EP0008667A1 - Furnace for the thermal treatment of granular or fine sized material - Google Patents
Furnace for the thermal treatment of granular or fine sized material Download PDFInfo
- Publication number
- EP0008667A1 EP0008667A1 EP79102695A EP79102695A EP0008667A1 EP 0008667 A1 EP0008667 A1 EP 0008667A1 EP 79102695 A EP79102695 A EP 79102695A EP 79102695 A EP79102695 A EP 79102695A EP 0008667 A1 EP0008667 A1 EP 0008667A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- coolant
- blower
- shaft
- gas
- fan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000463 material Substances 0.000 title claims abstract description 20
- 238000007669 thermal treatment Methods 0.000 title 1
- 238000001816 cooling Methods 0.000 claims abstract description 30
- 239000000110 cooling liquid Substances 0.000 claims abstract description 9
- 238000010438 heat treatment Methods 0.000 claims abstract description 7
- 238000005245 sintering Methods 0.000 claims abstract description 7
- 235000019738 Limestone Nutrition 0.000 claims abstract description 6
- 239000006028 limestone Substances 0.000 claims abstract description 6
- 239000010459 dolomite Substances 0.000 claims abstract description 5
- 229910000514 dolomite Inorganic materials 0.000 claims abstract description 5
- ZLNQQNXFFQJAID-UHFFFAOYSA-L magnesium carbonate Chemical compound [Mg+2].[O-]C([O-])=O ZLNQQNXFFQJAID-UHFFFAOYSA-L 0.000 claims abstract description 5
- 229910000021 magnesium carbonate Inorganic materials 0.000 claims abstract description 5
- 235000014380 magnesium carbonate Nutrition 0.000 claims abstract description 5
- 239000001095 magnesium carbonate Substances 0.000 claims abstract description 5
- 239000007789 gas Substances 0.000 claims description 83
- 238000002485 combustion reaction Methods 0.000 claims description 52
- 239000002826 coolant Substances 0.000 claims description 50
- 238000010304 firing Methods 0.000 claims description 12
- 239000000446 fuel Substances 0.000 claims description 9
- 238000000605 extraction Methods 0.000 claims description 4
- 238000012546 transfer Methods 0.000 claims description 4
- 239000007788 liquid Substances 0.000 claims description 3
- 229920002545 silicone oil Polymers 0.000 claims description 3
- 238000009835 boiling Methods 0.000 claims description 2
- 238000000034 method Methods 0.000 claims 5
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000001354 calcination Methods 0.000 abstract 7
- 239000000470 constituent Substances 0.000 description 3
- 230000017525 heat dissipation Effects 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000008646 thermal stress Effects 0.000 description 2
- 239000003513 alkali Substances 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 239000013590 bulk material Substances 0.000 description 1
- 239000002817 coal dust Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 238000002309 gasification Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000035882 stress Effects 0.000 description 1
- 150000003464 sulfur compounds Chemical class 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D5/00—Blades; Blade-carrying members; Heating, heat-insulating, cooling or antivibration means on the blades or the members
- F01D5/02—Blade-carrying members, e.g. rotors
- F01D5/08—Heating, heat-insulating or cooling means
- F01D5/085—Heating, heat-insulating or cooling means cooling fluid circulating inside the rotor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B1/00—Shaft or like vertical or substantially vertical furnaces
- F27B1/06—Shaft or like vertical or substantially vertical furnaces of other than up-draught type
Definitions
- the invention relates to a furnace for the heat treatment of mostly lumpy to fine-grained material, in particular a shaft furnace, rotary hearth furnace or the like for burning or sintering limestone, dolomite or magnesite, in which the fuel passes through a preheating zone, a combustion zone and a cooling zone and the combustion zone contains a gas or gas discharge device and a gas delivery device for generating a hot gas circulation.
- a cross-flow shaft furnace which has gas collection devices and heating devices.
- the hot gases required for sintering the fuel are collected in the gas collection devices after flowing through the material layer and again in the heating devices by means of injectors for the gas circulation heated up.
- the funds required for the gas circulation are represented by the rigid injectors, which circulate an essentially constant throughput volume of hot gases. Faults occur in such a cross-flow shaft furnace in particular if the gas volume available to the respective injector is changed due to a changed bulk density in the shaft and thus a changed pressure resistance in the man-made column.
- a cross-flow heated shaft kiln for limestone burning which has a preheating zone, two firing zones and a cooling zone in the passage direction of the material, each firing zone containing a quasi-closed hot gas circuit.
- the hot gas circuit is brought about in that at least one jet blower or injector is assigned to each combustion zone and generates the kinetic energy required for the hot gas circulation.
- the hot gases are circulated from the injector into a combustion chamber, a gas collection chamber, the assigned fuel bed, the exhaust gas collection chamber and a circulation channel back to the injector. Fuel and cooling air from the cooling zone are introduced into the combustion chamber.
- the intensive hot gas circulation results in a very even fire across the entire shaft cross-section.
- a heat treatment furnace in particular a shaft furnace for burning or sintering limestone, dolomite or magnesite, in such a way that furnace units of up to 400 tpd throughput, low specific, can be used with structurally simple means Energy consumption and high thermal efficiency can be built.
- This object is achieved in that in the hot gas circulation, preferably between the gas extraction device and the combustion device as a gas delivery device, a delivery fan charged with coolant is arranged.
- a delivery fan charged with coolant is arranged in the hot gas circulation system, which, in contrast to the rigid injectors previously used, easily generates a pressure drop of approx. 300 mm water column in the combustion zone, so that far larger amounts of gas per unit time are burned / sintering firing material can be introduced.
- This conveying blower which is acted on with coolants, can therefore convey hot gases up to approximately 1200 ° C. in the circulation between the gas extraction device and the combustion device without the blower being exposed to thermal limit stresses.
- the elaborate structural structures for the arrangement of the injectors on the combustion shaft can be dispensed with, so that overall the investment costs for the furnace system can be considerably reduced.
- the cooled gas delivery fan is arranged in the hot circulation channel between the gas discharge chamber and the combustion chamber, resulting in a particularly compact and achieve compact furnace construction.
- the conveying fan is arranged on the outside of the shaft and is connected to its cooling device with a self-contained coolant guide.
- This has the advantage that highly effective coolants are fed to the blower in a closed circuit, so that the temperatures on the blower can be set precisely and the blower parts are never exposed to undesirably high temperature ranges.
- the volatile constituents in the hot gases which tend to cake, crystallize directly on the relatively cold blower parts and are returned as solid constituents to the bulk material without the blower, even with a very high content of volatile harmful constituents in the hot gases Has caking. This ensures high operational reliability and availability of the blower and thus the entire furnace system.
- the recooler of the fan cooling device serves as a heat exchanger for the fuels introduced into the combustion chamber.
- the fan shaft and / or the fan wheel is hollow in the conveying fan and coolant-carrying devices, preferably coolant lines, are arranged in the hollow fan shaft or in the fan ring gear, thereby ensuring that the fan parts are specifically cooled there where the thermal stress from the hot gases is strongest.
- coolant lines of the blower shaft are connected to the fixed coolant lines of the recooler via a stationary distributor head, which is preferably designed as an air-flowed honeycomb cooler or tube cooler. This design is particularly advantageous when the preheater does not require fuel preheating, such as with coal dust.
- the coolant is then preferably recooled with the aid of a cooler through which air flows.
- the coolant lines in the hollow blower shaft are formed from a hollow cylinder which is coaxially oriented at a distance from the hollow shaft, the coolant being supplied through the resulting outer annular space and the coolant being discharged through the hollow cylinder. In conjunction with the stationary distributor head, this results in optimal coolant guidance with the lowest hydraulic resistance. It is furthermore expedient that the coolant line in the fan wheel preferably runs in a meandering fashion at the outer end of each wheel blade, which ensures that, particularly where high heat loads are to be expected from the fan blades, optimal heat dissipation is achieved by means of increased coolant supply.
- blower ring gear is connected to the hollow cylinder in the blower shaft via connecting lines in the wheel hub, so that an optimal coolant circulation, in particular on the thermally stressed parts of the blower, is achieved with simple constructional means.
- the conveying fan and / or the fan parts are cooled by a coolant, preferably by a temperature-resistant organic or inorganic liquid which has a boiling point of more than 100 ° C. and circulates in a closed circuit.
- a coolant preferably by a temperature-resistant organic or inorganic liquid which has a boiling point of more than 100 ° C. and circulates in a closed circuit.
- This measure achieves high heat dissipation and thus improved cooling of the individual blower parts at a relatively low liquid temperature, as a result of which, in particular, heat peaks on the blower parts can be reduced.
- the cross sections of the coolant lines can be chosen so small that coolant lines can also be laid in more complicated fan parts. Due to the closed circuit of the coolant, expensive, highly effective coolants can also be used, since the coolant does not have to be supplied again and again.
- the cooling liquid for the blower is a heat transfer oil, in particular a silicone oil, whereby it is advantageously achieved that the desired working temperature of more than 100 ° C is achieved with a commercially available coolant. It is expedient that the working temperature of the cooling liquid is set between 200 and 270 ° C, preferably between 200 and 220 ° C.
- the coolant circuit for the delivery fan is monitored by pressure switches, thermostats, flow meters, etc.
- a direct-acting, safe system for monitoring the cooling circuit is available, which immediately indicates a rise in temperature and / or a throughput fault in the cooling liquid, so that immediate countermeasures can be initiated. This ensures reliable cooling of the blower with regard to the material properties.
- a cross-flow heated shaft furnace 1 is partially shown in section.
- the furnace shaft 2 is divided into an upper preheating zone V, two firing zones B 1 / B 2 arranged below it and a cooling zone K.
- At the lower end of the shaft is a device, not shown, for the continuous removal of the fired material.
- the rectangular shaft 2 consists of two gas collection chambers 3 and 4 arranged on both sides of the shaft, of which the gas collection chamber 3, the gas supply chamber and the gas collection chamber 4, the gas train chamber.
- the shaft wall 6 provided with gas passage openings 5 runs between these two chambers.
- the firing material 7 moves from top to bottom in a dense column of firing material.
- the gas supply chamber 3 is connected to a combustion chamber 8, into which a combustion device 9 and a fresh air line 13 are guided, through which hot air from the cooling zone K is conducted as combustion air into the combustion chamber 8.
- the gas discharge chamber 4 has a discharge opening 10 in the upper region, to which a circulation channel 11 is connected, which in turn is guided into the combustion chamber 8.
- a conveying fan 12 charged with coolants is arranged to maintain a closed hot gas circulation in the combustion zone B 2 .
- a branch line from the fresh air line 13 can be connected to the circulation channel 11.
- the combustion chamber 8, the combustion device 9 and the conveying fan 12 arranged in the circulation duct 11 are arranged outside * of the shaft and are therefore shown in broken lines.
- the conveying fan 12 is connected to a cooling device 14 which is arranged outside the shaft and has a closed coolant guide.
- the supply of the cooling liquid to the hot gas blower 12 takes place through line 15 and the return to the air-cooled warm cooler 1 through line 17.
- the lines 15, 17 contain the measuring and control devices required for monitoring the coolant circuit, in each case in each supply and return line 15, 17 a pressure switch 18 and a quick-closing thermostat valve 19.
- the lines 15 and 17 have flow meters 20 for the cooling liquid, which are designed as orifice meters with a differential pressure manomet.
- a pneumatic valve 21 is arranged in line 15 for quick shutdown of the coolant supply.
- an expansion tank 22 for compensating for the change in volume of the coolant is arranged at the highest point of the circuit, and a filler and refill tank 24 for the coolant is located in front of the coolant pump 23.
- the honeycomb cooler 16 is air-cooled and equipped with an adjustable cooling fan 25.
- FIG. 2 shows, in section and in an enlarged view, the conveying fan 12 arranged on the outside of the shaft in the circulation channel 11, in particular the fan shaft 26 and the fan wheel 27. Both the fan shaft 26 and the fan wheel 27 are hollow.
- a hollow cylinder 28 is arranged coaxially in the hollow hollow shaft 26 at a distance from the hollow shaft itself, the coolant being supplied through the resulting outer annular space 32 and being discharged through the hollow cylinder 28.
- the coolant annulus as well as the hollow cylinder are connected via a stationary distributor head 29 to the stationary coolant lines 15 and 17, which in turn form a closed coolant circuit with the honeycomb cooler 16 through which air flows.
- the distributor head 29 is surrounded by a leakage housing known per se.
- each wheel blade 30 there are arranged guide plates 31 which run in a meandering band shape and to which the coolant is supplied from the annular space 32 of the fan shaft 26 via a line 33 arranged in the fan wheel.
- the interior of the blower ring gear 27 is connected to the hollow cylinder 28 via a connecting line 34 which are arranged in the wheel hub 35 of the blower wheel 27.
- the hot gases generated in the combustion chamber 8 flow from the combustion chamber into the gas collection chamber 3 and from there through the gas passage openings 5 in the shaft wall 6 transversely to the throughput direction of the Fired goods into the densely packed fired goods layer, enter the gas discharge chamber 4 on the other side of the bed through the gas passage openings 5 and are collected there.
- the hot gas is sucked out of the gas discharge chamber 4 via the discharge opening 10 into the circulation channel 11 by means of the delivery fan 12, which is thus directly in a hot gas flow of approximately 800 ° C. to 1200 ° C.
- the conveying fan 12 feeds the hot gas to the combustion chamber 8, into which fuels are introduced via the combustion device 9 and burn out there in the atmosphere enriched with preheated fresh air.
- the kinetic energy required for the multiple circulation of the hot gases in the combustion zone is supplied to the hot gas circuit in each combustion zone B, the fan allowing an exactly adjustable pressure drop of at least 350 mm / WS within each combustion zone.
- an intensive gas circulation with a high throughput volume is generated, so that the amount of heat that is required for an optimal firing can always be supplied to the firing material located in the firing zone, even with high firing material throughput, so that even very fine stones can be fired.
- sealing zones are arranged between each combustion zone B 1 / B 2 , which allow hot gases to flow out into the overlying combustion zone or preheating zone prevent.
- the combustible material that descends from the combustion zone into the cooling zone K is cooled in this by supplied cooling air 36 to a corresponding further processing temperature and processed further by means of extraction elements (not shown).
- the cooling air heated in the cooling zone releases the amount of heat absorbed by the material to be burned into the combustion chamber 8 as combustion air.
- a portion of the hot gases generated in the combustion zones B 1 and B 2 is branched off from the combustion zones and fed to the lumpy material in the preheating zone for preheating it via lines not shown in the furnace 1.
- the conveying fan 12 is connected via the distributor head 29 to a closed cooling circuit 14 which is designed as described above.
- the cooling of the blower with the cooling device takes place by means of a temperature-resistant heat transfer oil, in particular a silicone oil, which is regulated to a working temperature between 200 and 220 ° C, for which purpose corresponding control devices, such as pressure switch 18, thermostatic valve 19 and flow meter 20, are located in the fixed coolant lines of the cooling device are arranged.
- a temperature-resistant heat transfer oil in particular a silicone oil, which is regulated to a working temperature between 200 and 220 ° C, for which purpose corresponding control devices, such as pressure switch 18, thermostatic valve 19 and flow meter 20, are located in the fixed coolant lines of the cooling device are arranged.
- blower parts heated to a maximum of 240 ° C in the hot gas stream which volatilize from the combustible, harmful and prone to caking alkali or sulfur compounds, cool down and crystallize from the hot gases, so that the Ge blower or on the fan blades can not form approaches that either negatively affect the throughput characteristics of the fan or lead to increased bearing loads on the fan.
- blower which is cooled with a heat transfer oil in a closed circuit, directly in the hot gas circulation of the combustion zone of a cross-flow heated shaft furnace, it has become possible for the first time to generate such a high pressure drop in each combustion zone, and thus to provide such a high kinetic energy for the hot gas circulation that furnace units with double the throughput compared to the crossflow furnaces previously equipped with injectors.
- the present invention is not only limited to cross-flow heated shaft furnaces for burning or sintering limestone, dolomite or magnesite, but can also be used wherever blowers must be used directly in a hot gas stream in order to generate the kinetic energy required for gas production.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Furnace Details (AREA)
- Tunnel Furnaces (AREA)
- Crucibles And Fluidized-Bed Furnaces (AREA)
- Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
- Muffle Furnaces And Rotary Kilns (AREA)
Abstract
Description
Die Erfindung betrifft einen Ofen zur Wärmebehandlung von meist stückigem bis feinkörnigem Gut, insbesondere Schachtofen, Drehherdofen oder dergleichen zum Brennen oder Sintern von Kalkstein, Dolomit oder Magnesit, in welchem das Brenngut eine Vorwärmzone, eine Brennzone sowie eine Kühlzone durchsetzt und die Brennzone eine Gaszu- bzw. Gasabfuhreinrichtung sowie eine Gasfördereinrichtung zur Erzeugung eines Heißgasumlaufes aufweist.The invention relates to a furnace for the heat treatment of mostly lumpy to fine-grained material, in particular a shaft furnace, rotary hearth furnace or the like for burning or sintering limestone, dolomite or magnesite, in which the fuel passes through a preheating zone, a combustion zone and a cooling zone and the combustion zone contains a gas or gas discharge device and a gas delivery device for generating a hot gas circulation.
Aus der DE-PS 1 034 090 ist ein Querstromschachtofen bekannt, der Gassammeleinrichtungen und Heizeinrichtungen aufweist. Die zum Sintern des Brenngutes erforderlichen Heißgase werden nach dem Durchströmen der Gutschicht in den Gassammeleinrichtungen aufgefangen und in den Heizeinrichtungen mittels Injektoren für die Gasumwälzung wieder aufgeheizt. Die für den Gasumlauf erforderlichen Fördermittel werden dabei durch die starren Injektoren dargestellt, die ein im wesentlichen konstantes Durchsatzvolumen von Heißgasen umwälzen. Störungen treten bei einem solchen Querstromschachtofen insbesondere dann auf, wenn aufgrund einer veränderten Schüttdichte im Schacht und damit verändertem Druckwiderstand in der Gutsäule das dem jeweiligen Injektor zur Verfügung stehende Gasvolumen geändert wird.From DE-PS 1 034 090 a cross-flow shaft furnace is known which has gas collection devices and heating devices. The hot gases required for sintering the fuel are collected in the gas collection devices after flowing through the material layer and again in the heating devices by means of injectors for the gas circulation heated up. The funds required for the gas circulation are represented by the rigid injectors, which circulate an essentially constant throughput volume of hot gases. Faults occur in such a cross-flow shaft furnace in particular if the gas volume available to the respective injector is changed due to a changed bulk density in the shaft and thus a changed pressure resistance in the man-made column.
Aus der DE-PS 1 558 057 ist ein querstrombeheizter Schachtofen zum Brennen von Kalkstein bekannt, der in Durchgangsrichtung des Gutes eine Vorwärmzone, zwei Brennzonen und eine Kühlzone aufweist, wobei jede Brennzone einen quasi geschlossenen Heißgaskreislauf enthält. Der Heißgaskreislauf wird dadurch bewirkt, daß jeder Brennzone mindestens ein Strahlgebläse bzw. Injektor zugeordnet ist, welcher die für den Heißgasumlauf erforderliche kinetische Energie erzeugt. Der Kreislauf der Heißgase erfolgt vom Injektor aus in eine Brennkammer, eine Gassammelkammer, die zugeordnete Brenngutschicht, die abführende Gassammelkammer und einen Umlaufkanal zurück zum Injektor. In die Brennkammer wird Brennstoff und als Verbrennungsluft Kühlluft aus der Kühlzone eingeführt. Durch die intensive Heißgasumwälzung ergibt sich ein sehr gleichmäßiger Brand über den gesamten Schachtquerschnitt. Es hat sich jedoch im Zuge nach immer größeren Ofeneinheiten gezeigt, daß dem Einsatz von Strahlgebläsen oder Injektoren zur Aufrechterhaltung der Gasumwälzung in einer jeden Brennzone Grenzen gesetzt sind, die insbesondere in dem hohen konstruktiven und kostenträch- 'tigen:Aufwand für diese Injektoren liegen. Zum anderen lassen sich mit diesen Injektoren pro Brennzone bei großen Ofeneinheiten nur unzureichende Druckgefälle bis ca. 70 mm WS erzeugen, so daß bei den großen Ofeneinheiten die für den Heißgaskreislauf erforderliche kinetische Energie mit Injektoren nicht mehr erzeugt werden kann. Deshalb ließen sich nur Ofeneinheiten bis zu 120 tato Durchsatz darstellen.From DE-PS 1 558 057 a cross-flow heated shaft kiln for limestone burning is known, which has a preheating zone, two firing zones and a cooling zone in the passage direction of the material, each firing zone containing a quasi-closed hot gas circuit. The hot gas circuit is brought about in that at least one jet blower or injector is assigned to each combustion zone and generates the kinetic energy required for the hot gas circulation. The hot gases are circulated from the injector into a combustion chamber, a gas collection chamber, the assigned fuel bed, the exhaust gas collection chamber and a circulation channel back to the injector. Fuel and cooling air from the cooling zone are introduced into the combustion chamber. The intensive hot gas circulation results in a very even fire across the entire shaft cross-section. However, it has been shown in the course of ever larger furnace units that there are limits to the use of jet blowers or injectors for maintaining the gas circulation in each combustion zone, which lie in particular in the high constructive and cost-intensive expenditure for these injectors. On the other hand, with these injectors, only insufficient pressure drops up to approx generate, so that the kinetic energy required for the hot gas circuit can no longer be generated with injectors in the large furnace units. For this reason, only furnace units with a throughput of up to 120 tons could be represented.
Ausgehend von dem eingangs gewürdigten Stand der Technik ist es die Aufgabe der vorliegenden Erfindung, einen Wärmebehandlungsofen, insbesondere einen Schachtofen zum Brennen oder Sintern von Kalkstein, Dolomit oder Magnesit so zu verbessern, daß mit konstruktiv einfachen Mitteln Ofeneinheiten bis zu 400 tato Durchsatz, geringem spezifischen Energieverbrauch und hohem thermischen Wirkungsgrad gebaut werden können.Starting from the prior art recognized at the outset, it is the object of the present invention to improve a heat treatment furnace, in particular a shaft furnace for burning or sintering limestone, dolomite or magnesite, in such a way that furnace units of up to 400 tpd throughput, low specific, can be used with structurally simple means Energy consumption and high thermal efficiency can be built.
Diese Aufgabe wird dadurch gelöst, daß im Heißgasumlauf, vorzugsweise zwischen der Gasabzugseinrichtung und der Brenneinrichtung als Gasfördereinrichtung ein mit Kühlmittel beaufschlagtes Fördergebläse angeordnet ist. Hierdurch ist es erstmals möglich, direkt im Heißgasumlauf eine optimale regulierbare Gasfördereinrichtung einzusetzen, die im Gegensatz zu den bisher verwendeten starren Injektoren ohne weiteres in der Brennzone ein Druckgefälle von ca. 300 mm Wassersäule erzeugt, so daß weitaus größere Gasmengen pro Zeiteinheit an das zu brennende/sinternde Brenngut herangeführt werden können. Dieses mit Kühlmitteln beaufschlagte Fördergebläse kann also ohne weiteres Heißgase bis ca. 1200 °C im Umlauf zwischen Gasabzugseinrichtung und Brenneinrichtung fördern, ohne daß das Gebläse thermischen Grenzbeanspruchungen ausgesetzt ist. Die aufwendigen konstruktiven Bauten für die Anordnung der Injektoren am Brennschacht können entfallen, so daß insgesamt die Investitionskosten für die Ofenanlage erheblich gesenkt werden können.This object is achieved in that in the hot gas circulation, preferably between the gas extraction device and the combustion device as a gas delivery device, a delivery fan charged with coolant is arranged. This makes it possible for the first time to use an optimally adjustable gas delivery device directly in the hot gas circulation system, which, in contrast to the rigid injectors previously used, easily generates a pressure drop of approx. 300 mm water column in the combustion zone, so that far larger amounts of gas per unit time are burned / sintering firing material can be introduced. This conveying blower, which is acted on with coolants, can therefore convey hot gases up to approximately 1200 ° C. in the circulation between the gas extraction device and the combustion device without the blower being exposed to thermal limit stresses. The elaborate structural structures for the arrangement of the injectors on the combustion shaft can be dispensed with, so that overall the investment costs for the furnace system can be considerably reduced.
In Ausgestaltung der Erfindung ist vorgesehen, daß bei einem querstrombeheizten Schachtofen mit mindestens einer Brennzone und seitlich am Schacht angeordneter und jeder Brennzone zugeordneter Gaszu- bzw. Gasabfuhrkammer das gekühlte Gasfördergebläse im heißen Umlaufkanal zwischen der Gasabzugskammer und der Brennkammer angeordnet ist, wodurch sich eine besonders kompakte und gedrungene Ofenkonstruktion erzielen läßt.In an embodiment of the invention, it is provided that in a cross-flow-heated shaft furnace with at least one combustion zone and gas supply or gas discharge chamber arranged on the side of the shaft and assigned to each combustion zone, the cooled gas delivery fan is arranged in the hot circulation channel between the gas discharge chamber and the combustion chamber, resulting in a particularly compact and achieve compact furnace construction.
In Ausgestaltung der Erfindung ist vorgesehen, daß das Fördergebläse außem am Schacht angeordnet ist und an seiner Kühlvorrichtung mit in sich geschlossener Kühlmittelführung angeschlossen ist. Dies hat den Vorteil, daß hochwirksame Kühlmittel im geschlossenen Kreislauf dem Gebläse zugeführt werden, so daß eine exakte Einstellung der Temperaturen am Gebläse erfolgen kann und die Gebläseteile in keinem Fall unerwünscht hohen Temperaturbereichen ausgesetzt sind. Zum anderen wird erreicht, daß die flüchtigen und zu Anbackungen neigenden Bestandteile in den Heißgasen direkt an den relativ kalten Gebläseteilen auskristallisieren und als feste Bestandteile in die Gutschüttung zurückgeführt werden, ohne daß das Gebläse auch bei einem sehr hohen Gehalt an flüchtigen Schadbestandteilen in den Heißgasen keine Anbackungen aufweist. Hierdurch wird eine hohe Betriebssicherheit und Verfügbarkeit des Gebläses und damit der gesamten Ofenanlage erreicht.In an embodiment of the invention it is provided that the conveying fan is arranged on the outside of the shaft and is connected to its cooling device with a self-contained coolant guide. This has the advantage that highly effective coolants are fed to the blower in a closed circuit, so that the temperatures on the blower can be set precisely and the blower parts are never exposed to undesirably high temperature ranges. On the other hand, it is achieved that the volatile constituents in the hot gases, which tend to cake, crystallize directly on the relatively cold blower parts and are returned as solid constituents to the bulk material without the blower, even with a very high content of volatile harmful constituents in the hot gases Has caking. This ensures high operational reliability and availability of the blower and thus the entire furnace system.
In weiterer Ausgestaltung der Erfindung ist vorgesehen, daß der Rückkühler der Gebläsekühlvorrichtung als Wärmetauscher für die in die Brennkammer eingeführten Brennstoffe dient. Hierdurch wird eine optimale Nutzung der vom Gebläse angeführten Wärme erreicht und insbesondere bei ölbefeuerten Brennkammern wird durch die Vorwärmung der Brennstoffe deren schnellere Vergasung in der Brennkammer und damit eine optimale Verbrennung ohne Zündverzögerung erzielt.In a further embodiment of the invention it is provided that the recooler of the fan cooling device serves as a heat exchanger for the fuels introduced into the combustion chamber. In this way, optimal use of the heat supplied by the blower is achieved and, in particular in the case of oil-fired combustion chambers, the preheating of the fuels results in their faster gasification in the combustion chamber and thus optimal combustion without ignition delay.
In einer weiteren Ausgestaltung der Erfindung ist vorgesehen, daß beim Fördergebläse die Gebläsewelle und/oder das Gebläserad hohl ausgebildet ist und in der Gebläsehohlwelle bzw. in dem Gebläsehohlrad kühlmittelführende Einrichtungen, vorzugsweise Kühlmittelleitungen angeordnet sind, wodurch erreicht wird, daß die Gebläseteile gezielt dort gekühlt werden können, wo die thermische Belastung durch die Heißgase am stärksten ist. Zweckmäßig ist hierbei, daß die Kühlmittelleitungen der Gebläsewelle über einen ortsfesten Verteilerkopf mit den ortsfesten Kühlmittelleitungen des Rückkühlers in Verbindung stehen, der vorzugsweise als luftdurchströmter Wabenkühler oder Röhrenkühler ausgebildet ist. Diese konstruktive Ausbildung ist insbesondere dann von Vorteil, wenn mit dem Rückkühler keine Brennstoffvorwärmung wie zum Beispiel bei Kohlenstaub erforderlich ist. Die Rückkühlung der Kühlmittels erfolgt dann vorzugsweise mit Hilfe eines luftdurchströmten Kühlers.In a further embodiment of the invention it is provided that the fan shaft and / or the fan wheel is hollow in the conveying fan and coolant-carrying devices, preferably coolant lines, are arranged in the hollow fan shaft or in the fan ring gear, thereby ensuring that the fan parts are specifically cooled there where the thermal stress from the hot gases is strongest. It is expedient here that the coolant lines of the blower shaft are connected to the fixed coolant lines of the recooler via a stationary distributor head, which is preferably designed as an air-flowed honeycomb cooler or tube cooler. This design is particularly advantageous when the preheater does not require fuel preheating, such as with coal dust. The coolant is then preferably recooled with the aid of a cooler through which air flows.
In bevorzugter Ausgestaltung der Erfindung ist vorgesehen, daß die Kühlmittelleitungen in der Gebläsehohlwelle aus einem mit Abstand zur Hohlwelle koaxial ausgerichteten Hohlzylinder gebildet werden, wobei durch den entstehenden äußeren Ringraum das Kühlmittel zugeführt und durch den Hohlzylinder das Kühlmittel abgeführt wird. Dies ergibt in Verbindung mit dem ortsfesten Verteilerkopf eine optimale KUhlmittelführung mit geringsten hydraulischen Widerständen. Zweckmäßig ist weiterhin, daß die Kühlmittelleitung im Gebläserad vorzugsweise am äußeren Ende einer jeden Radschaufel mäanderbandförmig verlaufen, wodurch sichergestellt ist, daß insbesondere dort wo hohe Wärmebelastungen an den Gebläseschaufeln zu erwarten sind, eine optimale Abführung der Wärme durch erhöhtes Kühlmittelangebot erzielt wird.In a preferred embodiment of the invention it is provided that the coolant lines in the hollow blower shaft are formed from a hollow cylinder which is coaxially oriented at a distance from the hollow shaft, the coolant being supplied through the resulting outer annular space and the coolant being discharged through the hollow cylinder. In conjunction with the stationary distributor head, this results in optimal coolant guidance with the lowest hydraulic resistance. It is furthermore expedient that the coolant line in the fan wheel preferably runs in a meandering fashion at the outer end of each wheel blade, which ensures that, particularly where high heat loads are to be expected from the fan blades, optimal heat dissipation is achieved by means of increased coolant supply.
Ein weiterer Vorschlag sieht vor, daß das Gebläsehohlrad über Verbindungsleitungen in der Radnabe mit dem Hohlzylinder in der Gebläsewelle in Verbindung steht, so daß mit einfachen konstruktiven Mitteln ein optimaler Kühlmittelumlauf insbesondere an den thermisch beanspruchten Teilen des Gebläses erreicht wird.Another proposal provides that the blower ring gear is connected to the hollow cylinder in the blower shaft via connecting lines in the wheel hub, so that an optimal coolant circulation, in particular on the thermally stressed parts of the blower, is achieved with simple constructional means.
In einer weiteren bevorzugten Ausgestaltung der Erfindung ist vorgesehen, daß das Fördergebläse und/oder die Gebläseteile durch ein Kühlmittel gekühlt werden, vorzugsweise durch eine temperaturbeständige organische oder anorganische Flüssigkeit, welche einen Siedepunkt von mehr als 100 °C aufweist und im geschlossenen Kreislauf umläuft. Durch diese Maßnahme wird bei relativ niedriger Flüssigkeitstemperatur eine hohe Wärmeabfuhr und damit eine verbesserte Kühlung der einzelnen Gebläseteile erreicht, wodurch insbesondere Wärmespitzen an den Gebläseteilen abgebaut werden können. Außerdem können die Querschnitte der Kühlmittelleitungen so klein gewählt werden, daß auch in komplizierter gestaltete Gebläseteile Kühlmittelleitungen verlegt werden können. Durch den geschlossenen Kreislauf des Kühlmittels können auch teure hochwirksame Kühlmittel verwendet werden, da die Kühlflüssigkeit nicht laufend neu zugeführt werden muß.In a further preferred embodiment of the invention it is provided that the conveying fan and / or the fan parts are cooled by a coolant, preferably by a temperature-resistant organic or inorganic liquid which has a boiling point of more than 100 ° C. and circulates in a closed circuit. This measure achieves high heat dissipation and thus improved cooling of the individual blower parts at a relatively low liquid temperature, as a result of which, in particular, heat peaks on the blower parts can be reduced. In addition, the cross sections of the coolant lines can be chosen so small that coolant lines can also be laid in more complicated fan parts. Due to the closed circuit of the coolant, expensive, highly effective coolants can also be used, since the coolant does not have to be supplied again and again.
In Ausgestaltung der Erfindung ist weiterhin vorgesehen, daß die Kühlflüssigkeit für das Gebläse ein Wärmeträgeröl, insbesondere ein Silikonöl ist, wodurch mit Vorteil erreicht wird, daß die angestrebte Arbeitstemperatur von mehr als 100 °C mit einem Kühlmittel handelsüblicher Art erreicht wird. Zweckmäßig ist, daß die Arbeitstemperatur der Kühlflüssigkeit zwischen 200 und 270 °C, vorzugsweise zwischen 200 und 220 °C eingestellt wird.In an embodiment of the invention it is further provided that the cooling liquid for the blower is a heat transfer oil, in particular a silicone oil, whereby it is advantageously achieved that the desired working temperature of more than 100 ° C is achieved with a commercially available coolant. It is expedient that the working temperature of the cooling liquid is set between 200 and 270 ° C, preferably between 200 and 220 ° C.
Weiterhin ist in einer Ausgestaltung der Erfindung vorgesehen, daß der Kühlflüssigkeitskreislauf für das Fördergebläse durch Druckwächter, Thermostate, Strömungsmesser etc. überwacht wird. Hierdurch steht ein direkt wirkendes, sicheres System zur Überwachung des Kühlkreislaufes zur Verfügung, das einen Temperaturanstieg und/oder eine Durchsatzstörung der Kühlflüssigkeit sofort anzeigt, so daß sofortige Gegenmaßnahmen eingeleitet werden können. Hierdurch wird eine zuverlässige Kühlung des Gebläses im Hinblick auf die Materialeigenschaften gewährleistet.Furthermore, it is provided in one embodiment of the invention that the coolant circuit for the delivery fan is monitored by pressure switches, thermostats, flow meters, etc. As a result, a direct-acting, safe system for monitoring the cooling circuit is available, which immediately indicates a rise in temperature and / or a throughput fault in the cooling liquid, so that immediate countermeasures can be initiated. This ensures reliable cooling of the blower with regard to the material properties.
Nachfolgend wird die Erfindung anhand eines Ausführungsbeispieles näher beschrieben. Es zeigen:
- Fg. 1 einen Querstromschachtofen teilweise im Schnitt mit im Heißgasumlauf der Brennzone angeordnetem gekühlten Gebläse,
- Fig. 2 einen Längsschnitt durch das gekühlte Fördergebläse in vergrößerter Darstellung.
- 1 shows a cross-flow shaft furnace, partly in section, with a cooled fan arranged in the hot gas circulation of the combustion zone,
- Fig. 2 shows a longitudinal section through the cooled conveyor fan in an enlarged view.
In Figur 1 ist ein querstrombeheizter Schachtofen 1 teilweise im Schnitt dargestellt. Der Ofenschacht 2 ist in eine obere Vorwärmzone V, zwei darunter angeordnete Brennzonen B1/B2 und eine Kühlzone K gegliedert. Am unteren Schachtende befindet sich eine nicht näher dargestellte Vorrichtung zum kontinuierlichen Abzug des gebrannten Gutes.In Figure 1, a cross-flow heated shaft furnace 1 is partially shown in section. The
In der Brennzone B2 wie auch in der darüber nicht näher dargestellten Brennzone B1 besteht der rechteckige Schacht 2 aus zwei zu beiden Seiten des Schachtes angeordneten Gassammelkammern 3 und 4, von denen die Gassammelkammer 3, die Gaszufuhrkammer und die Gassammelkammer 4, die Gasabzugskammer darstellt. Zwischen diesen beiden Kammern verläuft die mit Gasdurchlaßöffnungen 5 versehene Schachtwand 6.. Innerhalb des Schachtes bewegt sich das Brenngut 7 von oben nach unten in einer dichten Brenngutsäule. Die Gaszufuhrkammer 3 steht mit einer Brennkammer 8 in Verbindung, in die eine Brenneinrichtung 9 und eine Frischluftleitung 13 geführt ist, durch die Heißluft aus der Kühlzone K als Verbrennungsluft in die Brennkammer 8 geleitet wird. Die Gasabzugskammer 4 weist im oberen Bereich eine Abzugsöffnung 10 auf, an die ein Umlaufkanal 11 angeschlossen ist, der seinerseits in die Brennkammer 8 geführt ist. In dem Umlaufkanal 11 ist ein mit Kühlmitteln beaufschlagtes Fördergebläse 12 zur Aufrechterhaltung eines geschlossenen Heißgasumlaufes in der Brennzone B2 angeordnet. Gegebenenfalls kann an den Umlaufkanal 11 eine Zweigleitung aus der Frischluftleitung 13 angeschlossen sein. Die Brennkammer 8, die Brenneinrichtung 9 und das im Umlaufkanal 11 angeordnete Fördergebläse 12 sind außerhalb*des Schachtes angeordnet und insofern in gebrochener Linienführung dargestellt.In the combustion zone B 2 as well as in the combustion zone B 1 not shown above, the
Das Fördergebläse 12 ist an eine außerhalb des Schachtes angeordnete Kühlvorrichtung 14 mit in sich geschlossener Kühlmittelführung angeschlossen. Die Zuführung der Kühlflüssigkeit zu dem Heißgasgebläse 12 erfolgt dabei durch die Leitung 15 und die Rückführung zu dem luftgekühlten Warmkühler 1 durch die Leitung 17. In den Leitungen 15, 17 befinden sich die für die Überwachung des Kühlmittelkreislaufes erforderlichen Meß- und Regelgeräte, und zwar jeweils in jeder Zu-und Rückführungsleitung 15, 17 ein Druckwächter 18 und ein Schnellschlußthermostatventil 19. Des weiteren weisen die Leitungen 15 und 17 Strömungsmesser 20 für die Kühlflüssigkeit auf, die als Blendenmeßgeräte mit Differenzdruckmanomett ausgebildet sind. Zur Schnellabschaltung der Kühlmittelzuführung ist in der Leitung 15 ein pneumatisches Ventil 21 angeordnet.The conveying
In der Kühlmittelabführleitung 17 ist am höchsten Punkt des Kreislaufes ein Ausgleichsbehälter 22 zum Ausgleich der Volumenänderung der Kühlflüssigkeit angeordnet und vor der Kühlmittelpumpe 23 befindet sich ein Ein- und Nachfüllbehälter 24 für das Kühlmittel. Der Wabenkühler 16 ist luftgekühlt und mit einem regelbaren Kühlgebläse 25 ausgestattet.In the
In Fig. 2 ist im Schnitt und in vergrößerter Darstellung das außen am Schacht im Umlaufkanal 11 angeordnete Fördergebläse 12, insbesondere die Gebläsewelle 26 und das Gebläserad 27, dargestellt. Sowohl die Gebläsewelle 26 wie auch das Gebläserad 27 sind hohl ausgebildet. In der Gebläsehohlwelle 26 ist mit Abstand zur Hohlwelle selbst koaxial ein Hohlzylinder 28 angeordnet, wobei durch den entstehenden äußeren Ringraum 32 das Kühlmittel zugeführt und durch den Hohlzylinder 28 abgeführt wird. Der Kühlmittelringraum wie auch der Hohlzylinder stehen über einen ortsfesten Verteilerkopf 29 mit den ortsfesten Kühlmittelleitungen 15 und 17 in Verbindung, die ihrerseits mit dem luftdurchströmten Wabenkühler 16 in Figur 1 einen geschlossenen Kühlmittelkreislauf bilden. Der Verteilerkopf 29 ist von einem an sich bekannten Leckagegehäuse umgeben.2 shows, in section and in an enlarged view, the conveying
In dem ebenfalls hohl ausgebildeten Gebläserad 27 sind am äußeren Ende einer jeden Radschaufel 30 mäanderbandförmig verlaufende Leitbleche 31 angeordnet, denen aus dem Ringraum 32 der Gebläsewelle 26 das Kühlmittel über eine im Gebläserad angeordnete Leitung 33 zugeführt wird. Der Innenraum des Gebläsehohlrades 27 steht mit dem Hohlzylinder 28 über eine Verbindungsleitung 34 in Verbindung, die in der Radnabe 35 des Gebläserades 27 angeordnet sind.In the
Im Betrieb des oben beschriebenen querstrombeheizten Schachtofens mit gekühltem Gebläse zur Erzeugung eines geschlossenen Heißgasumlaufes in der jeweiligen Brennzone B strömen die in der Brennkammer 8 erzeugten Heißgase aus der Brennkammer in die Gassammelkammer 3 und von dort durch die Gasdurchlaßöffnungen 5 in der Schachtwandung 6 quer zur Durchsatzrichtung des Brenngutes in die dichtgeschüttete Brenngutschicht, treten auf der anderen Seite der Schüttung durch die Gasdurchlaßöffnungen 5 in die Gasabzugskammer 4 ein und werden dort gesammelt. Aus der Gasabzugskammer 4 wird das Heißgas über die Abzugsöffnung 10 in den Umlaufkanal 11 mittels des Fördergebläses 12 gesaugt, welches damit unmittelbar in einem Heißgasstrom von etwa 800 °C.bis 1200 °C liegt. Das Fördergebläse 12 leitet das Heißgas der Brennkammer 8 zu, in die über die Brenneinrichtung 9 Brennstoffe eingeführt werden, die dort in der mit vorgewärmter Frischluft sauerstoffangereicherten Atmosphäre ausbrennen. Auf diese Weise wird dem Heißgaskreislauf in jeder Brennzone B die für die mehrfache Umwälzung der Heißgase in der Brennzone erforderliche kinetische Energie zugeführt, wobei mit dem Gebläse innerhalb einer jeden Brennzone ein genau einstellbares Druckgefälle von mindestens 350 mm/WS ermöglicht wird. Hierdurch wird eine intensive Gasumwälzung mit hohem Durchsatzvolumen erzeugt, so daß dem in der Brennzone befindlichen Brenngut auch bei hohem Brenngutdurchsatz immer die Wärmemenge zugeführt werden kann, die für einen optimalen Brand erforderlich ist, so daß auch Feinststeine gebrannt werden können.In the operation of the cross-flow-heated shaft furnace described above with a cooled fan for generating a closed hot gas circulation in the respective combustion zone B, the hot gases generated in the combustion chamber 8 flow from the combustion chamber into the
Um zu verhindern, daß die Gase den Schacht 2 in vertikaler Richtung aufwärts durchströmen, sind zwischen jeder Brennzone B1/B2 Dichtzonen angeordnet, die ein Abströmen der Heißgase in die darüberliegende Brennzone bzw. Vorwärmzone verhindern. Das aus der Brennzone in die Kühlzone K absinkende Brenngut wird in dieser durch zugeführte Kühlluft 36 auf entsprechende Weiterverarbeitungstemperatur gekühlt und über nicht näher dargestellte Abzugsorgane weiter verarbeitet. Die in der Kühlzone aufgeheizte Kühlluft gibt die vom Brenngut aufgenommene Wärmemenge an die Brennkammer 8 als Verbrennungsluft ab.In order to prevent the gases flowing through the
Ein Teil der in den Brennzonen B1 und B2 erzeugten Heißgase wird aus den Brennzonen abgezweigt und über nicht näher dargestellte im Ofen 1 verlaufende Leitungen dem stückigen Gut in der Vorwärmzone zu dessen Vorwärmung zugeleitet.A portion of the hot gases generated in the combustion zones B 1 and B 2 is branched off from the combustion zones and fed to the lumpy material in the preheating zone for preheating it via lines not shown in the furnace 1.
Das Fördergebläse 12 steht über den Verteilerkopf 29 mit einem geschlossenen Kühlkreislauf 14 in Verbindung, der wie oben beschrieben ausgebildet ist. Die Kühlung des Gebläses mit der Kühlvorrichtung erfolgt mittels eines temperaturbeständigen Wärmeträgeröls, insbesondere eines Silikonöls, welches auf eine Arbeitstemperatur zwischen 200 und 220 °C eingeregelt wird, wozu in den ortsfesten Kühlmittelleitungen der Kühlvorrichtung 14 entsprechende Regeleinrichtungen, wie Druckwächter 18, Thermostatventil 19 und Strömungsmesser 20 angeordnet sind. Hierdurch ist es möglich, sämtliche im Heißgasstrom (etwa 800 °C bis 1200 °C) des Umlaufkanals 11 liegende Gebläseteile so zu kühlen, daß deren Temperatur mit Sicherheit unter der thermischen Maximalbeanspruchung des eingesetzten Materials liegen. Zum anderen werden durch die auf maximal 240 °C aufgeheizten im Heißgasstrom liegenden Gebläseteile, die aus dem Brenngut verflüchtigten, schädlichen und zu Anbackungen neigenden Alkali- oder Schwefelverbindungen schockartig abgekühlt und aus den Heißgasen auskristalliert, so daß sich am Gebläse bzw. an den Gebläseschaufeln keine Ansätze bilden können, die entweder die Durchsatzcharakteristik des Gebläses negativ beeinflussen oder aber zu erhöhten Lagerbelastungen am Gebläse führen. Durch den Einsatz des mit einem Wärmeträgeröl im geschlossenen Kreislauf gekühlten Gebläses unmittelbar im Heißgasumlauf der Brennzone eines querstrombeheizten Schachtofens ist es erstmals möglich geworden, in jeder Brennzone ein so hohes Druckgefälle zu erzeugen, und damit eine so hohe kinetische Energie für den Heißgasumlauf bereitzustellen, daß Ofeneinheiten mit dem doppelten Durchsatz gegenüber den bisher mit Injektoren ausgestatteten Querstromöfen möglich sind.The conveying
Die vorliegende Erfindung ist nicht nur auf querstrombeheizte Schachtöfen zum Brennen oder Sintern von Kalkstein, Dolomit oder Magnesit beschränkt, sondern sie läßt sich überall dort anwenden, wo direkt in einem Heißgasstrom Gebläse eingesetzt werden müssen, um die für die Gasförderung erforderliche kinetische Energie zu erzeugen.The present invention is not only limited to cross-flow heated shaft furnaces for burning or sintering limestone, dolomite or magnesite, but can also be used wherever blowers must be used directly in a hot gas stream in order to generate the kinetic energy required for gas production.
Claims (16)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT79102695T ATE67T1 (en) | 1978-08-18 | 1979-07-30 | FURNACE FOR THE HEAT TREATMENT OF LITTLE TO FINE GRAIN MATERIAL. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2836162 | 1978-08-18 | ||
DE19782836162 DE2836162A1 (en) | 1978-08-18 | 1978-08-18 | OVEN FOR HEAT TREATMENT FROM MOST PIECE TO FINE GRAIN |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0008667A1 true EP0008667A1 (en) | 1980-03-19 |
EP0008667B1 EP0008667B1 (en) | 1981-05-13 |
Family
ID=6047346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP79102695A Expired EP0008667B1 (en) | 1978-08-18 | 1979-07-30 | Furnace for the thermal treatment of granular or fine sized material |
Country Status (6)
Country | Link |
---|---|
US (1) | US4252521A (en) |
EP (1) | EP0008667B1 (en) |
JP (1) | JPS5531298A (en) |
AT (1) | ATE67T1 (en) |
DE (2) | DE2836162A1 (en) |
SU (1) | SU932999A3 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102092968A (en) * | 2011-01-07 | 2011-06-15 | 重庆京庆重型机械有限公司 | Lime smoldering furnace |
CN101745783B (en) * | 2009-12-14 | 2011-07-20 | 成都天保重型装备股份有限公司 | Manufacturing technology of furnace body of calcining furnace |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3209836A1 (en) * | 1982-03-18 | 1983-09-29 | Dolomitwerke GmbH, 5603 Wülfrath | METHOD FOR PRODUCING SINTERDOLOMITE IN A SHAFT OVEN AND SHAFT OVEN FOR IMPLEMENTING THE METHOD |
JPH0543227Y2 (en) * | 1987-12-21 | 1993-10-29 | ||
CN102627418B (en) * | 2012-04-26 | 2013-08-21 | 石家庄新华能源环保科技股份有限公司 | Compound lime kiln |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1653217A (en) * | 1927-12-20 | Combustion turbine | ||
US2369795A (en) * | 1941-11-17 | 1945-02-20 | Andre P E Planiol | Gaseous fluid turbine or the like |
DE1034090B (en) * | 1956-07-14 | 1958-07-10 | Roechlingsche Eisen & Stahl | Cross-flow heated shaft furnace for heating bulk material, especially for burning limestone |
DE1197798B (en) * | 1963-10-12 | 1965-07-29 | Sofim Saar Saarofenbau Fuer In | Process for burning limestone and device for carrying out the process |
DE1241041B (en) * | 1961-12-27 | 1967-05-24 | Kloeckner Humboldt Deutz Ag | Cross-flow furnace for burning lime, dolomite or the like. |
FR1585178A (en) * | 1967-09-08 | 1970-01-09 | ||
DE1558057B1 (en) * | 1967-02-23 | 1970-07-30 | Kloeckner Humboldt Deutz Ag | Cross-flow shaft furnace |
US3936220A (en) * | 1974-08-26 | 1976-02-03 | Controls Southeast, Inc. | Jacket construction for fluid-circulating pumps |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1713237A (en) * | 1928-01-11 | 1929-05-14 | Pacific Abrasive Supply Compan | Drier |
US2345067A (en) * | 1939-08-17 | 1944-03-28 | Osann Bernhard | Method of and apparatus for operating shaft furnaces for roasting and the like |
US2393963A (en) * | 1944-09-22 | 1946-02-05 | Adolph L Berger | Turbine wheel |
US2455313A (en) * | 1945-02-19 | 1948-11-30 | Irving B Osofsky | Heat exchanging airplane propeller |
US2778601A (en) * | 1951-05-28 | 1957-01-22 | Ernst R G Eckert | Fluid cooled turbine blade construction |
US2883151A (en) * | 1954-01-26 | 1959-04-21 | Curtiss Wright Corp | Turbine cooling system |
US2948521A (en) * | 1956-07-14 | 1960-08-09 | Roechlingsche Eisen & Stahl | Process and apparatus for heating a cross stream shaft furnace in view of heating solid materials, particularly for the calcination of limestone |
US2952441A (en) * | 1956-12-10 | 1960-09-13 | Int Harvester Co | Cooling construction for gas turbine blades |
US3311344A (en) * | 1964-12-08 | 1967-03-28 | John V Yost | Turbine wheel |
FR1440786A (en) * | 1965-04-21 | 1966-06-03 | Sofim Saar Saarofenbau Fuer In | Method for firing limestone and device for carrying out this process |
US3544096A (en) * | 1968-05-22 | 1970-12-01 | Kloeckner Humboldt Deutz Ag | Cross-current blast furnace |
-
1978
- 1978-08-18 DE DE19782836162 patent/DE2836162A1/en not_active Withdrawn
-
1979
- 1979-01-15 US US06/003,726 patent/US4252521A/en not_active Expired - Lifetime
- 1979-07-30 DE DE7979102695T patent/DE2960351D1/en not_active Expired
- 1979-07-30 EP EP79102695A patent/EP0008667B1/en not_active Expired
- 1979-07-30 AT AT79102695T patent/ATE67T1/en not_active IP Right Cessation
- 1979-08-17 JP JP10413979A patent/JPS5531298A/en active Pending
- 1979-08-17 SU SU792804599A patent/SU932999A3/en active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1653217A (en) * | 1927-12-20 | Combustion turbine | ||
US2369795A (en) * | 1941-11-17 | 1945-02-20 | Andre P E Planiol | Gaseous fluid turbine or the like |
DE1034090B (en) * | 1956-07-14 | 1958-07-10 | Roechlingsche Eisen & Stahl | Cross-flow heated shaft furnace for heating bulk material, especially for burning limestone |
DE1241041B (en) * | 1961-12-27 | 1967-05-24 | Kloeckner Humboldt Deutz Ag | Cross-flow furnace for burning lime, dolomite or the like. |
DE1197798B (en) * | 1963-10-12 | 1965-07-29 | Sofim Saar Saarofenbau Fuer In | Process for burning limestone and device for carrying out the process |
DE1558057B1 (en) * | 1967-02-23 | 1970-07-30 | Kloeckner Humboldt Deutz Ag | Cross-flow shaft furnace |
FR1585178A (en) * | 1967-09-08 | 1970-01-09 | ||
US3936220A (en) * | 1974-08-26 | 1976-02-03 | Controls Southeast, Inc. | Jacket construction for fluid-circulating pumps |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101745783B (en) * | 2009-12-14 | 2011-07-20 | 成都天保重型装备股份有限公司 | Manufacturing technology of furnace body of calcining furnace |
CN102092968A (en) * | 2011-01-07 | 2011-06-15 | 重庆京庆重型机械有限公司 | Lime smoldering furnace |
Also Published As
Publication number | Publication date |
---|---|
ATE67T1 (en) | 1981-05-15 |
SU932999A3 (en) | 1982-05-30 |
US4252521A (en) | 1981-02-24 |
JPS5531298A (en) | 1980-03-05 |
DE2836162A1 (en) | 1980-02-28 |
EP0008667B1 (en) | 1981-05-13 |
DE2960351D1 (en) | 1981-08-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2150191C3 (en) | Conveyor tunnel oven for baking and / or drying purposes | |
DE2420322A1 (en) | PLANT FOR BURNING GRAINY OR POWDERED MATERIAL | |
DE2705710C3 (en) | Countercurrent burning process for the production of quicklime and shaft furnace for carrying out the process | |
DE2608228A1 (en) | TUNNEL OVEN WITH COOLING AND FLOOR EFFECT DEVICE | |
CH496220A (en) | Method for preheating the combustion air of a furnace and furnace for carrying out the method | |
DE1063579B (en) | Fluidized bed system with continuous flow of solids | |
DE2109825B2 (en) | Steam generator with a tube bundle arranged in a vertical pressure vessel | |
DE2360580B2 (en) | ROTARY FURNACE SYSTEM FOR FINE-GRAY GOODS, IN PARTICULAR PORTLAND CEMENT CLINKERS | |
DE2501457A1 (en) | TURNING SYSTEM | |
EP0008667B1 (en) | Furnace for the thermal treatment of granular or fine sized material | |
DE2657238A1 (en) | PROCESS FOR COOLING A SHAFT FURNACE FOR BURNING LIME, DOLOMITE OR MAGNESITE | |
DE1433339B2 (en) | METHOD AND DEVICE FOR HARD-BURNING PELLETS | |
DE2338147A1 (en) | ROTATING MANHOLE FURNACE WITH COOLED BURNER PIPE | |
DE3879752T2 (en) | Power plant for burning fuel in a fluidized bed made of particulate material. | |
DE2442054C3 (en) | Cooling tower | |
DE2164994C3 (en) | Recuperative coke oven | |
CH662405A5 (en) | Fluid bed firing. | |
DE873462C (en) | Pipe gas heater | |
DE919006C (en) | Grate furnace for steam generators with grate surface formed from water-cooled pipes | |
DE1796057C3 (en) | SHACHT OVEN heated with gasified oil | |
EP0369556B1 (en) | Process and apparatus for indirectly heating a process gas stream in a reaction space for an endothermal reaction | |
CH610647A5 (en) | Shaft furnace installation for burning lumpy, in particular endothermally reacting material | |
DE840571C (en) | Method and device for flushing gas and gasifying ash-rich fuels in continuously operated cross-flow ovens | |
AT220274B (en) | Firing for boiler systems to optionally burn lean gas on the one hand and fuel dust or oil on the other | |
DE3204812C2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Designated state(s): AT BE CH DE FR GB IT LU NL SE |
|
ITCL | It: translation for ep claims filed |
Representative=s name: SOCIETA' ITALIANA BREVETTI S.P.A. |
|
17P | Request for examination filed | ||
ITF | It: translation for a ep patent filed | ||
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Designated state(s): AT BE CH DE FR GB IT LU NL SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Effective date: 19810513 |
|
REF | Corresponds to: |
Ref document number: 67 Country of ref document: AT Date of ref document: 19810515 Kind code of ref document: T |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Effective date: 19810730 Ref country code: AT Effective date: 19810730 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19810731 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 19810731 Year of fee payment: 3 |
|
REF | Corresponds to: |
Ref document number: 2960351 Country of ref document: DE Date of ref document: 19810820 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Effective date: 19820201 |
|
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee |
Effective date: 19820201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19820331 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Effective date: 19820731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Effective date: 19830201 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Effective date: 19881118 |
|
EUG | Se: european patent has lapsed |
Ref document number: 79102695.8 Effective date: 19850612 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |