DE59801707D1 - METHOD AND ENVIRONMENT FOR THE PRODUCTION OF A PILLAR FOR THE REMOVAL OF CONSTRUCTION OR TRAFFIC LOADS - Google Patents
METHOD AND ENVIRONMENT FOR THE PRODUCTION OF A PILLAR FOR THE REMOVAL OF CONSTRUCTION OR TRAFFIC LOADSInfo
- Publication number
- DE59801707D1 DE59801707D1 DE59801707T DE59801707T DE59801707D1 DE 59801707 D1 DE59801707 D1 DE 59801707D1 DE 59801707 T DE59801707 T DE 59801707T DE 59801707 T DE59801707 T DE 59801707T DE 59801707 D1 DE59801707 D1 DE 59801707D1
- Authority
- DE
- Germany
- Prior art keywords
- ground
- sheathing
- tubular
- jacket tube
- diameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/66—Mould-pipes or other moulds
- E02D5/665—Mould-pipes or other moulds for making piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/08—Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
Abstract
The invention relates to a method for producing ground columns (28, 86, 88) to support building or travelling loads, wherein a tubular encasing (10) is driven into the ground in a stationary zone, the ground material is removed from the tubular encasing (10), a sheathing (16) made of geotextile material is inserted into the tubular encasing (10) and filled with a load-bearing, granulated, loose material (24), the load-bearing material (24) is subsequently compacted and the tubular encasing (10) is removed. An individual jacket tube for each ground column (28, 86, 88) is driven into the ground, the jacket tube (10) is emptied by excavation, a sack-like sheathing (16) with a diameter that is larger than the diameter of the inner diameter of the tubular jacket (10) is introduced into the empty jacket tube (10) and the granulated material (24) progressively presses the sheathing (16) against the stationary supporting layer and the inner wall of the tubular jacket (10) during filling. The granulated material (24) is so compacted upon removal of the jacket tube (10) that the sheathing (16) extends beyond its original diameter until the opposing forces produced by the compacted ground around it are approximately balanced out. The material of the sheathing (16) is endowed with sufficient penetrability qualities so that no surrounding earth can penetrate into the column (28, 86, 88) thus formed.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP97115299A EP0900883B1 (en) | 1997-09-04 | 1997-09-04 | Method for making a column in the ground, which can carry loads from buildings or traffic |
PCT/EP1998/005580 WO1999011870A1 (en) | 1997-09-04 | 1998-09-03 | Method and sheathing for producing a ground column to support building or travelling loads |
Publications (1)
Publication Number | Publication Date |
---|---|
DE59801707D1 true DE59801707D1 (en) | 2001-11-15 |
Family
ID=8227314
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE59706689T Expired - Lifetime DE59706689D1 (en) | 1997-09-04 | 1997-09-04 | Process for the production of a floor pillar for the removal of building or traffic loads |
DE59801707T Expired - Fee Related DE59801707D1 (en) | 1997-09-04 | 1998-09-03 | METHOD AND ENVIRONMENT FOR THE PRODUCTION OF A PILLAR FOR THE REMOVAL OF CONSTRUCTION OR TRAFFIC LOADS |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE59706689T Expired - Lifetime DE59706689D1 (en) | 1997-09-04 | 1997-09-04 | Process for the production of a floor pillar for the removal of building or traffic loads |
Country Status (8)
Country | Link |
---|---|
EP (2) | EP0900883B1 (en) |
AT (1) | ATE206787T1 (en) |
AU (1) | AU9741098A (en) |
DE (2) | DE59706689D1 (en) |
DK (2) | DK0900883T3 (en) |
HK (1) | HK1020443A1 (en) |
NL (1) | NL1010001C2 (en) |
WO (1) | WO1999011870A1 (en) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL1014185C2 (en) * | 2000-01-26 | 2001-07-27 | Trisoplast Int Bv | Method for applying a moisture-impermeable layer in the soil, as well as a trench obtained by such a method. |
DE10025966C2 (en) * | 2000-05-25 | 2002-12-05 | Bauer Spezialtiefbau | Support tube columns |
DE10108602A1 (en) | 2001-02-22 | 2002-09-12 | Keller Grundbau Gmbh | Method of making columns |
DE20120859U1 (en) * | 2001-12-27 | 2003-05-08 | Kirchner Martin E | Apparatus for manufacturing rubble columns in the ground with textile cladding |
DE10351956B3 (en) * | 2003-11-07 | 2005-07-14 | Josef Möbius Bau-Aktiengesellschaft | Device for extracting earth material from pipe driven into soil has flaps held by cable extending from one end of gripper pipe to other connected to actuator so this lowers cable and flaps drop to outlet position under pressure of soil |
DE102004013275B4 (en) * | 2004-03-16 | 2007-02-15 | Josef Möbius Bau-Aktiengesellschaft | Process for the production of an interactive load-bearing system made of geotextile-coated columns of granular material and the upcoming floors for the removal of building and traffic loads with unsustainable subsoil |
GB0414300D0 (en) * | 2004-06-25 | 2004-07-28 | Keller Ground Engineering | Method and structure for ground improvement |
DE102006033957B4 (en) * | 2006-07-22 | 2010-04-15 | Josef Möbius Bau-Aktiengesellschaft | Method for creating geotextile coated pillars of granular or rolling material |
CN102505682A (en) * | 2011-10-31 | 2012-06-20 | 山东鸿泰建设集团有限公司 | Building waste powder cement pile and foundation treatment method thereof |
DE102012004980A1 (en) | 2012-02-25 | 2013-08-29 | Werner Möbius Engineering GmbH | Method for stabilizing subsoil of road and building, for use in removal of e.g. building load in stable region, involves compressing and moving jacket tube to floor material installation site, while holding sheath at lower end of soil |
DE102012022164A1 (en) | 2012-05-09 | 2013-11-14 | Werner Möbius Engineering GmbH | Structural system for diverting vertical and horizontal loads from elongated building areas to less stable ground, has soil columns, which are covered with geotextile material and form multiple linked systems by connecting elements |
DE102015105780B4 (en) | 2015-04-15 | 2018-08-23 | Werner Möbius Engineering GmbH | Method of stabilizing the subsurface and removing structural and traffic loads in stable areas |
DE102015122202B4 (en) | 2015-10-22 | 2019-03-28 | Peter Wallis | Device for introducing a column element |
CN112030649A (en) * | 2020-09-07 | 2020-12-04 | 中国电建市政建设集团有限公司 | CFG pile-forming construction method suitable for fluid plastic soil layer |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB410280A (en) * | 1932-02-06 | 1934-05-17 | Nagel Friedrich | Improvements in and relating to the making of concrete and like piles |
LU41005A1 (en) * | 1961-01-11 | 1962-02-23 | ||
FR2079878A5 (en) * | 1970-02-16 | 1971-11-12 | Rhodiaceta | |
NL140592B (en) * | 1971-06-25 | 1973-12-17 | Nederhorst Grondtechniek B V | METHOD AND EQUIPMENT FOR FORMING A BODY OF CONCRETE OR SIMILAR MATERIAL IN THE GROUND, AS WELL AS A BODY THEREFORE. |
NL9200855A (en) * | 1992-05-14 | 1993-12-01 | Colijn Beheer Bv | METHOD FOR THE VIBRATION-FREE MANUFACTURE OF A GROUND-REPLACING FOUNDATION POLE |
DE4408173C5 (en) | 1994-03-10 | 2006-04-27 | Josef Möbius Bau-Gesellschaft (GmbH & Co.) | Method of stabilizing the substrate and removing structural and traffic loads |
DE19518830B4 (en) * | 1994-03-10 | 2005-02-24 | Josef Möbius Bau-Gesellschaft (GmbH & Co.) | Method of stabilising underground below roads and buildings - involves column excavation replaced by geo-textile load-bearing casing for dewatering and compacting in-situ with resultant ground load absorption |
-
1997
- 1997-09-04 DE DE59706689T patent/DE59706689D1/en not_active Expired - Lifetime
- 1997-09-04 EP EP97115299A patent/EP0900883B1/en not_active Expired - Lifetime
- 1997-09-04 DK DK97115299T patent/DK0900883T3/en active
-
1998
- 1998-09-02 NL NL1010001A patent/NL1010001C2/en not_active IP Right Cessation
- 1998-09-03 AT AT98951345T patent/ATE206787T1/en not_active IP Right Cessation
- 1998-09-03 DK DK98951345T patent/DK1009884T3/en active
- 1998-09-03 DE DE59801707T patent/DE59801707D1/en not_active Expired - Fee Related
- 1998-09-03 AU AU97410/98A patent/AU9741098A/en not_active Abandoned
- 1998-09-03 WO PCT/EP1998/005580 patent/WO1999011870A1/en active IP Right Grant
- 1998-09-03 EP EP98951345A patent/EP1009884B1/en not_active Expired - Lifetime
-
1999
- 1999-09-09 HK HK99103936A patent/HK1020443A1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
WO1999011870A1 (en) | 1999-03-11 |
EP0900883A1 (en) | 1999-03-10 |
DK1009884T3 (en) | 2001-11-19 |
AU9741098A (en) | 1999-03-22 |
HK1020443A1 (en) | 2000-04-20 |
EP0900883B1 (en) | 2002-03-20 |
DE59706689D1 (en) | 2002-04-25 |
ATE206787T1 (en) | 2001-10-15 |
DK0900883T3 (en) | 2002-07-15 |
EP1009884A1 (en) | 2000-06-21 |
NL1010001C2 (en) | 1999-06-23 |
NL1010001A1 (en) | 1999-03-05 |
EP1009884B1 (en) | 2001-10-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE59801707D1 (en) | METHOD AND ENVIRONMENT FOR THE PRODUCTION OF A PILLAR FOR THE REMOVAL OF CONSTRUCTION OR TRAFFIC LOADS | |
DE69724994D1 (en) | METHOD FOR INCREASING THE STRENGTH OF THE BUILDING FLOOR | |
EP1234916A3 (en) | Method for making column members | |
AU556738B2 (en) | Anchored mast foundation | |
ATE146838T1 (en) | DEVICE AND METHOD FOR PRODUCING COMPACTED STONE OR GRAVEL COLUMNS IN EARTH MASSES | |
DE4408173C2 (en) | Process for stabilizing the subsoil and for removing structural and traffic loads | |
KR100633418B1 (en) | Bamboo pole for drainage, reinforcing method for soft ground, and horizontal drainage method | |
US4588327A (en) | Precast concrete pile and method of placing it in the ground | |
SU1677180A1 (en) | Method of manufacturing reinforced cast-in-place pile | |
JPH10102490A (en) | Method of constructing underground structure | |
KR200325653Y1 (en) | Earth anchor including a duplex grouting pipe | |
EP1609914A1 (en) | Method and structure for ground improvement | |
FI91984C (en) | Method of reinforcing a structure to be formed in the soil | |
JPH0437955Y2 (en) | ||
CN214143745U (en) | A side slope supporting construction for side slope ecological management | |
JP3288645B2 (en) | Embankment method | |
EP1273713A3 (en) | Method for constructing material columns to improve soil consolidation | |
KR970059399A (en) | Electric osmotic load drainage consolidation device and method using geosynthetics | |
KR100419532B1 (en) | Method of Construction for Draining Columns to Reinforce Clay Stratum | |
RU2099488C1 (en) | Method of production of columns | |
SU1430463A1 (en) | Method of constructing cast-in-place piles | |
DE29522106U1 (en) | System for stabilizing the subsoil and for transferring building and traffic loads | |
RU2188948C1 (en) | Method of constructing vertical mine shaft | |
JPH0473320A (en) | Preparation of cast-in-place concrete pile | |
JPS6138015A (en) | Sheathing work |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8363 | Opposition against the patent | ||
8365 | Fully valid after opposition proceedings | ||
8339 | Ceased/non-payment of the annual fee |