DE814054C - Device for the organization of work on the basis of several tools - Google Patents

Device for the organization of work on the basis of several tools

Info

Publication number
DE814054C
DE814054C DEP28649D DEP0028649D DE814054C DE 814054 C DE814054 C DE 814054C DE P28649 D DEP28649 D DE P28649D DE P0028649 D DEP0028649 D DE P0028649D DE 814054 C DE814054 C DE 814054C
Authority
DE
Germany
Prior art keywords
tabs
work
work equipment
nesting
riders
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEP28649D
Other languages
German (de)
Inventor
Maurice Steiner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of DE814054C publication Critical patent/DE814054C/en
Expired legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09DRAILWAY OR LIKE TIME OR FARE TABLES; PERPETUAL CALENDARS
    • G09D1/00Railway or like time or fare tables; Indicating or reading aids therefor
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F7/00Signs, name or number plates, letters, numerals, or symbols; Panels or boards
    • G09F7/02Signs, plates, panels or boards using readily-detachable elements bearing or forming symbols
    • G09F7/08Signs, plates, panels or boards using readily-detachable elements bearing or forming symbols the elements being secured or adapted to be secured by means of grooves, rails, or slits

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

Gerät für die Organisation von Arbeiten unter Zugrundelegung mehrerer Arbeitsmittel Die Irrfindung betrifft die Organisation von Arbeiten unter Zugrundelegung mehrerer Arbeitsmittel, Facharbeiter und bzw. od°r Maschinen, und erstreckt sich insbesondere auf die Arbeitsplanung in Großbetrieben. Zur Vereinfachung der Beschreibung \vird nachstehend auf diese letztere Anwendung Bezug genommen, obwohl dadurch die Reichweite der Erfindung keineswegs eine Beschränkung erfahren soll.Device for organizing work on the basis of several Work equipment The misconception concerns the organization of work on the basis of several work equipment, skilled workers and / or machines, and extends especially on work planning in large companies. To simplify the description Reference will be made to this latter application below, although it does so The scope of the invention is in no way intended to be limited.

Die Planung in einem Großbetrieb hat im wesentlichen den Zweck, die Montagestelle mit Einzelteilen zu beschicken, deren Maschinenbearbeitung in den verschiedenen Fertigungsphasen derart gelenkt wird, claß alle :lrbeitstnittel des Betriebes, Arbeiter und bzw. oclcr Maschinen. (lauernd voll beschäftigt bzw. ausgenutzt sind. und dies bei geringster Brachlegung von Kapital in Gestalt von in der Fertigung begriffenen Aufträgen oder Einzelteilen.The main purpose of planning in a large company is that To load assembly point with individual parts, their machining in the different production phases is controlled in such a way that all: working tools of the Factory, workers and or oclcr machines. (lurking fully occupied or exploited are. and this with the least amount of idle capital in the form of manufacturing conceived orders or items.

Die bisher bekannten Planungsgeräte gewährleisten die Planung entweder nach Aufträgen oder nach Belastungen der Arbeitsmittel. Im ersteren Falle ist lediglich der Fertigungsablauf übersichtlich versinnbildlicht, während die Belastung derArbeitsmittel dabei nicht in Erscheinung tritt und nur auf umständliche Weise bestimmt werden kann. Die Planung nach verfügbaren Arbeitsmitteln wiederum bietet wohl einen Überblick über die Belastung der in Frage kommenden Arbeitsmittel, doch geschieht dies dann auf Kosten der Versinnbildlichung der einzelnen in der Fertigung befindlichen Aufträge.The previously known planning devices guarantee planning either after orders or after loads on the work equipment. In the former case is only the production process clearly symbolized, while the load on the work equipment does not appear and can only be determined in a cumbersome way can. The planning based on available work equipment, in turn, provides an overview about the load on the work equipment in question, but this happens then at the expense of the symbolization of the individual orders in production.

Die vorliegende Erfindung betrifft nun ein Gerät, das das Ablesen des Fertigungsstandes der Aufträge in derselben Weise wie die bekannten Auftragsplanungssysteme gestattet und außerdem noch selbsttätig und laufend die Gesamtbelastung jedes für die Ausführung der in Frage kommenden Aufträge benutzten Arbeitsmittels anzeigt. Gemäß einem Merkmal der Erfindung besteht dieses Gerät einerseits aus einer Auftragsplanungstafel für die Au fnahme lösbarer bzw. auswechselbarer Glieder mit mindestens einem physikalischen Merkmal (Gewicht, Volumen), die von einer durch diese Glieder versinnbildlichten Arbeitszeit abhängig ist, und andererseits aus einem für jedes Arbeitsmittel besonders vorgesehenen Belastungsanzeiger, wobei die sich auf die Benutzung dieses Arbeitsmittels beziehenden lösbaren Glieder im betreffenden Belastungsanzeiger enthalten sind und aus diesem in der Reihenfolge des Auftragsverzeichnisses je nach der für die einzelnen Aufträge benötigten Fertigungszeit entnommen und in die Planungstafel eingesetzt, nach Beendigung der von ihnen versinnbildlichten Arbeiten wiederum in diesen Belastungsanzeiger zurückgelegt werden. Der Belastungsanzeiger ist dabei derart durchgebildet, daß er die Messung des physikalischen Merkmals der entnommenen Glieder und somit die Messung des Zeitraumes gestattet, dem die Ausführung der in Gang gesetzten Arbeiten entspricht.The present invention now relates to a device that allows reading the production status of the orders in the same way as the known ones Order planning systems permitted and also automatically and continuously the Total load each used for the execution of the jobs in question Indicates work equipment. According to one feature of the invention, this device consists on the one hand from an order planning board for the inclusion of detachable or replaceable Members with at least one physical characteristic (weight, volume) that are determined by a working time symbolized by these links is dependent, and on the other hand from a load indicator specially provided for each work item, whereby the releasable links in the relevant debit indicators are included and from this in the order of the order directory depending on the production time required for the individual orders taken and inserted into the planning board, after the completion of the symbolized by them Work in turn can be put back in this load indicator. The load indicator is designed in such a way that it can measure the physical feature of the removed links and thus the measurement of the period of time that the execution corresponds to the work started.

Es ist somit u. a. möglich, unter Beibehaltung der Auftragsplanung die Fertigungsfristen für neue Aufträge in Abhängigkeit von den vorhandenen Arbeitsmitteln mühelos und mit mathematischer Genauigkeit zu bestimmen oder umgekehrt eine Heuerkurve in Abhängigkeit von' den in Gang gesetzten Arbeiten und den vorgeschriebenen Lieferfristen zu ermitteln.It is thus inter alia. possible, while maintaining the order planning the production deadlines for new orders depending on the existing work equipment to determine effortlessly and with mathematical accuracy or vice versa a hay curve depending on the work started and the stipulated delivery times to investigate.

Die erwähnten lösbaren Glieder können Reiter sein, die sich im allgemeinen durch eine Färbung ihrer sichtbaren Seite je nach der Art des von ihnen versinnbildlichten Arbeitsmittels voneinander unterscheiden und so durchgebildet sind, daß sie sich auf Gleitführungen lösbar anordnen, auf diesen verschielien und festlegen lassen, wobei jede einzelne Gleitführung einem bestimmten Auftrag zugeordnet und in der Planungstafel parallel zu einer Skala eingesetzt ist, deren gleichmäßigen Teilungen je einem bestimmten Zeitraum, im allgemeinen einem Arbeitstag entsprechen.The mentioned releasable members can be tabs, which are in general by coloring their visible side according to the nature of what they symbolize Work equipment differ from each other and are trained so that they are releasably arrange them on sliding guides, connect them to each other and have them fixed, with each individual sliding guide assigned to a specific order and in the Planning board is used parallel to a scale, whose even divisions each correspond to a certain period of time, generally one working day.

Die besagten Reiter, auch Anzeigereiter genannt, werden dem Belastungsanzeiger entnommen und je nach Bedarf auf die Gleitführungen aufgeschoben, wo sie bis zur Fertigstellung der von ihnen versinnbildlichten Arbeit verbleiben. Jeder Belastungsanzeiger kann mit einer Waage kombiniert sein, deren Teilung in unmittelbar ablesbaren Zeiteinheiten die Differenz zwischen dem Gesamtgewicht der lösbaren, für das betreffende Arbeitsmittel benutzten Reiter und dem Gewicht der im Belastungsanzeiger tatsächlich verbliebenen Reiter anzeigt.The said tabs, also called scoreboards, are called the load scoreboard removed and pushed onto the sliding guides as required, where they are up to Completion of the work symbolized by you remain. Every load indicator can be combined with a scale, the division of which in directly readable time units the difference between the total weight of the detachable, for the work equipment in question riders used and the weight of those actually left in the load indicator Tab indicates.

Die Erfindung erstreckt sich ferner auf Verbesserungen an den Gleitführungen oder Stäben und an den Reitern der Planungstafeln. Diese Verbesserungen haben den Zweck, die Herstellung der erwähnten Stäbe und Reiter zu vereinfachen, die Handhabung der Reiter zu erleichtern und netzartige Zusammenstellungen von Reitern, d. h. eine weit bessere Planung zu gestatten, als dies mit den bisher bekannten Geräten möglich ist. Erfindungsgemäß haben die Stäbe und Reiter ein und denselben C-förmigen Querschnitt sowie Rippen und Nuten zum gegenseitigen Ineinanderschachteln, und der zu ihrer Herstellung verwendete Werkstoff weist eine genügende Elastizität auf, um durch einfaches Spreizen der Schenkel des C-Profils das Rufschachteln der Reiter auf die Stäbe und auf andere Reiter sowie ihr Lösen von denselben zu gestatten.The invention also extends to improvements in the sliding guides or bars and on the tabs of the planning boards. These improvements have the Purpose to simplify the manufacture of the bars and riders mentioned, the handling to facilitate the rider and net-like compilations of riders, d. H. one To allow far better planning than is possible with the previously known devices is. According to the invention, the rods and riders have one and the same C-shaped cross section as well as ribs and grooves for nesting one inside the other, and that of theirs The material used in the manufacture has sufficient elasticity to pass through simple spreading of the legs of the C-profile, the call boxes of the riders on the To allow rods and on other riders as well as their detachment from them.

Auf diese Weise ist die Aufeinanderstapelung von Reitern mit verschiedenen Unterscheidungsmerkmalen, beispielsweise Farben, und somit auch die Planung nicht nur nach Aufträgen, sondern auch nach dem Belastungsstand der Arbeitsmittel durch einfache lineare Messung der Stapelhöhe der Reiter möglich.In this way, the stacking of tabs with different Differentiating features, such as colors, and therefore also the planning only according to orders, but also according to the load status of the work equipment simple linear measurement of the stacking height of the tabs possible.

In einer bevorzugten Ausführungsart können die Stäbe und die Reiter aus einem formbaren Werkstoff hergestellt sein, der eine gewisse Elastizität aufweist, und ihr Gesamtquerschnitt hat die Gestalt eines C, dessen Schenkel einerseits an ihrem Ausgangspunkt und an der Außenseite eine Rippe und eine Nut und andererseits nach ihrem Ende zu an der Innenseite eine Nut und eine Rippe aufweisen.In a preferred embodiment, the rods and the tabs can be made of a malleable material that has a certain elasticity, and their overall cross-section has the shape of a C, whose legs on the one hand at their starting point and on the outside a rib and a groove and on the other hand their end to have a groove and a rib on the inside.

In einer Abwandlung können die Stäbe und die Reiter aus einem @ metallenen C-Profil bestehen, dessen Schenkel je eine Verschachtelungsnut an der Außenseite an ihrem Ausgangspunkt und je eine Verschachtelungsrippe an der Innenseite nach ihrem Ende zu aufweisen.In a modification, the bars and the tabs can be made of a @ metal C-profile exist, the legs of which each have a nesting groove on the outside at their starting point and one nesting rib on the inside to show their end.

Weitere Merkmale und Einzelheiten der Erfindung ergeben sich aus der nachstehenden Beschreibung einiger Ausführungsbeispiele des erfindungsgemäßen Gerätes, das auf der Zeichnung schematisch veranschaulicht ist. Es zeigt Abb. i eine Gesamtansicht der Auftragsplanungstafel, Abb. 2 im größeren Maßstabe die graphische Darstellung eines Auftrages, Abb. 3 und 4 Reiter verschiedener Abmessungen in schaubildlicher Ansicht, Abb. 5 einen Schnitt durch einen auf eine Gleitführung aufgeschobenen Reiter nach den bisherigen Abbildungen, Abb. 6 dieGleitführung in schaubildlicherAnsicht, Abb. 7 einen Belastungsanzeiger für gemeinsame Benutzung mit den Reitern gemäß Abb. 8 bis io, Abb. 8, 9 und io drei Reiter gemäß einer Abwandlung, Abb. i i einen Belastungsanzeiger für gemeinsame Benutzung mit den Reitern gemäß Abb. 8 bis io, Abb. 12 die Seitenansicht eines Profils aus formbarem Werkstoff, das als Stab oder nach Aufteilung in kurze Abschnitte als Reiter verwendbar ist, Abb.13 einen Querschnitt des Profils nach Abb. 12, Abb. 14 eine Profilansicht eines Abschnittes des Stabes mit aufgesetztem Reiter, Abb. 15 einen Schnitt entsprechend der Linie IV-IV in Abb. 14, Abb. 16 die schaubildliche Ansicht zu Abb. 14, Abb. 17 einen Querschnitt, der die Ineinanderschachtelung zweier Metallprofilglieder veranschaulicht, Abb. 18 in Profilansicht einen Stab mit vier aufeinandergeschachtelten Reitern.Further features and details of the invention emerge from the following description of some exemplary embodiments of the device according to the invention, which is illustrated schematically in the drawing. It shows Fig. I a general view of the order planning board, Fig. 2 on a larger scale the graphic representation of an order, Fig. 3 and 4 tabs of different dimensions in a perspective view, Fig. 5 a section through a tab pushed onto a sliding guide according to the previous illustrations , Fig. 6 the sliding guide in a perspective view, Fig. 7 a load indicator for shared use with the tabs according to Fig. 8 to io, Fig. 8, 9 and io three tabs according to a modification, Fig. Ii a load indicator for shared use with the riders According to Fig. 8 to 10, Fig. 12 is a side view of a profile made of malleable material that can be used as a rod or, after being divided into short sections, as a rider, Fig. 13 is a cross-section of the profile according to Fig. 12, Fig. 14 is a profile view of a Section of the rod with attached rider, Fig. 15 a section according to the line IV-IV in Fig. 14, Fig. 16 the diagrammatic view of Fig. 14, Fig b. 17 a cross-section that illustrates the nesting of two metal profile members, Fig. 18 a profile view of a rod with four nested tabs.

In der dargestellten Ausführungsart ist für die Auftragsplanung eine Tafel vorgesehen, wie sie in Abb. i dargestellt ist. Diese Tafel besteht aus einem Rahmen i, der mittels eines Rostes o. dgl. einerseits eine Skala 2 mit gleichmäßigen, je einem Arbeitstag entsprechenden Teilungen und andererseits einen Satz mit der Skala gleichlaufender, auswechselbarer Führungsstäbe 3 trägt. Die Tafel ist durch eine Ablesevorrichtung 4 ergänzt, die sich aus zwei mit einem der Skalateilung entsprechenden Abstand rechtwinklig zu der Skala 2 verlaufenden Fäden zusammensetzt. Die Ablesevorrichtung 4 und die aus Skala 2 und Stäben 3 bestehende Einheit lassen sich parallel zur Skala 2 derart in bezug aufeinander verschieben, daß die Ablesevorrichtung 4 mit jeder einem Arbeitstag entsprechenden Teilung J, J + i usw. zur Deckung gelangt.In the embodiment shown, there is one for order planning Panel provided as shown in Fig. I. This board consists of one Frame i, which by means of a grate or the like. On the one hand, a scale 2 with uniform, divisions corresponding to one working day and, on the other hand, a sentence with the Scale of synchronous, interchangeable guide rods 3 carries. The board is through a reading device 4 is added, which is made up of two with one of the scale division corresponding Distance perpendicular to the scale 2 threads composed. The reading device 4 and the unit consisting of scale 2 and bars 3 can be parallel to the scale 2 so move with respect to each other that the reading device 4 with each division J, J + i, etc. corresponding to one working day.

Die Stäbe 3 können jede gewünschte Gestalt aufweisen. Wie die Abb.5 und 6 veranschaulichen, bestehen diese Stäbe zweckmäßig aus einem nachgiebigen Werkstoff in Gestalt eines Folienstreifens, der derart zugebogen ist, daß er einen U-förmigen Querschnitt aufweist, dessen beide Schenkel an ihren Enden auseinander laufen. An ihrem Ende sind diese Schenkel in gleichmäßigen Abständen mit Querschlitzen 7 versehen, die die Elastizität steigern.The rods 3 can have any desired shape. Like the figure 5 6 and 6, these rods are suitably made of a resilient material in the form of a film strip which is bent so that it has a U-shaped Has cross section, the two legs of which diverge at their ends. At At their end, these legs are provided with transverse slots 7 at regular intervals, which increase elasticity.

Die Stäbe dienen zur Aufnahme lösbarer bzw. auswechselbarer Reiter 8, die im Beispiel der Abb. 3 bis 5 aus einem gleichförmigen Werkstoff, beispielsweise Holz, bestehen und Parallelepipeden bilden, die auf ihrer ganzen Länge eine Schwalbenschwanzkehlung 9 aufweisen, deren Form das Ineinandergreifen mit den Schenkeln der Stäbe 3 gestattet.The rods are used to hold detachable or replaceable tabs 8, which in the example of Figs. 3 to 5 made of a uniform material, for example Wood, consist and form parallelepipeds, which form a dovetail groove along their entire length 9, the shape of which allows the legs of the rods 3 to interlock.

Die Seite der Reiter, die der ausgekehlten Seite gegenüberliegt, ist im allgemeinen durch Farbtöne kenntlich gemacht, wobei jeder Farbton oder jede Farbenzusammenstellung je ein Arbeitsmittel versinnbildlicht. Ferner gibt es auch weiße oderneutrale Reiter.The side of the tabs opposite the scalloped side is generally indicated by shades, each shade or any combination of colors each symbolizes a piece of work equipment. There are also white or neutral tabs.

Aus Gründen der Vereinfachung können die Reiter lediglich in drei verschiedenen Längen vorgesehen sein in dein Verhältnis von eins, zwei, vier, um beispielsweise 2, 4 und 8 Arbeitsstunden darzustellen, wobei der Achtstundenreiter der Länge nach einer Teilung der Skala 2 entspricht. Die Abb. 3 und ,4 veranschaulichen je einen Reiter für 8 bzw. 4 Stunden.For the sake of simplicity, the tabs can only be divided into three Different lengths can be provided in proportions of one, two, four, um for example, to represent 2, 4 and 8 hours of work, with the eight-hour tab the length corresponds to a division of the scale 2. Figs. 3 and 4 illustrate One rider each for 8 or 4 hours.

Alle Reiter derselben Farbe oder Farbenzusammenstellung befinden sich anfangs in einem Belastungsanzeiger, wobei je Arbeitsmittel mindestens ein Belastungsanzeiger vorgesehen ist. Das Arbeitsmittel, dem jeder Belastungsanzeiger entspricht, ist auf diesem durch eine Aufschrift i i (Ab)>. 7') bezeichnet, neben welcher die ihm zugeordnete Farbe bzw. Farbenzusammenstellung dargestellt ist. Der 111 Abb.7 veranschaulichte Belastungsanzeiger besteht aus einem Kasten 13, der durch Trennwände 15 in drei Fächer für Achtstunden-, Vierstunden- und Zweistundenreiter unterteilt ist und auf einer Waage 18 aufruht. Das Zifferblatt i9 dieser Waage ist derart unterteilt, daß es beispielsweise in Arbeitstagen, d. h. in Einheiten, von denen jede dem Wert eines Achtstundenreiters entspricht, die Differenz zwischen dem ursprünglichen Gewicht des Kastens 13 mit seinem vollständigen Inhalt an Reitern und dem jeweilig verbleibenden Gewicht anzeigt.All tabs of the same color or combination of colors are initially in a load indicator, with at least one load indicator being provided for each work item. The work equipment to which each load indicator corresponds is indicated by an inscription ii (Ab)>. 7 '), next to which the color or color combination assigned to it is shown. The 111 Fig.7 illustrated load indicator consists of a box 13 which is divided by partition walls into three compartments 1 5 for eight-hour, and two hours Vierstunden- tab and rests on a balance 18th The dial 19 of this scale is subdivided in such a way that it shows the difference between the original weight of the box 13 with its complete contents of tabs and the respective remaining weight, for example in working days, ie in units, each of which corresponds to the value of an eight-hour rider.

Handelt es sich nun beispielsweise um die Ausführung eines Monatsprogramms für Maschinenarbeit, was in einem Werksbetrieb meist der Fall ist, dann wird folgendermaßen verfahren: Das Arbeitsvorbereitungsbüro des Werkes legt für jeden Auftrag die Reihenfolge der Maschinenarbeit fest und überreicht dem Planungsbüro den Laufzettel, der den Auftrag auf seinem Wege durch die einzelnen Werkstätten begleitet und der auf die Planungseinrichtung übertragen wird.For example, if it is a question of running a monthly program for machine work, which is usually the case in a factory, then becomes as follows procedure: The work preparation office determines the sequence for each order of the machine work and hands over the routing slip to the planning office, which shows the Order accompanied on its way through the individual workshops and the one on the Planning facility is transferred.

Es sei nun angenommen, daß es sich um einen Auftrag A handelt, dessen Ausführung beispielsweise 8 Stunden Fräserarbeit, 2 Stunden Dreherarbeit und 4 Stunden Justierarbeit erfordert. Ein im voraus festgelegter Farbenschlüssel ist folgender: Fräser -Grün (bzw. schräge Schraffierung), Dreher - Grün (bzw. schräge Schraffierung), Dreher - Rot (bzw. senkrechte Schraffierung), Justierer - Blau (bzw. waagerechte Schraffierung), Justierer - Rot (bzw. senkrechte Schraffierung). Die Ausführung des Auftrages A wird auf der Tafel durch einen Stab (Abb.2) versinnbildlicht; aus den entsprechenden Belastungsanzeigern werden Reiter entnommen und auf diesen Stab aufgesetzt, und zwar: i. ein Auftragsreiter a, der den Wortlaut des Auftrages wiedergibt, 2. ein grüner Reiter b von der Länge, die 8 Stunden entspricht, ein grün und rot gefärbter Reiter c von der Länge, die 2 Stunden entspricht, ein weißer Reiter d von der Länge, die 6 Stunden entspricht, falls außer der Arbeit c keine weitere Arbeit für denselben Tag vorgesehen ist, ein blau und rot gefärbter Reiter e von der Länge, die 4 Stunden entspricht, usw. Diese Reiter werden federnd auf dem Stabe 3 festgehalten und der auf diese Weise besetzte Stab wird nun derart in die Tafel eingesetzt, daß der Reiter b genau unter den Tag T zu liegen kommt, an welchem der Auftrag in Arbeit gegeben wird; die durch den Reiter c versinnbildlichte Arbeit ist alsdann für den Tag T + i bestimmt usw.It is now assumed that it is an order A whose Execution, for example, 8 hours of milling work, 2 hours of lathe work and 4 hours Adjustment work required. A pre-determined color code is as follows: Milling cutter - green (or inclined hatching), lathe operator - green (or inclined hatching), Dreher - red (or vertical hatching), adjuster - blue (or horizontal Hatching), adjuster - red (or vertical hatching). Execution Order A is symbolized on the board by a stick (Fig.2); the end tabs are taken from the corresponding load indicators and placed on this stick put on, namely: i. an order tab a, which reproduces the wording of the order, 2. a green tab b 8 hours long, one green and one red colored tab c of the length corresponding to 2 hours, a white tab d of the length corresponding to 6 hours, if no other work besides work c Work is scheduled for the same day, a blue and red colored tab e of the length corresponding to 4 hours, etc. These riders are springy on the staff 3 and the staff occupied in this way is now inserted into the board inserted that the tab b comes to lie exactly under the day T on which the Order is in progress; the work symbolized by tab c is then determined for the day T + i, etc.

Am Tage T befindet sich der Reiter b zwischen den Fäden der Ablesevorrichtung 4, und die Werkstätte führt diese Arbeit aus. Am Tage T + i wird der Reiter b, da die Arbeit ausgeführt ist, abgenommen und wieder in den entsprechenden Belastungsanzeiger eingesetzt. Bei allen Aufträgen B und C wird jeden Tag in der gleichen Weise verfahren. Für jedes Arbeitsmittel könnten auch mehrere Belastungsanzeiger vorhanden sein, die alsdann je nach Bedarf nacheinander entleert werden. Selbstverständlich könnte sich auch der Fall ergeben, daß die Reiter nicht jeden Tag in den Belastungsanzeiger zurückzusetzen wären, z. B. wenn dieser ursprünglich nur die Reiter enthalten sollte, die der für einen gewissen Zeitraum, z. B. einen Monat, zulässigen Belastung entsprechen. Damit die an die Werkstätten verteilten Bestellungen ausführbar seien, muß die Belastung jedes Arbeitsmittels mit der Zahl der verfügbaren Arbeitsstunden genau übereinstimmen; werden beispielsweise vier Dreher beschäftigt, von denen jeder 8 Stunden arbeitet, dann muß die Werkstätte täglich mit 32 Stunden Arbeit versorgt werden.On day T, tab b is between the threads of the reading device 4, and the workshop does this work. On day T + i the rider will be b, da the work is done, removed and returned to the appropriate load indicator used. All orders B and C are dealt with in the same way every day. There could also be several load indicators for each work item, which are then emptied one after the other as required. Of course it could also be the case that the riders are not in the load indicator every day would be reset, z. B. if this should originally only contain the tabs, which for a certain period of time, e.g. B. correspond to one month, permissible load. So that the orders distributed to the workshops can be carried out, the burden of each work item exactly match the number of hours available; for example, four lathe operators are employed, each of whom works 8 hours, then the workshop has to be supplied with 32 hours of work every day.

Da der jedem Arbeitsmittel zugeordnete Belastungsanzeiger jederzeit darüber Aufschluß gibt, was noch insgesamt im Laufe des Monats zu fertigen bleibt, weiß der Industrielle im voraus, welche Maßnahmen er zu ergreifen hat, um die Durchführung des Programms zu sichern, insbesondere ob er Arbeiter einstellen, entlassen, Aufträge nach auswärts vergeben oder eine Verzögerung über die Herstellungsfrist hinaus in Kauf nehmen soll und im letzteren Falle, welches dann der eigentliche genaue Fertigstellungstermin ist.Because the load indicator assigned to each work item at any time gives information about what still remains to be finished in the course of the month, the industrialist knows in advance what measures he has to take to carry it out of the program, in particular whether it is hiring, dismissing, jobs outsourced or a delay beyond the manufacturing deadline in Purchase should take and in the latter case, which is the actual exact completion date is.

In der Ausführungsart gemäß Abb. 8 bis i i ist für die Reiter und den Belastungsanzeiger das Gewichtssystem durch das volumetrische System ersetzt worden, während die Tafel und die Stäbe unverändert bleiben. Die Reiter haben alsdann alle den gleichen Oberflächeninhalt und ihre Länge ist vorteilhaft dieselbe, die auf der Skala 2 einem Arbeitstag entspricht. Diese Reiter unterscheiden sich voneinander in ihrer Stärke, die der von jedem Reiter versinnbildlichten Zeitdauer verhältnisgleich ist. Es gibt zweckmäßig Zweistunden-, Vierstunden-, Sechsstunden- und Achtstundenreiter, deren Stärke in demselben Verhältnis zunimmt. Die Abb. 8, 9 und io veranschaulichen im schaubildlichen Schnitt Achtstunden-, Zweistunden- und Vierstundenreiter. Die Ziffern 2, 4, 6und 8können auf die sichtbare Seite dieser Reiter gezeichnet sein, um eine Verwechslung auszuschließen. Die weißen Reiter erübrigen sich alsdann. Die übrigen Reiter werden auf der Tafel in derselben Weise verwendet, wie dies beim vorbeschriebenen Beispiel bereits näher angegeben ist.In the embodiment according to Fig. 8 to i i is for the tabs and the load indicator replaces the weight system with the volumetric system while the board and bars remain unchanged. The riders then have all have the same surface area and their length is advantageously the same as that on the scale 2 corresponds to one working day. These riders are different from each other in their strength, which is proportionate to the length of time symbolized by each rider is. There are two-hour, four-hour, six-hour and eight-hour riders, whose strength increases in the same proportion. Figs. 8, 9 and io illustrate in the graphical section eight-hour, two-hour and four-hour riders. the Numbers 2, 4, 6 and 8 can be drawn on the visible side of these tabs, to avoid confusion. The white riders are then superfluous. the other tabs are used on the board in the same way as for the example described above is already specified in more detail.

Der Belastungsanzeiger (Abb. i i) besteht alsdann aus einem mehrzelligen Kasten 21, und jede Zelle 22 enthält ein gleiches Raummaß von aufeinandergestapelten Reitern, die beispielsweise io Arbeitstage darstellen. Das Ablesen vom Belastungsanzeiger erfolgt durch Zusammenzählen der ausgefüllten Zellen und der noch verbleibenden Reiter.The load indicator (Fig. I i) then consists of a multi-cell Box 21, and each cell 22 contains an equal amount of space stacked one on top of the other Tabs that represent, for example, io working days. Reading from the load indicator is done by adding up the filled cells and the remaining cells Equestrian.

Dieses System gestattet es nicht, auf ein und demselben Stabe für den gleichen Arbeitstag zwei Arbeitsgänge nebeneinanderzureinen, deren Summe weniger als 8 Stunden darstellt, was beim Gewichtssystem durchaus möglich ist. Es eignet sich ganz besonders für den Fall, in welchem die Zahl der Arbeitsmittel beschränkt ist.This system does not allow one and the same rod for To do two work steps side by side on the same working day, the total of which is less than 8 hours, which is quite possible with the weight system. It is suitable especially in the case in which the number of work equipment is limited is.

Die beiden Systeme können schließlich auch gleichzeitig zur Anwendung gelangen, wobei Gewicht und Volumen sogar unterschiedliche Bedeutung haben können; die Reiter haben alsdann verschieden großes spezifisches Gewicht.The two systems can ultimately also be used at the same time arrive, whereby weight and volume can even have different meanings; the riders then have specific weights of different sizes.

In der Ausführung gemäß Abb. 12 bis 16 besteht das einheitliche Profilstück für die Stäbe und Reiter aus formbarem Werkstoff. Es hat einen Steg 31 mit zwei Schenkeln 32, die an der Außenseite eine Rippe oder Feder 33 und eine Nut 3,4, an der Innenseite wiederum eine Nut 35 und eine Rippe oder Feder 36 aufweisen.In the design according to Fig. 12 to 16 there is a uniform profile piece for the bars and riders made of malleable material. It has a web 31 with two Legs 32, which have a rib or tongue 33 and a groove 3, 4 on the outside the inside in turn have a groove 35 and a rib or tongue 36.

Auf eine geeignete Länge, beispielsweise 5o cm, zugeschnitten, kann dieses Profilstück, das eine genügende Elastizität aufweist, um sich durch Spreizen seiner Schenkel aufweiten zu lassen, als Stab für die Planungstafel dienen. In kleine Abschnitte von einigen Zentimetern aufgeschnitten, kann jedes Profilstück als Reiter B benutzt werden, der sich durch einfaches Andrücken auf den Stab A setzen läßt.Can be cut to a suitable length, for example 50 cm this profile piece, which has sufficient elasticity to be spread by spreading to have his legs widened, serve as a stick for the planning board. In small Cut sections of a few centimeters, each profile piece can be used as a rider B, which can be placed on rod A by simply pressing it.

In der Abwandlung gemäß Abb. 17 ist das Profilstück aus Metall hergestellt und hat an seinen Schenkeln je eine Außennut 37 und eine Innenrippe oder Innenfeder 38.In the modification according to Fig. 17, the profile piece is made of metal and has an outer groove 37 and an inner rib or inner spring on each of its legs 38.

Wie die Abb.18 veranschaulicht, lassen sich mehrere Reiter (B, C, D, E usw.) übereinanderschieben, wodurch zahlreiche Planungskombinationen möglich sind, u. a. eine Planung, wonach die Belastung der Arbeitsmittel an einem einfachen, entsprechend der Höhe der Reiter geeichten Maßstab R abgelesen werden kann.As Figure 18 illustrates, several tabs (B, C, D, E etc.) can be pushed one above the other, which allows numerous planning combinations, including planning according to which the load on the work equipment is based on a simple scale that is calibrated according to the height of the tabs R can be read.

Selbstverständlich beschränkt sich die Erfindung nicht auf die dargestellten und beschriebenen Ausführungsbeispiele, deren Einzelheiten übrigens jede geeignete Abwandlung erfahren können.Of course, the invention is not limited to the ones shown and embodiments described, the details of which incidentally any suitable Can experience modification.

Claims (3)

PATENTANSPRÜCHE: i. Gerät für die Planung von Arbeiten unter Zugrundelegung mehrerer Arbeitsmittel, dadurch gekennzeichnet, daß es außer einer Auftragsplanungstafel bekannter Bauart mit lösbaren bzw. auswechselbaren Reitern für die Gesamtheit der vorhandenen Arbeitsmittel noch für jedes einzelne Arbeitsmittel einen besonderen Belastungsanzeiger aufweist, der derart durchgebildet ist, daß er ein physikalisches Merkmal, etwa das Gewicht oder den Rauminhalt, anzeigt, welches einer Arbeitsdauer dieses Arbeitsmittels entspricht und welches den Reitern eigen ist, die diesem Arbeitsmittel entsprechen und nicht auf die Auftragsplanungstafel aufgesetzt sind. PATENT CLAIMS: i. Device for planning work on the basis of several work equipment, characterized in that, in addition to an order planning board known design with detachable or replaceable tabs for the entirety of the Existing work equipment still has a special one for each individual work equipment Has load indicator, which is designed such that it is a physical Characteristic, such as the weight or the volume, indicates the duration of a work corresponds to this work equipment and which is specific to the riders who use this work equipment and are not placed on the order planning board. 2. Gerät nach Anspruch i, dadurch gekennzeichnet, daß jeder Belastungsanzeiger aus mindestens einem auf einer Waage aufruhenden Behälter besteht und die Waage zweckmäßig ein Zifferblatt aufweist, dessen Teilung in unmittelbar ablesbaren Zeiteinheiten die Differenz zwischen dem Gesamtgewicht der auswechselbaren, für das betreffende Arbeitsmittel benutzten Reiter und dem Gewicht der im Behälter verbliebenen Reiter anzeigt. 2. Device after Claim i, characterized in that each load indicator consists of at least a container resting on a balance and the balance is useful Has dial, the division of which in directly readable time units Difference between the total weight of the interchangeable equipment for the work equipment in question the tabs used and the weight of the tabs remaining in the container. 3. Gerät nach Anspruch i, dadurch gekennzeichnet, daß jeder Belastungsanzeiger aus minl; e?,@ilter besteht, der derart durchgei)ii<let ist, dall er für ein bestimmtes Arbeitsmittel die Arbeitsdauer volumetrisch anzeigt, die den dem Behälter entnommenen auswechselbaren Reitern entspricht. Gerät nach Anspruch i, dadurch gekennzeichnet, daß die jedem Arbeitsmittel entsprechenden auswechselbaren Reiter o. dgl. je eine einem Arbeitszeitraum dieses Arbeitsmittels entsprechende Stärke aufweisen und daß der Belastungsan7eiger aus einem zellenförmig unterteilten Behälter besteht, in dessen Zellen diese Reiter gestapelt sind. Stäbe und Reiter für die Planungstafeln, dadurch gekennzeichnet, daß sie den gleichen C-f()rmigen Querschnitt haben und mit Rippen oder Federn und Nuten zum gegenseitigen Einschachteln versehen sind und daß der Werkstoff, aus dein sie hergestellt sind, eine ausreichende 1?lastizität aufweist, tun durch einfaches Spreizen der Schenkel des C-Profils das Aufschachteln der Reiter auf die Stäbe und untereinander zu gestatten. f. Stäbe und Reiter nach Anspruch 5, dadurch gekennzeichnet, daß sie aus formbarem Werkstoff von gewisser Nachgiebigkeit in Gestalt eines C-förmigen Gesamtprofils herstellbar sind, dessen beide Schenkel außen an ihrem Ausgangspunkt je eine Rippe oder Feder und eine Nut und innen nach ihrem Ende zu je eine Nut und eine Rippe oder Feder für die Ineinanderschachtelung mit dem Stabe und mit zusätzlichen Reitern aufweisen. Stäbe und Reiter nach Anspruch 5, dadurch gekennzeichnet, daß sie aus einem Metallprofil mit C-förmigem Querschnitt herstellbar sind und ihre Schenkel außen an ihrem Ausgangspunkt je eine Verschachtelungsnut und innen nach ihrem 1?nde zu je eine Verschachtelungsrippe oder Feder aufweisen.3. Device according to claim i, characterized in that each load indicator off minl; e?, @ ilter, which is so thorough, dall it shows the working time volumetrically for a certain work equipment, which the corresponds to replaceable tabs removed from the container. Device according to claim i, characterized in that the interchangeable ones corresponding to each working medium Rider or the like, one corresponding to a working period of this work equipment Have strength and that the load indicator consists of a cell-shaped subdivision Container consists in whose cells these tabs are stacked. Staffs and riders for the planning boards, characterized in that they have the same C-f () shape Have cross-section and with ribs or tongues and grooves for mutual nesting are provided and that the material from which they are made is sufficient 1? Elasticity can be done by simply spreading the legs of the C-profile To allow nesting of the tabs on the bars and one below the other. f. rods and rider according to claim 5, characterized in that it is made of malleable material can be produced with a certain flexibility in the form of a C-shaped overall profile are, the two legs of which each have a rib or spring on the outside at their starting point and a groove and inside at its end a groove and a rib or tongue for nesting with the rod and with additional tabs. Bars and riders according to Claim 5, characterized in that they are made from a metal profile can be produced with a C-shaped cross section and their legs on the outside at their starting point one nesting groove each and one nesting rib on the inside after their end or spring.
DEP28649D 1943-08-25 1948-12-31 Device for the organization of work on the basis of several tools Expired DE814054C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR814054X 1943-08-25

Publications (1)

Publication Number Publication Date
DE814054C true DE814054C (en) 1951-09-20

Family

ID=9266526

Family Applications (1)

Application Number Title Priority Date Filing Date
DEP28649D Expired DE814054C (en) 1943-08-25 1948-12-31 Device for the organization of work on the basis of several tools

Country Status (1)

Country Link
DE (1) DE814054C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1090948B (en) * 1957-01-24 1960-10-13 Acme Visible Records Inc Movable runner designed for display boards
US3162174A (en) * 1963-05-23 1964-12-22 George E A Whyte Work scheduling means
US5453034A (en) * 1990-12-28 1995-09-26 Palimondial S.A. Plug-in module as a component of a toy building block system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1090948B (en) * 1957-01-24 1960-10-13 Acme Visible Records Inc Movable runner designed for display boards
US3162174A (en) * 1963-05-23 1964-12-22 George E A Whyte Work scheduling means
US5453034A (en) * 1990-12-28 1995-09-26 Palimondial S.A. Plug-in module as a component of a toy building block system

Similar Documents

Publication Publication Date Title
DE814054C (en) Device for the organization of work on the basis of several tools
DE2032883A1 (en) Method and device for the optical representation of one or more operationally economical large figures
DE2032904A1 (en) Facility for optimal production planning and monitoring of companies
DE10349271A1 (en) Device for defining information quantities for alternative features e.g. for teaching or demonstration purposes, detects object numbers with one feature or alternative feature for calculating corresponding ratio
DE10353898A1 (en) Apparatus and method for quantifying states with alternative features
Bergmann Zur Datierung und Deutung der Chlamysfiguren aus rotem Porphyr
DE1572942A1 (en) Programming board
DE2525843A1 (en) INFORMATION HANDLING DEVICE
DE2606482C3 (en) Device for weight dosing of mixtures with variable amounts and proportions
DE664002C (en) Device for the graphical representation of variable sizes
DE3014273A1 (en) Planning system eg for program training - has grid board and individually programmed composite cursors superimposed to mark up board
DE634743C (en) Beam scales, in particular for making dental mixtures
DE698183C (en) Garden bench
DE551015C (en) Material box for the tailoring trade
DE837932C (en) Device for the continuous presentation of the development of a company
Kromer Radiokohlenstoffdatierung
AT106186B (en) Computing device for explaining simple computing operations.
DE716695C (en) Device for monitoring the soil balance and calculating the need for nutrients and fertilizers
DE291079C (en)
DE159006C (en)
DE874517C (en) Runner for rack
DE448360C (en) Counting scale
DE865829C (en) Teaching aids for ordinary fractions
DE806294C (en) Computing kit
DEP0028649DA (en) Device for organizing work on the basis of several work equipment