DEG0014910MA - - Google Patents
Info
- Publication number
- DEG0014910MA DEG0014910MA DEG0014910MA DE G0014910M A DEG0014910M A DE G0014910MA DE G0014910M A DEG0014910M A DE G0014910MA
- Authority
- DE
- Germany
- Prior art keywords
- concrete
- partial beam
- formwork
- partial
- sand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 claims description 16
- 238000009415 formwork Methods 0.000 claims description 16
- 239000004576 sand Substances 0.000 claims description 8
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 239000011513 prestressed concrete Substances 0.000 claims description 5
- 238000011065 in-situ storage Methods 0.000 claims description 4
- 239000011150 reinforced concrete Substances 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 description 8
- 210000000614 Ribs Anatomy 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000002040 relaxant effect Effects 0.000 description 1
Description
BUNDESREPUBLIK DEUTSCHLANDFEDERAL REPUBLIC OF GERMANY
Tag der Anmeldung: 16. Juli 1954 Bekanntgeniacht am 5. Juli 1956Registration date: July 16, 1954 Announced on July 5, 1956
DEUTSCHES PATENTAMTGERMAN PATENT OFFICE
Es ist bekannt, innerhalb der Schalungswand einer Spannbahn zur Herstellung von Teilbalken aus Stahl- oder Spannbeton Schubbügel, die dem Verbund des Teilbalkens mit dem Ortbeton dienen, so anzuordnen, daß sie die Bewehrungselemente ganz oder teilweise umfassen und ihre freien Enden sich in, Richtung auf die Spannbahn erstrecken.It is known within the formwork wall of a tensioning track for the production of partial beams made of reinforced or prestressed concrete push bars, which are used to bond the partial beam with the in-situ concrete, to be arranged so that they completely or partially encompass the reinforcement elements and their free ends extend in the direction of the tensioning path.
Mit Schubbügeln versehene, T-förmige Betonbalken wurden bisher beispielsweise dadurch gefertigt, daß man die die Bewehrungseinlagen umfassenden Schubbügel im der Schalung so anordnete, daß ihre Enden nach oben herausragten. Gegen eine solche Fertigung bestehen keine Bedenken, wenn der Beton durch Rütteln der seitlichen Schalung verdichtet wird. Die Verdichtung des Betons ist in diesem Fall jedoch für Spannbeton nicht ausreichend. Um den Beton besser verdichten zu können, hat man die gesamte Schalung, also auch den ganzen Schalungsboden, in Rüttelschwingungen versetzt und die Schubbügel erst kurz nach dem Verdichten des Betons in diesen eingedrückt. Eine kraftschlüssige Verbindung der Schubbügel mit den Bewehrungselementen ist dann nicht möglich.T-shaped concrete beams with push bars have previously been manufactured, for example, by that the push bar encompassing the reinforcement layers was arranged in the formwork in such a way that that their ends protruded upwards. There are no concerns about such a production, when the concrete is compacted by shaking the formwork on the side. The compression However, in this case the concrete is not sufficient for prestressed concrete. To better compact the concrete To be able to do so, the entire formwork, including the entire formwork base, is vibrating offset and the push handle is only pressed into the concrete shortly after it has been compacted. A positive connection of the Push bar with the reinforcement elements is then not possible.
Um diesen Nachteil zu vermeiden, hat man den Betonbalken in zwai Stufen gefertigt, und zwar erst die eine. Half te des Balkens, hergestellt, dann die Bewehrungselemente mit den Schubbügeln ein-In order to avoid this disadvantage, the concrete beam was made in two stages, namely first the one. Half te of the beam, made, then the reinforcement elements with the push bars
609 548/320609 548/320
G 14910 IVc/'80aG 14910 IVc / '80a
gelegt und darauf die zweite Hälfte aufbetoniert. Die Schubbügel wurden dabei zwischen einer zweiteiligen Schalungswand so festgeklemmt, daß sich ihre freien Enden in'einer'horizontalen Ebene erstreckten. Diese Fertigung von Teilbalken ist unwirtschaftlich, ganz davon abgesehen, daß man sie bei Spannbeton nicht anwenden kann.laid and the second half concreted on top. The push handle was between a two-part Formwork wall clamped so that its free ends extended in 'one' horizontal plane. This production of partial beams is uneconomical, Quite apart from the fact that they cannot be used with prestressed concrete.
Man hat Teilbalken auch schon so gefertigt, daß der Beton in eine muldenförmige Schalung eingebracht wurde und die die Bewehrungselemente umfassenden Schubbügel so gestaltet waren, daß ihre freien Enden in der horizontal liegenden Bodenplatte vorgesehene Öffnungen durchdrangen. Diese Art der Fertigung hatte Nachteile: Die Durchführungsstellen mußten abgedichtet werden, beispielsweise durch Gummiringe, Papier od. dgl.; die Schubbügel konnten erst nach Erhärten des Teilbalkens an ihren Enden abgebogen werden; außerdem verklemmen sich die Bügel in den Öffnungen des Schalungsbodens, da sich die Länge des Teilbalkens beim Entspannen verringert, wodurch die Gefahr des Aufreißens des Teilbalkens besteht.Partial beams have already been manufactured in such a way that the concrete was placed in a trough-shaped formwork and the reinforcement elements comprehensive push handle were designed so that their free ends in the horizontal lying Openings provided in the base plate penetrated. This type of production had disadvantages: The Implementation points had to be sealed, for example by rubber rings, paper or the like; the push bars could only be bent at their ends after the partial beam had hardened; In addition, the stirrups get stuck in the openings in the bottom of the formwork, as the length increases of the partial beam when relaxing, reducing the risk of the partial beam tearing open consists.
Diese Nachteile werden vermieden, wenn man die Teilbalken aus Stahl- oder Spannbeton nach dem Hauptpatent 938 329 fertigt. Das Kennzeichen des Hauptpatents besteht darin, daß die Schubbügel von dem Beton des Teilbalkens ganz oder teilweise umhüllt sind, und zwar derart, daß die Bügel vor der Verbindung mit dem Ortbeton leicht freigelegt und gegebenenfalls aufgebogen werden können. Der Teilbalken weist an der dem später einzubringenden Ortbeton.zugewandten Seite eine oder mehrere Rippen auf, und die Schubbügelteile fassen in diese Rippe ein.These disadvantages are avoided if the partial beams are made of reinforced or prestressed concrete the main patent 938 329 manufactures. The distinguishing feature of the main patent is that the push handle are completely or partially encased by the concrete of the partial beam, in such a way that the Brackets are slightly exposed before the connection with the in-situ concrete and, if necessary, bent up be able. The partial beam has on the side facing the in-situ concrete to be added later or more ribs, and the push handle parts engage in this rib.
Mit Rücksicht auf die Erhöhung der Tragfähigkeit von Bewehrungselementen bei der Montage ist es zweckmäßig, die Rippen, in denen die die Schubkräfte übertragenden Mittel untergebracht sind, verhältnismäßig breit bzw. höher auszuführen, als dies bisher der Fall war. Dies führt dazu, daß die ganz oder teilweise in dem Beton eingebetteten Schubübertragungsmittel auf der Baustelle schwieriger losgelöst und hochgebogen werden können.With regard to increasing the load-bearing capacity of reinforcement elements during assembly it is expedient to remove the ribs in which the means that transmit the thrust forces are accommodated, to be carried out relatively wide or higher than was previously the case. This leads to the fact that the Wholly or partially embedded in the concrete thrust transmission means on the construction site more difficult can be detached and bent up.
Der Erfindung liegt die Aufgabe zugrunde, diesen Nachteil . auszuschalten.The invention is based on this disadvantage. turn off.
-Erfindungsgemäß wird vorgeschlagen, die Spannbahn an der Stelle, an der die Schubbügel aus dem zu fertigenden Teilbalken herausragen, tiefer als es der Querschnittsform des Teilbalkens an dieser Stelle entspricht, zu gestalten und diesen Raum mit Sand od. dgl. auszufüllen und die aus demAccording to the invention, it is proposed that the tensioning track at the point where the push handle comes from the partial beam to be produced protrude deeper than the cross-sectional shape of the partial beam on this Place corresponds to design and fill this space with sand or the like and from the
Teilbalken herausragenden Schubbügelteile in den ■Part of the bar protruding push handle parts in the ■
Sand od. dgl. einfassen zu lassen.Sand or the like to be enclosed.
Der Erfindungsgedanke wird an Hand der Zeichnungen schematiech veranschaulicht. Es zeigtThe concept of the invention is illustrated schematically with reference to the drawings. It shows
Fig. ι einen Schnitt durch einen mit einer Rippe oder einem Steg versehenen Teilbalken in seiner Schalung,Fig. Ι a section through one with a rib or a bar provided with partial beams in its formwork,
Fig. 2 einen Schnitt durch.einen Teilbalken mit rechteckigem Querschnitt in seiner Schalung.Fig. 2 is a section through a partial beam with a rectangular cross-section in its formwork.
Das Schalungsbett 1 weist eine Ausnehmung 2 auf, die bis zu einer wählbaren Höhe mit Sand 3 ausgefüllt wird. Nach dem Spannen der Bewehrungseinlagen 4, die gegebenenfalls vorgespannt sein können, werden die Bügel 5 in den Schalungsraum eingelegt, und zwar beispielsweise so, daß ein Teil ihrer Enden zwischen den beiden Bewehrungseinlagen zu liegen kommt, während die anderen Enden auf dem Schalungsboden aufliegen. Diese Enden fassen also in den in der Aussparung 2 eingebrachten Sand ein. Nunmehr wird der Beton in den Schalungsraum eingefüllt, von oben her verdichtet und der Teilbalken nach dem Erhärten des Betons aus der Schalung herausgehoben. Die Schubbügel liegen dann bereits frei, da der Sand abfällt. Voraussetzung ist, daß der einzufüllende Beton erdfeuchte Konsistenz aufweist, damit er sich mit dem eingefüllten Sand nicht verbindet. . Selbstverständlich kann man den Erfindungsgedanken auch anwenden, wenn der Querschnitt der Teilbalken rechteckförmig ist, wie dies aus Fig. 2 hervorgeht.The formwork bed 1 has a recess 2 which is filled with sand 3 up to a selectable height is filled out. After tensioning the reinforcement layers 4, which may be pre-tensioned can be, the bracket 5 are inserted into the formwork space, for example so that part of its ends come to rest between the two reinforcement layers, while the other ends rest on the bottom of the formwork. These ends therefore engage in the recess 2 introduced sand. Now the concrete is poured into the formwork space, from above compacted and the partial beam lifted out of the formwork after the concrete had hardened. the Push bars are then already exposed as the sand falls off. The prerequisite is that the Concrete has an earth-moist consistency so that it does not combine with the poured sand. . Of course, the idea of the invention can also be used when the cross-section the partial bar is rectangular, as can be seen from FIG.
Claims (1)
Deutsche Patentschrift Nr. 573 695.Considered publications:
German patent specification No. 573 695.
Family
ID=
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2005080704A1 (en) | Method and auxiliary agent for producing concrete elements, especially concrete semi-finished products and/or concrete surfaces, and auxiliary agent for producing concrete surfaces | |
DE2101084A1 (en) | Procedure for erecting a structure | |
DE2917024A1 (en) | PREFABRICATED WALL | |
DE1434624B2 (en) | Multi-storey building composed of box-shaped, laterally open room elements | |
DE1947249A1 (en) | Foundation or civil engineering structure and process for its production | |
DE959627C (en) | Circuit for the production of partial beams made of reinforced or prestressed concrete | |
CH665668A5 (en) | HANGER BASKET. | |
DEG0014910MA (en) | ||
DE202007002425U1 (en) | Endless Gabion Wall | |
DE202005003420U1 (en) | Wire cage for gabion-type fences and walls consists of cage modules constructed from wire cage elements connected via hinges, to contain natural stone | |
DE10103080B4 (en) | formwork | |
EP3315678B1 (en) | Prefabricated element for connecting a concrete cantilever plate to a building structure | |
EP3299524B1 (en) | Wall made of prefabricated products and method for manufacturing the same | |
DE102005038996A1 (en) | Composite floor element | |
DE1684213C3 (en) | Buildings with frames made from individual parts | |
DE202017106103U1 (en) | Wire basket and protective wall against noise and / or flood | |
DE4006664A1 (en) | Roof structure for hall construction - has bearing inner shell of steel plates with inwardly facing, hollow, hole-free trapezoidal ribs | |
DE69001688T2 (en) | METHOD FOR ATTACHING HORIZONTAL BEAMS TO STEEL COLUMNS OF A BUILDING AND A BUILDING CONSTRUCTED BY THIS METHOD. | |
EP2175079B1 (en) | Method for forming a rigid corner reinforcement for reinforced concrete construction, reinforcement element and rigid corner reinforcement | |
DE202016105371U1 (en) | Precast wall | |
DE102005022495A1 (en) | Sound protection wall made from finished units e.g. for sound insulation, has finished units made from aggregate of material mixture which are bonded and formed as plate like wall elements | |
DE2647583C3 (en) | Framework | |
DE1559530A1 (en) | Wall construction, especially reinforcement unit | |
AT369821B (en) | FINISHED GARAGE OD. DGL. IN STEEL CONCRETE | |
DE2121503A1 (en) | Enclosed building unit |