DE481225C - Method and device for the manufacture of brickwork - Google Patents

Method and device for the manufacture of brickwork

Info

Publication number
DE481225C
DE481225C DEE38496D DEE0038496D DE481225C DE 481225 C DE481225 C DE 481225C DE E38496 D DEE38496 D DE E38496D DE E0038496 D DEE0038496 D DE E0038496D DE 481225 C DE481225 C DE 481225C
Authority
DE
Germany
Prior art keywords
mortar
boxes
same
layer
masonry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEE38496D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DEE38496D priority Critical patent/DE481225C/en
Application granted granted Critical
Publication of DE481225C publication Critical patent/DE481225C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/22Tools or apparatus for setting building elements with mortar, e.g. bricklaying machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)

Description

Verfahren und Vorrichtung zur Herstellung von Ziegelmauerwerk Die vorliegende Erfindung betrifft ein neues Verfahren zur Herstellung von Ziegelsteinmauerwerk und bezweckt eine Verbilligung und Verbesserung des Handmauerns. Sie ist für jeden Betriebsumfang anwendbar und Zestattet sowohl dem kleinsten Maurermeister als auch dem Großunternehmer ohne umständliche und kostspielige Vorrichtungen und Maschinen unter grundsätzlicher Beibehaltung der bisher üblichen und bewährten Mauerweise schneller und billiger zu mauern als bisher. Die Erfindung betrifft ferner eine einfache Hilfsvorrichtung, welche zur Ausübung des Verfahrens besonders zweckmäßig ist.Method and device for the manufacture of brick masonry Die The present invention relates to a new method of making brick masonry and aims to reduce the cost and improve the walling of the hand. It is for everyone Scope of operation applicable and paid to both the smallest master mason and the large entrepreneur without cumbersome and expensive devices and machines while basically maintaining the previously customary and proven wall method to build faster and cheaper than before. The invention also relates to a simple auxiliary device, which is particularly useful for performing the method is.

Die Erfindung geht von der durch Arbeitszeitstudien erlangten Erkenntnis aus, daß bei dem heutigen Handmauern eine Reihe Arbeitsvorgänge einen Leerlauf darstellen, d. h. daß bei dem bisher üblichen Verfahren das häufige Anfassen der Baustoffe, der Steine und des Mörtels, das Auf- und Abladen derselben den Bauvorgang unnötig erschwert und verlangsamt.The invention is based on the knowledge obtained through working time studies from the fact that with today's hand walls a number of work processes represent an idle, d. H. that with the previously usual procedure the frequent touching of the building materials, the stones and mortar, the loading and unloading of the same make the construction process unnecessary difficult and slowed down.

Das neue Verfahren will diese hauptsächlich bei der Förderung der Baustoffe entstehende Leerlaufarbeit, die, wie sorgfältig durchgeführte Arbeitszeitstudien ergeben haben, einen großen Teil der Gesamtarbeitszeit beansprucht, ausschalten und kommt so zu einer ganz neuen Art des Handmauerns: Nach dieser werden die Ziegelsteine sofort beim ersten Anfassen in eine für die Vermauerung endgültige Lage zueinander ge-` bracht (Verband), indem dieselben in Versetz-. fasten gelegt und gleich mit dem nötigen Mörtel übergössen werden. Diese Versetzkasten fassen eine gewisse Anzahl von Ziegelsteinen, die im vorgeschriebenen Mauerverbande in einer Schichthöhe eingelegt werden. Bezüglich ihrer Schwere sind die Kasten so eingerichtet, daß ein Mann sie einschließlich der Steine und des Mörtels noch gut handhaben bann. Die Kasten können auch entsprechend größer eingerichtet werden, so daß zwei oder mehrere Arbeiter zum Bewegen derselben notwendig sind.The new process aims to promote this mainly in the Building materials arising idle work, which, like carefully carried out working time studies have taken up a large part of the total working time and so comes a completely new type of walling: the bricks are made according to this immediately when touched for the first time in a position to one another that is definitive for the masonry ge-`brought (association) by putting the same in displacement. fasted and at the same time be poured over the necessary mortar. These displacement boxes hold a certain number of bricks laid in the prescribed wall connection at one layer height will. Regarding their weight, the boxes are arranged so that a man can hold them including the stones and mortar can still be handled well. The boxes can can also be set up accordingly larger, so that two or more workers are necessary to move them.

Das heue des Verfahrens besteht darin, daß die Steine außer Ort, z. B. schon an der Abladestelle oder beim Abladen selbst, in auf geeignete Unterlagen gestellte Versetzkasten zu verbandsgerechten Schichtteilen von einem Stein Höhe gelegt, mit Mörtel versehen, an Ort befördert und dort durch unmittelbares .lufsetzen auf die Mauer vermauert werden, indem der Boden und der Rahmen der Setzkasten entfernt werden.The current of the process is that the stones out of place, z. B. already at the unloading point or when unloading itself, in on suitable documents Placed shifting boxes to layer parts suitable for the association from a height of one stone laid, provided with mortar, transported to the site and there by immediate be bricked up on the wall by removing the bottom and the frame of the type case will.

Während der Beförderung an Ort ändert sich der flüssige Zustand des Mörtels nur insofern, als der Stein Wasser au ihm aufsaugt, so daß derselbe, wenn er an Ort anlangt, die richtige und zum Mauern geeignete weiche Beschaffenheit hat. Der Mörtel kann deshalb beim Aufbringen auf die Steine dünnflüssiger sein als bisher üblich, und dadurch ist eine Gewähr gegeben, daß er in alle Fugen des Schichtteiles eingeschlemmt wird; auch entstehen stets gleich hohe Fugen und Schichten, da die Versetzkasten alle gleiche Höhe haben. Der Arbeitsvorgang ist folgender: Die Arbeit beginnt bereits im Bureau des Bauleiters, wo die Schichtteile in die Schichtpläne schichtweise eingezeichnet oder wegen der häufigen Wiederkehr gleicher Schichtteile der Einfachheit halber aufgedruckt werden und die Reihenfolge des Versetzens festgelegt wird, so daß der Maurer, der die Schichtteile später herstellt, nicht wie bisher, nur nach den Regeln seines Handwerkes, sondern nach einem Schichtplane arbeitet, der ihm zeigt, wie die einzelnen Teile in die Versetzkasten zu legen, wo Vorlagen, öffnungen, Anschläge usw. zu berücksichtigen sind. Auch zeigen diese Schichtpläne an, ob starke oder schwache Stoßfugen angeordnet werden müssen, um die vorgeschriebene Gesamtlänge der Mauer oder des Mauerteiles zu erreichen. Durch Herausnehmen oder Einfügen eines Kopfbrettchens in den Setzkasten erhält man starke oder schwache Stoßfugen. Schichtteile mit Anschlägen u. dgl. werden durch Einlegen von Formen von dem entstehenden Hohlraum im Setzkasten abgegrenzt. Nach dem Versetzen der Schichtteile an Ort entsteht so ein dem bekannten in seinem Aufbau vollkommen gleiches Verbandsmauerwerk, das jenem aber in der Genauigkeit der Ausführung noch überlegen ist, da die Verbandsbildung durch die Schichtpläne zwangsläufig festgelegt wird, und weil ferner durch die Anwendung der Kasten ein, vollfugiges Mauerwerk von selbst entsteht.The liquid state of the changes during transport on site Mortar only in so far as the stone soaks up water from it, so that the same when he arrives at the place, has the right and soft texture suitable for masonry. The mortar can therefore be thinner than before when it is applied to the stones usual, and this is a guarantee that it will be in all joints of the layer part is swallowed up; joints and layers of the same height are always created because the Displacement boxes all have the same height. The process is as follows: The work begins in the site manager's office, where the shift parts are included in the shift plans drawn in layers or because of the frequent return of the same Layer parts are printed for the sake of simplicity and the order of displacement is set so that the bricklayer who will make the layer parts later will not as before, only according to the rules of his trade, but according to a shift schedule who shows him how to put the individual parts in the relocation boxes, where templates, openings, stops, etc. must be taken into account. Also show this Shift plans indicate whether strong or weak butt joints need to be arranged to achieve the prescribed total length of the wall or part of the wall. By Removing or inserting a headboard into the type case produces strong ones or weak butt joints. Layer parts with stops and the like are by inserting delimited by shapes from the resulting cavity in the type case. After moving the layer parts on site are thus completely familiar in their structure same association masonry, but still the same in the accuracy of the execution is superior, since the formation of the association is inevitably determined by the shift schedules becomes, and because furthermore, through the use of the box, a full-jointed masonry arises by itself.

Bereits bekannten Verfahren, die gleichfalls außerhalb der Mauerstelle Ziegelsteine mit Mörtel versahen, diesen aber vor Verwendung erhärten ließen oder mittels Maschinen Blöcke bildeten, berühren das Verfahren nach der vorliegenden Erfindung nicht. Denn dieses will das Mauern von Hand verbessern, so daß man ohne umständliche Vorrichtungen oder Maschinen wirtschaftlicher und besser mauern kann. Vorher fertiggestellte Platten mit erhärtetem Mörtel können nicht für normales Ziegelsteinmauerwerk verwendet werden, weil es nicht möglich ist, die örtlichen Einzelheiten, wie Stoßfugenbreite, Vorsprünge, Anschläge, Kaminöffnungen usw. und' insbesondere den erforderlichen durchgehenden Verband, zu berücksichtigen.Already known methods, which are also outside the wall Plastering bricks with mortar, but allowing it to harden before use or using machines to form blocks, touch the method according to the present invention Invention not. Because this wants to improve the masonry by hand, so that one without masonry cumbersome devices or machines more economically and better. Previously finished panels with hardened mortar cannot be used for normal brick masonry used because it is not possible to determine the local details, such as the butt joint width, Projections, stops, chimney openings, etc. and 'in particular the necessary continuous association.

Wenn die Steine vor der Baustelle abgeladen sind und der Mörtel bereitet ist, werden die Steine in den Setzkasten zum vorgeschriebenen Schichtteil, dem Schichtplan entsprechend, zusammengefügt. Hierauf wird der geladene Kasten mit dünnflüssigem Mörtel gefüllt und, wenn nötig, abgestrichen, so daß der Schichtteil mit einer stets gleich hohen Schicht frischen Mörtels bedeckt ist. Der mauerfertig vorbereitete Setzkasten wird nun zur Versetzstelle an Ort befördert und hier auf die zu errichtende Mauerstelle gesetzt, der Boden desselben herausgezogen und der Setzkasten abgehoben. Wenn ein Stein des Verbandes in Fortfall kommt, so kann dessen Stelle auch durch Beton ersetzt werden, ohne daß die Festigkeit des Verbandsgefüges darunter leidet. Die leeren Kasten werden wieder zur Füllstelle zurückbefördert. Die Hinundherfördennig der Kasten. kann gegebenenfalls auf einem laufenden Bande erfolgen, wodurch sich unter Umständen auch die Zahl der Förderkasten und die der Arbeiter vermindern läßt.When the stones are unloaded in front of the construction site and the mortar is ready is, the stones in the type case become the prescribed shift part, the shift plan accordingly, put together. The loaded box is then filled with liquid Mortar filled and, if necessary, leveled off so that the layer part with one always the same high layer of fresh mortar is covered. The one prepared ready for the wall Type case is now transported to the relocation point on site and here to the one to be erected Wall is set, the bottom of the same pulled out and the type case lifted off. If a stone of the association is lost, its place can also go through Concrete can be replaced without the strength of the association structure suffering. The empty boxes are returned to the filling station. The back and forth the box. can optionally be done on a running belt, which means possibly also the number of conveyor boxes and the number of workers reduced.

Die eingangs erwähnte einfache Vorrichtung zur Ausübung des Verfahrens besteht aus dem schon mehrfach erwähnten Setzkasten.The simple device mentioned at the beginning for carrying out the method consists of the case already mentioned several times.

Eine Ausführungsform desselben ist in der beiliegenden Zeichnung dargestellt.An embodiment of the same is shown in the accompanying drawing.

Die Abb. i zeigt denselben in Draufsicht. Die Abb. a ist ein Längsschnitt und die Abb. 3 ein Querschnitt.Fig. I shows the same in plan view. Fig. A is a longitudinal section and Fig. 3 is a cross-section.

Der Setzkasten dieser Ausführungsform besteht aus einem etwa 8 cm (ein Stein und Lagerfuge) hohen Kasten a mit herausziehbarem Boden b. Durch die beiden mit Hilfe des Handgriffes c nach oben drehbaren Haken d wird der Boden b, der außerdem an der Unterseite der beiden am Kasten a befestigten kleinen Bleche e ein Widerlager findet, gehalten. Werden die beiden Haken d mittels des Handgriffes c nach oben gedreht, dann wird das herausziehbare Bodenblech b frei und kann entfernt werden, so daß die Ladung des Kastens genau an die beabsichtigte Stelle kommt. Damit beim Herausziehen dieses Bleches keine Verschiebung des Kastens eintritt, sind die beiden Anschlageisen f vorgesehen.The type case of this embodiment consists of an approximately 8 cm (a stone and horizontal joint) high case a with a pull-out bottom b. The bottom b, which also has an abutment on the underside of the two small metal sheets e attached to the box a, is held by the two hooks d that can be rotated upwards with the aid of the handle c. If the two hooks d are turned up by means of the handle c, the pull-out base plate b is free and can be removed, so that the load of the box comes exactly to the intended place. The two stop irons f are provided so that the box does not move when this sheet is pulled out.

Claims (1)

PATENTANSPRÜCHE: i. Verfahren zur Herstellung von Ziegelmauerwerk, dadurch gekennzeichnet, daß die Steine außer Ort von Hand verbandgerecht in einer Schichthöhe in Kasten verlegt und mit Mörtel eingeschlemmt werden und die so entstandenen Schichtteile an die Verwendungsstelle gefördert und dort mit noch frischem Mörtel vermauert werden. z. Vorrichtung für das Verfahren nach dem Anspruche i, gekennzeichnet durch einen kastenartigen Behälter vom Rauminhalt eines zu fördernden Schichtteils mit verschiebbarem Boden.PATENT CLAIMS: i. Method of making brick masonry, characterized in that the stones out of place by hand in a suitable way to connect The layer height is laid in boxes and grouted with mortar and the resulting Layer parts conveyed to the point of use and there with still fresh mortar be walled up. z. Device for the method according to claim i, characterized through a box-like container of the volume of a layer part to be conveyed with sliding floor.
DEE38496D 1928-12-25 1928-12-25 Method and device for the manufacture of brickwork Expired DE481225C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEE38496D DE481225C (en) 1928-12-25 1928-12-25 Method and device for the manufacture of brickwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEE38496D DE481225C (en) 1928-12-25 1928-12-25 Method and device for the manufacture of brickwork

Publications (1)

Publication Number Publication Date
DE481225C true DE481225C (en) 1929-08-16

Family

ID=7078368

Family Applications (1)

Application Number Title Priority Date Filing Date
DEE38496D Expired DE481225C (en) 1928-12-25 1928-12-25 Method and device for the manufacture of brickwork

Country Status (1)

Country Link
DE (1) DE481225C (en)

Similar Documents

Publication Publication Date Title
DE481225C (en) Method and device for the manufacture of brickwork
DE460542C (en) formwork
DE2531957C3 (en) Method for the automatic prefabrication of wall parts from block bricks or the like.
AT120612B (en) Method and device for the manufacture of brickwork.
DE644586C (en) Process for the production of hollow stone ceilings
DE2053519C2 (en) Method for building up walls from individual shaped stones and for the simultaneous application of a single or double-sided plaster layer by means of sliding formwork
DE1684430B2 (en) Method for building high-rise buildings or the like. and device for carrying out the method
DE606253C (en) Process for the production of hollow stone ceiling beams
DE860920C (en) Process for the manufacture of reinforced stone beams or slabs and the product manufactured by this process
DE1683943C3 (en)
DE804125C (en) Joint filling and smearing device for the production of limited mortar beds on walls
DE830406C (en) Reinforced concrete ceiling beams
DE2111485C3 (en) Process for the production of concrete slabs with two layers arranged at a distance from one another
AT215342B (en) Method and device for the production of prefabricated stairs
AT212538B (en) Process for the simultaneous production of plaster and a ceiling made of cast concrete, slag concrete or the like.
DE813767C (en) Method and device for producing a ceiling with a finished sub-surface
DE1534901C3 (en) Formwork scaffolding for the production of reinforced concrete skeleton structures by storey using a step process
DE811390C (en) Process and manufacture of walls and walls with bricks obtained from rubble
DE824551C (en) Manufacture of building walls
DE2917998A1 (en) Brick wall prefabrication equipment - has transfer mechanisms inserting and removing frames from jig to knock=out point
DE328569C (en) Method for forming and drying clay panels
DE621673C (en) Process for the production of hollow brick beams
DE805923C (en) Method of erecting concrete walls
DE555892C (en) Process for the production of hollow spaces closed on all sides in reinforced concrete beams
DE838370C (en) Concrete wall