DE3644793A1 - Method for producing a foundation by integrating a prefabricated part, in particular a support, in a situ-cast foot - Google Patents

Method for producing a foundation by integrating a prefabricated part, in particular a support, in a situ-cast foot

Info

Publication number
DE3644793A1
DE3644793A1 DE19863644793 DE3644793A DE3644793A1 DE 3644793 A1 DE3644793 A1 DE 3644793A1 DE 19863644793 DE19863644793 DE 19863644793 DE 3644793 A DE3644793 A DE 3644793A DE 3644793 A1 DE3644793 A1 DE 3644793A1
Authority
DE
Germany
Prior art keywords
finished part
nozzle
foot
borehole
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19863644793
Other languages
German (de)
Other versions
DE3644793C2 (en
Inventor
Joachim Dipl Ing Berg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Keller Grundbau GmbH
Original Assignee
GKN Keller GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GKN Keller GmbH filed Critical GKN Keller GmbH
Priority to DE19863644793 priority Critical patent/DE3644793A1/en
Publication of DE3644793A1 publication Critical patent/DE3644793A1/en
Application granted granted Critical
Publication of DE3644793C2 publication Critical patent/DE3644793C2/de
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/32Prefabricated piles with arrangements for setting or assisting in setting in position by fluid jets

Abstract

A method for producing a foundation by integrating a prefabricated part, in particular a support, in a situ-cast foot is specified. A borehole and also a foot, which adjoins the latter in the axial direction, are produced by means of a drill column also by means of a jet method known per se. According to the proposal of the invention, the prefabricated part is used as drill column for sinking the borehole and pile foot; at least one nozzle is arranged on the prefabricated part. The borehole and pile foot are sunk one after the other and are both supported and kept open using a supporting fluid. Subsequently, a binder, for example a cement suspension or the like, is introduced and the prefabricated part is positioned in the pile foot at the desired depth. To increase both the ultimate load and the bond between prefabricated part and situ-cast foot, a binder, preferably a cement suspension, is injected into the situ-cast foot after the setting of the pile foot. <IMAGE>

Description

Die Erfindung betrifft ein Verfahren zum Herstellen einer Gründung durch Einbinden eines Fertigteils, insbesondere einer Stütze, in einen Ortfuß, wobei das Fertigteil in Richtung seiner Längsachse wenigstens einen hierzu paral­ lelen rohrförmigen Kanal, Öffnung od. dgl. aufweist, und ein Bohrloch sowie ein sich an dieses in Axialrichtung anschließender Fuß mittels eines Bohrgestänges sowie unter Anwendung eines Düsenstrahlverfahrens hergestellt werden und das Fertigteil in das Bohrloch derart eingebracht wird, daß es in ausreichender Tiefe im Ortfuß einbindet.The invention relates to a method for producing a Foundation by incorporating a finished part, in particular a prop, into a base, with the finished part in Direction of its longitudinal axis at least one parallel to this lelen tubular channel, opening or the like. Has, and a borehole and an axially attached to it subsequent foot using a drill pipe and under Application of a jet process and the finished part is introduced into the borehole in such a way that it ties into the foot of the site to a sufficient depth.

In der DE-OS 34 16 679 wurde bereits ein Verfahren zum Her­ stellen einer Gründung durch Einbinden eines Fertigteils, insbesondere einer Stütze, in einen Ortfuß vorgeschlagen. In DE-OS 34 16 679 a method for the Her establishing a foundation by integrating a finished part, in particular a prop, proposed in a base.  

Das Fertigteil weist hierzu einen parallelen rohrförmigen Kanal, Öffnung od. dgl. auf. Nach dem Niederbringen eines Bohrlochs sowie eines sich an dieses in Axialrichtung an­ schließenden Fußes wird das Fertigteil in das Bohrloch der­ art eingebracht, daß es in ausreichender Tiefe im Ortfuß kraftschlüssig einbindet.For this purpose, the finished part has a parallel tubular one Channel, opening or the like. After bringing down one Borehole as well as one to this in the axial direction When the foot closes, the finished part is inserted into the borehole Art introduced that there is sufficient depth in the local foot integrates non-positively.

Das insoweit schon vorgeschlagene Verfahren zeichnet sich dabei durch die Kombination folgender Merkmale aus:The procedure already proposed in this respect stands out by combining the following features:

  • a) der Ortfuß wird auf (in) einem tragfähigen Untergrund unter Anwendung einer injizierten Zementsuspension bzw. unter Einbringung von Beton hergestellt,a) the base is placed on a stable surface using an injected cement suspension or manufactured using concrete,
  • b) das über dem Ortfuß liegende Bohrloch wird mittels einer Stützflüssigkeit, insbesondere mittels einer Zementsus­ pension, gestützt und offengehalten,b) the borehole lying above the base is by means of a Support fluid, especially by means of a cement pension, supported and kept open,
  • c) die durch das Fertigteil verdrängte Zementsuspension dringt zumindest teilweise in die Bodenrandzone des Bohr­ lochs ein,c) the cement suspension displaced by the finished part penetrates at least partially into the bottom edge zone of the drill hole in,
  • d) ein ein- oder mehrteilig ausgebildeter und dem besseren Übertragen der Einbindekraft des Fertigteils auf den Ortfuß dienender Anker ist durch den rohrförmigen Kanal des Fertigteils bis in den Ortfuß hindurchgeführt,d) a one or more parts trained and the better Transfer the binding force of the finished part to the Anchor serving as base is through the tubular channel the finished part is led into the base,
  • e) die Kontaktzone zwischen Fertigteil und Ortfuß wird nach dem Einsetzen des Fertigteils in den Ortfuß nach­ verpreßt,e) the contact zone between the finished part and the base becomes after inserting the finished part into the base pressed,
  • f) das Verpressen des freibleibenden Bohrlochs erfolgt bei trockenen und standfesten Bodenrandzonen zusätzlich durch den rohrförmigen Kanal des Fertigteils von unten nach oben.f) the remaining borehole is pressed additional dry and stable bottom edge zones through the tubular channel of the finished part from below up.

Wiewohl dieses Verfahren bereits alle wesentlichen Voraus­ setzungen für eine erfolgreiche Anwendung in der Praxis besitzt, ist es Aufgabe der vorliegenden Erfindung, ein weiteres und vor allem noch einfacheres Gründungsverfah­ ren zu finden. Dabei soll es dieses Verfahren zudem eben­ falls erlauben, hohe Einzellasten über eine Zone nichttrag­ fähigen Baugrunds in tieferliegende, tragfähige Schichten derart zu übertragen, daß diese Kräfte bei kleinstmögli­ chem Querschnitt des Fertigteils über einen wesentlich verstärkten Ortfuß sicher in den Untergrund eingeleitet werden können. Das die Kräfte aufnehmende Fertigteil, etwa ein Pfahl od. dgl., soll zugleich sereinmäßig herstellbar und für den jeweiligen Anwendungsfall berechenbar, kon­ trollierbar und belastbar sowie von der Beschaffenheit der Bodenschichten weitgehend unabhängig sein. Aufgabe der vor­ liegenden Erfindung ist es schließlich auch, den Aufwand an Material und Zeit zu verringern sowie schließlich die Si­ cherheit der Standfestigkeit der Pfahlkonstruktion zu er­ höhen.Although this procedure already all essential advance setting for a successful application in practice  has, it is an object of the present invention, a another and above all even easier start-up procedure to find. It is also supposed to be this procedure if permitted, high individual loads over a zone not load capable building ground in deeper, stable layers to be transferred in such a way that these forces are kept to a minimum chem cross section of the finished part over an essential Reinforced foot securely introduced into the ground can be. The finished part, which absorbs the forces, for example a pile or the like, is also intended to be manufactured serially and calculable for the respective application, kon trollable and resilient as well as the nature of the Soil layers are largely independent. Task of before After all, the invention lies at the expense Reduce material and time, and finally the Si to ensure the stability of the pile construction heights.

Erfindungsgemäß wird diese Aufgabe durch die Kombination folgender Merkmale gelöst:According to the invention, this object is achieved by the combination solved the following features:

  • a) als Bohrgestänge zum Abteufen des Bohrlochs und des Pfahlfußes wird das Fertigteil benutzt,a) as a drill pipe for sinking the borehole and the The prefabricated part is used,
  • b) am Fertigteil ist wenigstens eine Düse angeordnet,b) at least one nozzle is arranged on the finished part,
  • c) Bohrloch und Pfahlfuß werden hintereinander abgeteuft und mittels einer Stützflüssigkeit sowohl gestützt als auch offengehalten, wobei sodann das Bindemittel, etwa Zementsuspension od. dgl., eingebracht wird,c) The borehole and pile foot are sunk one after the other and both supported by means of a support fluid as well as kept open, the binder, about cement suspension or the like, is introduced,
  • d) das Fertigteil wird hernach im Pfahlfuß auf Solltiefe positioniert,d) the finished part is then in the pile foot to the desired depth positioned,
  • e) sowohl zur Traglasterhöhung als auch zur Erhöhung des Verbunds zwischen Fertigteil und Ortfuß erfolgt nach Erhärten des Pfahlfußes eine Bindemittel-Injektion, vorzugsweise eine Zementsuspension, in den Ortfuß.e) both to increase the payload and to increase the  The bond between the prefabricated part and the base is carried out Hardening the pile foot with a binder injection, preferably a cement suspension, in the local foot.

Weitere erfindungswesentliche Merkmale lassen sich den Unteransprüchen 2 bis 24 entnehmen.Other features essential to the invention can be See subclaims 2 to 24.

Von besonderem Vorteil erweist es sich bei der insoweit vorgeschlagenen Erfindung, daß das Abteufen von Bohrloch und Pfahlfuß sowie auch das Einsetzen des Fertigteils in einem Zuge erfolgen kann. Es liegt auf der Hand, hierdurch die Bohr- und Montagezeiten zu verkürzen.In this respect, it proves to be particularly advantageous proposed invention that drilling wells and pile foot as well as the insertion of the finished part in one move can take place. It is obvious from this shorten the drilling and assembly times.

Ein weiterer, nicht unerheblicher Vorteil ergibt sich zu­ dem durch die Kombination der hohen Bohrgeschwindigkeit des Düsenstrahlverfahrens mit dem zugleich als Bohrwerk­ zeug ausgebildeten Fertigteil.Another not inconsiderable advantage arises by combining the high drilling speed the jet process with the same time as a boring machine finished part.

Schließlich besteht ein Vorteil auch darin, daß neben der Zeitersparnis bei der Herstellung des Pfahlsystems das Offenhalten eines unverrohrten Bohrlochs mit der Gefahr des Eintretens von Nachfall trotz Stützflüssigkeit ver­ mieden wird.Finally, there is an advantage that in addition to the Time savings in the manufacture of the pile system Keeping an uncased borehole open with the hazard of the occurrence of a fall despite supporting fluid is avoided.

In den Zeichnungen ist die Erfindung anhand eines Ausfüh­ rungsbeispiels dargestellt. Dabei zeigtIn the drawings, the invention is based on an embodiment example shown. It shows

Fig. 1 das Abteufen des Bohrlochs mit dem Fertigteil als Bohrgestänge, Fig. 1, the drilling of the borehole with the drill string as a finished part,

Fig. 2 das Abteufen des Pfahlfußes mit dem Fertigteil als Bohrgestänge, Fig. 2, the sinking of the pile base with the finished part as the drill string,

Fig. 3 die Endposition des Fertigteils mit Einbindung in den Pfahlfuß, und schließlich Fig. 3 shows the final position of the finished part with integration in the pile foot, and finally

Fig. 4 einen Querschnitt durch das Bohrloch mit dem darin befindlichen Fertigteil. Fig. 4 shows a cross section through the borehole with the finished part located therein.

In den Fig. 1 bis 3 wird der Erfindungsgegenstand mit Hilfe eines an sich bekannten Düsenstrahlverfahrens her­ gestellt. Dabei ist in Fig. 1 das Abteufen des durch die Bohrlochwand 2 in Radialrichtung begrenzten Bohrlochs er­ sichtlich, während in Fig. 2 das Abteufen des Pfahlfußes 4 und in Fig. 3 die Endposition des Fertigteils 1 mit seiner Einbindung in den Pfahlfuß gezeigt ist. Der Quer­ schnitt entsprechend Fig. 4 läßt einige der rohrförmigen Kanäle, Öffnungen od. dgl. 7 erkennen, die parallel zur Längsachse im Fertigteil 1 angeordnet sind. Während mit 6 ein Anker zur Erhöhung der Traglast gekennzeichnet ist, ist das das Bohrloch umgebende Erdreich od. dgl. mit 8 markiert.In Figs. 1 to 3, the subject invention is provided by means of a per se known jet grouting forth. In Fig. 1, the sinking of the borehole bounded by the borehole wall 2 in the radial direction is evident, while in Fig. 2 the sinking of the pile foot 4 and in Fig. 3 the end position of the prefabricated part 1 with its integration into the pile foot is shown. The cross-section shown in FIG. 4 can od some of the tubular channels, openings. Like. 7 recognize that are arranged parallel to the longitudinal axis of the finished Part 1. While 6 is an anchor to increase the load, the soil surrounding the borehole or the like is marked with 8 .

  • Bezugszeichenliste:  1 Fertigteil
     2 Bohrlochwand
     3 Bohrlochringraum
     4 Pfahlfuß (in erhärtetem Zustand = Ortfuß)
     5 Austretendes Flüssigkeits-Boden-Gemisch
     6 Anker
     7 Achsparalleler Kanal, Öffnung od. dgl.
     8 Erdreich
     9 Pumpleitung
    10 Düse(n)
    Reference symbol list: 1 finished part
    2 borehole wall
    3 well annulus
    4 pile foot (in hardened condition = site foot)
    5 Escaping liquid-soil mixture
    6 anchors
    7 axially parallel channel, opening or the like
    8 soil
    9 pump line
    10 nozzle (s)

Claims (24)

1. Verfahren zum Herstellen einer Gründung durch Einbinden eines Fertigteils, insbesondere einer Stütze, in einen Ortfuß, wobei das Fertigteil in Richtung seiner Längs­ achse wenigstens einen hierzu parallelen rohrförmigen Ka­ nal, Öffnung oder dgl. aufweist, und ein Bohrloch sowie ein sich an dieses in Axialrichtung anschließender Fuß mittels eines Bohrgestänges sowie unter Anwendung eines Düsenstrahlverfahrens hergestellt werden und das Fertig­ teil in das Bohrloch derart eingebracht wird, daß es in ausreichender Tiefe im Ortfuß kraftschlüssig einbindet, gekennzeichnet durch die Kombination folgender Merkmale:
  • a) als Bohrgestänge zum Abteufen des Bohrlochs und des Pfahlfußes wird das Fertigteil benutzt,
  • b) am Fertigteil ist wenigstens eine Düse angeordnet,
  • c) Bohrloch und Pfahlfuß werden hintereinander abgeteuft und mittels einer Stützflüsssigkeit sowohl gestützt als auch offengehalten, wobei sodann das Bindemittel, etwa Zementsuspension oder dergleichen, eingebracht wird,
  • d) das Fertigteil wird hernach im Pfahlfuß auf Solltiefe positioniert,
  • e) sowohl zur Traglasterhöhung als auch zur Erhöhung des Verbunds zwischen Fertigteil und Ortfuß erfolgt nach Erhärten des Pfahlfußes eine Bindemittel-Injektion, vorzugsweise eine Zementsuspension, in den Ortfuß.
1. A method for producing a foundation by incorporating a prefabricated part, in particular a support, into a place foot, wherein the prefabricated part has at least one parallel tubular channel, opening or the like in the direction of its longitudinal axis, and a borehole and one itself foot in the axial direction using a drill pipe and using a jet-blasting process and the finished part is inserted into the borehole in such a way that it engages non-positively at a sufficient depth in the base, characterized by the combination of the following features:
  • a) the prefabricated part is used as a drill pipe for sinking the borehole and the pile foot,
  • b) at least one nozzle is arranged on the finished part,
  • c) the borehole and the pile foot are sunk one after the other and both supported and kept open by means of a supporting liquid, the binder, for example cement suspension or the like, then being introduced,
  • d) the finished part is then positioned in the pile base at the desired depth,
  • e) both to increase the load capacity and to increase the bond between the prefabricated part and the base, a binder injection, preferably a cement suspension, takes place in the base after the pile base has hardened.
2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß zur Traglasterhöhung ein oder mehrere Anker durch ein oder mehrere der rohrförmigen Kanäle des Fertigteils bis in den Pfahlfuß geführt werden.2. The method according to claim 1, characterized, that one or more anchors through a or more of the tubular channels of the finished part to be guided into the pile foot. 3. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß das Abteufen des Bohrlochs mit der bzw. den am Fer­ tigteil angebrachten Düse(n) unter Drehung des Fertig­ teils um seine Längsachse sowie unter Bewegung in seiner Längsachse erfolgt.3. The method according to claim 1, characterized, that the sinking of the borehole with the or the Fer part attached nozzle (s) while rotating the finish partly around its longitudinal axis and with movement in its Longitudinal axis takes place. 4. Verfahren nach Anspruch 3, dadurch gekennzeichnet, daß die Düse(n) im wesentlichen nach unten gerichtet ist bzw. sind.4. The method according to claim 3, characterized, that the nozzle (s) is directed essentially downwards or are. 5. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß das Abteufen des Pfahlfußes mit der bzw. den am Fer­ tigteil angeordneten, im wesentlichen seitlich gerichte­ ten, Düse(n) unter gleichzeitiger Bewegung des Fertig­ teils in seiner Längsrichtung und Drehung um seine Längs­ achse erfolgt. 5. The method according to claim 1, characterized, that the sinking of the pile foot with the or the Fer tigteil arranged, essentially side dishes ten, nozzle (s) with simultaneous movement of the finished product partly in its longitudinal direction and rotation about its longitudinal axis is done.   6. Verfahren nach Anspruch 1, 3 und 4, dadurch gekennzeichnet, daß am Fertigteil eine solche Vielzahl von Düsen angeord­ net ist, die zum Abteufen des Bohrlochs lediglich das Be­ wegen des Fertigteils in seiner Längsachse bedingen.6. The method according to claim 1, 3 and 4, characterized, that such a large number of nozzles is arranged on the finished part net is that only for loading the borehole due to the finished part in its longitudinal axis. 7. Verfahren nach Anspruch 1 und 5, dadurch gekennzeichnet, daß, bedingt durch die Vielzahl der am Fertigteil ange­ ordneten Düsen, das Herstellen des Pfahlfußes ausschließ­ lich durch Bewegung des Fertigteils in seiner Längsrich­ tung erfolgt.7. The method according to claim 1 and 5, characterized, that, due to the large number of prefabricated parts arranged nozzles, excluding the manufacture of the pile foot Lich by moving the finished part in its longitudinal direction tion takes place. 8. Verfahren nach Anspruch 1 und einem oder mehreren der folgenden, dadurch gekennzeichnet, daß das Abteufen des Bohrlochs mit einer oder mehreren auf einem Düsenträger angeordneten Düse(n) durch Drehung des Fertigteils um und gleichzeitiger Bewegung in seiner Längsachse erfolgt, wobei der Düsenträger an einem Ge­ stänge durch eine Öffnung des Fertigteils eingefahren und mit ihm lösbar verbunden ist.8. The method according to claim 1 and one or more of the following characterized, that sinking the borehole with one or more nozzle (s) arranged on a nozzle carrier by rotation of the finished part around and simultaneous movement in its Longitudinal axis takes place, the nozzle carrier on a Ge rods retracted through an opening in the finished part and is releasably connected to it. 9. Verfahren nach Anspruch 1 und einem oder mehreren der folgenden, dadurch gekennzeichnet, daß das Abteufen des Pfahlfußes mit einer oder mehreren auf einem Düsenträger angeordneten, im wesentlichen seit­ lich angeordneten, Düse(n) durch Drehung des Fertigteils um und gleichzeitiger Bewegung in seiner Längsachse er­ folgt, wobei der Düsenträger an einem Gestänge durch ei­ ne Öffnung des Fertigteils eingefahren und mit ihm lös­ bar verbunden ist. 9. The method according to claim 1 and one or more of the following characterized, that sinking the pile foot with one or more arranged on a nozzle carrier, essentially since Lich arranged nozzle (s) by rotating the finished part um and simultaneous movement in its longitudinal axis he follows, the nozzle carrier on a rod by egg ne opening of the finished part retracted and released with it bar is connected.   10. Verfahren nach Anspruch 8, dadurch gekennzeichnet, daß am Düsenträger eine solche Vielzahl von Düsen ange­ ordnet ist, die zum Abteufen des Bohrlochs lediglich ei­ ne Bewegung des Fertigteils in seiner Längsrichtung be­ dingen.10. The method according to claim 8, characterized, that on the nozzle carrier such a variety of nozzles is arranged, which only for sinking the borehole ne movement of the finished part in its longitudinal direction things; matters. 11. Verfahren nach Anspruch 9, dadurch gekennzeichnet, daß, bedingt durch die Vielzahl der am Düsenträger ange­ ordneten Düsen, das Herstellen des Pfahlfußes ausschließ­ lich durch Bewegung des Fertigteils in seiner Längsrich­ tung erfolgt.11. The method according to claim 9, characterized, that, due to the variety of the nozzle holder arranged nozzles, excluding the manufacture of the pile foot Lich by moving the finished part in its longitudinal direction tion takes place. 12. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß das Abteufen des Bohrlochs mit einer oder mehreren auf einem Düsenträger angeordneten Düse(n) durch Drehung des Düsenträgers um seine Längsachse und gleichzeitige Bewegung von Düsenträger und Fertigteil in ihren Längs­ achsen erfolgt, wobei der Düsenträger an einem Gestänge durch eine Öffnung des Fertigteils eingefahren ist.12. The method according to claim 1, characterized, that sinking the borehole with one or more nozzle (s) arranged on a nozzle carrier by rotation of the nozzle carrier about its longitudinal axis and simultaneous Movement of nozzle holder and finished part in their longitudinal axles, the nozzle holder on a linkage through an opening in the finished part. 13. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß das Abteufen des Pfahlfußes mit einer oder mehreren auf einem Düsenträger angeordneten, im wesentlichen seit­ lich gerichteten Düse(n) durch Drehung des Düsenträgers um seine Längsachse und gleichzeitige Bewegung von Düsen­ träger und Fertigteil in ihren Längsachsen erfolgt, wobei der Düsenträger an einem Gestänge durch eine Öffnung des Fertigteils eingefahren ist. 13. The method according to claim 1, characterized, that sinking the pile foot with one or more arranged on a nozzle carrier, essentially since Lich directed nozzle (s) by rotating the nozzle holder about its longitudinal axis and simultaneous movement of nozzles beam and finished part in their longitudinal axes, whereby the nozzle holder on a rod through an opening of the Finished part is retracted.   14. Verfahren nach Anspruch 12, dadurch gekennzeichnet, daß am Düsenträger eine Vielzahl von Düsen angeordnet ist, die zum Abteufen des Bohrlochs lediglich die Bewe­ gung des Düsenträgers und gegebenenfalls des Fertigtei­ les in ihren Längsachsen bedingen.14. The method according to claim 12, characterized, that a plurality of nozzles are arranged on the nozzle carrier is only the movement to sink the borehole supply of the nozzle holder and, if necessary, the finished part les in their longitudinal axes. 15. Verfahren nach Anspruch 13, dadurch gekennzeichnet, daß am Düsenträger eine Vielzahl von im wesentlichen seitlich gerichteten Düsen angeordnet ist, die zum Ab­ teufen des Pfahlfußes lediglich die Bewegung des Düsen­ trägers und gegebenenfalls des Fertigteiles in ihren Längsachsen bedingen.15. The method according to claim 13, characterized, that on the nozzle holder a variety of essentially laterally directed nozzles is arranged to Ab of the pile foot only the movement of the nozzle carrier and possibly the finished part in their Condition longitudinal axes. 16. Verfahren nach Anspruch 1 und 12 bis 15, dadurch gekennzeichnet, daß sowohl wenigstens eine Düse zum Abteufen des Bohr­ lochs als auch wenigstens eine Düse zum Abteufen des Pfahlfußes übereinander derart angeordnet sind, daß beim Einführen des Düsenträgers in das Fertigteil die der Her­ stellung des Pfahlfußes dienende(n) Düse(n) zunächst in­ nerhalb des Fertigteils verbleibt bzw. verbleiben und dieses erst zur Herstellung des Pfahlfußes wieder verlas­ sen.16. The method according to claim 1 and 12 to 15, characterized, that both at least one nozzle for sinking the drill holes as well as at least one nozzle for sinking the Pile base are arranged one above the other such that when Insert the nozzle holder into the finished part of the Her position of the pile foot serving nozzle (s) initially in remains or remain within the finished part and only read this out again to produce the pile foot sen. 17. Verfahren nach Anspruch 1 sowie einem oder mehreren der folgenden, dadurch gekennzeichnet, daß zum Abteufen von Bohrloch und Pfahlfuß Wasser oder ein anderes geeignetes liquides Medium benutzt wird, das zugleich als Stützflüssigkeit dient. 17. The method according to claim 1 and one or more of the following characterized, that for sinking borehole and pile base water or another suitable liquid medium is used which also serves as a support fluid.   18. Verfahren nach Anspruch 1 sowie einem oder mehreren der folgenden, dadurch gekennzeichnet, daß über eine oder mehrere der dem Abteufen dienenden Düsen Bindemittelsuspension, wie etwa Zementsuspension od. dgl., verpumpt wird, die sich zunächst mit dem Flüs­ sigkeits-Boden-Gemisch des Pfahlfußes vermischt und so­ dann als Ortfuß verfestigt.18. The method according to claim 1 and one or more of the following characterized, that about one or more of those serving the sinking Nozzles of binder suspension, such as cement suspension od. Like., Is pumped, which is initially with the river liquid-soil mixture of the pile foot mixed and such then solidified as a base. 19. Verfahren nach Anspruch 1 sowie einem oder mehreren der folgenden, dadurch gekennzeichnet, daß über eine oder mehrere der dem Abteufen dienenden Düsen Bindemittelsuspension, wie etwa Zementsuspension od. dgl., verpumpt wird, die sich gleichermaßen mit dem Flüssigkeits-Boden-Gemisch des Pfahlfußes und dem des Bohrloch-Ringraums vermischt und sodann verfestigt.19. The method according to claim 1 and one or more of the following characterized, that about one or more of those serving the sinking Nozzles of binder suspension, such as cement suspension or the like, is pumped, which is equally with the Liquid-soil mixture of the pile foot and that of the Borehole annulus mixed and then solidified. 20. Verfahren nach Anspruch 1 sowie einem oder mehreren der folgenden, dadurch gekennzeichnet, daß über eine oder mehrere der im Fertigteil vorgesehen­ en Kanäle, Öffnungen od. dgl. Bindemittelsuspension, wie etwa Zementsuspension od. dgl., verpumpt wird, die das Flüssigkeits-Boden-Gemisch des Pfahlfußes über den Bohr­ loch-Ringraum hinweg verdrängt und sich sodann als Ort­ fuß verfestigt.20. The method according to claim 1 and one or more of the following characterized, that provided over one or more of those in the finished part channels, openings or the like. Binder suspension, such as about cement suspension or the like, which is pumped Liquid-soil mixture of the pile foot over the drill Loch-Ringraum displaced and then as a place solidified foot. 21. Verfahren nach Anspruch 1 sowie einem oder mehreren der folgenden, dadurch gekennzeichnet, daß über eine oder mehrere der im Fertigteil vorgesehen­ en Kanäle, Öffnungen od. dgl. Beton verpumpt wird, der das Flüssigkeits-Gemisch des Pfahlfußes über den Bohr­ loch-Ringraum hinweg verdrängt und sich sodann als Ort­ fuß verfestigt.21. The method according to claim 1 and one or more of the following characterized,  that provided over one or more of those in the finished part channels, openings or the like. Concrete is pumped, the the liquid mixture of the pile foot over the drill Loch-Ringraum displaced and then as a place solidified foot. 22. Verfahren nach Anspruch 20 oder 21, dadurch gekennzeichnet, daß beim Verpumpen Bindemittelsuspension, wie etwa Ze­ mentsuspension, oder Beton zusätzlich den Ringraum zwischen Bohrlochwand und Mantel des Fertigteils aus­ füllt und sodann verfestigt.22. The method according to claim 20 or 21, characterized, that when pumping binder suspension, such as Ze suspension, or concrete additionally the annulus between the borehole wall and the casing of the finished part fills and then solidifies. 23. Verfahren nach Anspruch 1 sowie einem oder mehreren der folgenden, dadurch gekennzeichnet, daß zum Abteufen von Bohrloch und Pfahlfuß eine Binde­ mittelsuspension, wie etwa Zementsuspension od. dgl., verwendet wird, die zugleich als Stützflüssigkeit dient.23. The method according to claim 1 and one or more of the following characterized, that a bandage for sinking the borehole and pile base medium suspension, such as cement suspension or the like, is used, which also serves as a support fluid. 24. Verfahren nach Anspruch 23, dadurch gekennzeichnet, daß die in Bohrloch und Pfahlfuß befindliche Bindemittel­ suspension derart mit Bindemittel, wie etwa Zementsus­ pension od. dgl., angereichert wird, daß sie Tragfunk­ tion erfüllt.24. The method according to claim 23, characterized, that the binders in the borehole and pile base suspension with a binder such as cement pension or the like, is enriched that they have portable radio tion fulfilled.
DE19863644793 1986-12-31 1986-12-31 Method for producing a foundation by integrating a prefabricated part, in particular a support, in a situ-cast foot Granted DE3644793A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19863644793 DE3644793A1 (en) 1986-12-31 1986-12-31 Method for producing a foundation by integrating a prefabricated part, in particular a support, in a situ-cast foot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19863644793 DE3644793A1 (en) 1986-12-31 1986-12-31 Method for producing a foundation by integrating a prefabricated part, in particular a support, in a situ-cast foot

Publications (2)

Publication Number Publication Date
DE3644793A1 true DE3644793A1 (en) 1988-07-14
DE3644793C2 DE3644793C2 (en) 1992-02-27

Family

ID=6317423

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19863644793 Granted DE3644793A1 (en) 1986-12-31 1986-12-31 Method for producing a foundation by integrating a prefabricated part, in particular a support, in a situ-cast foot

Country Status (1)

Country Link
DE (1) DE3644793A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4111604A1 (en) * 1991-04-10 1992-10-15 Keller Grundbau Gmbh METHOD FOR PRODUCING CONCRETE AND CEMENT BODIES IN THE FLOOR
DE4302986A1 (en) * 1993-02-03 1994-08-04 Zueblin Ag Cut-and-cover construction of tunnel or underground garage
DE29509386U1 (en) * 1995-06-08 1995-08-24 Stange Ulrich Injection lance for injecting injection bodies into the ground
DE4441335A1 (en) * 1994-11-08 1996-05-09 Atisage Jean Samuel D Ngoumtsa Device and method for producing deep foundations
DE10122001A1 (en) * 2001-05-05 2002-11-07 Zueblin Ag Prefabricated trench anchorage post has armoured high-pressure shaft

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3416679A1 (en) * 1984-05-05 1985-11-14 Gkn Keller Gmbh, 6050 Offenbach Method and apparatus for producing foundations by embedding precast members, in particular pillars, in the end base

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3416679A1 (en) * 1984-05-05 1985-11-14 Gkn Keller Gmbh, 6050 Offenbach Method and apparatus for producing foundations by embedding precast members, in particular pillars, in the end base

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4111604A1 (en) * 1991-04-10 1992-10-15 Keller Grundbau Gmbh METHOD FOR PRODUCING CONCRETE AND CEMENT BODIES IN THE FLOOR
DE4302986A1 (en) * 1993-02-03 1994-08-04 Zueblin Ag Cut-and-cover construction of tunnel or underground garage
DE4441335A1 (en) * 1994-11-08 1996-05-09 Atisage Jean Samuel D Ngoumtsa Device and method for producing deep foundations
DE29509386U1 (en) * 1995-06-08 1995-08-24 Stange Ulrich Injection lance for injecting injection bodies into the ground
DE10122001A1 (en) * 2001-05-05 2002-11-07 Zueblin Ag Prefabricated trench anchorage post has armoured high-pressure shaft

Also Published As

Publication number Publication date
DE3644793C2 (en) 1992-02-27

Similar Documents

Publication Publication Date Title
DE102018123794B3 (en) Method for producing a tip-pressure-free component
DE3416679C2 (en)
DE3445965A1 (en) COMPACTING DEPTH, METHOD AND DEVICE FOR PRODUCING THE SAME
DE102005001227A1 (en) Method for improving a foundation in the ground comprises inserting columns having a lower bound section made from mortar or cement and an upper bound section made from ballast
DE2403988A1 (en) PROCEDURE FOR MAKING OR STABILIZING A FOUNDATION USING STAKES EXTENDING THE GROUND
DE10239278B4 (en) Foundation for hydraulic structures
DE2422489C2 (en) Earth drill and method for inserting piles or the like.
DE4224042A1 (en) Method and device for pile foundation
DE3644793A1 (en) Method for producing a foundation by integrating a prefabricated part, in particular a support, in a situ-cast foot
EP2003251B1 (en) Holder stem
EP0151389B1 (en) Method and apparatus for constructing building elements in the soil like piles, injection anchorages, cut-off walls or similar
DE2229383A1 (en) METHOD AND DEVICE FOR CONSOLIDATING THE SOIL, IN PARTICULAR FOR THE FOUNDATION OF PILES OR SIMILAR FOUNDATION STRUCTURES
DE2413418C3 (en) Method of making pile foundations and precast concrete pile for use in this method
DE3100733A1 (en) METHOD FOR FASTENING OBJECTS TO FINISHED CONCRETE OR STONE WALLS, AND DEVICE FOR IMPLEMENTING THE METHOD
DE3926787C2 (en) Method and device for inserting and anchoring a tensile pile
CH693934A5 (en) Method for earth and rock anchor bore drilling uses drill crown to which drill pipe is attached to define annular space for evacuation of hardened material
EP1108818A2 (en) Active foundation
DE19744322C1 (en) Method of placing anchor piles in friable soils
EP3789469B1 (en) Method for producing a base module
DE3543059A1 (en) Method of stabilising soil sections
DE3400741C2 (en)
EP0048959A2 (en) Load-bearing foundation element, especially in reinforced concrete
DE19838487C1 (en) Drill pipe used for jet injection into the subsoil
CH634370A5 (en) Method of placing a pile, a girder or a sheet pile, use of the method, and drill for carrying out the method
DE2342581C3 (en) Method for producing a grout anchor and device for carrying out the method

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8127 New person/name/address of the applicant

Owner name: KELLER GRUNDBAU GMBH, 6050 OFFENBACH, DE

D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee