EA201070985A1 - Способ определения приемистости скважины по размещению отходов бурения - Google Patents
Способ определения приемистости скважины по размещению отходов буренияInfo
- Publication number
- EA201070985A1 EA201070985A1 EA201070985A EA201070985A EA201070985A1 EA 201070985 A1 EA201070985 A1 EA 201070985A1 EA 201070985 A EA201070985 A EA 201070985A EA 201070985 A EA201070985 A EA 201070985A EA 201070985 A1 EA201070985 A1 EA 201070985A1
- Authority
- EA
- Eurasian Patent Office
- Prior art keywords
- determining
- volume
- modeling
- formation
- placement
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 4
- 239000002699 waste material Substances 0.000 title abstract 4
- 230000015572 biosynthetic process Effects 0.000 abstract 4
- 238000002347 injection Methods 0.000 abstract 4
- 239000007924 injection Substances 0.000 abstract 4
- 238000005553 drilling Methods 0.000 abstract 2
- 238000004088 simulation Methods 0.000 abstract 2
- 238000004364 calculation method Methods 0.000 abstract 1
- 238000005520 cutting process Methods 0.000 abstract 1
- 239000010802 sludge Substances 0.000 abstract 1
- 239000000725 suspension Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
- E21B41/0057—Disposal of a fluid by injection into a subterranean formation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/30—Circuit design
- G06F30/36—Circuit design at the analogue level
- G06F30/367—Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods
Landscapes
- Engineering & Computer Science (AREA)
- Computer Hardware Design (AREA)
- Physics & Mathematics (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Theoretical Computer Science (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Geometry (AREA)
- Evolutionary Computation (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Processing Of Solid Wastes (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
- Analysing Materials By The Use Of Radiation (AREA)
Abstract
Способ определения максимального объема размещения бурового шлама в пласте включает в себя ввод параметров пласта в моделирующее устройство, моделирование пласта во время закачки отходов на основе параметров пласта, определение полезного давления на основе моделирования, определение увеличения давления смыкания разрыва на основе моделирования, расчет объема размещения бурового шлама на основе полезного давления и давления смыкания разрыва, расчет интервала времени закачки отходов на основе рассчитанного объема закачки и вывод данных по меньшей мере одного из следующего: объема размещения бурового шлама и интервала времени. Способ оптимизации процесса закачки отходов включает в себя моделирование пласта на основе входных параметров, определение увеличения давления смыкания разрыва на единицу объема суспензии на основе моделирования, расчет выбранного пласта и вывод данных вместимости пласта.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US3087708P | 2008-02-22 | 2008-02-22 | |
PCT/US2009/032946 WO2009105330A2 (en) | 2008-02-22 | 2009-02-03 | Method of estimating well disposal capacity |
Publications (2)
Publication Number | Publication Date |
---|---|
EA201070985A1 true EA201070985A1 (ru) | 2011-04-29 |
EA017606B1 EA017606B1 (ru) | 2013-01-30 |
Family
ID=40986125
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EA201070985A EA017606B1 (ru) | 2008-02-22 | 2009-02-03 | Способ определения приемистости скважины по размещению отходов бурения |
Country Status (11)
Country | Link |
---|---|
US (1) | US8731890B2 (ru) |
CN (1) | CN101978372B (ru) |
AR (1) | AR070397A1 (ru) |
AU (1) | AU2009215713A1 (ru) |
BR (1) | BRPI0907526A2 (ru) |
CA (1) | CA2716018C (ru) |
EA (1) | EA017606B1 (ru) |
GB (1) | GB2469976B (ru) |
MX (1) | MX2010009138A (ru) |
NO (1) | NO340875B1 (ru) |
WO (1) | WO2009105330A2 (ru) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2009215713A1 (en) * | 2008-02-22 | 2009-08-27 | M-I L.L.C. | Method of estimating well disposal capacity |
US20130246022A1 (en) * | 2012-03-14 | 2013-09-19 | Schlumberger Technology Corporation | Screening potential geomechanical risks during waterflooding |
US10578766B2 (en) | 2013-08-05 | 2020-03-03 | Advantek International Corp. | Quantifying a reservoir volume and pump pressure limit |
CN104698492B (zh) * | 2013-12-09 | 2017-12-19 | 中国石油天然气股份有限公司 | 一种计算异常地层压力的方法 |
CN104698493B (zh) * | 2013-12-09 | 2018-07-10 | 中国石油天然气股份有限公司 | 一种计算异常地层压力的方法 |
CN104698494A (zh) * | 2013-12-09 | 2015-06-10 | 中国石油天然气股份有限公司 | 一种计算异常地层压力的方法 |
WO2016004137A1 (en) | 2014-06-30 | 2016-01-07 | Advantek International Corporation | Slurrification and disposal of waste by pressure pumping into a subsurface formation |
US10823868B2 (en) | 2015-10-21 | 2020-11-03 | Baker Hughes Holdings Llc | Estimating depth-dependent lateral tectonic strain profiles |
CN107292753B (zh) * | 2016-03-31 | 2020-09-08 | 中国石油天然气股份有限公司 | 油气井水力压裂效果的评价方法 |
AU2018285940B2 (en) * | 2017-06-16 | 2020-11-26 | Advantek Waste Management Services, Llc | Optimizing waste slurry disposal in fractured injection operations |
CN111734383B (zh) * | 2020-08-05 | 2021-06-01 | 西南石油大学 | 一种获取地层闭合压力的压裂测试与解释方法 |
CN112231989B (zh) * | 2020-09-18 | 2021-12-28 | 中海石油(中国)有限公司深圳分公司 | 海上油田微压裂注入时间计算系统及方法 |
CA3194159A1 (en) * | 2020-09-29 | 2022-04-07 | Lon Benjamin Saline | Power post |
RU2771016C1 (ru) * | 2020-11-27 | 2022-04-25 | Общество с ограниченной ответственностью "АКРОС" | Способ определения максимального объема отходов, утилизируемого в пластах |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4393933A (en) * | 1980-06-02 | 1983-07-19 | Standard Oil Company (Indiana) | Determination of maximum fracture pressure |
US5050674A (en) * | 1990-05-07 | 1991-09-24 | Halliburton Company | Method for determining fracture closure pressure and fracture volume of a subsurface formation |
US5105659A (en) * | 1990-09-19 | 1992-04-21 | Dowell Schlumberger Incorporated | Detection of fracturing events using derivatives of fracturing pressures |
US5442950A (en) * | 1993-10-18 | 1995-08-22 | Saudi Arabian Oil Company | Method and apparatus for determining properties of reservoir rock |
US6002063A (en) * | 1996-09-13 | 1999-12-14 | Terralog Technologies Inc. | Apparatus and method for subterranean injection of slurried wastes |
US6394194B1 (en) * | 1999-04-26 | 2002-05-28 | Abb Vetco Gray Inc. | Method and apparatus for a drill cutting injection system |
US7063147B2 (en) * | 2004-04-26 | 2006-06-20 | Schlumberger Technology Corporation | Method and apparatus and program storage device for front tracking in hydraulic fracturing simulators |
US6832159B2 (en) * | 2002-07-11 | 2004-12-14 | Schlumberger Technology Corporation | Intelligent diagnosis of environmental influence on well logs with model-based inversion |
US7134492B2 (en) * | 2003-04-18 | 2006-11-14 | Schlumberger Technology Corporation | Mapping fracture dimensions |
US7349807B2 (en) * | 2004-03-08 | 2008-03-25 | Geomechanics International, Inc. | Quantitative risk assessment applied to pore pressure prediction |
US7440876B2 (en) * | 2004-03-11 | 2008-10-21 | M-I Llc | Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach |
US7478020B2 (en) * | 2005-03-07 | 2009-01-13 | M-I Llc | Apparatus for slurry and operation design in cuttings re-injection |
US7318013B2 (en) * | 2005-03-07 | 2008-01-08 | M-I, L.L.C. | Method for slurry and operation design in cuttings re-injection |
US7721594B2 (en) * | 2005-07-29 | 2010-05-25 | M-I L.L.C. | Apparatus and method to monitor slurries for waste re-injection |
MX343973B (es) * | 2007-09-13 | 2016-11-30 | M-I Llc | Metodo de uso de firmas de presion para predecir anomalias de pozo de inyeccion. |
AU2009215713A1 (en) * | 2008-02-22 | 2009-08-27 | M-I L.L.C. | Method of estimating well disposal capacity |
US8047284B2 (en) * | 2009-02-27 | 2011-11-01 | Halliburton Energy Services, Inc. | Determining the use of stimulation treatments based on high process zone stress |
US8437962B2 (en) * | 2009-11-25 | 2013-05-07 | Halliburton Energy Services, Inc. | Generating probabilistic information on subterranean fractures |
-
2009
- 2009-02-03 AU AU2009215713A patent/AU2009215713A1/en not_active Abandoned
- 2009-02-03 CN CN2009801059921A patent/CN101978372B/zh not_active Expired - Fee Related
- 2009-02-03 WO PCT/US2009/032946 patent/WO2009105330A2/en active Application Filing
- 2009-02-03 BR BRPI0907526-7A patent/BRPI0907526A2/pt active Search and Examination
- 2009-02-03 MX MX2010009138A patent/MX2010009138A/es active IP Right Grant
- 2009-02-03 CA CA2716018A patent/CA2716018C/en active Active
- 2009-02-03 US US12/918,553 patent/US8731890B2/en not_active Expired - Fee Related
- 2009-02-03 EA EA201070985A patent/EA017606B1/ru not_active IP Right Cessation
- 2009-02-03 GB GB1014704.9A patent/GB2469976B/en active Active
- 2009-02-16 AR ARP090100543A patent/AR070397A1/es active IP Right Grant
-
2010
- 2010-09-21 NO NO20101314A patent/NO340875B1/no unknown
Also Published As
Publication number | Publication date |
---|---|
US8731890B2 (en) | 2014-05-20 |
GB201014704D0 (en) | 2010-10-20 |
US20100332204A1 (en) | 2010-12-30 |
EA017606B1 (ru) | 2013-01-30 |
MX2010009138A (es) | 2010-11-10 |
CN101978372B (zh) | 2013-11-06 |
GB2469976B (en) | 2013-02-20 |
WO2009105330A3 (en) | 2009-11-05 |
CN101978372A (zh) | 2011-02-16 |
NO20101314L (no) | 2010-09-21 |
AU2009215713A1 (en) | 2009-08-27 |
NO340875B1 (no) | 2017-07-03 |
BRPI0907526A2 (pt) | 2015-07-28 |
GB2469976A (en) | 2010-11-03 |
AR070397A1 (es) | 2010-03-31 |
WO2009105330A2 (en) | 2009-08-27 |
CA2716018A1 (en) | 2009-08-27 |
CA2716018C (en) | 2016-12-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA201070985A1 (ru) | Способ определения приемистости скважины по размещению отходов бурения | |
EA201270525A1 (ru) | Способ и устройство для бурения, использующие вероятностный подход | |
EA200601673A1 (ru) | Способ и устройство для размещения отходов бурения с использованием вероятностного подхода | |
MY149843A (en) | Method for quantifying reservoir connectivity using fluid travel times | |
NO20083392L (no) | Bronnkontrollsystem og tilhorende metoder | |
EA200970728A1 (ru) | Моделирование и расчет системы бурения скважины с учетом вибраций | |
DE602006002489D1 (de) | Verfahren zur erleichterung eines bohrlochbetriebes | |
GB2472919B (en) | Adjustment of mud circulation when evaluating a formation | |
GB2445305A (en) | Method and system for integrated asset management utilizing multi-level modeling of oil field assets | |
GB2457823A (en) | System and method for performing oilfield simulation operations | |
MX2011009376A (es) | Metodo para integrar el modelo de deposito de carga y el analisis de fluido del fondo de la perforacion. | |
GB2462227A (en) | System and method for performing a drilling operation in an oilfield | |
EA200800434A1 (ru) | Моделирование скважины, связанное с добычей углеводородов из подземных формаций | |
MX346613B (es) | Metodo y sistema para producción de presión de poro. | |
EA200970017A1 (ru) | Способ и система для проектирования и оптимизации операций бурения и заканчивания в углеводородных пластах - коллекторах | |
DE602005024044D1 (de) | Verfahren, system und programmspeichervorrichtung zur optimierung von ventileinstellungen in instrumentierten bohrlöchern unter verwendung von adjungierter gradiententechnologie und reservoirsimulation | |
EA201300951A1 (ru) | Способы и системы для моделирования, проектирования и проведения буровых работ, которые учитывают вибрации | |
GB2537489A (en) | Real-time risk prediction during drilling operations | |
EA201070362A1 (ru) | Способ использования характеристик давления для прогнозирования аномалий нагнетательных скважин | |
GB2534729A (en) | Real-time risk prediction during drilling operations | |
GB2464003B (en) | System and method for performing oilfield simulation operations | |
EA200801161A1 (ru) | Устройство и способ бурения с большим отходом от вертикали | |
GB2544699A (en) | Methods and systems for modeling an advanced 3-dimensional bottomhole assembly | |
GB2545860A (en) | Real-time control of drilling fluid properties using predictive models | |
GB2474955B (en) | Pay zone protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | Lapse of a eurasian patent due to non-payment of renewal fees within the time limit in the following designated state(s) |
Designated state(s): AM BY KG MD TJ TM |
|
MM4A | Lapse of a eurasian patent due to non-payment of renewal fees within the time limit in the following designated state(s) |
Designated state(s): AZ |
|
MM4A | Lapse of a eurasian patent due to non-payment of renewal fees within the time limit in the following designated state(s) |
Designated state(s): KZ |