DE495939C - Switching arrangement for multiple busbar systems in which the busbars can be connected by a coupling switch designed as an energy switch - Google Patents

Switching arrangement for multiple busbar systems in which the busbars can be connected by a coupling switch designed as an energy switch

Info

Publication number
DE495939C
DE495939C DEL66682D DEL0066682D DE495939C DE 495939 C DE495939 C DE 495939C DE L66682 D DEL66682 D DE L66682D DE L0066682 D DEL0066682 D DE L0066682D DE 495939 C DE495939 C DE 495939C
Authority
DE
Germany
Prior art keywords
switch
busbar
busbars
energy
switching arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEL66682D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WILHELM WALDVOGEL DIPL ING
Original Assignee
WILHELM WALDVOGEL DIPL ING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WILHELM WALDVOGEL DIPL ING filed Critical WILHELM WALDVOGEL DIPL ING
Priority to DEL66682D priority Critical patent/DE495939C/en
Application granted granted Critical
Publication of DE495939C publication Critical patent/DE495939C/en
Expired legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/24Circuit arrangements for boards or switchyards

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

Schaltanordnung fürMehrfachsammeischienensysteme,bei denen die Sammelschienen durch einen als Energieschalter ausgebildeten Kupplungsschalter verbunden werden können In größeren Hochspannungsschaltanlagen pflegt man zur Vermeidung langdauernder Betriebsunterbrechungen einen sogenannten Bereitschaftsschalter vorzusehen, welcher von den Sammelschienen aus betrieben und mit Hilfe einer Umgehungsleitung über Umschalter wahlweise auf jeden Abzweig geschaltet werden kann. Ferner ist es üblich, derartige Anlagen finit einem besonderen Energieschalter auszurüsten, durch welchen die Sammelschienensvsteine gekuppelt werden können. Schließlich sind auch Schaltanordnungen für Anlagen mit Doppelsammelschienen bekannt geworden, bei denen unter gewissen Voraussetzungen der Kupplungsschalter auch als Dereitschaftssclialter verwendet werden kann. Diese Voraussetzungen bestehen in der Hauptsaclie darin, daß zuerst sämtliche von der SV3rung nicht betroffenen Abzweige auf eines der beiden Betriebssammelschienensysteme umgeschaltet werden müssen, worauf dann nach Vornahme entsprechender Trennschalterumlegungen der den außer Betrieb zu nehmenden Energieschalter enthaltende Abzweig über das andere, von sonstigen. Abzweigen frei gemachte Betriebssammelschienensystem oder ein besonderes Umgehungssammelschienensvstein Weiterbetrieben «-erden kann. Die Nachteile letzterer Schaltanordnungen sind vor allem darin zu erblicken, daß bei asynchronem Betrieb der beiden Betriebssammelschienen - ein in Umspannwerken häufig vorkommender Betriebsfall - ein so geschalteter Kupphingsschalter seine zusätzliche Eigenschaft als Bereitschaftsschalter entweder überhaupt nicht oder erst nach vorangegangener Synchronisierung Synchronisierung der beiden Betriebssanimelschienensysteme erfüllen kann. Die in jedem Fall gegebene Notwendigkeit, alle von der Störung nicht betroffenen Abzweige auf ein einziges Betriebssammelschienensystem zu schalten, birgt ferner die Gefahr von Fehlschaltungen in sich und verursacht eine verhältnismäßig große Zeitverzögerung bis zur Wiederinbetriebsetzung eines Abzweiges. Da somit diese Anordnung vom betriebstechnischen Standpunkt aus unvollkommen bzw. zeitraubend und gefährlich ist und andererseits der Einbau eines Kupplungsschalters und eines Bereitschaftsschalters, d. h. zweier nacht der eigentlichen Stromversorgung dienender und nur vorübergehend benötigter Energieschalter, als zu kostspielig empfunden wird, ist nachstehend eine Schaltanordnung beschrieben, durch welche die angeführten Nachteile vermieden werden. In beiliegender Fig. i ist das Prinzip der neuen Schaltanordnung für ein Doppelsammelschienensystem veranschaulicht. S, und S2 sind die beiden B'etriebssammelschienensysteme. L, und L, sind Abzweige. B stellt den Bereitschaftsschalter dar, welcher einerseits über Trennschalter T, und T, (in Anlagen mit mehr als zwei Betriebssammelschienensystemen entsprechend mehr) mit den Doppelsammelschienen verbunden werden kann, anderseits mit der Umgehungsschiene S$ verbunden ist und mit Hilfe eines Trennschalters T7 an eine der Betriebssammelschienen angeschlossen werden kann. Die dargestellte Schaltungsweise zeigt jene Ausführungsmöglichkeit, bei welcher der geringste Aufwand an Trennschaltern bzw. Trennstellen notwendig ist, um die nachbeschriebenen Wirkungen zu erreichen.Switching arrangement for multiple busbar systems in which the busbars be connected by a clutch switch designed as an energy switch can In larger high-voltage switchgear, care is taken to avoid long-term To provide a so-called standby switch, which operated from the busbars and with the help of a bypass line via changeover switches can optionally be switched to each branch. It is also common to have such To equip systems finitely with a special energy switch, through which the busbar blocks can be coupled. Finally, switching arrangements for systems are also included Double busbars have become known where under certain conditions the clutch switch can also be used as a standby switch. These The main prerequisites are that all of the SV3rung unaffected branches on one of the two company busbar systems must be switched over, whereupon after making appropriate disconnector relocations the feeder containing the power switch to be taken out of service via the others, from others. Branching off cleared operating busbar system or a special bypass busbar system can continue to operate. the Disadvantages of the latter switching arrangements are primarily to be seen in the fact that at asynchronous operation of the two operating busbars - one common in substations Occurring operational case - a coupling switch switched in this way is an additional one Property as a standby switch either not at all or only after a previous one Synchronization Fulfill the synchronization of the two company animation rail systems can. The necessity given in each case, all unaffected by the disorder Switching branches to a single company busbar system is also beneficial the risk of incorrect switching in itself and causes a relatively large Time delay until a feeder is restarted. As this arrangement from an operational point of view imperfect or time-consuming and dangerous and on the other hand the installation of a clutch switch and a standby switch, d. H. two nights serving the actual power supply and only temporarily The power switch needed that is felt to be too costly is one below Switching arrangement described, by means of which the disadvantages mentioned are avoided. In Enclosed Fig. i is the principle of the new switching arrangement for a double busbar system illustrated. S and S2 are the two operating busbar systems. L, and L, are branches. B represents the standby switch, which is on the one hand Disconnectors T, and T, (in systems with more than two operating busbar systems accordingly more) can be connected to the double busbars, on the other hand is connected to the bypass busbar S $ and with the help of a disconnector T7 can be connected to one of the company busbars. The circuit shown shows the design option that requires the least amount of disconnectors or separation points is necessary to achieve the effects described below.

Wird beispielsweise einer der Energieschalter 0, oder OZ defekt bzw. zum Zwecke der Revision außer Betrieb genommen, so wird der betreffende Umschalter U1, UZ auf die Uingehungssammelschiene S3 umgelegt und Trennschalter Ts bzw. T" eingelegt. Darauf kann der Abzweig sofort, und zwar von der ursprünglichen Sammelschiene und ohne Veränderung der Trennschalterlage der anderen Abzweige, mittels des Bereitschaftsschalters B Weiterbetrieben werden. Sollen die beiden Betriebssammelschienen S, und % gekuppelt werden, so kann das ebenfalls mit dem Bereitschaftsschalter B geschehen. Zu diesem Zweck werden zunächst die Trennschalter T6 und T,, eingelegt und dann Schalter B geschlossen. T, bleibt in diesem Falle geöffnet. Muß bei gekuppelten Doppelsainmelschienen im Sinne vorbeschriebenen Betriebsfalles der Energieschalter eines Abzweiges außer Betrieb genommen und der betreffende Abzweig trotzdem weiter mit Strom versorgt werden, so kann dies ebenfalls mit dem Bereitschaftsschalter, und zwar in der Weise durchgeführt werden, daß zunächst der noch offene Trennschalter der Trennschaltergruppe T,-T, ebenfalls eingelegt wird. Hierauf wird der Bereitschaftsschalter B ausgeschaltet, Trennschalter T,, gezogen und der Abzweig nach Umlegung auf die Umgehungssammelschiene über den Bereitschaftsschalter Weiterbetrieben.If, for example, one of the energy switches 0 or OZ is defective or taken out of service for the purpose of revision, the relevant switch U1, UZ transferred to the inspection busbar S3 and disconnector Ts or T " inserted. The feeder can then immediately from the original busbar and without changing the disconnector position of the other feeders, by means of the standby switch B Continue to operate. Should the two company busbars S, and% be coupled this can also be done with the standby switch B. To this The first step is to insert the isolating switches T6 and T ,, and then switch B closed. T, remains open in this case. Must with coupled double sealing rails in the sense of the operating case described above, the energy switch of a branch except Put into operation and the relevant branch still supplied with power this can also be done with the standby switch, in this way be carried out that first the still open disconnector of the disconnector group T, -T, is also inserted. The standby switch B is then switched off, Disconnector T ,, pulled and the branch after switching to the bypass busbar Continue to operate via the standby switch.

Erscheint es wünschenswert, das Hilfssammelschienensystern (Umgehungssammelschiene) während .der Kupplung des Doppel sammelschienensystems spannungslos halten zu können, so ist ein Trennschalter T$ vorzusehen.Does it seem desirable to use the auxiliary busbar system (bypass busbar) to be able to keep the double busbar system de-energized while coupling the double busbar system, a disconnector T $ must be provided.

Die Umschalter U" UZ . . . können in bekannter Weise durch Trennschalter ersetzt werden. .The changeover switches U "UZ ... can in a known manner by disconnectors be replaced. .

Für manche Fälle mit Doppelsammelschienensystern erscheint es aus Gründen der räumlichen Anordnung empfehlenswert, die Schaltung nach Fig. z auszuführen. Auch diese Schaltanordnung vermeidet die den bekannten Anordnungen anhaftenden Nachteile. Sie stellt jedoch die umständlichere Lösung der Erfindungsaufgabe dar. Die Kupplung der Sammelschienen erfolgt über Trennschalter T9, Bereitschaftsschalter B und Trennschalter Tlo. Der Betrieb als Bereitschaftsschalter erfolgt entweder von S, aus bei geöffneten Trennschaltern T, und T12 über Trennschalter T,o, Bereitschaftsschalter B, Trennschalter T" oder von S, aus bei geöffneten Trennschaltern T,o und T" über Trennschalter T9, Bereitschaftsschalter B, Trennschalter T12 auf Umgehungsschiene S3 und von hier über den betreffenden Umschalter U1, UZ auf den gewünschten Abzweig L1, L2. Muß bei gekuppelten Sammelschienen S, und SZ der Energieschalter eines Abzweiges durch den Kupplungsschalter ersetzt werden, so werden in einem ungestörten, aber in Betrieb befindlichen Abzweig zunächst beide Sammelschienentrennschalter T,-T4 in den eingeschalteten Zustand gebracht, hernach Bereitschaftsschalter B ausgeschaltet und der Ersatzbetrieb von S, oder SZ aus durchgeführt, wie oben beschrieben.For some cases with double busbar systems, it does not appear For reasons of spatial arrangement, it is advisable to carry out the circuit according to FIG. This switching arrangement also avoids the disadvantages inherent in the known arrangements. However, it represents the more complicated solution to the problem of the invention. The clutch the busbars are made via disconnector T9, standby switch B and disconnector Tlo. Operation as a standby switch takes place either from S when the switch is open Disconnectors T, and T12 via disconnector T, o, standby switch B, disconnector T "or from S, with open disconnectors T, o and T" via disconnector T9, Standby switch B, disconnector T12 on bypass bus S3 and from here Via the relevant switch U1, UZ to the desired branch L1, L2. Got to with coupled busbars S and SZ the energy switch of a feeder through If the clutch switch is replaced, it will be in an undisturbed but operating condition located branch, first switch both busbar disconnectors T, -T4 to the switched on Condition brought, afterwards standby switch B switched off and the substitute operation carried out from S or SZ as described above.

Claims (1)

PATENTANSPRÜCHE: i. Schaltanordnung für Mehrfachsammelschienensysteme, bei denen die Sammelschienen durch einen als Energieschalter ausgebildeten Kupplungsschalter verbunden werden können, der seinerseits den Energieschalter eines jeden Abzweiges mit Hilfe einer Umgehungssammelschiene ersetzen kann, dadurch gekennzeichnet, daß der Kupplungsschalter auf seinereinen Anschlußseite mittels Trennschalter wahlweise an jedes Betriebs.sammelschienensystem angeschlossen werden kann, auf seiner anderen Anschlußseite aber fest oder abtrennbar mit der Umgehungssammelschiene verbunden ist und an eines der Betnüebs.sammelschienensysteanedurch Trennschalter angeschlossen werden kann, so daß jeder außer Betrieb zu nehmende Abzweigenergieschalter durch den Kupplungsschalter ersetzt werden kann, gleichgültig, wie die Abzweige an den einzelnen Betriebssammelschienen angeschlossen sind. z. Schaltanordnung für Doppels-ammelschienen, bei denen die Sammelschienen durch einen als Energieschalter ausgebildeten Kuppelschalter verbunden werden können, der seinerseits den Energieschalter eines jeden Abzweiges mit Hilfe einer Umgehungssammelschiene ersetzen kann, dadurch gekennzeichnet, daß der Kupplungsschalter auf seiner einen Anschlußseite mittels Trennschalter wahlweise an das eine der beiden Betriebssammelschien ensysteme oder an die Umgehungssammelschiene und auf seiner anderen Anschlußseite ebenfalls mittels Trennschalter wahlweise an das zweite Betriebssammelschienensystem oder an die Umgehungssammelschiene angeschlossen «-erden kannPATENT CLAIMS: i. Switching arrangement for multiple busbar systems, in which the busbars are connected by a coupling switch designed as an energy switch can be connected, which in turn is the energy switch of each branch can replace with the help of a bypass busbar, characterized in that the coupling switch on its one connection side by means of an isolating switch can be connected to each company busbar system, on its other Connection side but firmly or detachably connected to the bypass busbar and is connected to one of the operating busbar systems through disconnectors can be so that any branch power switch to be taken out of service by the clutch switch can be replaced, regardless of how the branches to the individual company busbars are connected. z. Switching arrangement for double ammel rails, in which the busbars are connected by a coupling switch designed as an energy switch can be connected, which in turn is the energy switch of each branch can replace with the help of a bypass busbar, characterized, that the clutch switch on its one connection side by means of an isolating switch optionally to one of the two company busbar systems or to the bypass busbar and optionally on its other connection side also by means of a disconnector the second service busbar system or connected to the bypass busbar «-Can earth
DEL66682D 1926-09-02 1926-09-02 Switching arrangement for multiple busbar systems in which the busbars can be connected by a coupling switch designed as an energy switch Expired DE495939C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEL66682D DE495939C (en) 1926-09-02 1926-09-02 Switching arrangement for multiple busbar systems in which the busbars can be connected by a coupling switch designed as an energy switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEL66682D DE495939C (en) 1926-09-02 1926-09-02 Switching arrangement for multiple busbar systems in which the busbars can be connected by a coupling switch designed as an energy switch

Publications (1)

Publication Number Publication Date
DE495939C true DE495939C (en) 1930-04-11

Family

ID=7281652

Family Applications (1)

Application Number Title Priority Date Filing Date
DEL66682D Expired DE495939C (en) 1926-09-02 1926-09-02 Switching arrangement for multiple busbar systems in which the busbars can be connected by a coupling switch designed as an energy switch

Country Status (1)

Country Link
DE (1) DE495939C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE971731C (en) * 1948-01-02 1959-03-19 Siemens Ag Low-voltage switchgear with double busbars and changeover switch for the branch lines

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE971731C (en) * 1948-01-02 1959-03-19 Siemens Ag Low-voltage switchgear with double busbars and changeover switch for the branch lines

Similar Documents

Publication Publication Date Title
DE1615835A1 (en) Separator for fully insulated electrical high-voltage switchgear
DE495939C (en) Switching arrangement for multiple busbar systems in which the busbars can be connected by a coupling switch designed as an energy switch
DE647608C (en) High voltage electrical switchgear
EP0166206A2 (en) Method and device for actuating - with protection against false connection - of a switchboard plant with multiple switchboard sections in an electric energy distribution network
DE897276C (en) Device for removing dust on preferably horizontal ducts
DE506526C (en) Reversible oil switch with three bushing insulators per phase
DE565331C (en) Busbar suspension
DE915357C (en) Switching station
DE859913C (en) Changeover switch for low-voltage switchgear with double busbars
DE432162C (en) Encapsulated lever switch
DE870428C (en) Electric railway vehicle, the switching devices of which are arranged in special protective boxes below the railway vehicle
DE926018C (en) Arrangement for synchronization
DE964606C (en) Procedure for converting signal boxes, in particular track diagram signal boxes
DE892625C (en) Arrangement for short-circuit forwarding in electrical distribution systems
DE767685C (en) Switching arrangement for uninterrupted busbar change in systems with double busbars without coupling switches
DE1030860B (en) Circuit arrangement for track plan signal boxes with individual resolution of the switch locks
DE976204C (en) Switchgear for high voltage purposes
AT286459B (en) Circuit arrangement for the safe connection of branches to a busbar system in an alternating current network
DE1640948C (en) Method for controlling any number of electrically controllable electrical switches according to a program
DE459011C (en) Three-phase high voltage line
DE896077C (en) Device for switching off faulty line sections in a line system
DE683036C (en) Circuit arrangement for pictorial representations of line systems
DE760694C (en) Substation for high voltage switchgear
DE1640952C3 (en) Method for controlling any number of electrically controllable electronic switches according to a program
DE587842C (en) Device for the automatic disconnection of a diseased phase conductor and for the automatic connection of a replacement conductor