DE3943229A1 - Casting process for paste materials - involves multistage casting of construction sections, including insertion of coarse filler - Google Patents

Casting process for paste materials - involves multistage casting of construction sections, including insertion of coarse filler

Info

Publication number
DE3943229A1
DE3943229A1 DE19893943229 DE3943229A DE3943229A1 DE 3943229 A1 DE3943229 A1 DE 3943229A1 DE 19893943229 DE19893943229 DE 19893943229 DE 3943229 A DE3943229 A DE 3943229A DE 3943229 A1 DE3943229 A1 DE 3943229A1
Authority
DE
Germany
Prior art keywords
casting
potting
highest level
sections
components
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19893943229
Other languages
German (de)
Inventor
Hans Schreiner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PROJEKTGEMEINSCHAFT FESTE FAHRBAHN SYSTEM SATO GLE
Original Assignee
SALZGITTER PEINE STAHLWERKE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SALZGITTER PEINE STAHLWERKE filed Critical SALZGITTER PEINE STAHLWERKE
Priority to DE19893943229 priority Critical patent/DE3943229A1/en
Publication of DE3943229A1 publication Critical patent/DE3943229A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/001Track with ballast
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/03Injecting, mixing or spraying additives into or onto ballast or underground

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Architecture (AREA)
  • Railway Tracks (AREA)

Abstract

The process is for casting, in stages, of several construction sections, using mortar, asphalt, etc. The sections to be cast are located precisely on a levelled base; the highest level section of a casing surface between two sections is determined, and the material is cast, beginning at the highest level. The material flow is braked, and partly deflected at right angles to the casting direction, by insertion of coarse-grained filler material. The casting process is stopped, when the casting surface is filled at least to a pre-set height, and the material flows under or around the construction section, into the neighbouring casting surface.

Description

Die Erfindung betrifft ein Verfahren gemäß dem Oberbegriff des Anspruchs 1.The invention relates to a method according to the preamble of claim 1.

Es ist bekannt, daß das Vergießen von Bauteilen auf unebenen Flächen Probleme bereitet, weil die fließfähigen Massen sich in der Regel nahezu vollkommen nivellieren und deshalb sehr viel überlüssige Masse verwendet werden muß, um die Bauteile bis zu einer festgelegten Bauteilhöhe zu vergießen. Dieses Problem stellt sich beispielsweise beim Eingießen von Sockeln von Ständerbauwerken, bei der Befestigung von Schienenankern für Gleise von Hafenkränen oder auch bei der Verlegung von Eisenbahn-Schwellen auf festem Asphalt - oder Betongrund in Kurven, die eine Kurvenüberhöhung aufweisen. Je nach Baugelände und Untergrund hat man sich bisher damit beholfen, Schalungen einzusetzen oder eine kaum fließfähige Konsistenz des Mörtels oder des Asphaltes einstellte und die Masse nur im Bereich um das Bauteil konzentrierte, um durch Stampfen die Untergrundhohlräume um das Bauteil herum auszufüllen.It is known that the casting of components on uneven Surface problems because the flowable masses usually level almost completely and therefore very a lot of excess mass must be used to make up the Cast components up to a specified component height. This problem arises, for example, when pouring Pedestals of stud structures, when fastening Rail anchors for tracks on harbor cranes or at the Laying railway sleepers on solid asphalt - or Concrete base in curves that have a curve elevation. Depending on the construction site and the subsoil, you have been using it so far help to use formwork or a hardly flowable Set the consistency of the mortar or asphalt and that Mass concentrated only in the area around the component to pass through Stamp the underground cavities around the component to fill in.

In vielen Fällen muß aber zur Füllung der Unebenheiten unter den Bauteilen oder an den Bauteilkanten eine sehr fließfähiges Material verwendet werden. Als Beispiel sei das Vergießen von Betonschwellen auf einem Asphaltbetonbett genannt. Dabei hat die Vergußmasse mehrere Funktionen zu erfüllen. Über das Gleissystem eingebrachte Kräfte aus dem Eigengewicht der Verkehrsbelastung und den Temperaturspannungen zwischen Sommer- und Winterbetrieb müssen aufgenommen und in den Untergrund abgeleitet werden. Bei Fahrbetrieb entstehen an den Schwellen auch nach oben gerichtete Kräfte; daher muß die Vergußmasse auch in gewissem Maße Zugkräfte aufnehmen können. Für dieses Problem wendete man bisher eine Bauweise an, bei der das Gleisrost aus Betonschwellen und Schienen über höhenverstellbare Spindeln auf dem Unterbau abgestützt wird. Zur endgültigen Festlegung wurde das in der Höhen- und Längsrichtung exakt ausgerichtete Gleisrost mit einer speziellen bituminösen gießfähigen Masse unterfüllt. Die Zwischenräume zwischen den einzelnen Schwellen wurden zur Erhöhung des Längs- und Querverschiebewiderstandes ebenfalls ausgegossen bis etwa 2 oder 3 cm über der Schwellenunterkante. Nach fast vollständigem Erkalten des heiß eingebrachten Vergußes wurden die an den Schwellen angesetzten Spindeln entlastet und schließlich entfernt und so die Schwellen durch das Eigengewicht des Gleisrostes um das gewünschte Maß in die Vergußmasse versenkt. Dieses Verfahren ist insbesondere bei Kurvenüberhöhungen sehr aufwendig, da durch die Nivellierung der fließfähigen Massen ein erheblicher Überschuß an Material benötigt wird. Außerdem ist das Verfahren nur manuell auszuführen und behindert die Mechanisierung und Automatisierung des Verlegevorganges derartiger Gleise.In many cases, however, the bumps must be filled under the components or on the component edges a very flowable material can be used. As an example Pouring concrete sleepers on an asphalt concrete bed called. The potting compound has several functions fulfill. Forces brought in from the Dead weight of the traffic load and the Temperature voltages between summer and winter operation must be taken up and drained into the underground. When driving, thresholds also arise upwards directed forces; therefore the sealing compound must also be in can absorb tensile forces to a certain extent. For this problem  So far, one used a construction method in which the track grate from concrete sleepers and rails via height adjustable Spindles are supported on the substructure. To the final This became exact in the vertical and longitudinal direction aligned track grate with a special bituminous pourable mass underfilled. The gaps between the individual sleepers were used to increase the longitudinal and Transverse displacement resistance also poured out to about 2 or 3 cm above the lower edge of the sleeper. After almost complete cooling of the hot casting the spindles attached to the sleepers were relieved and finally removed and so the thresholds through that Own weight of the track grate in the desired dimension Potting compound sunk. This procedure is particularly useful for Elevating curves is very complex because of the leveling a considerable excess of the flowable masses Material is needed. Besides, the procedure is only run manually and hampers mechanization and Automation of the laying process of such tracks.

Von daher ist es Aufgabe der Erfindung ein Verfahren zum Vergießen von Bauteilen vorzuschlagen, das insbesondere auf unebenen Gründen oder an geneigten Untergründen angewendet werden kann, sowie einen höheren Mechanisierungsgrad ermöglicht und den Materialaufwand minimiert.It is therefore an object of the invention to provide a method for Potting components to suggest that particular on used on uneven grounds or on inclined surfaces can be, as well as a higher degree of mechanization enables and minimizes the cost of materials.

Die Aufgabe wird erfindungsgemäß durch den Anspruch 1 gelöst. Der Unteranspruch erfaßt eine Weiterbildung der Erfindung.The object is achieved by claim 1 solved. The subclaim covers a further development of Invention.

Das erfindungsgemäße Verfahren ermöglicht durch Verwendung hochfließfähiger, bei Raumtemperatur jedoch fester oder allenfalls für einige Zeit pastöser, Massen eine vollständige Unterfüllung von Bauteilhohlräumen, auch wenn die Zwischenräume sehr gering sind. Weitere Vorteile liegen in der Materialersparnis, da es mit dem erfindungsgemäßen Verfahren gelingt, die Bauteilumgebung weitgehend gleichmäßig dick anzufüllen. Insbesondere das Problem, Neigungsflächen mit bis zu 15% Gefälle relativ gleichmäßig anzufüllen wird gelöst. Bitumen oder Mörtel oder Asphalt in fließfähiger Konsistenz können aus großen Behältern über Pumpen und Leitungen oder Rinnen schnell und zielsicher vergossen werden, da das Vergießen an der höchsten Stelle des jeweiligen Vergießgrundes beginnt und somit zwangsläufig die Gießrichtung des Materials bestimmt ist. Das grobkörnige Füllmaterial - je nach Füllhöhe sind Schotter, Splitt, Kies oder auch Schlacken einsetzbar - kann von mitgeführten fahrbaren Vorratsbehältern mechanisch oder von Hand eingestreut werden. Je nach aufgebrachter Menge und Größe des Füllmaterial läßt sich der Bremseffekt und der Verteileffekt durch das Einstreuen steuern. Das Eigengewicht des Füllmaterials und der dadurch verursachte Druck bewirken eine Beschleunigung und Verdrängung des Vergußmaterials an der Streustelle und sorgen so für eine Optimierung des Fließvorganges der Vergußmasse an den Bauteilkanten. Zudem wird durch die Einstreuung härteren Materials als es die Vergußmasse ist, die Standfestigkeit und die Widerstandsfähigkeit des Vergußes gegen Längs- und Querkräfte sowie Temperaturspannungen erhöht.The method according to the invention enables through use more flowable, but more solid at room temperature or at most for some time pasty, masses one complete underfilling of component cavities, even if the gaps are very small. There are other advantages  in material savings, since it is with the invention Process succeeds, the component environment largely fill evenly thick. In particular the problem Slopes with a gradient of up to 15% are relatively even filling is solved. Bitumen or mortar or asphalt in flowable consistency can come from large containers Pumps and lines or channels quickly and accurately be shed because the shedding at the highest point of the respective potting base begins and therefore inevitably the pouring direction of the material is determined. The coarse-grained Filling material - depending on the filling level are gravel, grit, gravel or also slag can be used - can be carried by carried mobile storage containers mechanically or by hand be sprinkled. Depending on the amount and size applied of the filling material, the braking effect and the Control the spreading effect by sprinkling. The dead weight of the filling material and the pressure caused thereby an acceleration and displacement of the potting material the spreading point and thus optimize the Flow process of the sealing compound on the component edges. In addition, the bedding in harder material than it is the sealing compound, the stability and the Resistance of the potting against longitudinal and Lateral forces and temperature stresses increased.

Bei Verwendung des Verfahrens für das Vergießen von Betonschwellen beispielsweise, kann als Füllmaterial handelsüblicher Schotter eingesetzt werden, der so grobkörnig ist, daß er aus der Vergußmasse herausragt und so schallmindernd wirkt.When using the procedure for potting Concrete sleepers, for example, can be used as a filler commercial ballast can be used, the so is coarse-grained that it protrudes from the potting compound and such has a sound-reducing effect.

In der Regel ist das einzustreuende Material auch preiswerter als die Vergußmasse selbst. Somit wird die Wirtschaftlichkeit des Verfahrens weiter erhöht. Je nach Anwendungsbereich in der Bautechnik können als Vergußmassen Mörtelverbindungen wie Zementmörtel, Kunststoffmörtel oder spezieller Fließmörtel eingesetzt werden. Im Eisenbahnoberbau oder Straßenbau werden Kaltasphaltmörtel, bituminöse, mastix- oder gußasphaltähnliche Massen sowie zementgefüllte bitumenöse Massen verwendet. Die Fließfähigkeit wird in durch Erhitzen oder Zusetzen chemischer Mittel, die exoterme Reaktionen hervorrufen, beziehungsweise das Abbinden verzögern oder beschleunigen können, eingesetzt.As a rule, the material to be strewn is also cheaper than the potting compound itself Economy of the process further increased. Depending on Area of application in construction technology can be used as casting compounds Mortar connections such as cement mortar, plastic mortar or  special flowing mortar can be used. in the Railway superstructure or road construction become cold asphalt mortar, bituminous, mastic or mastic asphalt-like masses as well cement-filled bitumen-like masses are used. The Flowability is achieved by heating or clogging chemical agents that cause exotic reactions, or delay or accelerate the setting can, used.

Claims (2)

1. Verfahren zum abschnittsweisen Vergießen von mehreren Bauteilen mit pastösen Massen, gekennzeichnet durch folgende Verfahrenskombinationen:
  • - ortsgetreue Positionierung der Bauteile auf eingeebnetem Vergießgrund,
  • - Feststellen des höchsten Ebenenabschnittes einer Vergießfläche zwischen zwei Bauteilen,
  • - Vergießen der Masse beginnend am höchsten Ebenenabschnitt,
  • - Bremsen des Abfließens und teilweises Umleiten der Masse quer zur Gießrichtung durch Einstreuen von grobkörnigem Füllmaterial,
  • - Beenden des Vergießens, wenn die Vergießfläche mindestens zu einer vorbestimmten Bauteilhöhe gefüllt ist und die Masse unter oder um das Bauteil herum in die benachbarte Vergießfläche fließt.
1. Process for the section-wise casting of several components with pasty masses, characterized by the following process combinations:
  • - accurate positioning of the components on the leveled grout,
  • Determining the highest level section of a casting surface between two components,
  • - pouring the mass from the highest level section,
  • - braking of the outflow and partial redirection of the mass transversely to the pouring direction by sprinkling in coarse-grained filling material,
  • - Stop the potting when the potting surface is filled to at least a predetermined component height and the mass flows under or around the component in the adjacent potting surface.
2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß als Massen reine Materialien oder Mischungen aus der Gruppe Mörtel, Bitumen, Asphalt angewendet werden, die durch thermische oder chemische Behandlung in einen fließfähigen Phasenzustand versetzt sind.2. The method according to claim 1, characterized in that as masses of pure materials or mixtures of the Group mortar, bitumen, asphalt can be applied by thermal or chemical treatment in one flowable phase state are offset.
DE19893943229 1989-01-07 1989-12-22 Casting process for paste materials - involves multistage casting of construction sections, including insertion of coarse filler Withdrawn DE3943229A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19893943229 DE3943229A1 (en) 1989-01-07 1989-12-22 Casting process for paste materials - involves multistage casting of construction sections, including insertion of coarse filler

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE3900540 1989-01-07
DE19893943229 DE3943229A1 (en) 1989-01-07 1989-12-22 Casting process for paste materials - involves multistage casting of construction sections, including insertion of coarse filler

Publications (1)

Publication Number Publication Date
DE3943229A1 true DE3943229A1 (en) 1990-07-12

Family

ID=25876660

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19893943229 Withdrawn DE3943229A1 (en) 1989-01-07 1989-12-22 Casting process for paste materials - involves multistage casting of construction sections, including insertion of coarse filler

Country Status (1)

Country Link
DE (1) DE3943229A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10064748A1 (en) * 2000-09-12 2002-03-21 Boegl Max Bauunternehmung Gmbh Method and device for correcting the position of a slab structure made of precast concrete slabs

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3429413A1 (en) * 1984-08-09 1986-02-20 Alfred Kunz GmbH & Co, 8000 München Height-adjustable and laterally adjustable superstructure for rail lines with separable covering of sleepers on a jointless plate

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3429413A1 (en) * 1984-08-09 1986-02-20 Alfred Kunz GmbH & Co, 8000 München Height-adjustable and laterally adjustable superstructure for rail lines with separable covering of sleepers on a jointless plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10064748A1 (en) * 2000-09-12 2002-03-21 Boegl Max Bauunternehmung Gmbh Method and device for correcting the position of a slab structure made of precast concrete slabs
DE10064748B4 (en) * 2000-09-12 2014-10-16 Max Bögl Bauunternehmung GmbH & Co. KG Method and device for correcting the position of a slab construction made of precast concrete slabs

Similar Documents

Publication Publication Date Title
EP1417379B1 (en) Method for the continuous laying of a rail on a rigid track, in addition to an alignment device and a rigid track
DE2306428B2 (en) TRACK SUPERVISION AND METHOD FOR MANUFACTURING IT
EP0135478B1 (en) Method of stabilising soils so as to improve their bearing capacity
DE2063727A1 (en) Method for stabilizing a ballast bed
EP0663470B1 (en) Process for obtaining a superstructure for railway tracks
DE4401260C1 (en) Permanent waxy construction for railway tracks, esp. for high speed
DE3810700A1 (en) Method for producing a superstructure for railways
DE10046479A1 (en) Two-block concrete sleeper for fixed rail tracks
EP1576240B1 (en) Method for constructing a rigid track and a communication track
DE3943229A1 (en) Casting process for paste materials - involves multistage casting of construction sections, including insertion of coarse filler
WO2012130425A2 (en) Track way for rail-bound vehicles and track support for such a track way
EP0905319B1 (en) Railway track and its construction method
DE4423542A1 (en) Ballast for railway permanent way
DE3833720A1 (en) Method for producing a superstructure for railways
DE4325476A1 (en) Method for producing a substructure for a track for rail vehicles
DE10236535B4 (en) Process for the production of a slab track with the traverse method on bridges and other art structures
DE102007056408B4 (en) System and method for building a roadway
DE19837950A1 (en) Method for producing solid rail bed
DE10218309B4 (en) Track for railway vehicles with a ballast bed for tracks, process for its manufacture and a binder mixture for use in the process
DE2146159C3 (en) Railway superstructure
WO2009036990A1 (en) Railway superstructure devices
DE1658311B2 (en) METHOD OF LAYING RAILWAY TRACKS ON A SUBSTANTIAL LEVEL OF CONCRETE SUBSTRUCTURE
EP0698143A1 (en) Stable railway superstructure
AT500876B1 (en) METHOD FOR MANUFACTURING A FIXED RAILWAY RAILWAY
DE10319298A1 (en) Construction method for permanent way for railways, with construction of track bed incorporating antifreeze layer, sub base, concrete sub base, and thin asphalt layer to compensate for unevenness

Legal Events

Date Code Title Description
8127 New person/name/address of the applicant

Owner name: PREUSSAG STAHL AG, 3150 PEINE, DE

8110 Request for examination paragraph 44
8139 Disposal/non-payment of the annual fee
8170 Reinstatement of the former position
8127 New person/name/address of the applicant

Owner name: PROJEKTGEMEINSCHAFT FESTE FAHRBAHN SYSTEM SATO GLE

8139 Disposal/non-payment of the annual fee