" of the screw are well established, and the feed section is much less sensitive to a shortened residence time of the material in the feed sec¬ tion if the pitch of the flight were to be increased. As a result, the pitch of the flight may be increased without loss of mechanical advantage; and further, the first channel depth in a feed section can be increased without detriment to melting occurring in the first channel.
In addition, the characteristics and design of the feed section of the screw is less dependent upon the physi- cal and thermal characteristics of the material. The melt film can be established in a second channel for a wide variety of materials since it is independent of what is occurring in the first or main channel. If there should appear an increase in downstream pressure, the melt film in the second channel is not as readily disturbed as in the prior art. In fact it has been observed that such pressure increases serve to assist the entire melting process by further compacting the yet unmelted material in the vicinity of the step in the transition section, thus permitting improved heat transfer from the melted material as the two commingle toward the end of the transition section.
It should also be noted that because the melt film is formed in the second channel as an independent event, it can likewise be controlled by independent means. In the present invention as in the prior art, barrel heaters are used in the vicinity of the feed section to assist the formation of a melt film. It has been observed that by increasing the initial temperatures in the feed zone by increasing the heat imput from the heaters, melt formation in the second channel is increased. This, in turn, provides an improved "wetting" of the bore together with more melted material to commingle with the yet unmelted material in the transition section, resulting in an increase in output, sometimes measured in the art as the variable "pounds per hour per revolutions per minute" or "lbs./hr./rpm". A decrease in the initial heater temperatures would have an opposite effect by reducing the amount of melt formed in the second channel, thereby reducing lbs./hr./rpm. This adjustment would occur indepen¬ dent of screw speed and permits a much greater control of output than merely a varying of the screw speed, since den¬ sity and viscosity effects do not have so great an impact on melting. The advantage to the control of sheet thickness should be apparant because, in the invention disclosed herein, heater temperature may be used to vary output which permits a greater degree of control without producing adverse changes in bulk density, pressure or viscosity or without allowing slight fluctuations of these variables, if they do occur, to adversely effect the quality of the extru¬ ders output.
Although only certain embodiments of the present invention have been illustrated and described, it will be apparent to those skilled in the art that various changes and modification may be made to these embodiments without departing from the spirit and scope of the invention.

Claims

I claim:
1. Apparatus for melting and conveying plasticated material comprising:
(a) a barrel having a cylindrical bore therethrough;
(b) a shaft rotatable in said bore and having a substantially circular cross-section and an axis for rota¬ tion concentric with said bore, said barrel and said shaft defining a feed section, a metering section and a transition section therebetween;
(c) a helical first channel means integral with said shaft for conveying plasticated material through said feed section, said transition section and said metering sec¬ tion in a downstream direction upon rotation of said shaft; and
(d) a helical second channel means integral with said shaft for forming a melted film of said plasti¬ cated material in proximity to a point of commencement of said feed section.
2. The apparatus of claim 1 wherein said first and second channel means are defined by a first helical flight, a second helical flight and said shaft, said first channel means having a width and a radial depth, said flights having a diameter less than the diameter of said bore.
3. The apparatus of claim 2 wherein said second channel means has a width and is located upstream from said first channel means, said second channel means further having a radial depth which is less than said radial depth of said first channel means, said radial depth of said second channel means decreasing in a downstream direction to a predetermined depth, said second flight and said second channel means terminating at a point of beginning of said transition section.
4. The apparatus of claim 3 wherein said radial depth of said first channel means is constant throughout said feed section.
5. The apparatus of claim 4 wherein said width of said first channel means decreases in a downstream direc- tion .
6. The apparatus of claim 4 wherein said width of said second channel means decreases in a downstream direc¬ tion.
7. The apparatus of claim 4 wherein said first chan¬ nel means and said second channel means are parallel, said width of said second channel means being less than said width of said first channel means.
8. The apparatus of claim 7 wherein said constant radial depth of said first channel means in said feed sec¬ tion extends a predetermined distance in said transition section.
9. The apparatus of claim 8 wherein said second flight has a flight diameter which is equal to a flight diameter of said first flight.
10. The apparatus of claim 8 wherein said second flight has a flight diameter which is less than a flight diameter of said first flight.
11. Apparatus for melting and conveying plasticated material comprising:
(a) a barrel having a cylindrical bore therethrough;
(b) a shaft rotatable in said bore and having a substantially circular cross-section and an axis for rota- tion concentric with said bore;
(c) a continuous helical first flight integral with said shaft and having a pitch larger than the diameter of said bore and having a diameter less than the diameter of said bore, said first flight and said shaft defining a feed section, a metering section and a transition section there¬ between, said first flight further having a pushing side and a trailing side;
(d) a continuous helical second flight integral with said shaft and parallel to said first flight having a diameter equal to said first flight and having a pushing side and a trailing side, said second flight extending from a point of beginning of said feed section to a point of com¬ mencement of said transition section, said trailing side of said first flight, said pushing side of said second flight and said shaft defining a first channel having a first chan¬ nel depth and a first channel width for conveying plasti¬ cated material in a downstream direction as said shaft is rotated, said pushing side of said first flight, said trailing side of said second flight and said shaft defining a second channel having a second channel depth less than said first channel depth and a second channel width, said second channel extending through said feed section to said point of commencement of said transition section, said first channel depth being constant within said first channel throughout said feed section, said second channel depth decreasing in a downstream direction, said pitch of said first flight being reduced at said point of commencement of said transition section to approximately the diameter of said bore, said first channel in said transition and metering sections being defined by said first flight and said shaft, said shaft within said transition section having a larger diameter and a smaller diameter adjacent thereto within said first channel, said smaller diameter being downstream from said larger diameter and defining a helical step having a pitch which step extends through said tran¬ sition section to a point of commencement of said metering section.
12. The apparatus of claim 11 wherein said larger diameter of said shaft decreases, and said smaller diameter increases such that said diameters become substantially equal at said point of commencement of said metering sec¬ tion.
13. The apparatus of claim 12 wherein said pitch of said step is equal to said pitch of said first flight.
14. The apparatus of claim 12 wherein said pitch of said step is larger than said pitch of said first flight.
15. The apparatus of claim 14 wherein said first channel width is greater than said second channel width.
16. The apparatus of claim 15 wherein said smaller diameter remains substantially constant for a predetermined distance in said downstream direction in said transition section and thereafter increases so as to become equal to said larger diameter.
17. Apparatus for melting and conveying plasticated material comprising: (a) a barrel having a cylindrical bore therethrough;
(b) a shaft rotatable in said bore and having a substantially circular cross-section and an axis for rota¬ tion concentric with said bore; (c) a continuous helical flight integral with said shaft, said flight having a diameter which is less than the diameter of said bore, said flight and shaft defining a channel between consecutive turns of said flight for con¬ veying said plasticated material introduced into said chan- nel in a downstream direction, said flight and said shaft further defining a feed section, a metering section and a transition section therebetween, said shaft being further provided with a larger diameter and an adjacent smaller diameter within said transition section, said adjacent diameters defining a helical step on said shaft within said transition section, said smaller diameter being oriented downstream from said larger diameter, said flight having a predetermined pitch throughout said transition section, said step having a predetermined pitch which is slightly larger than said pitch of said flight, said larger diameter of said shaft decreasing and said smaller diameter of said shaft increasing in said downstream direction throughout said transition section such that said diameters become equal at said point of termination of said transition section.
18. The apparatus of claim 17 wherein said pitch of said flight within said transition section is approximately equal to the diameter of said bore.
19. A method for melting and conveying plasticated material in a plasticating apparatus, said plasticating apparatus having: a barrel having a cylindrical bore therethrough; a shaft rotatable within said bore and having a substantially circular cross-section and an axis of rotation concentric with said said bore, said method including the steps of:
(a) forming a melt film by introducing plasticated material during rotation of said shaft into a channel defined by a pushing side of a helical first flight integral with said shaft, a trailing side of a helical second flight integral with said shaft and said shaft, said shaft having a diameter within said channel predetermined in accordance with the melting characteristics of said plasti¬ cated material such that said material is subjected to high shear rates and shearing stresses within said channel;
(b) conveying in a downstream direction other plasticated material introduced into another channel defined by a trailing side of said first flight, a pushing side of said second flight and said shaft, said shaft having a pre¬ determined diameter within said other channel such that said material is subjected to shear rates and shearing stresses which are less than said shear rates and stresses in said other channel, said channels defining a feed section;
(c) commingling said melt film in said channel and said material in said other channel in a transition sec¬ tion commencing at a point of termination of said feed sec¬ tion, said second channel and said second flight terminating at said point, said first channel thereafter being defined by said first flight and said shaft and including a helical step formed by adjacent and unequal diameters of said shaft between consecutive turns of said first flight, a larger diameter being downstream of a smaller diameter, said smaller diameter increasing in said downstream direction and said larger diameter decreasing in said downstream direction until said larger and smaller diameters become equal at a location along longitudinal axis in proximity to a point of commencement of a metering section defined by said first flight and said shaft.
20. The method of claim 19 wherein said first flight and said second flight are parallel and have a pitch in said feed section which is larger than said diameter of said bore .
21. The method of claim 20 wherein said first flight has a pitch downstream from said feed section which is substantially equal to said diameter of said bore.
22. The method of claim 21 wherein said step has a pitch which is equal to said pitch of said first flight.
23. The method of claim 21 wherein said step has a pitch which is larger than said pitch of said first flight.
24. The method of claim 23 wherein said channel beco- mes shallower in a downstream direction within said feed section.
25. The method of claim 24 wherein said other chan¬ nel has a constant depth within said feed section.
26. The method of claim 25 wherein said channel has a width which decreases in a downstream direction.
27. The method of claim 25 wherein said other chan¬ nel has a width which decreases in a downstream direction.
28. The method of claim 25 wherein said channel and said other channel are parallel, said channel having a width which is less than width of said other channel.
EP86903023A 1985-05-02 1986-04-24 Method and apparatus for melting and conveying plasticated material Withdrawn EP0221141A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US72968485A 1985-05-02 1985-05-02
US729684 1985-05-02

Publications (1)

Publication Number Publication Date
EP0221141A1 true EP0221141A1 (en) 1987-05-13

Family

ID=24932147

Family Applications (1)

Application Number Title Priority Date Filing Date
EP86903023A Withdrawn EP0221141A1 (en) 1985-05-02 1986-04-24 Method and apparatus for melting and conveying plasticated material

Country Status (6)

Country Link
EP (1) EP0221141A1 (en)
JP (1) JPS62502677A (en)
CA (1) CA1284413C (en)
DE (1) DE3690220T1 (en)
GB (1) GB2184975B (en)
WO (1) WO1986006325A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4964730A (en) * 1986-08-19 1990-10-23 Alzner Bernard G Plasticating extruder screw
JPS63291632A (en) * 1987-05-25 1988-11-29 Mitsubishi Heavy Ind Ltd Plasticized screw
JP2966735B2 (en) * 1994-07-29 1999-10-25 積水化成品工業株式会社 Thermoplastic resin extruder
JP4226745B2 (en) 2000-01-18 2009-02-18 富士重工業株式会社 Coating film peeling equipment for painted resin products
DE102012008023B4 (en) * 2012-04-21 2016-06-02 Kraussmaffei Technologies Gmbh screw extruder
BR112019015212A2 (en) 2017-06-01 2020-03-24 Wenger Manufacturing Inc. SPECIFIC HIGH ENERGY EXTRUSION SCREW ASSEMBLY
DE102017124091B4 (en) * 2017-10-17 2019-08-01 Kraussmaffei Technologies Gmbh Shear and single screw plasticizing unit

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US28901A (en) * 1860-06-26 Improvement in making eaves-troughs
US3375549A (en) * 1961-04-05 1968-04-02 Uniroyal Inc Method and apparatus for refining and separating plastic materials
DE1909009B2 (en) * 1969-02-22 1973-04-26 Fried Krupp GmbH, 4300 Essen MULTIPLE EXTRUDER SCREW
US3650652A (en) * 1970-05-05 1972-03-21 Feed Screws Inc Apparatus for extruding plastic material
FR2093483A5 (en) * 1970-05-08 1972-01-28 Plast Elastverarbeitungsmasch
US3698541A (en) * 1971-08-11 1972-10-17 Midland Ross Corp Extruder, or extruder-like melting apparatus
USRE28901E (en) * 1972-08-10 1976-07-13 The B. F. Goodrich Company Apparatus for refining polymeric material
US3989941A (en) * 1972-09-28 1976-11-02 Midland-Ross Corporation Extruder and screw therefor for effecting transverse currents in work material handled thereby
US3998438A (en) * 1973-09-17 1976-12-21 Beloit Corporation Extruder plasticizing and mixing screw
US3866890A (en) * 1973-11-13 1975-02-18 Scient Process & Research Inc Apparatus for simultaneous plasticating and mixing
US4136967A (en) * 1974-09-04 1979-01-30 Bayer Aktiengesellschaft Screw machine for the continuous degradation of plastics
US4000884A (en) * 1975-07-25 1977-01-04 Chung Chan I Extruder screw
GB1595850A (en) * 1978-05-31 1981-08-19 Hpm Corp Extruder with multi-channel wave screw
US4240755A (en) * 1978-07-13 1980-12-23 New Castle Industries, Inc. Injection molding screw for processing heat sensitive polymeric materials
US4341474A (en) * 1980-08-27 1982-07-27 Wheeler Jr Norton C Extruder screw
IT8025032A0 (en) * 1980-09-30 1980-09-30 Mazzoni G Mecc Costr FAST HIGH PERFORMANCE DIES FOR THE EXTRUSION AND REFINING OF SOAPS, DETERGENTS AND OTHER SIMILAR PLASTIC PRODUCTS.

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO8606325A1 *

Also Published As

Publication number Publication date
GB2184975B (en) 1989-07-12
DE3690220T1 (en) 1987-06-04
WO1986006325A1 (en) 1986-11-06
GB2184975A (en) 1987-07-08
CA1284413C (en) 1991-05-28
GB8630021D0 (en) 1987-01-28
JPS62502677A (en) 1987-10-15

Similar Documents

Publication Publication Date Title
US4896969A (en) Method and apparatus for melting and conveying plasticated material
US4277182A (en) Extruder with short cycle multichannel wave screw
EP0456230B1 (en) Extrusion screw
EP1207991B1 (en) Extruder screw
US3924842A (en) Apparatus for preparing a plasticated material
US4639143A (en) Extrusion screw
US4000884A (en) Extruder screw
CA1124026A (en) Plastic extrusion apparatus
US4752136A (en) Extruder injection apparatus and method
EP0110694B1 (en) Screw extruders
JPH01204715A (en) Method of deaerating thermoplastic synthetic resin melt within wide viscous range and extruder
US5056925A (en) Extruder screws and method for accelerating melting in plasticating extruders
US4015832A (en) Extruder screws
US5370456A (en) Continuous kneading apparatus provided with rotatable kneading members and fixed kneading members
US6056430A (en) Plasticating apparatus having a multichannel wave screw with a cross channel solids transition
US5219590A (en) Triple channel wave screw
US4053143A (en) Screw for use in an extruder
EP0221141A1 (en) Method and apparatus for melting and conveying plasticated material
US5153009A (en) Extrusion device
US4770539A (en) Barrier screw
JP3824535B2 (en) Extruder screw
EP0069271A2 (en) Extruder for plastic resin
JPH11513626A (en) Extruder
JPH05220818A (en) Single-spindle extruder
US6132075A (en) Multichannel wave screw with a slush channel barrier section

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE FR GB IT LI LU NL SE

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19870727