DE802187C - Process for the production of suspended ceilings suspended from load-bearing ceilings and a device for its implementation - Google Patents

Process for the production of suspended ceilings suspended from load-bearing ceilings and a device for its implementation

Info

Publication number
DE802187C
DE802187C DEP35102A DEP0035102A DE802187C DE 802187 C DE802187 C DE 802187C DE P35102 A DEP35102 A DE P35102A DE P0035102 A DEP0035102 A DE P0035102A DE 802187 C DE802187 C DE 802187C
Authority
DE
Germany
Prior art keywords
attached
iron
suspended
wire mesh
ceilings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEP35102A
Other languages
German (de)
Inventor
Paul Martens
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DEP35102A priority Critical patent/DE802187C/en
Application granted granted Critical
Publication of DE802187C publication Critical patent/DE802187C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Wire Processing (AREA)

Description

Verfahren zur Herstellung von an tragenden Decken schwebend angehängten Unterdecken und Vorrichtung zu dessen Durchführung Die vorliegende Erfindung bezieht sich auf ein Verfahren zur Herstellung von aus Drahtge-%vebe bestehenden, an tragenden Decken schwebend aufgehängten Unterdecken und Vorrichtung zur Durchführung des Verfahrens.Process for the production of suspended ceilings from load-bearing ceilings Suspended ceilings and apparatus for carrying out the same The present invention relates on a process for the production of wire mesh, to load-bearing Ceilings suspended suspended ceilings and device for carrying out the process.

Bisher erfolgte die Herstellung von Zimmer-(lecken in der Weise, daß für die in beliebiger Höhe anzubringende Decke zuerst die an sich bekannten Hängeeisen in bestimmten Abständen voneinander befestigt wurden. Durch eine in der Waage angebrachte Schnur wurden die Hängeeisen gleichmäßig umgebogen. In die so hergestellte schlaufenartige Umbiegung wurden alsdann Rundeisenstangen eingelegt und befestigt und die Enden der Eisenstangen in das :Mauerwerk eingelassen. Quer zu diesen parallel liegenden Stangen wurden außerdem weitere Eisenstangen gelegt und befestigt, so daß (,in annäherend quadratisches Stangennetzwei-I,: entstand. Unter diesem Stangennetzwerk wurde zunächst das Drahtgewebe lose befestigt und die Enden an den beiden Querstangen, die unmittelbar vor dem Mauerwerk an den Längsstangen befestigt sind, mittels einer Zange durch Drahtverdrillung straffgezogen. Nach diesen Vorarbeiten wurde das Gewebe, welches als Putztträger dienen soll, an die Längs- und Querstangen mittels Binde-<Iralit in etwa 6 bis 8 cm Abständen angenäht. Ein Nachteil dieses Verfahrens besteht darin, daß die Anbringung des Drahtgewebes sowie die dazu notwendigen Vorabeiten sehr viel Zeit und Kosten verursachen und daß trotzdem das Drahtgewebe noch durchhängt. Um nun eine einwandfreie gerade Decke zii erhalten, muß mit erheblichem Mörtelaufwand die wellenartige Dralitgewebedtii-clilüegung ausgefüllt und verputzt werden.So far, the production of room (licking in such a way that for the ceiling to be attached at any height first the known hanging iron at certain distances from each other. By a mounted on the scales The hanging irons were bent evenly over the cord. In the so-made loop-like Round iron bars were then inserted and fastened, and the ends the iron bars embedded in the masonry. At right angles to these lying parallel Bars were also placed and fastened further iron bars so that (, in approx square rod network two-I,: arose. Under this pole network was initially the wire mesh loosely attached and the ends on the two cross bars that immediately are attached to the longitudinal bars in front of the masonry, using pliers Wire twist pulled tight. After this preliminary work, the fabric, which to serve as a plaster support, to the longitudinal and transverse rods by means of binding <Iralit sewn in about 6 to 8 cm intervals. A disadvantage of this method is that that the attachment of the wire mesh and the necessary preliminary work very much Cause time and money and that the wire mesh still sags. Around Now get a perfect straight ceiling zii, must with considerable mortar expenditure the wave-like Dralitgewebedtii-cli-laying are filled in and plastered.

\ach dein vorliegenden Verfahren werden die oben angeführten Nachteile beseitigt. Dies geschieht nun so, daß zuerst die bekannten Gehänge in einem Abstand von der geplanten Deckenhöhe angebracht werden und die frei hängenden Enden zu einer Schlaufe umgebogen werden, ohne Rücksicht darauf, wie der Abstand der einzelnen gebogenen Schlaufen von der Decke ist. Alsdann werden in den gegenüberstehenden Mauerwänden in vorgeschriebener Höhe Befestigungsmittel, z. B. Haken, in beliebigen Abständen, und zwar in gleicher Höhe unverrückbar befestigt. Auf diese Haken werden nun je zwei Rundeisenstangen in Mauerlänge gelegt, wovon die eine fest mit dem Haken, die andere am Haken verschiebbar befestigt ist. Anschließend werden Bretter oder Latten in der gewünschten Deckenhöhe aufgestellt, auf welchen das Drahtgewebe des hohen Gewichtes wegen provisorisch aufgelegt wird, um die Drahtgewebeenden leichter an den lose auf den Haken befestigten Eisenstangen, z. B. mit Bindedraht, zu befestigen. Ist dies geschehen, dann wird mit Hilfe einer Spannvorrichtung, wie z. B. Abb. 3 und 4 zeigen, das Drahtgewebe ohne jegliche Durchbiegung stramm gespannt. Lotrecht unter den Hängeeisen, und zwar vom Fußboden aus gesehen unter dem Drahtgewebe, werden Eisenstangen befestigt. Um nun eine Verbindung mit den bereits befestigten Hängeeisen und mit den unter dem Drahtgewebe befestigten Eisenstangen zu erreichen, werden weitere Hängeeisen verwendet, von denen das eine, umgebogene Ende in die bereits festsitzenden Hängeeisen kettenartig eingreift, während das andere Ende des Hängeeisens um die an dem Drahtgewebe befestigten Eisenstangen gebogen wird. Hierbei entsteht der Vorteil, daß das Drahtgewebe, das als Putzträger dient, von den unterhalb desselben liegenden Eisenstangen getragen wird, wogegen es nach dem bekannten Verfahren durch den genähten Bindedraht an den Eisenstangen gehalten wurde.\ oh your present case, the above Disadvantages eliminated. This is done in such a way that first the known hangers in at a distance from the planned ceiling height and the free-hanging Ends are bent into a loop regardless of how the spacing of the individual curved loops from the ceiling. Then be in the opposite Wall walls at the prescribed height fasteners, e.g. B. Hook, in any Distances, fixed immovably at the same height. Be on this hook now two round iron bars placed the length of the wall, one of which is firmly attached to the hook, the other is slidably attached to the hook. Then boards or Slats set up at the desired ceiling height on which the wire mesh of the Due to its high weight, it is temporarily placed to make the wire mesh ends lighter on the iron bars loosely attached to the hook, e.g. B. with binding wire to attach. If this is done, then with the help of a clamping device, such as. B. Fig. 3 4 and 4 show the wire mesh tensioned tightly without any deflection. Perpendicular under the hanging iron, and seen from the floor under the wire mesh Iron bars attached. To now connect to the hanging iron already attached and to be reached with the iron bars fastened under the wire mesh another hanging iron used, one of which, bent end into the already Fixed hanging iron engages like a chain, while the other end of the hanging iron is bent around the iron bars attached to the wire mesh. This creates the advantage that the wire mesh, which serves as a plaster base, of the same below lying iron bars is carried, whereas it is carried by the known method the sewn binding wire was held on the iron bars.

Ein weiterer Vorteil nach dem Verfahren besteht darin, daß bei Belastung und Durchbiegung des Fußbodens die Decke durch die lose ineinandergreifenden Hängeeisen nicht darunter beeinflußt wird und daß durch die vollkommen waagerechte Lage des Drahtgewebes der Mörtelverbrauch sehr gering ist. Ein wirtschaftlicher Vorteil nach diesem Verfahren besteht darin, daß die Eisenstangen für das Stangennetzwerk sowie der für diese Stangen zu befestigende Bindedraht fortfällt. In der Zeichnung ist ein Ausführungsbeispiel nach dem Verfahren nebst Vorrichtung zur Ausübung des Verfahrens dargestellt, und es zeigt Abb. i eine Ansicht der Decke nach Ausführung des Verfahrens, Abb. 2 eine Aufsicht von Abb. i, Abb.3 eine Ansicht der Vorrichtung zur Ausübung des Verfahrens, Abb. 4 eine Aufsicht von Abb. 3.Another advantage of the method is that when loaded and deflection of the floor caused the ceiling by the loosely interlocking hanging irons is not influenced by it and that the perfectly horizontal position of the Wire mesh the mortar consumption is very low. An economic advantage after This method consists in making the iron rods for the rod network as well the binding wire to be attached for these rods is omitted. In the drawing is an embodiment according to the method together with a device for performing the method and Fig. i shows a view of the ceiling after the method has been carried out, Fig. 2 is a plan view of Fig. I, Fig. 3 is a view of the device for exercising of the process, Fig. 4 is a plan view of Fig. 3.

Nach dem Verfahren werden an den Balken 18 Hängeeisen i9 befestigt, in deren Ösen weitere Hängeeisen 2o lose eingreifen, deren Enden vorerst gerade auslaufen. In den gegenüberliegenden Mauerwänden 21, 22 sind Befestigungsmittel, z. B. Haken 23, eingelassen. Auf diese Haken 23 werden Rundeisenstangen 24, 25 aufgelegt, wovon die eine Stange 24 fest, d. h. unverrückbar mit dem Haken 23 verbunden ist, während die andere Stange 25 auf dem Haken 23 verschiebbar ist. Um das schwere Drahtgewebe 27, das als Putzträger dienen soll, leichter in die unmittelbare gewünschte Deckenhöhe bringen zu können, wird dieses auf bereitliegende Latten 28 o. dgl. aufgelegt und beide Enden des Gewebes 27 an den Eisenstangen 25 befestigt, wodurch nach Befestigung desselben die Latten 28 weggelegt werden können. Nun wird zur Ausübung des Verfahrens eine Spannvorrichtung verwendet, wovon die eine Spannklaue i zwischen Mauerwerkwand 21 bzw. 22 und dem fest angeordneten Eisen 24 und die andere Spannklaue 2 in die dargestellte Lage gebracht wird.After the procedure, hanging irons are attached to the beams 18, further hanging irons loosely engage in their eyelets, the ends of which are initially straight leak. In the opposite wall walls 21, 22 are fasteners, z. B. hook 23, let in. Round iron bars 24, 25 are placed on these hooks 23, one rod 24 of which is fixed, d. H. is immovably connected to the hook 23, while the other rod 25 is slidable on the hook 23. About the heavy wire mesh 27, which is to serve as a plaster base, more easily in the immediate desired ceiling height To be able to bring, this is placed on slats 28 or the like lying ready and both ends of the fabric 27 attached to the iron bars 25, whereby after attachment the same the slats 28 can be put away. Now is going to exercise the procedure a clamping device is used, one of which is a clamping claw i between the masonry wall 21 or 22 and the fixed iron 24 and the other clamping claw 2 in the position shown is brought.

Beim Spannen der Vorrichtung nähern sich die beiden Spannklauen 1, 2, der Abstand der beiden Rundeisenstangen :24,25 wird verkleinert und dadurch das Drahtgewebe 27 vollkommen straffgespannt. Nachdem werden unterhalb des Drahtgewebes 27 und der Hängeeisen i9 Eisenstangen 26 am Drahtgewebe 27 befestigt und so nach Umbiegen der Hängeeisenenden 2o die Stangen 26 tragend gehalten.When clamping the device, the two clamping claws 1 approach, 2, the distance between the two round iron bars: 24.25 is reduced and thereby the Wire mesh 27 stretched completely taut. After that will be below the wire mesh 27 and the hanging iron i9 iron rods 26 attached to the wire mesh 27 and so after Bending over the hanging iron ends 2o held the rods 26 supporting.

Die Vorrichtung zum Spannen des Drahtgewebes 27 besteht aus den beiden Spannklauen 1, 2. Die eine Spannklaue 2 besitzt Führungen 4, zwischen denen die Klaue i geführt wird. Durch einen Stift 18 wird die Spannklaue 2 stets in Führung gehalten. Weiter läuft die Spannklaue 2 in eine Zahnstange aus, in die ein kleines Getriebe eingreift. Zwischen den an dem Klauenschaft i befestigten Blechen 5, 6 ist ein Zahnradgetriebe 7, 8 vorgesehen. Außerhalb des Bleches6 sitzt auf der gleichen Achse des Zahnrades 7 ein Handrad 9 nebst Sperrrad io. Zwischen Handrad 9 und Sperrad io ist eine Handhabe 14 schwenkbar gelagert, und besitzt diese einen schwenkbaren Sperrzahn 12. Sollen sich die beiden Spannklauen 1, 2 nähern, dann wird beim Bedienen der Handhabe 14 und durch den Schnepper 12 das Getriebe in Drehung versetzt und dabei die lose auf den Haken 23 liegende Eisenstange 25 durch die Spannklaue 2 in Pfeilrichtung verschoben und dabei das Drahtgewebe 27 strammgespannt. Gegen selbsttätiges Zurückgleiten der gespannten Spannklaue 2 wird diese durch Einschnappen eines Sperrzahnes i i in das Sperrad i o gesichert. Vor dem Lösen der Spannklauen 1, 2 werden die Eisenstangen 25 mit den daran befestigten Drahtgewebeenden an den Eisenstangen 24 z. B. mittels Bindedraht befestigt.The device for tensioning the wire mesh 27 consists of the two Clamping claws 1, 2. The one clamping claw 2 has guides 4, between which the Claw i is guided. The clamping claw 2 is always guided by a pin 18 held. Next, the clamping claw 2 runs out into a rack, into which a small one Gear engages. Between the metal sheets 5, 6 attached to the claw shaft i a gear transmission 7, 8 is provided. Outside the sheet 6 sits on the same Axis of the gear 7 a handwheel 9 together with ratchet wheel io. Between handwheel 9 and ratchet wheel io a handle 14 is pivotably mounted, and this has a pivotable one Ratchet tooth 12. If the two clamping claws 1, 2 are to approach each other, then during operation the handle 14 and the gear set in rotation by the snapper 12 and while the iron bar 25 lying loosely on the hook 23 through the clamping claw 2 in Shifted the direction of the arrow while the wire mesh 27 is stretched taut. Against automatic The tensioned clamping claw 2 slides back by snapping in a ratchet tooth i i secured in the ratchet wheel i o. Before loosening the clamping claws 1, 2, the Iron bars 25 with the wire mesh ends attached to the iron bars 24 z. B. attached by means of binding wire.

Claims (1)

PATENTANSPRÜCHE: i. Verfahren zur Herstellung von an tragenden Decken schwebend angehängten Unterdekken, dadurch gekennzeichnet, daß in den gegenüberliegenden Mauerwänden (21, 22) in Höhe der Decke Haken (23) eingeschlagen werden, worauf auf den in den Raum ragenden Hakenenden Stabeisenstangen (24,25) aufgelegt wer- (1e», deren eine (?4) iin geringen Abstand von den beiden Mauerwänden (21, 22) fest und un- verrückbar auf den Hakenenden angebracht werden, während die Stangen (2j) vorerst lose vorzugsweise mittels Bindedraht befestigt und an denen die beiden Enden eines inmitten des Deckenfeldes auf dein festen Deckenbalken (18) durch Drahtschlaufen (ig) und Haken (20) ge- lialtenen DrahtgeNvebes (27), welches als Putz- träger dient, unter vorheriger zeitweiliger Unterstützung durch Latten oder Bretter (28) befestigt «-erden, worauf mittels der Spann- vorrichtung die Stabeisen (25) durch Spannen des Drahtgewebes (27) an das Stabeisen (24) angezogen und mit ihm fest verbunden Werden. 2. Verfahren nach Anspruch i, dadurch ge- kenn7eiclinet, daß nach Spannen des Gewebe-
<lralites (27) unterhalb desselben in beliebigen Abständen Eisenstangen (26) befestigt werden, die von einem dartun umgreifenden Ende eines Hakens (20) getragen werden, während das ent- gegengesetzte Hakenende kettenartig in die Drahtschlaufen (i9) eingreift. 3. Vorrichtung zur Ausübung des Verfahrens nach Anspruch r, dadurch gekennzeichnet, daß die Vorrichtung Spannklaueil (1, 2) besitzt, auf deren Klatienschenkel die als Zahnstange (3) :..usgelüldete Spantiklatie (2) durch einen Be- tatigungshebel (1d) und Getrieberäder (7, 8) zwangsweise führbar ist, daß bei Benutzung der Vorrichtung von den zwischen den Spann- klauen (1, 2) liegenden Stabeisecistangeti'(2-4, 25) die Stange (25) in Pfeilrichtung verschiebbar ist und dabei das Drahtgewebe (27) stramm spannt.
PATENT CLAIMS: i. Process for the production of suspended ceilings suspended from load-bearing ceilings, characterized in that hooks (23) are knocked into the opposite wall walls (21, 22) at the level of the ceiling, whereupon iron rods (24, 25) are placed on the hooks protruding into the room who- (1e », one of which (? 4) i at a small distance from the two wall walls (21, 22) firmly and un- displaceably attached to the hook ends while the rods (2j) are initially loose preferably attached by means of binding wire and at which the two ends of one amidst the Ceiling field on your fixed ceiling beam (18) by wire loops (ig) and hooks (20) Lialtenen wire mesh (27), which is used as a plaster Serves carrier, under previous temporary Support by battens or boards (28) attached «-ground, whereupon by means of the tensioning device the bar iron (25) by clamping the wire mesh (27) to the bar iron (24) Being attracted and firmly attached to it. 2. The method according to claim i, characterized in that know that after tensioning the tissue
<lralites (27) below it in any Spaced iron bars (26) are attached, the end of one encompassing one another Hook (20) while the opposite hook end like a chain in the Wire loops (i9) engages. 3. Apparatus for carrying out the procedure according to claim r, characterized in that the device has clamping claw (1, 2) on whose clap legs are designed as a rack (3) : .. cleared Spantiklatie (2) by a operating lever (1d) and gears (7, 8) is compulsorily feasible that when using the device of the between the clamping claw (1, 2) lying stick ice cistangeti '(2-4, 25) the rod (25) is displaceable in the direction of the arrow while the wire mesh (27) is taut.
DEP35102A 1949-02-25 1949-02-25 Process for the production of suspended ceilings suspended from load-bearing ceilings and a device for its implementation Expired DE802187C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEP35102A DE802187C (en) 1949-02-25 1949-02-25 Process for the production of suspended ceilings suspended from load-bearing ceilings and a device for its implementation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEP35102A DE802187C (en) 1949-02-25 1949-02-25 Process for the production of suspended ceilings suspended from load-bearing ceilings and a device for its implementation

Publications (1)

Publication Number Publication Date
DE802187C true DE802187C (en) 1951-03-01

Family

ID=7374039

Family Applications (1)

Application Number Title Priority Date Filing Date
DEP35102A Expired DE802187C (en) 1949-02-25 1949-02-25 Process for the production of suspended ceilings suspended from load-bearing ceilings and a device for its implementation

Country Status (1)

Country Link
DE (1) DE802187C (en)

Similar Documents

Publication Publication Date Title
DE802187C (en) Process for the production of suspended ceilings suspended from load-bearing ceilings and a device for its implementation
DEP0035102DA (en)
DE2219564C2 (en) Concrete wall cladding panel - has hooked suspension system with steel cable hung by curved piece on vertically moving block vertically
DE1559527C3 (en)
DE293625C (en)
DE1118434B (en) Flying scaffolding provided with a safety net for use in the construction of buildings
CH331792A (en) Frame to be clamped between floor and ceiling, especially for a plant stand or a partition
DE872411C (en) Process for raising plants, especially vines
DE101473C (en)
DE8917C (en) Device for knitting on basket straps
AT310479B (en) Support for Schwedenreuter
DE2024483C (en) Device for inserting a weaving harness into a weaving machine
DE701098C (en) Process for the production of reinforced concrete rib ceilings
DE226482C (en)
DE8524796U1 (en) Device for gripping and moving ceiling tiles
AT132439B (en) Device for installing and removing supports in foundation engineering and building construction.
DD221072A1 (en) DEVICE FOR HOLLOWING EXHIBITION OBJECTS
DE211431C (en)
DE802447C (en) Method and device for hand weaving
DE2930873C2 (en) Suspension device for ventilation ducts
DE2156757B2 (en) Adjustable wall cladding suspension system - has retainer hinged at top and bottom to swing about transverse axes
DE1857482U (en) CONVEYOR DEVICE FOR TOBACCO DRYING SYSTEMS.
DE1859107U (en) DEVICE FOR DEMONSTRATING BRIDGES, CARPETS AND THE LIKE ATTACHED TO ROLLERS ON RAILS ON THE CEILING.
CH332718A (en) Device for hanging suspended ceilings and ceilings on concrete ceilings
DE1791381U (en) TENSIONING PIECE FOR CLAMPING ONE END OF WIRE.