DE847776C - Arrangement for counting the duration of voltage deviations - Google Patents

Arrangement for counting the duration of voltage deviations

Info

Publication number
DE847776C
DE847776C DEJ3595A DEJ0003595A DE847776C DE 847776 C DE847776 C DE 847776C DE J3595 A DEJ3595 A DE J3595A DE J0003595 A DEJ0003595 A DE J0003595A DE 847776 C DE847776 C DE 847776C
Authority
DE
Germany
Prior art keywords
voltage
arrangement according
counter
arrangement
during
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEJ3595A
Other languages
German (de)
Inventor
Hans Dipl-Ing Jockusch
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DEJ3595A priority Critical patent/DE847776C/en
Application granted granted Critical
Publication of DE847776C publication Critical patent/DE847776C/en
Expired legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/46Electrically-operated clockwork meters; Oscillatory meters; Pendulum meters

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Measurement Of Unknown Time Intervals (AREA)

Description

Anordnung zur Zählung der Zeitdauer von Spannungsabweichungen Für die elektrische Energieversorgung ist von entscheidender Bedeutung, daß den Verbrauchsapparaten die Nennspannung innerhalb einer gewissen Toleranz zugeführt wird.Arrangement for counting the duration of voltage deviations For the electrical power supply is vital to that of the consuming apparatus the nominal voltage is supplied within a certain tolerance.

Bei den Elektrizitatsversorgungsunternehmen erfolgt die Überwachung entweder durch gelegentliche Spannungsmessung, was sehr primitiv ist, oder durch laufende Aufzeichnung der Netzspan nung beim Verbraucher durch schreibende Span nungsmesser. Schreibende Spannungsmesser sind so kostspielig, daß sie nur an wichtigen Netzstellen ein gebaut werden konnen. An weniger wichtigen Stellen muß man sich mit einem Gerät, das einmal @ner, einmal dort eingebaut wird, behelfen. Monitoring is carried out at the electricity supply companies either by occasional voltage measurements, which is very primitive, or by Continuous recording of the mains voltage at the consumer by means of writing voltage voltage meter. Writing voltmeters are so costly that they only work on important ones Network points can be built in. You have to go to less important places help with a device that is installed once @ner, once there.

Für die Netzuberwachung hinsichtlich der Span nungshaltung ist es in vielen Fallen nicht von so großer Bedeutung, welche hochste und welche tiefste Spannung im Laufe eines Zeitraums beim Abnchmer vorhanden ist, als vielmehr die Feststellung, während einer wie langen Zeit der Toleranzspielraum für die Spannungshaltung über-oder unterschritten wird.For network monitoring with regard to voltage maintenance, it is in many cases not of so great importance, which is the highest and which is the lowest Tension is present in the deviator over a period of time, rather than the Determination of how long the tolerance range for voltage maintenance will be for how long is exceeded or not reached.

Die hier beschriebene Anordnung dient dem vorstchenden Zweck, wobei gleichzeitig geringe Beschaffungskosten und betriebskosten erreicht werden. The arrangement described here serves the primary purpose, whereby low procurement costs and operating costs can be achieved at the same time.

Die erfindungsgemäße Anordnung zur Zählung der Zeitdauer von Spannungsabweichungen besteht darin, daß ein Zeitwerk in Kombination mit einem Spannungsmeßwerk. welches die Steuerung übernimmt, derart auf zwei Zählwerke einwirkt, daß das @ine Zahlwerk die Betriebszeit zählt, wahrend deren eine Sollspannung, gegebenenfalls nebst Toleranz, uberschritten wird, und das andere Zählwerk die Betriebszeit zahlt, wahrend der eine Sollspannung unterschritten wird. The arrangement according to the invention for counting the duration of voltage deviations consists in the fact that a timer in combination with a voltmeter. which control takes over, acts on two counters in such a way that the @one counter the operating time counts, during which a nominal voltage, possibly together with a tolerance, is exceeded, and the other counter pays the operating time while the a target voltage is not reached.

Im folgenden sei ein Ausführungsbeispiel der Erfindung an Hand der beigegebenen Zeichnung näher beschrieben. In the following an embodiment of the invention is based on the attached drawing described in more detail.

Das Triebwerk TrE, die Ferrarisscheibe FSch und der Bremsmagnet BrM bilden ein Spannungsmeßwerk, dem aller auch ein anderes als bekannt vorausgesetztes Meßsystem zugrunde liegen kann. The engine TrE, the Ferrari disk FSch and the brake magnet BrM form a tension measuring mechanism for which everyone also presupposes something else that is known to be known Measurement system can be based.

Die Gegenkraft zum Triebwerk liefert die Feder F dal>ei dient der Helel USo zur Einstellung der Federspannung, das heißt zur Einstellung der Sollspannung. Der Hebel EE dient zur Kürzung und Längung der Feder und demgemäß zur Einstellung der Empfindlichkeit des Geräts. Auf der Meßwerksachse MA ist der Sperrhebel SpH fest verbunden.The counterforce to the engine is provided by the spring F because it serves Helel USo for setting the spring tension, i.e. for setting the target tension. The lever EE is used to shorten and lengthen the spring and accordingly for adjustment the sensitivity of the device. The locking lever SpH is on the measuring mechanism axis MA firmly connected.

Weiterhin ist ein Dreifachzählwerk, bestehend aus drei Rollenzählwerken h, Üh und Uh, dem Antrieb durch einen selbstanlaufenden Synchronmotor SyM mit zwei Tasthebeln Thü und Thu, zwei Klinkwerken Klü und Klu sowie einem Kurbeltrieb KTr vorhanden. There is also a triple counter consisting of three roller counters h, Üh and Uh, the drive by a self-starting synchronous motor SyM with two Touch levers Thü and Thu, two Klinkwerke Klü and Klu and a crank drive KTr available.

Das Zeitwerk, der selbstanlaufende Synchronmotor SyM, treibt das Stundenzählwerk h, welches die Gesamtbetriebsstunden zählt, während deren die Netzspannung vorhanden ist. Der Kurbeltrieb KTr läßt unter Mitwirkung von zwei Rückzugsfedern RFii und RFu die beiden Tasthebel Titel und Thu hin und her schwingen. The Zeitwerk, the self-starting synchronous motor SyM, drives it Hour meter h, which counts the total operating hours during which the mains voltage is available. The crank mechanism KTr leaves with the help of two return springs RFii and RFu swing the two tactile levers Titel and Thu back and forth.

1st die Netzspannung gleich der Sollspannung, befindet sich demgemäß der Sperrhebel SpH in der Mittelage und befinden sich die Sperrstifte Rzü und Rzu in den Positionen 2 und 3, so kann eine Schwingbewegung in dem Sinne nicht stattfinden, daß die Klinkwerke Klü und Klü weiterschalten; die Zählwerke Üh und Uh bleiben somit in Ruhe. If the mains voltage is equal to the nominal voltage, it is accordingly the locking lever SpH is in the middle position and the locking pins Rzu and Rzu are located in positions 2 and 3, a swinging movement cannot take place in the sense that that Klinkwerke Klü and Klü continue to switch; the counters Üh and Uh remain in peace.

Weicht aber z.B. die Istspannung von der Sollspannung um mehr als die eingestellte Toleranz nach oben ab, so wandert der Sperrhebel SpH nach oben aus, der Sperrstift RZü gerät in die Lage 1, und der Tasthebel Thü für das Überspannungszählwerk kann im vollen Umfang hin und her schwingen, wodurch vermittels des Klinkwerks Klü das Rollenzählwerk Üh die Stunden zählt, während deren die Sollspannung einschließlich Toleranz überschritten wird. If, for example, the actual voltage deviates from the nominal voltage by more than the set tolerance upwards, the locking lever SpH moves upwards off, the locking pin RZü is in position 1, and the tactile lever Thü for the overvoltage counter can swing back and forth to the full extent, which means that Klü the roller counter Üh counts the hours during which the target voltage including Tolerance is exceeded.

Die gleiche, jedoch entgegengesetzte Wirkung haben der Tasthebel Thu, das Klinkwerk Klu und das Rollenzählwerk Uh bei Vorhandensein einer Unterspannung. The tactile levers have the same but opposite effect Thu, the Klinkwerk Klu and the roller counter Uh in the presence of an undervoltage.

Das Rollenzählwerk h gibt an, wieviel Stunden das Gerät uberhaupt an Spannung gelegen hat; das Rollenzählwerk Üh zeigt an, wie lange innerhalb dieser Zeit eine Überspannung über den Toleranzbereich hinaus bestanden hat, und das Rollenzählwerk Uh zeigt an, wie lange innerhalb derselben Zeit eine Spannung unterhalb des Toleranzwerts bestanden hat. vollständiges Fortbleiben der Spannung wird nicht registriert, da sowohl das Meßwerk als auch der Synchronmotor außer Betrieb sind. The roller counter h indicates how many hours the device was in at all was due to tension; the roller counter Üh shows how long within this Time has exceeded the tolerance range and the roller counter Uh shows how long a voltage is below the tolerance value within the same time has passed. complete absence of the tension is not registered because Both the measuring mechanism and the synchronous motor are out of order.

An das Zeitwerk brauchen hinsichtlich der Genauigkeit keinerlei hohe Anforderungen gestellt werden. Ein Verbrauch von Registrierpapier findet nicht statt. Für einen Untersuchungszeitraum werden die drei Rollenzählwerke abgelesen und ihre Angaben ergeben ein eindeutiges Urteil darüber, ob die Spannungsverhältnisse in dem zu untersuchenden Netz in Ordnung sind oder nicht. In terms of accuracy, no high precision is required on the timer Requirements are made. There is no consumption of recording paper. The three roller counters and their Information provides a clear assessment of whether the tension in are OK or not in the network to be examined.

Bei der Schwingbewegung der Tasthebel Thü und Thu werden durch geeignete Auslegung des Kurbeltriebs Sperrhebel und Sperrstifte entlastet, so daß während einer Einstellperiode eine eindeutige Einstellung des Sperrhebels unabhängig von jeder mechanischen Belastung möglich ist. During the swinging movement of the feeler levers Thü and Thu, suitable Design of the crank mechanism locking lever and locking pins relieved so that during a setting period a clear setting of the locking lever regardless of any mechanical load is possible.

Claims (5)

P A T E N T A N S P R Ü C H E : 1. Anordnung zur Zählung der Zeitdauer von Spannungsabweichungen, dadurch gekennzeichnet, daß ein Zeitwerk in Kombination mit einem Spannungsmeßwerk, welches die Steuerung übernimmt, derart auf zwei Zählwerke einwirkt, daß das eine Zählwerk die Betriebszeit zählt, während deren eine Sollspannung, gegebenenfalls nebst Toleranz, überschritten wird, und das andere Zählwerk die Betriebszeit zählt, während der eine Sollspannung in gleicher Weise unterschritten wird. P A T E N T A N S P R Ü C H E: 1. Arrangement for counting the duration of voltage deviations, characterized in that a timer in combination with a voltmeter, which takes over the control, so on two counters has the effect that one counter counts the operating time during which a nominal voltage, possibly including tolerance, is exceeded, and the other counter the operating time counts, during which a target voltage is undershot in the same way. 2. Anordnung nach Anspruch 1, dadurch gekennzeichnet, daß durch ein drittes Zählwerk die Gesamtbetriebszeit zusätzlich gezählt wird. 2. Arrangement according to claim 1, characterized in that by a third counter, the total operating time is also counted. 3. Anordnung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß das Zeitwerk ein selbstanlaufender Synchronmotor ist, wodurch die Zeiträume völliger Spannungslosigkeit aus der Zählung eliminiert werden. 3. Arrangement according to claim 1 or 2, characterized in that the timer is a self-starting synchronous motor, which makes the time periods more complete No tension can be eliminated from the count. 4. Anordnung nach Anspruch 1 oder folgende, dadurch gekennzeichnet, daß das eigentliche Spannungsmeßwerk, vorzugsweise ein Induktionsmeßwerk, während der jeweiligen Einstellperiode mechanisch nicht belastet ist und die Zählwerke nur durch einen Abtastvorgang betätigt werden. 4. Arrangement according to claim 1 or the following, characterized in that that the actual voltage measuring unit, preferably an induction measuring unit, during the respective setting period is not mechanically loaded and the counters only can be actuated by a scanning operation. 5. Anordnung nach Anspruch 1 oder folgende, dadurch gekennzeichnet, daß die als Richtkraft dienende Feder des Meßwerks doppelt beeinflußt wird, und zwar durch Veränderung der Vorspannung für die Sollspannung und durch Veränderung der Federkonstante für den Toleranzbereich. 5. Arrangement according to claim 1 or the following, characterized in that that the spring of the measuring mechanism serving as a straightening force is influenced twice, and by changing the preload for the target voltage and by changing it the spring constant for the tolerance range.
DEJ3595A 1950-12-03 1950-12-03 Arrangement for counting the duration of voltage deviations Expired DE847776C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEJ3595A DE847776C (en) 1950-12-03 1950-12-03 Arrangement for counting the duration of voltage deviations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEJ3595A DE847776C (en) 1950-12-03 1950-12-03 Arrangement for counting the duration of voltage deviations

Publications (1)

Publication Number Publication Date
DE847776C true DE847776C (en) 1952-08-28

Family

ID=7198031

Family Applications (1)

Application Number Title Priority Date Filing Date
DEJ3595A Expired DE847776C (en) 1950-12-03 1950-12-03 Arrangement for counting the duration of voltage deviations

Country Status (1)

Country Link
DE (1) DE847776C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1020800B (en) * 1953-06-08 1957-12-12 Licentia Gmbh Measuring device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1020800B (en) * 1953-06-08 1957-12-12 Licentia Gmbh Measuring device

Similar Documents

Publication Publication Date Title
DE847776C (en) Arrangement for counting the duration of voltage deviations
DE1273214B (en) Method and device for the statistical quality control of products of mass production and for the regulation of mass production
DE2054643A1 (en) Device for determining dimensions
DE943072C (en) Tolerance measuring bridge
DE2855482B2 (en) Method for evaluating the diagonal signal of a resistor bridge and device for carrying out the method
DE529696C (en) Combustion regulator
DE867762C (en) Device for displaying frequency distributions
DE660938C (en) Device for the automatic regulation of company sizes
DE577017C (en) Jet pipe regulator for engines with electrical adjustment
DE953019C (en) Scale with automatic electrical load balancing
DE761256C (en) Device for determining the transmission ratio of a transformer
AT212926B (en) Voltmeter
DE667590C (en) Apparatus for measuring the power appearing at the far end of a line by a multi-link indicator at the other end of the line
DE591177C (en) Electromagnetic force meter
DE750434C (en) Method and device for recording events which vary in intensity over time
DE968160C (en) Control device provided with a feedback
DE748791C (en) Arrangement for receiving a pulse frequency
DE547120C (en) Method for measuring products of two or more arbitrary, in particular electrical, measured quantities and possibly also the time, using compensation devices
DE741635C (en) Halyard force switch
DE911987C (en) Controller in connection with writing measuring device
DE976041C (en) Arrangement for the acquisition of pulses, especially for multi-pulse welding
DE562786C (en) Device for remote transmission of pointer positions according to the compensation method using at least one electromagnetic measuring instrument
DE388875C (en) Device for measuring the highest or lowest mean power factor in electrical AC systems with the help of two measuring devices
DE480697C (en) Electric measuring device
DE755546C (en) Phase shift measuring or recording device