EA201291106A1 - Способ и система планирования оценки и смягчения последствий рисков - Google Patents
Способ и система планирования оценки и смягчения последствий рисковInfo
- Publication number
- EA201291106A1 EA201291106A1 EA201291106A EA201291106A EA201291106A1 EA 201291106 A1 EA201291106 A1 EA 201291106A1 EA 201291106 A EA201291106 A EA 201291106A EA 201291106 A EA201291106 A EA 201291106A EA 201291106 A1 EA201291106 A1 EA 201291106A1
- Authority
- EA
- Eurasian Patent Office
- Prior art keywords
- risk
- mitigation
- risk management
- assessment
- planning system
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
Описаны системы и способы управления рисками для ЕРССОМ производственного предприятия. Система содержит базу данных управления рисками для хранения объектов риска, каждый объект представляет реальный фактор смягчения последствий рисков. Подсистема рекомендаций по рискам с возможностью обмена информации присоединена к базе данных управления рисками и выполнена с возможностью выдавать рекомендации для смягчения последствий и управления рисками в качестве функции атрибутов эффективности объектов риска. Атрибуты эффективности представляют эффективность реализованных ранее и/или смоделированных стратегий смягчения последствий рисков. Атрибуты эффективности предпочтительно являются зависящими от многих переменных и определяются посредством определения приоритетов и взвешивания разных целей.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US32784510P | 2010-04-26 | 2010-04-26 | |
PCT/US2011/033738 WO2011139625A1 (en) | 2010-04-26 | 2011-04-25 | Risk assessment and mitigation planning system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
EA201291106A1 true EA201291106A1 (ru) | 2013-04-30 |
Family
ID=44903965
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EA201291106A EA201291106A1 (ru) | 2010-04-26 | 2011-04-25 | Способ и система планирования оценки и смягчения последствий рисков |
Country Status (6)
Country | Link |
---|---|
US (2) | US20130197965A1 (ru) |
EP (1) | EP2564366A4 (ru) |
AU (1) | AU2011248728B2 (ru) |
CA (1) | CA2797487A1 (ru) |
EA (1) | EA201291106A1 (ru) |
WO (1) | WO2011139625A1 (ru) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2564366A4 (en) * | 2010-04-26 | 2015-01-21 | Fluor Tech Corp | PLANNING SYSTEM AND METHODS FOR RISK ASSESSMENT AND REDUCTION |
US20130035974A1 (en) * | 2011-08-01 | 2013-02-07 | Infosys Limited | Systems, methods, and computer-readable media for innovation co-creation |
US9880916B2 (en) * | 2012-09-25 | 2018-01-30 | International Business Machines Corporation | Management of system events using one or more event attributes |
US10360524B2 (en) * | 2013-05-22 | 2019-07-23 | Ernest Forman | System and a method for providing risk management |
US9270749B2 (en) * | 2013-11-26 | 2016-02-23 | International Business Machines Corporation | Leveraging social media to assist in troubleshooting |
US20150242857A1 (en) * | 2014-02-24 | 2015-08-27 | Bank Of America Corporation | Transaction Risk Assessment Aggregation |
US20180082386A1 (en) * | 2016-09-19 | 2018-03-22 | International Business Machines Corporation | Travel advisor for visiting different countries |
US10902954B2 (en) * | 2018-06-25 | 2021-01-26 | International Business Machines Corporation | Mosquito population minimizer |
EP4256502A1 (en) * | 2020-12-02 | 2023-10-11 | Swiss Reinsurance Company Ltd. | Electronic system for forward-looking measurements of frequencies and/or probabilities of accident occurrences based on localized automotive device measurements, and corresponding method thereof |
Family Cites Families (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7117162B1 (en) * | 1997-09-11 | 2006-10-03 | Bellsouth Intellectual Property Corp. | System and Method for Facilitating Managing a Job |
US6965855B1 (en) * | 1999-05-17 | 2005-11-15 | General Electric Company | Methods and apparatus for system and device design and control |
MXPA01011785A (es) * | 2000-03-17 | 2002-05-14 | Siemens Ag | Arquitectura de tecnologia de planta. |
US7319971B2 (en) * | 2001-01-31 | 2008-01-15 | Corprofit Systems Pty Ltd | System for managing risk |
US20030172002A1 (en) * | 2001-03-15 | 2003-09-11 | Spira Mario Cosmas | Menu driven management and operation technique |
US8285615B2 (en) * | 2001-03-20 | 2012-10-09 | Goldman, Sachs & Co. | Construction industry risk management clearinghouse |
US6587091B2 (en) * | 2001-04-23 | 2003-07-01 | Michael Lawrence Serpa | Stabilized tactile output mechanism for computer interface devices |
CA2364425A1 (en) * | 2001-12-05 | 2003-06-05 | Algorithmics International Corp. | A system for calculation of operational risk capital |
US7146326B1 (en) * | 2001-12-31 | 2006-12-05 | Bellsouth Intellectual Property Corp. | System and method for outside plant construction pit scheduling tool and log |
US20030135401A1 (en) * | 2002-01-14 | 2003-07-17 | Parr Ian Barry Anthony | Method and process of program management for the owner's representative of design-build construction projects |
JP2003242321A (ja) * | 2002-02-20 | 2003-08-29 | Hitachi Ltd | プロジェクト情報処理装置及びコンピュータ・ソフトウエア |
US7441197B2 (en) * | 2002-02-26 | 2008-10-21 | Global Asset Protection Services, Llc | Risk management information interface system and associated methods |
US20040059589A1 (en) * | 2002-09-19 | 2004-03-25 | Moore Richard N. | Method of managing risk |
AU2003303250A1 (en) * | 2002-12-20 | 2004-07-14 | Accenture Global Services Gmbh | Quantification of operational risks |
US7584165B2 (en) * | 2003-01-30 | 2009-09-01 | Landmark Graphics Corporation | Support apparatus, method and system for real time operations and maintenance |
JP4072102B2 (ja) * | 2003-07-08 | 2008-04-09 | 株式会社日立製作所 | プロジェクト事前評価方法、プロジェクト事前評価装置及びプログラム |
US7698148B2 (en) * | 2003-09-12 | 2010-04-13 | Raytheon Company | Web-based risk management tool and method |
US7593859B1 (en) * | 2003-10-08 | 2009-09-22 | Bank Of America Corporation | System and method for operational risk assessment and control |
US20050114829A1 (en) * | 2003-10-30 | 2005-05-26 | Microsoft Corporation | Facilitating the process of designing and developing a project |
US7944445B1 (en) * | 2003-12-15 | 2011-05-17 | Microsoft Corporation | System and method for providing a dynamic expanded timeline |
US20050267771A1 (en) * | 2004-05-27 | 2005-12-01 | Biondi Mitchell J | Apparatus, system and method for integrated lifecycle management of a facility |
US8041647B2 (en) * | 2004-12-30 | 2011-10-18 | Computer Aid Inc. | System and method for an automated project office and automatic risk assessment and reporting |
US20060259336A1 (en) * | 2005-05-16 | 2006-11-16 | General Electric Company | Methods and systems for managing risks associated with a project |
US20080255910A1 (en) * | 2007-04-16 | 2008-10-16 | Sugato Bagchi | Method and System for Adaptive Project Risk Management |
US7788150B2 (en) * | 2007-06-15 | 2010-08-31 | Trustwave Holdings, Inc. | Method for assessing risk in a business |
US8000992B1 (en) * | 2007-08-03 | 2011-08-16 | Sprint Communications Company L.P. | System and method for project management plan workbook |
US8620708B2 (en) * | 2007-11-09 | 2013-12-31 | Hitachi-Ge Nuclear Energy, Ltd. | Progress status management method, program, and progress status management device |
US8589203B1 (en) * | 2009-01-05 | 2013-11-19 | Sprint Communications Company L.P. | Project pipeline risk management system and methods for updating project resource distributions based on risk exposure level changes |
WO2011085203A1 (en) * | 2010-01-08 | 2011-07-14 | Fluor Technologies Corporation | Systems for estimating new industrial plant operational readiness costs |
EP2564366A4 (en) * | 2010-04-26 | 2015-01-21 | Fluor Tech Corp | PLANNING SYSTEM AND METHODS FOR RISK ASSESSMENT AND REDUCTION |
-
2011
- 2011-04-25 EP EP11777868.8A patent/EP2564366A4/en not_active Withdrawn
- 2011-04-25 AU AU2011248728A patent/AU2011248728B2/en not_active Ceased
- 2011-04-25 US US13/643,886 patent/US20130197965A1/en not_active Abandoned
- 2011-04-25 CA CA2797487A patent/CA2797487A1/en not_active Abandoned
- 2011-04-25 EA EA201291106A patent/EA201291106A1/ru unknown
- 2011-04-25 WO PCT/US2011/033738 patent/WO2011139625A1/en active Application Filing
-
2019
- 2019-01-16 US US16/249,411 patent/US20190147379A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
US20130197965A1 (en) | 2013-08-01 |
WO2011139625A1 (en) | 2011-11-10 |
AU2011248728B2 (en) | 2015-01-22 |
EP2564366A4 (en) | 2015-01-21 |
US20190147379A1 (en) | 2019-05-16 |
EP2564366A1 (en) | 2013-03-06 |
AU2011248728A1 (en) | 2012-11-15 |
CA2797487A1 (en) | 2011-11-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA201291106A1 (ru) | Способ и система планирования оценки и смягчения последствий рисков | |
Tol | The double trade-off between adaptation and mitigation for sea level rise: an application of FUND | |
Arnett et al. | Altering turbine speed reduces bat mortality at wind‐energy facilities | |
Sparks et al. | Climate change may have limited effect on global risk of potato late blight | |
Bull et al. | Conservation when nothing stands still: moving targets and biodiversity offsets | |
Poulter et al. | Net biome production of the Amazon Basin in the 21st century | |
Shvets et al. | Aggregated methodology of multicriterion economic and ecological examination of the ecologically oriented investment projects | |
WO2013184811A3 (en) | Automatically generating a crop insurance policy | |
Wu et al. | Incorporating land-use requirements and environmental constraints in low-carbon electricity planning for California | |
WO2012037326A3 (en) | Methods and systems for implementing fulfillment management | |
GB2499734A (en) | Computer-implemented systems and methods for methods forecasting performance of polymer flooding of an oil reservoir system | |
WO2015002886A3 (en) | Methods and systems for forecasting economic movements | |
Allard | Climate change adaptation: Infrastructure and extreme weather | |
Menth et al. | An agent-based modeling approach to improve coordination between humanitarian relief providers | |
Rahim | Towards low carbon economy via carbon intensity reduction in Malaysia | |
Zuidema et al. | Plausible 21 st century water management through stakeholder-driven modeling of a water-stressed, agricultural socio-economic system in the American West | |
Movahed Atar et al. | Evaluation of Zayanderud dam operation during drought period by using weap model | |
Mehta | The Role of AI in Countering Climate Change: Legal, and Ethical Challenges in European Union and Ukraine | |
Jalalzadeh Fard et al. | Effective Mitigation and Adaptation Strategies for Public Health Impacts of Heatwaves for Brookline, MA | |
Milo et al. | Quantifying and Reducing Nitrogen Footprints of Urban Areas: A Case Study for Baltimore, Maryland | |
Rollinson et al. | Are future forests driven by climate or management? | |
WO2015099987A3 (en) | Hydrocarbon data management software execution system | |
Rosenzweig et al. | Challenges of Adapting to Upper-End Sea Level Rise and Increased Coastal Flooding: the Case of New York City | |
Lee et al. | Estimation of Energy Consumption and Greenhouse Gas Emissions considering Aging and Climate Change in Residential Sector | |
Bobeica et al. | Sustainable development in healthcare and the direct connection with the wine industry |