US6853921B2
(en)
|
1999-07-20 |
2005-02-08 |
Halliburton Energy Services, Inc. |
System and method for real time reservoir management
|
US6549879B1
(en)
*
|
1999-09-21 |
2003-04-15 |
Mobil Oil Corporation |
Determining optimal well locations from a 3D reservoir model
|
US6980940B1
(en)
*
|
2000-02-22 |
2005-12-27 |
Schlumberger Technology Corp. |
Intergrated reservoir optimization
|
US20020049575A1
(en)
*
|
2000-09-28 |
2002-04-25 |
Younes Jalali |
Well planning and design
|
US6978210B1
(en)
*
|
2000-10-26 |
2005-12-20 |
Conocophillips Company |
Method for automated management of hydrocarbon gathering systems
|
US6454002B1
(en)
*
|
2000-11-01 |
2002-09-24 |
Conoco Inc. |
Method and apparatus for increasing production from a well system using multi-phase technology in conjunction with gas-lift
|
EP1358394B1
(en)
*
|
2001-02-05 |
2007-01-24 |
Schlumberger Holdings Limited |
Optimization of reservoir, well and surface network systems
|
EP1389259B1
(en)
*
|
2001-04-24 |
2005-11-23 |
ExxonMobil Upstream Research Company |
Method for enhancing production allocation in an integrated reservoir and surface flow system
|
FR2826449B1
(fr)
*
|
2001-06-26 |
2003-09-26 |
Schlumberger Services Petrol |
Procede et installation de determination de la position du front forme a l'interface entre deux fluides contenus dans un reservoir
|
US6891606B2
(en)
|
2001-10-11 |
2005-05-10 |
Baker Hughes Incorporated |
Real-time on-line sensing and control of mineral scale deposition from formation fluids
|
US6662884B2
(en)
*
|
2001-11-29 |
2003-12-16 |
Halliburton Energy Services, Inc. |
Method for determining sweep efficiency for removing cuttings from a borehole
|
US20040084186A1
(en)
*
|
2002-10-31 |
2004-05-06 |
Allison David B. |
Well treatment apparatus and method
|
US7181380B2
(en)
*
|
2002-12-20 |
2007-02-20 |
Geomechanics International, Inc. |
System and process for optimal selection of hydrocarbon well completion type and design
|
US7584165B2
(en)
*
|
2003-01-30 |
2009-09-01 |
Landmark Graphics Corporation |
Support apparatus, method and system for real time operations and maintenance
|
US6810332B2
(en)
*
|
2003-01-31 |
2004-10-26 |
Chevron U.S.A. Inc. |
Method for computing complexity, confidence and technical maturity indices for reservoir evaluations
|
US6739165B1
(en)
|
2003-02-05 |
2004-05-25 |
Kjt Enterprises, Inc. |
Combined surface and wellbore electromagnetic measurement system and method for determining formation fluid properties
|
US6823297B2
(en)
*
|
2003-03-06 |
2004-11-23 |
Chevron U.S.A. Inc. |
Multi-scale finite-volume method for use in subsurface flow simulation
|
US7496488B2
(en)
*
|
2003-03-06 |
2009-02-24 |
Schlumberger Technology Company |
Multi-scale finite-volume method for use in subsurface flow simulation
|
US7835893B2
(en)
*
|
2003-04-30 |
2010-11-16 |
Landmark Graphics Corporation |
Method and system for scenario and case decision management
|
US6999879B2
(en)
*
|
2003-05-14 |
2006-02-14 |
Exxonmobil Upstream Research Company |
Method for controlling seismic coverage using decision theory
|
WO2004104373A1
(en)
*
|
2003-05-20 |
2004-12-02 |
Silversmith, Inc. |
Wireless well communication system and method for using the same
|
US20060197678A1
(en)
*
|
2003-05-20 |
2006-09-07 |
David Silvers |
Wireless well communication system and method
|
US8560476B2
(en)
*
|
2003-08-26 |
2013-10-15 |
The Trustees Of Columbia University In The City Of New York |
Martingale control of production for optimal profitability of oil and gas fields
|
CN1323336C
(zh)
*
|
2003-12-08 |
2007-06-27 |
西安交通大学 |
设备运行状态数据质量动态检测和保障方法
|
CN100337124C
(zh)
|
2004-02-24 |
2007-09-12 |
Kjt企业公司 |
用于监测储层的方法及用于测绘地球内部结构的系统
|
US7108069B2
(en)
*
|
2004-04-23 |
2006-09-19 |
Offshore Systems, Inc. |
Online thermal and watercut management
|
US7337660B2
(en)
*
|
2004-05-12 |
2008-03-04 |
Halliburton Energy Services, Inc. |
Method and system for reservoir characterization in connection with drilling operations
|
US7627461B2
(en)
*
|
2004-05-25 |
2009-12-01 |
Chevron U.S.A. Inc. |
Method for field scale production optimization by enhancing the allocation of well flow rates
|
EP1759226A1
(en)
*
|
2004-06-07 |
2007-03-07 |
ExxonMobil Upstream Research Company |
Method for solving implicit reservoir simulation matrix equation
|
BRPI0512548A
(pt)
*
|
2004-06-25 |
2008-03-25 |
Shell Int Research |
método de controle de produção de fluido de hidrocarboneto a partir de uma formação subterránea
|
US20070203723A1
(en)
*
|
2006-02-28 |
2007-08-30 |
Segura Michael J |
Methods for designing, pricing, and scheduling well services and data processing systems therefor
|
US7636671B2
(en)
*
|
2004-08-30 |
2009-12-22 |
Halliburton Energy Services, Inc. |
Determining, pricing, and/or providing well servicing treatments and data processing systems therefor
|
US7317990B2
(en)
*
|
2004-10-25 |
2008-01-08 |
Schlumberger Technology Corporation |
Distributed processing system for subsurface operations
|
US8209202B2
(en)
*
|
2005-04-29 |
2012-06-26 |
Landmark Graphics Corporation |
Analysis of multiple assets in view of uncertainties
|
US20070016389A1
(en)
*
|
2005-06-24 |
2007-01-18 |
Cetin Ozgen |
Method and system for accelerating and improving the history matching of a reservoir simulation model
|
US20090216508A1
(en)
*
|
2005-07-27 |
2009-08-27 |
Bruce A Dale |
Well Modeling Associated With Extraction of Hydrocarbons From Subsurface Formations
|
WO2007018860A2
(en)
*
|
2005-07-27 |
2007-02-15 |
Exxonmobil Upstream Research Company |
Well modeling associated with extraction of hydrocarbons from subsurface formations
|
MX2007016574A
(es)
*
|
2005-07-27 |
2008-03-04 |
Exxonmobil Upstream Res Co |
Modelaje de pozo asociado con extraccion de hidrocarburos a partir de yacimientos subterraneos.
|
US20070032994A1
(en)
*
|
2005-08-02 |
2007-02-08 |
Kimminau Stephen J |
System and method of flow assurance in a well
|
US8145463B2
(en)
*
|
2005-09-15 |
2012-03-27 |
Schlumberger Technology Corporation |
Gas reservoir evaluation and assessment tool method and apparatus and program storage device
|
US7673682B2
(en)
*
|
2005-09-27 |
2010-03-09 |
Lawrence Livermore National Security, Llc |
Well casing-based geophysical sensor apparatus, system and method
|
US7809538B2
(en)
*
|
2006-01-13 |
2010-10-05 |
Halliburton Energy Services, Inc. |
Real time monitoring and control of thermal recovery operations for heavy oil reservoirs
|
EP1999492A4
(en)
*
|
2006-01-20 |
2011-05-18 |
Landmark Graphics Corp |
DYNAMIC PRODUCTION MANAGEMENT SYSTEM
|
US8812334B2
(en)
*
|
2006-02-27 |
2014-08-19 |
Schlumberger Technology Corporation |
Well planning system and method
|
NO327866B1
(no)
*
|
2006-03-09 |
2009-10-12 |
Abb Research Ltd |
En fremgangsmåte for styring og/eller overvåking
|
US7765091B2
(en)
*
|
2006-06-18 |
2010-07-27 |
Chevron U.S.A Inc. |
Method, apparatus and system for reservoir simulation using a multi-scale finite volume method including black oil modeling
|
US7832482B2
(en)
|
2006-10-10 |
2010-11-16 |
Halliburton Energy Services, Inc. |
Producing resources using steam injection
|
US7895241B2
(en)
*
|
2006-10-16 |
2011-02-22 |
Schlumberger Technology Corp. |
Method and apparatus for oilfield data repository
|
US8818777B2
(en)
*
|
2006-10-30 |
2014-08-26 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US20100318337A1
(en)
*
|
2006-10-30 |
2010-12-16 |
Bailey William J |
Method, apparatus and system for modeled carbon sequestration
|
US20080181230A1
(en)
*
|
2007-01-25 |
2008-07-31 |
Halliburton Energy Services, Inc. |
Remote monitoring of wellsite data
|
US7606666B2
(en)
*
|
2007-01-29 |
2009-10-20 |
Schlumberger Technology Corporation |
System and method for performing oilfield drilling operations using visualization techniques
|
US7627430B2
(en)
*
|
2007-03-13 |
2009-12-01 |
Schlumberger Technology Corporation |
Method and system for managing information
|
US8014987B2
(en)
*
|
2007-04-13 |
2011-09-06 |
Schlumberger Technology Corp. |
Modeling the transient behavior of BHA/drill string while drilling
|
US8688487B2
(en)
*
|
2007-04-18 |
2014-04-01 |
Schlumberger Technology Corporation |
Method and system for measuring technology maturity
|
BRPI0810840A2
(pt)
*
|
2007-05-09 |
2014-10-29 |
Exxonmobil Upstream Res Co |
Métodos para inversão de dados sísmicos de lapso de tempo e para produzir hidrocarbonetos a partir de uma formação em uma região de sub-superfície
|
US7814989B2
(en)
*
|
2007-05-21 |
2010-10-19 |
Schlumberger Technology Corporation |
System and method for performing a drilling operation in an oilfield
|
US7921915B2
(en)
*
|
2007-06-05 |
2011-04-12 |
Baker Hughes Incorporated |
Removable injection or production flow equalization valve
|
US9175547B2
(en)
*
|
2007-06-05 |
2015-11-03 |
Schlumberger Technology Corporation |
System and method for performing oilfield production operations
|
US8775141B2
(en)
*
|
2007-07-02 |
2014-07-08 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US8046314B2
(en)
*
|
2007-07-20 |
2011-10-25 |
Schlumberger Technology Corporation |
Apparatus, method and system for stochastic workflow in oilfield operations
|
US8332194B2
(en)
*
|
2007-07-30 |
2012-12-11 |
Schlumberger Technology Corporation |
Method and system to obtain a compositional model of produced fluids using separator discharge data analysis
|
US8073800B2
(en)
*
|
2007-07-31 |
2011-12-06 |
Schlumberger Technology Corporation |
Valuing future information under uncertainty
|
US8244509B2
(en)
*
|
2007-08-01 |
2012-08-14 |
Schlumberger Technology Corporation |
Method for managing production from a hydrocarbon producing reservoir in real-time
|
WO2009023659A1
(en)
*
|
2007-08-14 |
2009-02-19 |
Shell Oil Company |
System and methods for continuous, online monitoring of a chemical plant or refinery
|
EP2185981A4
(en)
*
|
2007-08-17 |
2012-03-21 |
Ife Venture As |
SYSTEM AND METHOD FOR VIRTUAL GAS EMISSION DETECTION BASED ON AN EMPIRICAL ENSEMBLE
|
US8265915B2
(en)
*
|
2007-08-24 |
2012-09-11 |
Exxonmobil Upstream Research Company |
Method for predicting well reliability by computer simulation
|
US8768672B2
(en)
*
|
2007-08-24 |
2014-07-01 |
ExxonMobil. Upstream Research Company |
Method for predicting time-lapse seismic timeshifts by computer simulation
|
US8548782B2
(en)
*
|
2007-08-24 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method for modeling deformation in subsurface strata
|
WO2009029133A1
(en)
|
2007-08-24 |
2009-03-05 |
Exxonmobil Upstream Research Company |
Method for multi-scale geomechanical model analysis by computer simulation
|
CA2705319C
(en)
*
|
2007-11-10 |
2019-01-15 |
Laurence Reid |
Systems and methods for workflow automation, adaptation and integration
|
US8437996B2
(en)
*
|
2007-12-13 |
2013-05-07 |
Exxonmobil Upstream Research Company |
Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
|
US8396826B2
(en)
|
2007-12-17 |
2013-03-12 |
Landmark Graphics Corporation |
Systems and methods for optimization of real time production operations
|
US7878268B2
(en)
*
|
2007-12-17 |
2011-02-01 |
Schlumberger Technology Corporation |
Oilfield well planning and operation
|
WO2009085395A1
(en)
*
|
2007-12-31 |
2009-07-09 |
Exxonmobil Upstream Research Company |
Methods and systems for determining near-wellbore characteristics and reservoir properties
|
US8135862B2
(en)
*
|
2008-01-14 |
2012-03-13 |
Schlumberger Technology Corporation |
Real-time, bi-directional data management
|
US7894991B2
(en)
*
|
2008-02-01 |
2011-02-22 |
Schlumberger Technology Corp. |
Statistical determination of historical oilfield data
|
CN101952539B
(zh)
|
2008-02-11 |
2013-11-20 |
兰德马克绘图国际公司,哈里伯顿公司 |
用于改进的垫板定位的系统和方法
|
US8285532B2
(en)
*
|
2008-03-14 |
2012-10-09 |
Schlumberger Technology Corporation |
Providing a simplified subterranean model
|
EP2104067A1
(en)
|
2008-03-17 |
2009-09-23 |
Philip Morris Products S.A. |
Method and apparatus for identifying, authenticating, tracking and tracing manufactured items
|
WO2009117741A1
(en)
*
|
2008-03-21 |
2009-09-24 |
The Trustees Of Columbia University In The City Of New York |
Decision support control centers
|
WO2009117742A1
(en)
*
|
2008-03-21 |
2009-09-24 |
The Trustees Of Columbia University In The City Of New York |
Methods and systems of determining the effectiveness of capital improvement projects
|
US10552391B2
(en)
|
2008-04-04 |
2020-02-04 |
Landmark Graphics Corporation |
Systems and methods for real time data management in a collaborative environment
|
EP2266021A4
(en)
|
2008-04-04 |
2014-01-01 |
Landmark Graphics Corp |
SYSTEMS AND METHOD FOR CORRELATING METADATA MODELS AND ASSET LOGIC MODEL PRESENTATIONS
|
CA2724002C
(en)
*
|
2008-05-16 |
2016-11-01 |
Chevron U.S.A. Inc. |
Multi-scale method for multi-phase flow in porous media
|
US9488044B2
(en)
|
2008-06-23 |
2016-11-08 |
Schlumberger Technology Corporation |
Valuing future well test under uncertainty
|
AU2009266935B2
(en)
*
|
2008-07-03 |
2015-08-20 |
Chevron U.S.A. Inc. |
Multi-scale finite volume method for reservoir simulation
|
CA2730446A1
(en)
*
|
2008-09-30 |
2010-04-08 |
Exxonmobil Upstream Research Company |
Self-adapting iterative solver
|
WO2010039325A1
(en)
*
|
2008-09-30 |
2010-04-08 |
Exxonmobil Upstream Reseach Company |
Method for solving reservoir simulation matrix equation using parallel multi-level incomplete factorizations
|
US9228415B2
(en)
*
|
2008-10-06 |
2016-01-05 |
Schlumberger Technology Corporation |
Multidimensional data repository for modeling oilfield operations
|
BRPI0919572A2
(pt)
*
|
2008-10-09 |
2019-09-24 |
Chevron Usa Inc |
método implementado por computador em múltipla escala, sistema implementado por computador, e, método para operar um reservatório de subsuperfície
|
AU2009333601B2
(en)
|
2008-12-17 |
2014-08-21 |
Exxonmobil Upstream Research Company |
Method for imaging of targeted reflectors
|
EP2376945A4
(en)
|
2008-12-17 |
2017-02-22 |
Exxonmobil Upstream Research Company |
System and method for performing time-lapse monitor surveying using sparse monitor data
|
WO2010077569A1
(en)
|
2008-12-17 |
2010-07-08 |
Exxonmobil Upstream Research Company |
System and method for reconstruction of time-lapse data
|
US8914268B2
(en)
|
2009-01-13 |
2014-12-16 |
Exxonmobil Upstream Research Company |
Optimizing well operating plans
|
WO2010096783A1
(en)
|
2009-02-20 |
2010-08-26 |
The Trustees Of Columbia University In The City Of New York |
Dynamic contingency avoidance and mitigation system
|
US8725625B2
(en)
|
2009-05-28 |
2014-05-13 |
The Trustees Of Columbia University In The City Of New York |
Capital asset planning system
|
US8332154B2
(en)
|
2009-06-02 |
2012-12-11 |
Exxonmobil Upstream Research Company |
Estimating reservoir properties from 4D seismic data
|
US20110030963A1
(en)
*
|
2009-08-04 |
2011-02-10 |
Karl Demong |
Multiple well treatment fluid distribution and control system and method
|
US9085957B2
(en)
|
2009-10-07 |
2015-07-21 |
Exxonmobil Upstream Research Company |
Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same
|
AU2010315455B2
(en)
*
|
2009-10-28 |
2015-01-29 |
Chevron U.S.A. Inc. |
Multiscale Finite Volume method for reservoir simulation
|
US8469090B2
(en)
*
|
2009-12-01 |
2013-06-25 |
Schlumberger Technology Corporation |
Method for monitoring hydrocarbon production
|
BR112012017275A2
(pt)
|
2010-02-12 |
2016-04-19 |
Exxonmobil Upstream Res Co |
método e sistema para divisão de modelos de simulação paralelos
|
WO2011106511A1
(en)
|
2010-02-24 |
2011-09-01 |
The Trustees Of Columbia University In The City Of New York |
Metric monitoring and financial validation system for tracking performance of improvement to an infrastructure
|
CA2786584C
(en)
|
2010-03-12 |
2017-07-18 |
Exxonmobil Upstream Research Company |
Dynamic grouping of domain objects via smart groups
|
US9399901B2
(en)
|
2010-06-15 |
2016-07-26 |
Schlumberger Technology Corporation |
Characterizing flow production
|
EP2593844A4
(en)
|
2010-07-16 |
2017-05-31 |
The Trustees of Columbia University in the City of New York |
Machine learning for power grids
|
US10133831B2
(en)
*
|
2012-05-14 |
2018-11-20 |
Landmark Graphics Corporation |
Method and system of predicting future hydrocarbon production
|
AU2013274606B2
(en)
|
2012-06-11 |
2015-09-17 |
Landmark Graphics Corporation |
Methods and related systems of building models and predicting operational outcomes of a drilling operation
|
US20150088424A1
(en)
*
|
2013-09-20 |
2015-03-26 |
Schlumberger Technology Corporation |
Identifying geological formation depth structure using well log data
|
US9569521B2
(en)
|
2013-11-08 |
2017-02-14 |
James W. Crafton |
System and method for analyzing and validating oil and gas well production data
|
RU2570686C1
(ru)
*
|
2014-07-21 |
2015-12-10 |
Руслан Радмирович Ишкильдин |
Способ моделирования технологических процессов на газовом промысле
|
US10590752B2
(en)
|
2016-06-13 |
2020-03-17 |
Saudi Arabian Oil Company |
Automated preventive and predictive maintenance of downhole valves
|
US10689958B2
(en)
|
2016-12-22 |
2020-06-23 |
Weatherford Technology Holdings, Llc |
Apparatus and methods for operating gas lift wells
|
US11041976B2
(en)
|
2017-05-30 |
2021-06-22 |
Exxonmobil Upstream Research Company |
Method and system for creating and using a subsurface model in hydrocarbon operations
|
US11372123B2
(en)
|
2019-10-07 |
2022-06-28 |
Exxonmobil Upstream Research Company |
Method for determining convergence in full wavefield inversion of 4D seismic data
|
US11989790B2
(en)
|
2019-10-28 |
2024-05-21 |
Schlumberger Technology Corporation |
Drilling activity recommendation system and method
|
US11341830B2
(en)
|
2020-08-06 |
2022-05-24 |
Saudi Arabian Oil Company |
Infrastructure construction digital integrated twin (ICDIT)
|
US11687053B2
(en)
|
2021-03-08 |
2023-06-27 |
Saudi Arabian Oil Company |
Intelligent safety motor control center (ISMCC)
|
US20230258059A1
(en)
*
|
2022-02-16 |
2023-08-17 |
Saudi Arabian Oil Company |
Method and system for operating wells at optimum rates using orifice performance curves
|
CN114776267B
(zh)
*
|
2022-05-03 |
2023-05-12 |
四川大学 |
一种可多次座封的分离式井下节流器
|