DE7507028U - TRIPOD TOMBSTONE FOUNDATION - Google Patents

TRIPOD TOMBSTONE FOUNDATION

Info

Publication number
DE7507028U
DE7507028U DE19757507028 DE7507028U DE7507028U DE 7507028 U DE7507028 U DE 7507028U DE 19757507028 DE19757507028 DE 19757507028 DE 7507028 U DE7507028 U DE 7507028U DE 7507028 U DE7507028 U DE 7507028U
Authority
DE
Germany
Prior art keywords
tripod
foundation
tombstone
grave
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19757507028
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19757507028 priority Critical patent/DE7507028U/en
Publication of DE7507028U publication Critical patent/DE7507028U/en
Expired legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

Johannes JensenJohannes Jensen

2251 Ostenfeld2251 Ostenfeld

Anlage 1 zur Gebrauchsmusteranmeldung : Beschreibung Stativ-Grabstein-Fundament Appendix 1 to the utility model registration: Description of the tripod tombstone foundation

Das Stativ-Grabstein-Fundament gewährleistet ein einf?;heres Aufstellen von Grabsteinen gegenüber der herkömmlichen Methode bei zumindest gleicher, wenn nicht sogar größerer Standsicherheit.The tripod tombstone foundation ensures easy erection of tombstones compared to the conventional method with at least the same, if not even greater, stability.

Grabsteine sind nach den geltenden Vorschriften mit Fundamenten auszurüsten, die nach der herkömmlichen Methode aus Beton hergestellt werden. Sinn und Zweck dieser Vorschriften ist, zu verhindern, daß die Grabsteine umstürzen. Dabei werden an die Fundamente jedoch von den Berufsgenossenschaften unterschiedliche Anforderungen gestellt, die in der Regel so ausgestaltet sind, daß - im Erdverbau hergestellt - erhebliche Tiefbauarbeiten anfallen, wobei teilweise bis zu 1,70 Meter tief ausgehoben werden muß. Zudem ist es erforderlich, wenn das Grabsteinfundament im Frischbeton hergestellt wird, daß der Beton zunächst einmal austrocknet. Das bedeutet einen Zeitverlust, so daß der Grabstein nicht in einem Zuge aufgestellt werden kann. Werden dagegen vorgefertigte Betonfundamente verwandt, dann ist dies insoweit nachteilig, als sie wegen ihres hohen Eigengewichtes nur mit erheblicher Arbeitskraft, niit mehreren Leuten und unter Verwendung entsprechender technischer Mittel eingebracht werden können. Abgesehen hiervon entstehen aber auch dann größte Schwiarigkeixen, wenn NeuD^legungen von Gräbern vorzunehmen sind bzw. Ruhezeiten beendet sind. Auch hier ist dann ein großer Kostenaufwand erforderlich,um die vorhandenen Fundamente herauszuziehen, wozu ebenfalls das friedshofseigene Gerät nicht geeignet ist.According to the applicable regulations, tombstones are to be equipped with foundations made of concrete using the conventional method will. The purpose of these regulations is to prevent the tombstones from falling over. In doing so, the Foundations, however, set different requirements by the employers' liability insurance association, which are usually designed in such a way that that - made in the earthworks - considerable civil engineering work is incurred, with some of the excavations up to 1.70 meters deep having to be excavated. In addition, if the gravestone foundation is made in fresh concrete, it is necessary for the concrete to dry out first. This means a loss of time so that the tombstone does not fall into can be set up in a train. If, on the other hand, prefabricated concrete foundations are used, this is disadvantageous insofar as because of their heavy weight they only require considerable manpower, with several people and with the use of appropriate people technical means can be introduced. Apart from this, however, the greatest difficulties arise when new ideas are laid of graves or rest periods have ended. Here, too, a great deal of cost is required to upgrade the existing Pulling out foundations, for which the cemetery-owned device is not suitable either.

Die Erfindung des Stativ-Grabstein-Fundaments überwindet alle diese Nachteile in einfacher Weise.The invention of the tripod tombstone foundation overcame them all these disadvantages in a simple manner.

7507028 11.11757507028 11.1175

-1--1-

Das erfindungsgemäße Stativ-Grabstein-Fundament, das in Montagebauweise hergestellt wird, ist sowohl für Einzelgräber als auch für mehrfeldrige Grabstätten verwendbar. Beim Einzelgrab stehen zwei Stativbeine (Figuren 1 und 3) neben dem Sarg, während das dritte Stativbein dahinter steht. Bei einem zweifeldrigen Grab (Figur 2) ist das Grabsteinfundament gegenüber dem Einzelgrabfundament um 180° horizontal verdreht einzubetten, so daß das eine Stativbein zwischen den beiden Särgen und die beiden anderen Beine dahinter stehen, Das hat gleichzeitig den Vorteil, daß bei dem zweifeldrigen Grab der Grabstein nicht entfernt werden muß, wenn eine zweite Bestattung vorgenommen werden muß.The tripod tombstone foundation according to the invention, which is in assembly design is made for both individual graves and for Multi-field graves can be used. In the case of a single grave, there are two tripod legs (Figures 1 and 3) next to the coffin, while the third Stand behind it. In the case of a two-field grave (Figure 2), the gravestone foundation is around compared to the single grave foundation Rotated 180 ° horizontally, so that one tripod leg between the two coffins and the other two legs behind it stand, that also has the advantage that with the two-field Grave The tombstone does not need to be removed if a second burial is to be performed.

Das Kernstück des Stativ-Grabstein-Fundamentes (GesamtübersJcht für Einzel- und Mahrfeidgrab Figuren 1-3) bildet der Fundanientsockel (Ziffer 4) mit den Aufnahme-bo?zenlir den Grabstein (Ziffer 8) und ä"den Stativbein-Aufnahmeschächten (Ziffer 7). Der Fundament sockel (Figur 4) besteht aus einem Maschinengußkörper mit entsprechend eingearbeiteten Aufnahmeschachten für die Stativbeine (Ziffer 7) und den Bohrungen für die Grabstein-Aufnahmebolzen (Ziffer 8). Der Fundamentsockel in Maschinenguß-Ausführung muß gegen Witterungseinflüsse verzinkt oder kunststoffbeschichtet sein.The core of the tripod tombstone foundation (overall overview for individual and Mahrfeid graves, Figures 1-3) is the foundation base (number 4) with the receptacle bo? zen lir the tombstone (number 8) and ä "the tripod leg mounting shafts (number 7). The foundation base (Figure 4) consists of a cast machine body with correspondingly incorporated mounting shafts for the tripod legs (number 7) and the holes for the tombstone mounting bolts (Item 8) The machine-cast foundation plinth must be galvanized or plastic-coated to protect it from the effects of the weather.

Der Fundamentsockel kann aber (Figur 6) auch aus einem dickwandigen Stahlrohr bestehen, rund oder quadratisch, das mit entsprechenden AufnahmeSchächten (Ziffer 13) und Aufnahmebohrungen für die Grabstein-Aufnahmebolzen (Ziffer 8) versehen ist. Diese Ausführung wird soklt Beton (ziffer 14) bzw. Kunststein (Ziffer 15) angefüllt, daß eine quadratische Einheit entsteht. Die gleiche Stahl-Armieiang wird für die Anfüllung in Kunststoff-Ausführung verwendet.The foundation base can, however (Figure 6) also consist of a thick-walled one There are steel tubes, round or square, with the corresponding mounting shafts (number 13) and mounting holes for the tombstone mounting bolts (Item 8) is provided. This version is filled with concrete (number 14) or artificial stone (number 15) that a square unit is created. The same steel Armieiang is used for filling in plastic.

Die Ziffern 16 und 17 zur Figur 4 stellen den Schnitt a-b und c-d car, letzterer ist analog zur Figur 6 anwendbar.The numbers 16 and 17 in FIG. 4 represent the section a-b and c-d car; the latter can be used analogously to FIG.

Um den FundamentsDckel einzubringen, wird zunächst der Aushub vorgenommen. Der Fundamentsockel wir so eingebracht, daß er in einem Kiesbett eingebettet liegt, das entsprechend verdichtet wird, so daß es den Sockel von unter und von allen Seiten von mindestens 50 mm umgibt.In order to bring in the foundation cover, the first step is the excavation performed. The foundation plinth is placed in such a way that it is embedded in a gravel bed that is compressed accordingly, so that it surrounds the base from below and from all sides by at least 50 mm.

Die angespitzten, dickwandigen und verzinketen Stahlrohre (Ziffer9)The pointed, thick-walled and galvanized steel pipes (number 9)

7507028 11.11757507028 11.1175

werden unter Anwendung eines Kunststofftreibdornes mit einem mechanischen Hammer bis Ziffer 18 in die Erde gerammt. Die zuverlässige Verbindung zwischen Sockelträgsr und Stativbein wird durch Kaltschweißung udn Spreizvorrichtufng hergestellt.are rammed into the earth using a plastic drift with a mechanical hammer up to number 18. the reliable connection between base support and tripod leg is produced by cold welding and spreading device.

An den schematischen Zeichnungen wird die Erfindung noch waiter erläutert. Sie stellen dar:In the schematic drawings, the invention is still waiter explained. They represent:

1. Figur 1-einfeldrige Grabstelle mit Stativ-Fundament (Vorderansicht)1. Figure 1 single-field grave site with tripod foundation (Front view)

2. Figur 2-zweifeldrige Grabstelle mit Stativ-Fundament (Vorderansicht)2. Figure 2-two-field grave site with tripod foundation (Front view)

3. Figur 3-einfeldrige Grabstelle mit Stativ-Fundament Seitenansicht)3. Figure 3-single-span grave site with tripod foundation Side view)

4. Figur 4-Grabfundamentrockel mit Aufnahmeschächten4. Figure 4-grave foundation rock with receiving shafts

(Ziffer 7)(Section 7)

mit Aufnahmebolzen (Ziffer 8)
mit Stativbein (Ziffer 9)
with locating pin (number 8)
with tripod leg (number 9)

5. Figur 5-Spreizkörper mit Spreizbolzen5. Figure 5 expansion body with expansion bolt

(Ziffer Io und 11)(Numbers Io and 11)

6. Schnitt C-D für Beton- und Kunststoffausführung Armierungsbezeichnungen (Zoffer 12 und 13) Beton- und Kunststein (Ziffer 14 und 15) Stativbeinanschlag (Ziffer 18)6. Section C-D for concrete and plastic construction Reinforcement designations (Zoffer 12 and 13) Concrete and artificial stone (Numbers 14 and 15) Tripod leg stop (item 18)

Husum, den 29. August 1975Husum, August 29, 1975

7507028 11.12.757507028 12/11/75

Claims (2)

• ♦ · · Il Il H I ! • ♦ · · Il Il HI ! • I > * ■ I• I> * ■ I Johannes JensenJohannes Jensen 2251 Ostenfeld
Kreis Nordfriesland
2251 Ostenfeld
District of North Friesland
SchutzanspruecheClaims for protection j 1. Das Stativ-Grabstein-Fundament wird dadurch gekennzeichnet,j 1. The tripod tombstone foundation is characterized by daß der Sockelträger mit drei oder mehr Stativbein-Durch-that the base support with three or more tripod leg diameters ; führungen und mit einer oder mehreren Aufnahmebohrungen für; guides and with one or more mounting holes for die Grabsteinaufnahmebolzen ausgestattet ist.the tombstone mounting bolt is equipped.
2. Das Stativ-Grabstein-Fundament nach Anspruch (1) wird dadurch gekennzeichnet, daß drei oder mehr iStativbeine (9) verwendet werden.2. The tripod tombstone foundation according to claim (1) is thereby characterized in that three or more tripod legs (9) are used. Husum, den 29 „ August 1975Husum, August 29, 1975 7507028 ii.i2.757507028 ii.i2.75
DE19757507028 1975-03-06 1975-03-06 TRIPOD TOMBSTONE FOUNDATION Expired DE7507028U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19757507028 DE7507028U (en) 1975-03-06 1975-03-06 TRIPOD TOMBSTONE FOUNDATION

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19757507028 DE7507028U (en) 1975-03-06 1975-03-06 TRIPOD TOMBSTONE FOUNDATION

Publications (1)

Publication Number Publication Date
DE7507028U true DE7507028U (en) 1975-12-11

Family

ID=6650688

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19757507028 Expired DE7507028U (en) 1975-03-06 1975-03-06 TRIPOD TOMBSTONE FOUNDATION

Country Status (1)

Country Link
DE (1) DE7507028U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3009167A1 (en) * 1980-03-10 1981-09-24 Granitwerk Hans Seeger u. Sohn, 6147 Lautertal Demountable gravestone base unit - is reinforced concrete beam with longitudinal slots for bolts and nuts
DE102005054983A1 (en) * 2005-11-16 2007-05-31 Bösch, Rainer Gravestone is formed from industrially producible material e.g. from a plastic material or a metallic material

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3009167A1 (en) * 1980-03-10 1981-09-24 Granitwerk Hans Seeger u. Sohn, 6147 Lautertal Demountable gravestone base unit - is reinforced concrete beam with longitudinal slots for bolts and nuts
DE102005054983A1 (en) * 2005-11-16 2007-05-31 Bösch, Rainer Gravestone is formed from industrially producible material e.g. from a plastic material or a metallic material
DE102005054983B4 (en) * 2005-11-16 2010-06-02 Rainer Bösch Gravestone, gravestone kit and method of making a gravestone

Similar Documents

Publication Publication Date Title
EP3441527B1 (en) Shut-off device for preventing the passage of land vehicles
EP2698476B1 (en) Method for the construction of an offshore structure and foundation for an offshore structure
DE2545572C3 (en) Foundation in subsoil susceptible to subsidence, especially for a dam
CH610966A5 (en) Rock or slope revetment and method of constructing it
DE7507028U (en) TRIPOD TOMBSTONE FOUNDATION
AT397397B (en) U-SHAPED CONCRETE STONE FOR GARDEN, PARK AND LANDSCAPE DESIGN
DE2821340A1 (en) METHOD AND DEVICE FOR SUPPORTING A BUILDING CONSTRUCTION
DE2117711A1 (en) Foundation stand that can be placed on the ground
DE19701229A1 (en) Anchoraged post for e.g. solar cells
DE3620650A1 (en) Method for producing multi-storey underground structures, in particular underground garages
DE2829712B1 (en) Process for the production of underground structures
DE102007036965B4 (en) Building for the storage of urns
EP0513435A1 (en) Method of constructing edifices and buildings and prefabricated module for executing the method
EP1878857A2 (en) Foundation for gravestones and funerary monuments
DE3442913C2 (en)
DE7913787U1 (en)
DE2446508C3 (en) Reinforced concrete room cell
DE3735111A1 (en) Building foundation vertically adjustable in the event of mining subsidence
DE1684769B2 (en) BUILDING FOR A TRANSFORMER STATION, SWITCHING STATION OR DGL.
DE2747774B2 (en) Holding device for support cheeks to support slope material on an embankment
DE1157164B (en) Underwater foundation made of prefabricated components, which are placed on ram piles with support eyes on the underside
DE102010000589B4 (en) Method and device for creating a sheet piling
EP1081045A2 (en) Supply device
DE9111674U1 (en) Prefabricated module for the production of structures and buildings
DE202013011136U1 (en) Prefabricated concrete element for creating a protective wall