European Patent Office
Prior art keywords
tunnel
chamber
units
unit
sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP81300640A
Other languages
German (de)
French (fr)
Other versions
EP0034907B1 (en
Inventor
Anthony David Blee
Michael Sadler-Forster
Dimitris Foundoukos
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SADLER FORSTER MICHAEL
Original Assignee
SADLER FORSTER MICHAEL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SADLER FORSTER MICHAEL filed Critical SADLER FORSTER MICHAEL
Priority to AT81300640T priority Critical patent/ATE7809T1/en
Publication of EP0034907A1 publication Critical patent/EP0034907A1/en
Application granted granted Critical
Publication of EP0034907B1 publication Critical patent/EP0034907B1/en
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/063Tunnels submerged into, or built in, open water
    • E02D29/067Floating tunnels; Submerged bridge-like tunnels, i.e. tunnels supported by piers or the like above the water-bed

Abstract

A method of, and apparatus for, constructing a submerged tunnel in situ and a submerged tunnel formed thereby has an inverted arch formation to resist upward buoyancy thrust and a sealed chamber unit mounted on the tunnel and longitudinally displaceable along it for servicing the exterior of the tunnel. The tunnel is constructed in situ by progressively lengthening towards each othertwotunnel sections (3, 3'), which extend in cantilevered manner from opposed base foundations (1 and 2). Each tunnel section has mounted on the free end thereof of an outer chamber unit (13, 13') and an inner chamber unit (6,6') within the latter of which the free end of the tunnel section is progressively formed and extended. As the tunnel sections (3, 3') are lengthened their associated chamber units (6, 6', 13, 13') are displaced longitudinally and sequentially to provide clearance for further lengthening, such displacement may be effected by hydraulic rams (20) or mechanical rack and pinion devices (19) When the tunnel sections 3, 3' are sufficiently lengthened the outer chamber units (13, 13') dock and are sealed together at 28,28' and a passage opened between those chamber units (13,13'). The inner chamber units (6, 6') are removed from within the combined outer chamber units (13. 13') and a passage is opened between these latter units through which the tunnel sections are extended and connected together to form the continuous tubular tunnel. The submerged depth of the tunnel sections may be controlled during construction by winches and anchorages devices (25,26 and 27).

Description

  • This invention relates to a method of, and means for constructing a submerged tunnel and also to a submerged tunnel.
  • Submerged tunnels extending between land bases are usually provided in conditions where a bridge is not possible (for example, if the span is too great, the land bases or sea bed are inadequate foundations or a shipping hazard would result) or where a bridge is undesirable (for example, aesthetically or environmentally).
  • Hitherto it has been the practice for submerged tunnels to be constructed on land and thereafter floated to the appropriate site and sunk into position; this technique besides requiring a large land based building site and heavy equipment for manoeuvring the tunnel or tunnel sections prior to their submergence is often disrupted by adverse weather conditions and interrupts shipping. It is an object of the present invention to provide a method and means of constructing a submerged tunnel in situ which alleviates the aforementioned disadvantages.
  • According to the present invention there is provided a method of constructing a submerged tunnel in situ which comprises providing a longitudinally extending substantially cantilevered tunnel section with a chamber unit mounted on the free end thereof so that the chamber unit and bore of the tunnel section provide a water sealed working chamber; lengthening the longitudinal extent of the tunnel section within the chamber unit, and displacing the chamber unit longitudinally relative to the tunnel section over the lengthened part thereof to permit further lengthening of the tunnel section within the chamber unit.
  • Further according to the present inventibn there is provided means for constructing a submerged tunnel in situ comprising a longitudinally extending substantially cantilevered tunnel section; a chamber unit mounted on the free end of the tunnel section so that that unit and the bore of the tunnel section provide a water sealed working chamber within which the longitudinal extent of the tunnel can be lengthened in the chamber unit, and means for displacing the chamber unit longitudinally relative to the tunnel section over the lengthened part thereof to permit further lengthening of the tunnel section within the chamber unit.
  • The present invention therefore envisages the construction of a submerged tunnel in situ by successively lengthening a cantilevered tunnel section which latter will usually be anchored in support foundations of a land base so that the bore of the tube is in direct communication with land throughout the construction of the tunnel. The construction,being effected in a submerged state, is unlikely to be affected to any great extent by adverse weather conditions and may be at such a depth as not to present a shipping hazard. The tunnel section being in the form of a tube will-usually, but not necessarily, be of circular section and its lengthening within the chamber unit will usually be achieved by the addition of pre-formed elements to the end of the tunnel section or by progressively casting or moulding material to the end of the section. The present invention was primarily developed having in mind the construction of tunnels for the passage of vehicles therethrough in which case its dimensions will usually call for a basic tube structure of reinforced concrete although it will be appreciated that other materials for the tube can be utilised, say reinforced plastics sections for smaller tunnels which may be required for conduiting or a fluid flow passage. -
  • The chamber unit effectively provides a pressure vessel within which work is carried out to progressively lengthen the tunnel section within that unit; this work may be effected both on the interior and the exterior of the tunnel section and when appropriate the pressure unit is displaced longitudinally over the newly lengthened tube wall to permit further lengthening.
  • Preferably two chamber units are mounted on the free end of the tunnel section, one such unit being located wholly within the other unit so that the inner chamber unit provides with the bore of the tunnel section a first working chamber and the outer chamber unit provides with the exterior of the inner unit a second working chamber within which there is access to the exterior of the tunnel section. By this arrangement the outer chamber unit effectively provides a second pressure vessel within the chamber of which further work may be carried out on the exterior of the tube section while the tunnel section is being progressively lengthened within the first working chamber. The inner and outer chamber units are displaced progressively along the tunnel section as the length thereof is increased. This displacement of the inner and outer chamber units may be effected simultaneously so that they move in combination.but it is preferred that each chamber unit is displaceable relative to the tube section independently of the other so that when the outer chamber unit is stationary relative to the tube section the inner unit can be displaced longitudinally as the tube section is progressively lengthened to a maximum extent permitted by the outer unit and thereafter while the inner unit is stationary relative to the tube section the outer unit can be displaced over the inner unit to permit subsequent displacement of the inner unit.
  • As the length of the cantilevered tunnel progressively increases from its support foundation it will be apparent that the upward buoyancy thrust thereon increases and desirably the free end of the tunnel section is restrained at a desired depth of submergence by anchoring.
  • The whole construction of the tunnel may be effected by progressively lengthening the tunnel section from one land base to another and in such an event it is preferred that the shape of the tube which is formed is controlled, say by use of appropriate anchorages, so that the tube is an inverted arch to resist the upward buoyancy thrust thereon. It is realised however that on many occasions the construction of the tunnel from a single land base will be impractical or inefficient and it is preferred therefore that the construction is by means of two longitudinally extending substantially cantilevered tunnel sections each having a chamber unit mounted on its free end within which unit the lengthening of the longitudinal extent of the respective tunnel section is effected. A first of these tunnel sections is secured at a location corresponding to one end of the tunnel which is to be constructed while the second tunnel section is secured at a location corresponding to the other end of the tunnel which is to be constructed. The first and second tunnel sections are then progressively lengthened by working within their respective chamber units so that the free ends of the tunnel sections project towards each other and a condition is reached where the chamber units of the respective tunnel sections can be coupled together. With the chamber units coupled together a longitudinally extending water sealed passage can be formed between those units and thereafter one or both of the tunnel sections is lengthened to extend through the sealed passage and connect the two tunnel sections together to provide continuity of the tunnel. To resist the upward buoyancy thrust on the tunnel it is preferred that the tube is an inverted arch formation as aforementioned and generally the chamber unit of the first and second tunnel sections will be coupled together in the region of the centre of the arch mid-way between the land bases. Where each tunnel section has inner and outer chamber units mounted on the free end thereof, the two outer units can be coupled together to provide the water sealed passage therethrough while the two inner units can be dismantled or otherwise removed from the sealed passage prior to connecting the tunnel sections together. Alternatively the two inner chamber units can be retained within the sealed chamber of the outer units provided that their structure is appropriately modified to permit extension of the tunnel sections to form the continuous tunnel.
  • With the chamber units coupled together to provide the water sealed passage through which the tube of the tunnel extends a desirable feature can be provided by arranging for the chamber units to be longitudinally displaceable over the tube for the purpose of maintenance or servicing of the exterior of the tube. With this in mind the present invention still further provides a 1 tunnel comprising a submerged tube extending between support foundations, said tube having the form of an inverted arch to resist upward buoyancy thrust thereon and there being mounted on the exterior of the tube a chamber unit providing with the exterior of the tube a water sealed working chamber and wherein said chamber unit is longitudinally displaceable along the tube for servicing the tube.
  • As will be appreciated appropriate water seals will be provided between the chamber unit or units and the tunnel section. Longitudinal displacement of a chamber unit will usually be effected by fluid pressure operated means such as hydraulic rams and/or mechanical means such as a rack and pinion device; displacement of a chamber unit may be effected by reaction directly between that unit and the tunnel section or, in the case of the inner and outer chamber unit proposal by reaction directly between-the inner and outer units where one unit will be longitudinally displaced while the other unit is secured relative to the tunnel section. - It is envisaged that the chamber unit or units will generally be displaced longitudinally without rotation relative to the tunnel section such as by use of appropriate sliding seals although alternative displacement means are available, for example the or a chamber unit may have an internal screw thread which mates with a complementary external screw thread provided on the tunnel section so that the chamber unit is displaced longitudinally by rotating it relative to the tunnel section.
  • One embodiment of the present invention will now be described, by way of example only, with reference to the accompanying illustrative drawings, in which:-
    • Figure 1 diagrammatically illustrates a section through a cantilevered tunnel section and chamber units mounted on such section for the construction of a tunnel;
    • Figure 2 diagrammatically illustrates an arrangement whereby two tunnel sections and associated chamber units similar to that shown in Figure 1 are disposed for constructing a tunnel from opposed ends thereof, and
    • Figure 3 is a similar view to that shown in Figure 2 and diagrammatically illustrates the tunnel when completed and having mounted thereon a chamber unit which is longitudinally displaceable along the tunnel for maintenance and inspection purposes.
  • The submerged tunnel is to be constructed between opposed land based support foundations 1 and 2. A generally cylindrical walled tunnel section 3 is secured in the foundation 1 so that the tunnel section projects from the foundation below water level 1a as a cantilever and the bore 3a of the tunnel section opens to atmosphere through the foundation. The completed tunnel may be intended for the passage of vehicles and may therefore include a road surface 4 or a railway and may be in the order of 12 metres diameter being constructed from reinforced concrete with internal water-proof membranes and textured external rendering. Mounted on the free end 5 of the tunnel section 3 is a bottle shaped chamber unit 6 having a neck part 7 within which the tunnel section 3 is received. Water seals 8 are provided between the neck part 7 and the tunnel section; the unit 6 is intended to be longitudinally displaceable along the tunnel section 3 and the seals 8 permit relative sliding movement and remain effective between the said two components during their relative longitudinal displacement. The chamber unit 6 forms with the bore 3a a working chamber 9 within which the free end of the tunnel section can be extended as indicated at 5a, for example by use of shuttering 10 where material is cast on to the existing free end of the tunnel section or by the addition of pre-cast elements to lengthen the tunnel section. The chamber 9 and bore 3a are substantially at atmospheric pressure and adequate ventilation can be achieved by circulating fresh air-in the direction of arrow A from the land base while exhaust air can pass in the direction of arrow B through ducts 11 located beneath the road surface 4. To promote rapid curing of the material cast in the shuttering 10 the chamber 9 can be heated.
  • Following completion of the additional part 5a of the tunnel section (and removal of the shuttering 10) the chamber unit 6 is intended to be displaced longitudinally over the part 5a to permit sufficient working area in the chamber 9 for the free end of the tunnel section to be further and progressively lengthened. If required, spacers indicated at 12 can be provided between an enlarged diameter part of the unit 6-and the tunnel section 3 to maintain appropriate alignment between that section and unit.
  • Also mounted on the free end of the tunnel-section 3 is a further bottle-shaped chamber unit 13 within which the chamber unit 6 is wholly received. The unit 13 similarly to the unit 6 has a mouth part 14 with internal
  • water seals 15 within which the tunnel section 3 is received. Again similarly to the unit 6, the chamber unit 13 is intended to be longitudinally displaceable relative to the tunnel section 3 and this outer unit forms a second working chamber 16 which permits, in part, access to the exterior of the tunnel section 3 over the cylindrical region indicated at 17.
  • The chamber 16 being water sealed permits work to be carried out on the exterior of the tunnel section 3 over the cylindrical region 17 as aforementioned and both chamber units 6 and 13 provide effective pressure vessels which ensure adequate safety for the personnel in the chamber 9 and in the submerged length of the bore 3a.
  • The chamber units 6 and 13 are intended to be displaced longitudinally progressively and successively over the lengthened parts of the tunnel section 3. For this latter purpose, each chamber unit has associated therewith a clamping unit indicated at 18 by which the respective units can be selectively secured against longitudinal displacement relative to the tunnel section; the clamping units 18 may be operated by any convenient means such as mechanical, fluid pressure operated or electrical.
  • Relative longitudinal displacement between the units 6 and 13 is effected by rack and pinion units indicated at 19 operating in conjunction with hydraulic rams 20. As shown in Figure 1, the driven components of the device 19 are mounted on the inner chamber unit 6 while the longitudinally extending racks with which the pinion components co-operate are mounted on the outer unit 13 and the rams 20 connect between the inner and outer units to provide a stroke which extends longitudinally thereof. If required spacer means (not shown) can be provided between the units 6 and 13 to maintdin, or assist in maintaining, alignment between those units.
  • With the outer unit 13 secured by clamp 18 to the tunnel section 3 the components in devices 19 can be driven and the rams 20 contracted to slidably displace the inner unit 6 rightwardly in Figure 1 along the newly lengthened tunnel section until the maximum extent of displacement of the inner unit 6 rightwardly in the outer unit 13 is reached. At this latter stage the inner unit 6 can be secured by its associated clamp unit 18 to the tunnel section 3 and the clamp unit 18 associated with the outer unit 13 released; the pinion components of devices 19 can now be driven and the rams 20 extended to displace the outer chamber unit 13 along the tunnel section 3 and rightwardly in Figure 1 to a desired extent whereafter the unit 13 can again be secured to the tunnel section 3 prior to rightward displacement of the inner chamber unit 6 as described above for further lengthening of the tunnel section.
  • As will be appreciated from the aforegoing all of the materials, equipment and facilities necessary for lengthening the tunnel section are fed into the working chamber 9 through the bore 3a.
  • Desirably-the chamber 16 is maintained at a greater pressure than that in chamber 9 to relieve pressure on the seals 15 and for this purpose an air compressor 21 is provided. Air locks and de-compression chambers 22 and 23 are provided to permit access between the chamber 9 and the chamber 16 and between the chamber 16 and the water (the latter being convenient for external nspection). A water pump/sump 24 is provided in the outer chamber unit 13.
  • As the cantilevered length of the tunnel section 3 is progressively increased from the base foundation 1 the upward buoyancy thrust on the free end of the tunnel section (by which is included the buoyancy attributed to the chamber units) increases. To restrain upward movement of the free end of the tunnel section as a result of this buoyancy thrust the outer chamber unit 13 is anchored to the sea bed by a hawser 25 extending from a winch 26(mounted in the unit 13) to an appropriate sea bed anchorage 27. As the outer chamber unit 13 is progressively displaced along the progressively lengthening tunnel section 23 the winch 26 can be operated to vary the length of the hawser 25 to maintain the free end of the tunnel section at a predetermined depth of submergence. As will be appreciated, several such anchoring devices can be provided.
  • If required, the tunnel section 3 can be lengthened and the chamber units 6 and 13 progressively displaced to extend that tunnel section from the base foundation 1 to the opposing foundation 2 while the. submerged depth of the tunnel section is controlled by appropriate anchorages. Preferably however the tunnel is constructed by progressively lengthening(in a similar manner to that previously described) two similar tunnel sections extending in cantilevered manner from the base foundations 1 and 2 and at opposite ends of the effective tubular tunnel which is to be formed.* This preference is illustrated in Figure 2 where, for convenience, the same parts or members associated with with the second tunnel section as those associated with the first tunnel section 3 are indicated by dashed references having the same numerals. As the tunnel sections 3 and 3' are progressively lengthened towards each other their respective depth of submergence and alignment may be controlled by the winches 26 and 26' which, for convenience, are connected with the anchorage 27 (which is common to both winched and may be situated beneath what will be the mid-length position of the tubular tunnel when completed. The tunnel sections 3 and 3' are extended until the outer chamber units 13 and 13' can conveniently be coupled together in alignment. To facilitate such coupling the chamber units are provided with mutually co-operable docking means 28, 28' which move into engagement with each other and can be welded, bolted or otherwise joined together as indicated at 29 in Figure 3 to provide a water seal. Following the sealed connection of the two outer units, bulk heads (shown at 30 in Figure 1) in the walls of those'units are removed to provide a passage which extends longitudinally through the water sealed coupling 29 and within the enlarged chamber formed by the combined chambers 16 and 16'. The inner chamber units 6 and 6' are now dismantled and conveniently removed through the bore of the tunnel sections. One or both of the tunnel sections-3 and 3' is now lengthened to join with the other tunnel section within the enlarged chamber 16, 16' to complete the tubular tunnel as shown at 31 in Figure 3.
  • From Figure 3 it will be seen that the completed tunnel 31 is spaced from the sea bed and may be regarded as a "submerged floating tunnel". Furthermore, the tunnel 31 has the form of an inverted arch which resists the buoyancy thrust thereon and, if required, the anchorages 25, 25' can be removed.
  • Following completion of the tunnel 31 the coupled chamber units 13, 13' are preferably retained to provide the water sealed chamber 16, 16' and these units can be longitudinally displaceable over the length of the tunnel to permit servicing and maintenance of the exterior of the tunnel as and when necessary. Any convenient means can be provided for longitudinally displacing the combined units 13, 13' for example the units may be connected by hawsers to winches on the base foundations 1 and 2 which are controlled as necessary to move the units over the tunnel.
  • Usually the tunnel section or sections will extend between opposed land bases so that the tunnel lies in a single vertical plane and in plan view is substantially straight - this permits maximum advantage to be taken of the inverted arch form of the tunnel to withstand the buoyancy thrust. It is to be realised however that the present invention is applicable to the construction of a submerged tunnel which extends other than in a single vertical plane between opposed base foundations, that is to say the tunnel may be curved in plan view and although it may still have a substantially arch-like form in side elevation the curvature in plan view may require anchorages to resist the buoyancy thrust. Furthermore, to counter variations in upward buoyancy thrust that may occur on the tunnel section or sections during their lengthening as a result of the movement of heavy loads (such as material and equipment) along those sections, it may be desirable that the winch devices 26 provide self (automatic) levelling and/or that buoyancy tanks are incorporated within the tunnel sections or in the working chambers, such tanks being optionally water filled or air blown to vary the effective buoyancy of the tunnel sections as required.

Claims (29)

1. A method of constructing a submerged tunnel in situ which comprises providing a longitudinally extending substantially cantilevered tunnel section with a chamber unit mounted on the free end thereof so that the chamber unit and bore of the tunnel section provide a water sealed working chamber; lengthening the longitudinal extent of the tunnel section within the chamber unit, and displacing the chamber unit longitudinally relative to the tunnel section over the lengthened part thereof to permit further lengthening of the tunnel section within the chamber unit.
2. A method as claimed in claim 1 which comprises mounting two chamber units on the free end of the tunnel section with one chamber unit located wholly within the other chamber unit so that the inner chamber unit provides with the bore of the tunnel section a first working chamber and the outer chamber unit provides with the exterior of the inner unit a second working chamber within which there is access to the exterior of the tunnel section; lengthening the longitudinal extent of the tunnel section within the inner chamber unit, and displacing the inner and outer chamber units longitudinally with, respect to the tunnel section over the lengthened part thereof.
3. A method as claimed in claim 2 which comprises providing a water seal between each chamber unit and the tunnel section.
4. A method as claimed in either claim 2 or claim 3 which comprises maintaining a greater pressure in the second working chamber than that in the first working chamber.
5. A method as claimed in any one of the preceding claims which comprises maintaining the pressure in the or the first working chamber substantially at atmospheric pressure.
6. A method as claimed in any one of the preceding claims which comprises restraining the free end of the tunnel section in a submerged condition by anchoring.
7. A method as claimed in any one of the preceding claims which comprises forming the tunnel as an inverted arch to resist the upward buoyancy thrust thereon.
8. A method as claimed in any one of the preceding claims which comprises providing two said longitudinally extending substantially cantilevered tunnel sections with chamber units mounted on the free ends thereof within which lengthening of the longitudinal extent of the respective tunnel sections is effected; locating the first of the tunnel sections and its associated chamber unit at a location corresponding to one end of the tunnel which is to be constructed and locating the second of the tunnel sections and its associated chamber unit at a location corresponding to the other end of the tunnel which is to be constructed; lengthening the respective=. first and second tunnel sections towards each other until the chamber units of the respective tunnel sections can be coupled together; coupling the chamber units together; providing a longitudinally extending water sealed passage between the chamber units, and lengthening at least one of the tunnel sections to extend through the sealed passage to connect the two tunnel sections together and provide continuity of the tunnel.
9. A method as claimed in claim 8 when appendant to claim 2 in which each of the first and second tunnel sections has mounted thereon a said inner and a said outer chamber unit and which comprises coupling together the two said outer chamber-units; providing the longitudinally extending sealed passage between the outer chamber units; removing at least part of the two inner chamber units from the notional extent of the tunnel through the sealed passage and lengthening at least one of the tunnel sections to connect the first and second tunnel sections with each other.
10. A method as claimed in claim 9 which comprises wholly removing the two inner chamber units
from within the outer chamber units prior to lengthening the first and second tunnel sections to connect with each other.
11. A method as claimed in any one of claims 8 to 10 which comprises securing together the chamber units which form the sealed passage and mounting those chamber units on the tunnel sections so that they are longitudinally displaceable in combination along the exterior of the tunnel when constructed for servicing purposes.
12. Means for constructing a submerged tunnel in situ comprising a longitudinally extending substantially cantilevered tunnel section; a chamber unit mounted on the free end of the tunnel section so that that unit and the bore of the tunnel section provide a water sealed working chamber within which the longitudinal extent of the tunnel can be lengthened in the chamber unit, and means for displacing the chamber unit longitudinally relative to the tunnel section over the lengthened part thereof to permit further lengthening of the tunnel section within the chamber unit.
13. Means as claimed in claim 12 and comprising two chamber units mounted on the free end of the tunnel section with one of the chamber units being located wholly within the other, the inner chamber unit providing with the bore of the tunnel section a first working chamber and the outer chamber unit providing with the exterior of the inner unit a second working chamber within which there is access to the exterior of the tunnel section, and means for displacing the inner and outer chamber units longitudinally with respect to the tunnel section to permit lengthening of the tunnel section within the inner chamber unit.
14. Means as claimed in claim 13 in which the inner and outer chamber units are longitudinally displaceable relative to each other and to the tunnel section.
15. Means as claimed in claim 14 in which displacement of the inner and outer chamber units is effected by means which reacts between those units so that when one of the units is secured from longitudinal displacement relative to the tunnel section the other unit is displaceable longitudinally by reacting against the said secured unit and vice versa.
16. Means as claimed in any one of claims 13 to 15 in which both the inner and outer chamber units are in water sealed engagement with the tunnel section.
17. Means as claimed in any one of claims 13 to 16 in which means is provided for maintaining the pressure in the second working chamber greater than that in'the first working chamber.
18. Means as claimed in any one of claims 1'3 to 17 in which spacer means is provided between the inner and outer chamber units to maintain relative alignment between those units.
19.. Means as claimed in any one of claims 12 to 18 in which the or each chamber unit is substantially bottle-shaped having a neck portion within which the tunnel section is received and which neck portion is in water sealed engagement with the exterior of the tunnel section.
20. Means as claimed in any one of claims 12 to 19 in which the or at least one of the chamber units is longitudinally displaceable relative to the tunnel section by non-rotatable longitudinal sliding movement over the exterior of the tunnel section.
21. Means as claimed in any one of claims 12 to 20 in which the or at least one of the chamber units has an internal thread which engages with a complementary thread on the exterior of the tunnel section and longitudinal displacement of the chamber unit is effected by rotation of the unit relative to the tunnel section,
22. Means as claimed in any one of claims 12 to 21 in which longitudinal displacement of the or a chamber unit is effected by at least one of fluid pressure operated ram means and co-operating rack and pinion means.
23. Means as claimed in any one of claims 12 to 22 and comprising anchoring means for retaining the free end of the tunnel section at a desired . submerged depth.
24. Means as claimed in claim 23 in which the anchoring means comprises a winch device carried by the, or one of the chamber units.
25. Means as claimed in any one of claims 12 to 24 and comprising two said longitudinally extending substantially cantilevered tunnel sections each having a said chamber unit mounted on the free end thereof within which the lengthening of the respective tunnel sections is effected, a first of the tunnel sections and its associated chamber unit being located at a position corresponding to one end of the tunnel which is to be constructed and the second of the tunnel sections and its associated chamber unit being located at a position corresponding to the other end of the tunnel which is to be constructed; the chamber units associated with said first and second tunnel sections being capable of being coupled one with the other and their structure modified to provide a water sealed passage extending longitudinally therethrough, the arrangement being such that the first and second tunnel sections can be lengthened towards each other until the chamber units of the respective tunnel sections can be and are coupled together and their structure modified to provide the water sealed passage between the chamber units and thereafter at least one of the tunnel sections lengthened to extend through the sealed passage to connect the two tunnel sections together and provide continuity of the tunnel.
26. Means as claimed in claim 25 in which the two chamber units which are intended to be coupled together are movable into engagement one with the other and include means to facilitate alignment and docking of those units.
27. Means as claimed in either claim 25 or claim 26 when appendant to claim 13 in which each of the first and second tunnel sections has an inner and an outer chamber unit mounted thereon, the respective outer chamber units being intended to be coupled together and their structure modified to provide the water sealed passage between those units and at least part of each of the two inner chamber units being removable from the notional extent of the tunnel through the sealed passage to permit the first and second tunnel sections to connect with each other.
28 . Means as claimed in claim 27 in which the two inner chamber units are removable from the water sealed passage formed by the two outer chamber units prior to connecting together the first and second tunnel sections through the sealed passage.
29. A tunnel comprising a submerged tube extending between support foundations, said tube having the form of an inverted arch to resist upward buoyancy thrust thereon and there being mounted on the exterior of the tube a chamber unit providing with the exterior of the tube a water sealed working chamber and wherein said chamber unit is longitudinally displaceable along the tube for servicing the tube.
EP81300640A 1980-02-22 1981-02-17 A submerged tunnel and a method of, and means for, constructing a submerged tunnel Expired EP0034907B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT81300640T ATE7809T1 (en) 1980-02-22 1981-02-17 UNDERWATER TUNNEL AND METHOD AND APPARATUS FOR MAKING AN UNDERWATER TUNNEL.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB8006114A GB2070111B (en) 1980-02-22 1980-02-22 Method of constructing a submerged tunnel
GB8006114 1980-02-22

Publications (2)

Publication Number Publication Date
EP0034907A1 true EP0034907A1 (en) 1981-09-02
EP0034907B1 EP0034907B1 (en) 1984-06-06

Family

ID=10511601

Family Applications (1)

Application Number Title Priority Date Filing Date
EP81300640A Expired EP0034907B1 (en) 1980-02-22 1981-02-17 A submerged tunnel and a method of, and means for, constructing a submerged tunnel

Country Status (5)

Country Link
EP (1) EP0034907B1 (en)
AT (1) ATE7809T1 (en)
DE (1) DE3162634D1 (en)
GB (1) GB2070111B (en)
GR (1) GR78276B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT202200008171A1 (en) 2022-04-26 2023-10-26 Mario Burigo INNOVATIVE METHOD FOR THE CONSTRUCTION OF SUBMERGED TUNNELS

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3607002A1 (en) * 1986-03-04 1987-09-17 Bernhard Furrer Method of constructing an underwater tunnel, and an underwater tunnel constructed according to the method
NO881538L (en) * 1988-04-08 1989-10-09 Moss Rosenberg Verft As FLOATING ROERBRO.

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE306127C (en) *
DE369557C (en) * 1923-02-20 Gustav Peter Helfrich Method of making underwater tunnels
DE1784974C2 (en) * 1963-07-19 1972-05-04 Holzmann Philipp Ag Method for making an underwater tunnel
DE2423854A1 (en) * 1974-05-16 1975-12-04 Josef Boessner Cable-curve-suspended concrete marine tunnel - with suspended weights loading tube to produce heaviness approaching buoyancy thrust
US3952524A (en) * 1974-01-04 1976-04-27 Rand Burgess F Pipe laying method and apparatus
GB2016065A (en) * 1978-03-09 1979-09-19 Precontrainte Structures Soc F A method and an installation for launching a submerged tunnel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE306127C (en) *
DE369557C (en) * 1923-02-20 Gustav Peter Helfrich Method of making underwater tunnels
DE1784974C2 (en) * 1963-07-19 1972-05-04 Holzmann Philipp Ag Method for making an underwater tunnel
US3952524A (en) * 1974-01-04 1976-04-27 Rand Burgess F Pipe laying method and apparatus
DE2423854A1 (en) * 1974-05-16 1975-12-04 Josef Boessner Cable-curve-suspended concrete marine tunnel - with suspended weights loading tube to produce heaviness approaching buoyancy thrust
GB2016065A (en) * 1978-03-09 1979-09-19 Precontrainte Structures Soc F A method and an installation for launching a submerged tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT202200008171A1 (en) 2022-04-26 2023-10-26 Mario Burigo INNOVATIVE METHOD FOR THE CONSTRUCTION OF SUBMERGED TUNNELS
WO2023209744A1 (en) 2022-04-26 2023-11-02 Mario Burigo Submerged tunnels

Also Published As

Publication number Publication date
GB2070111B (en) 1983-12-14
GB2070111A (en) 1981-09-03
ATE7809T1 (en) 1984-06-15
GR78276B (en) 1984-09-26
DE3162634D1 (en) 1984-07-12
EP0034907B1 (en) 1984-06-06

Similar Documents

Publication Publication Date Title
US4000624A (en) Multi-component offshore platform
US2907172A (en) Method and apparatus for constructing offshore drilling platforms
US4072018A (en) Tunnel support structure and method
US7004737B2 (en) Methods and apparatus for forming concrete structures
CN101832049B (en) Concrete-structured conjoined cylindrical shell construction device and method therefor
US3750407A (en) Tunnel construction method
JPS61294015A (en) Construction of offshore platform
US3891037A (en) Remotely operated seafloor coring and drilling method and system
US3893304A (en) Method and a device for the underwater construction of concrete structures
US4444526A (en) Submerged tunnel and a method of and means for constructing a submerged tunnel
EP0034907B1 (en) A submerged tunnel and a method of, and means for, constructing a submerged tunnel
US3293865A (en) System for lining large diameter bore holes
US4193714A (en) Method for erecting a deck on a marine structure
US2675680A (en) Construction of submerged
US4486989A (en) Elevated storage tank
WO2010115933A2 (en) Method for erecting an offshore station and offshore station
CN212153427U (en) Peripheral firm high accuracy zero interference weir mould body structure
JP2668184B2 (en) How to launch a submerged box
CN111379265A (en) Peripherally-stabilized high-precision zero-interference weir-mold integrated structure and construction method thereof
EP3943666A1 (en) Method for the installation of an offshore maritime structure and offshore maritime structure
US4912890A (en) Air/water cranes
US3117423A (en) Method for the production of underwater foundations
IE44972B1 (en) Iprovements in deep water platforms for marine work
EP0500221A1 (en) Method and apparatus for constructing long span, shell-shaped, substantially horizontal concrete structures
US4327656A (en) Floating docks

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): AT BE CH DE FR IT LU NL SE

17P Request for examination filed

Effective date: 19820225

ITF It: translation for a ep patent filed

Owner name: JACOBACCI & PERANI S.P.A.

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Designated state(s): AT BE CH DE FR IT LI LU NL SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Effective date: 19840606

Ref country code: CH

Effective date: 19840606

Ref country code: BE

Effective date: 19840606

Ref country code: AT

Effective date: 19840606

REF Corresponds to:

Ref document number: 7809

Country of ref document: AT

Date of ref document: 19840615

Kind code of ref document: T

REF Corresponds to:

Ref document number: 3162634

Country of ref document: DE

Date of ref document: 19840712

ET Fr: translation filed
REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19850228

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19850228

Year of fee payment: 5

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19860228

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Effective date: 19870218

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19870901

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19871030

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19871103

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

EUG Se: european patent has lapsed

Ref document number: 81300640.0

Effective date: 19880215