DK200900994A - Installation and process for the production of gas or gas and condensate / oil. - Google Patents

Installation and process for the production of gas or gas and condensate / oil. Download PDF

Info

Publication number
DK200900994A
DK200900994A DK200900994A DKPA200900994A DK200900994A DK 200900994 A DK200900994 A DK 200900994A DK 200900994 A DK200900994 A DK 200900994A DK PA200900994 A DKPA200900994 A DK PA200900994A DK 200900994 A DK200900994 A DK 200900994A
Authority
DK
Denmark
Prior art keywords
pressure
water
production
well
increasing device
Prior art date
Application number
DK200900994A
Other languages
Danish (da)
Inventor
Underbakke Harald
Original Assignee
Statoilhydro Asa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Statoilhydro Asa filed Critical Statoilhydro Asa
Publication of DK200900994A publication Critical patent/DK200900994A/en
Application granted granted Critical
Publication of DK178457B1 publication Critical patent/DK178457B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water

Claims (10)

1. Undervandsplaceret installation til produktion af gas, eller gas og kondensat/olie, fra et undersøisk gasholdigt reservoir, hvor mindst én produktionsbrønd er tilvejebragt fra havbunden til en produktionszone og mindst én vandinjektionsbrønd er tilvejebragt fra havbunden til en injektionszone, kendetegnet ved, at installationen omfatter: en trykøgende indretning forbundet til udløbet fra produktionsbrønden, forat øge trykket i en produktionsstrøm fra produktionsbrønden, og en vandturbine forbundet til og som driver den trykøgende indretning, hvilken vandturbine har et indløb for vand med et højt hydrostatisk tryk i henhold til vandturbinens placering og et udløb forbundet til vandinjektionsbrøndens indløb, hvor vandturbinen drives af og udtager i det mindste en del af den hydrostatiske energi fra vandet som derved leveres med et lavere tryk til vandinjektionsbrønden, sådan at vand som derved leveres til vandinjektionsbrønden har et lavere tryk end det hydrostatiske tryk ved vandinjektionsbrøndens indløb.1. Underwater installation for the production of gas, or gas and condensate / oil, from a subsea gas-containing reservoir, wherein at least one production well is provided from the seabed to a production zone and at least one water injection well is provided from the seabed to an injection zone, characterized in that the installation comprises: a pressure-increasing device connected to the outlet of the production well, to increase the pressure in a production stream from the production well, and a water turbine connected to and driving the pressure-increasing device, said water turbine having an inlet for water having a high hydrostatic pressure according to the location of the water turbine; an outlet connected to the inlet of the water injection well, wherein the water turbine is driven by and withdraws at least a portion of the hydrostatic energy from the water thereby supplied at a lower pressure to the water injection well such that water thus delivered to the water injection well has a lower pressure than the hydrostat pressure at the water injection well inlet. 2. Installation ifølge krav 1, kendetegnet ved, at produktionsbrønden og vandinjektionsbrønden er fluidveje i én og sammeInstallation according to claim 1, characterized in that the production well and the water injection well are fluid paths in one and the same. 3. Installation ifølge krav 2, kendetegnet ved, at fluidvejen til produktion er et ringformigt rum omkring et indre rør, mens fluidvejen for injektion er i det indre rør.Installation according to claim 2, characterized in that the fluid path for production is an annular space around an inner tube, while the fluid path for injection is in the inner tube. 4. Installation ifølge krav 1, kendetegnet ved, at den trykøgende indretning er tilvejebragt på toppen af et brøndhoved.Installation according to claim 1, characterized in that the pressure-increasing device is provided on top of a wellhead. 5. Installation ifølge krav 1, kendetegnet ved, at den trykøgende indretning er en gaskompressor.Installation according to claim 1, characterized in that the pressure-increasing device is a gas compressor. 6. Installation ifølge krav 1, kendetegnet ved, at den trykøgende indretning er en flerfasemaskine/-pumpe.Installation according to claim 1, characterized in that the pressure-increasing device is a multiphase machine / pump. 7. Installation ifølge krav 1, kendetegnet ved, at den trykøgende indretning og vandturbinen er tilvejebragt på en fælles aksel.Installation according to claim 1, characterized in that the pressure-increasing device and the water turbine are provided on a common shaft. 8. Installation ifølge krav 1, kendetegnet ved, at den trykøgende indretning og vandturbinen er placeret på havbunden ved udløbet fra produktionsbrønden.Installation according to claim 1, characterized in that the pressure-increasing device and the water turbine are located on the seabed at the outlet from the production well. 9. Installation ifølge krav 1, kendetegnet ved, at den trykøgende indretning og vandturbinen er tilvejebragt i en fordybning i havbunden ved udløbet fra produktionsbrønden.Installation according to claim 1, characterized in that the pressure-increasing device and the water turbine are provided in a depression in the seabed at the outlet from the production well. 10. Fremgangsmåde til produktion af gas, eller gas og kondensat/olie, fra et undersøisk gasholdigt reservoir, hvor mindst én produktionsbrønd tilvejebringes fra havbunden til produktionszonen og mindst én vandinjektionsbrønd tilvejebringes fra havbunden til en injektionszone ved anvendelse af installationen ifølge krav 1, kendetegnet ved, at fremgangsmåden omfatter: at øge trykket i en produktionsstrøm fra produktionsbrønden ved hjælp af en trykøgende indretning forbundet til udløbet fra produktionsbrønden, og at injicere vand gennem injektionsbrønden til injektionszonen for at opretholde trykket i reservoiret, hvorved en vandturbine kobles til vandinjektionsbrøndens indløb, hvilken vandturbine kobles til og driver den trykøgende indretning, idet vandturbinen har et indløb for vand med højt hydrostatisk tryk i henhold til vandturbinens placering og et udløb forbundet til vandinjektionsbrøndens indløb, hvor vandturbinen drives afog udtager i det mindste en del af den hydrostatiske energi fra vandet, som derved leveres med et lavere tryk til vandinjektionsbrønden, sådan at vand som derved leveres til vandinjektionsbrønden har et lavere tryk end det hydrostatiske tryk ved vandinjektionsbrøndens indløb.A process for producing gas, or gas and condensate / oil, from an undersea gas-containing reservoir, wherein at least one production well is provided from the seabed to the production zone and at least one water injection well is provided from the seabed to an injection zone using the installation of claim 1, characterized by the method comprising: increasing the pressure in a production stream from the production well by means of a pressure-increasing device connected to the outlet from the production well, and injecting water through the injection well into the injection zone to maintain the pressure in the reservoir thereby connecting a water turbine to the water injection well inlet, is connected to and operates the pressure-increasing device, the water turbine having a high hydrostatic pressure inlet according to the location of the water turbine and an outlet connected to the water injection well inlet, wherein the water turbine is driven and takes out at least a portion of the water turbine. the hydrostatic energy from the water thereby supplied at a lower pressure to the water injection well, such that water thus delivered to the water injection well has a lower pressure than the hydrostatic pressure at the water injection well inlet.
DK200900994A 2008-01-07 2009-09-04 Installation and process for the production of gas or gas and condensate / oil. DK178457B1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
NO20080105A NO329284B1 (en) 2008-01-07 2008-01-07 Composition and process for the production of gas or gas and condensate / oil
NO20080105 2008-01-07
NO2008000461 2008-12-18
PCT/NO2008/000461 WO2009088294A1 (en) 2008-01-07 2008-12-18 Assembly and method for production of gas or gas and condensate/oil

Publications (2)

Publication Number Publication Date
DK200900994A true DK200900994A (en) 2009-09-04
DK178457B1 DK178457B1 (en) 2016-03-14

Family

ID=40853267

Family Applications (1)

Application Number Title Priority Date Filing Date
DK200900994A DK178457B1 (en) 2008-01-07 2009-09-04 Installation and process for the production of gas or gas and condensate / oil.

Country Status (9)

Country Link
US (1) US8534364B2 (en)
AU (1) AU2008345750B2 (en)
BR (1) BRPI0821626B1 (en)
CA (1) CA2711376C (en)
DK (1) DK178457B1 (en)
EA (1) EA016743B1 (en)
GB (1) GB2470305B (en)
NO (1) NO329284B1 (en)
WO (1) WO2009088294A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102454181A (en) * 2010-10-18 2012-05-16 孟宪贵 Water injection well for supplementing underground water
CN105370256B (en) * 2015-10-15 2018-09-21 山东科技大学 A method of segmentation presplitting improves low air permeability coal seam high pressure water injection radius of wetted bulb
CN105239983B (en) * 2015-10-15 2017-12-08 山东科技大学 A kind of presplitting weakens anti-reflection method with the low air permeability coal seam that high pressure water injection is combined
GB2550325B (en) * 2016-04-16 2022-10-12 Singh Johal Kashmir Offshore power generation system using seawater injection into gas reservoirs
WO2018093456A1 (en) 2016-11-17 2018-05-24 Exxonmobil Upstream Research Company Subsea reservoir pressure maintenance system
US10539141B2 (en) 2016-12-01 2020-01-21 Exxonmobil Upstream Research Company Subsea produced non-sales fluid handling system and method

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2953204A (en) * 1957-07-23 1960-09-20 Shell Oil Co Filtering method and apparatus for water flooding process
US4095421A (en) * 1976-01-26 1978-06-20 Chevron Research Company Subsea energy power supply
GB1564025A (en) * 1976-11-01 1980-04-02 British Petroleum Co Treating sea water containing inorganic and organic impurities
NO175020C (en) * 1986-08-04 1994-08-17 Norske Stats Oljeselskap Method of transporting untreated well stream
DE3810951A1 (en) * 1988-03-31 1989-10-12 Klein Schanzlin & Becker Ag METHOD AND DEVICE FOR GENERATING ENERGY FROM OIL SOURCES
RU2109930C1 (en) * 1996-02-05 1998-04-27 Сумбат Набиевич Закиров Method for development of gas deposits in continental shelf
US5813469A (en) * 1997-03-12 1998-09-29 Texaco Inc. Coupled downhole pump for simultaneous injection and production in an oil wheel
US6336503B1 (en) * 2000-03-03 2002-01-08 Pancanadian Petroleum Limited Downhole separation of produced water in hydrocarbon wells, and simultaneous downhole injection of separated water and surface water
US6457522B1 (en) * 2000-06-14 2002-10-01 Wood Group Esp, Inc. Clean water injection system
NO312978B1 (en) 2000-10-20 2002-07-22 Kvaerner Oilfield Prod As Methods and facilities for producing reservoir fluid
EP1353038A1 (en) * 2002-04-08 2003-10-15 Cooper Cameron Corporation Subsea process assembly
NO323324B1 (en) * 2003-07-02 2007-03-19 Kvaerner Oilfield Prod As Procedure for regulating that pressure in an underwater compressor module
BR0303094A (en) * 2003-08-14 2005-04-05 Petroleo Brasileiro Sa Equipment for the production of oil wells
BR0303129B1 (en) * 2003-08-14 2013-08-06 Method and apparatus for the production of oil wells
US6998724B2 (en) * 2004-02-18 2006-02-14 Fmc Technologies, Inc. Power generation system
US7224080B2 (en) * 2004-07-09 2007-05-29 Schlumberger Technology Corporation Subsea power supply
NO324806B1 (en) 2004-08-31 2007-12-10 Statoil Asa Underwater Gas Compressor
US7686086B2 (en) * 2005-12-08 2010-03-30 Vetco Gray Inc. Subsea well separation and reinjection system
US7963335B2 (en) * 2007-12-18 2011-06-21 Kellogg Brown & Root Llc Subsea hydraulic and pneumatic power

Also Published As

Publication number Publication date
US8534364B2 (en) 2013-09-17
GB2470305B (en) 2012-01-18
NO329284B1 (en) 2010-09-27
GB2470305A (en) 2010-11-17
US20110024127A1 (en) 2011-02-03
NO20080105L (en) 2009-07-08
WO2009088294A1 (en) 2009-07-16
BRPI0821626A2 (en) 2015-06-16
AU2008345750A1 (en) 2009-07-16
GB201012701D0 (en) 2010-09-15
DK178457B1 (en) 2016-03-14
CA2711376A1 (en) 2009-07-16
EA201001091A1 (en) 2011-02-28
BRPI0821626B1 (en) 2018-10-16
AU2008345750B2 (en) 2014-08-14
CA2711376C (en) 2016-05-03
EA016743B1 (en) 2012-07-30
BRPI0821626A8 (en) 2017-01-10

Similar Documents

Publication Publication Date Title
DK200900994A (en) Installation and process for the production of gas or gas and condensate / oil.
WO2009047521A3 (en) Pumping module and system
NO20065649L (en) Separation and reinjection system for subsea wells
RU2735593C1 (en) Method for dehydration and operation of wells for production of gas from coal beds
WO2009058706A3 (en) Anchored riserless mud return systems
CO6190566A2 (en) INSITU COMBUSTION PROCESS IMPROVED IN OIL FIELD
US20100320768A1 (en) Hydraulic electricity generator
NO20093258A1 (en) Underwater Pump System
NO20130170A1 (en) SYSTEM AND PROCEDURE FOR HYDROCARBON PRODUCTION FROM A SOURCE
RU2012145545A (en) METHOD OF PRESSURE PRESSURE IN A WELL
WO2011031682A3 (en) Multiple electric submersible pump system
RU2016133036A (en) METHOD FOR PREVENTING LOSS OF PARAFFINS IN OIL WELLS WITH PACKERS
RU2017122385A (en) METHOD OF MODERNIZING A PLANT FOR PRODUCING AMMONIA
RU2010115323A (en) METHOD FOR FIGHTING PARAFFIN DEPOSITS IN OIL AND GAS WELLS
RU2012100024A (en) IMPROVED BOREHOLE FEEDING SYSTEM
RU2674042C1 (en) Pumping-ejector unit for operating wells
RU2013109017A (en) METHOD AND DEVICE FOR REMOVING LIQUID FROM A GAS PRODUCING WELL
PE20110174A1 (en) SYSTEM AND METHOD FOR A DIRECT DRIVE PUMP
PL1925785T3 (en) Water drainage apparatus for a turbine
RU2007137574A (en) Mouth fittings
WO2010130981A3 (en) Heat engine for producing mechanical work and a refrigerating heat pump
RU2431738C1 (en) Procedure for hydro-dynamic influence on reservoir and device for its implementation
RU2357070C1 (en) Method of oil production
RU2403442C1 (en) Rod-type well pump unit
CN203097853U (en) Wellhead-diversion offset-well oil production device boosted by ejection of high-pressure gas and liquid and used for deepwater oilfield mud lines

Legal Events

Date Code Title Description
PBP Patent lapsed

Effective date: 20201218