DE3642786A1 - Process for damming-off burning heaps - Google Patents
Process for damming-off burning heapsInfo
- Publication number
- DE3642786A1 DE3642786A1 DE19863642786 DE3642786A DE3642786A1 DE 3642786 A1 DE3642786 A1 DE 3642786A1 DE 19863642786 DE19863642786 DE 19863642786 DE 3642786 A DE3642786 A DE 3642786A DE 3642786 A1 DE3642786 A1 DE 3642786A1
- Authority
- DE
- Germany
- Prior art keywords
- ring
- washing
- stockpile
- heap
- rings
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62C—FIRE-FIGHTING
- A62C3/00—Fire prevention, containment or extinguishing specially adapted for particular objects or places
- A62C3/02—Fire prevention, containment or extinguishing specially adapted for particular objects or places for area conflagrations, e.g. forest fires, subterranean fires
Abstract
Description
Die Erfindung betrifft ein Verfahren zur Abdämmung brennender Halden wie insbesondere Bergehalden, Müllhalden u. dgl.The invention relates to a method for insulation Burning heaps like in particular rock heaps, rubbish heaps u. the like
Um eine brennende Halde unter Kontrolle zu bekommen, ist es erforderlich, die Zufuhr von Sauerstoff zu unterbin den oder zumindest so gering zu halten, daß ein Ausbruch bzw. ein Ausbreiten des offenen Brandes vermieden wird. Dabei ist auch zu beachten, daß sich eine starke gesund heitliche Gefährdung für in der Nähe der brennenden Halde lebende Menschen und Tiere durch hierbei entstehende Oxyde und andere freiwerdende Stoffe ergeben kann. Die regelmäßig entstehende Geruchsbelästigung ist je nach Windrichtung und Windstärke unangenehm bzw. unzumutbar.To get a burning heap under control is it is necessary to stop the supply of oxygen to keep the or at least so low that an outbreak or spreading of the open fire is avoided. It should also be noted that a strong healthy common danger for near the burning heap living people and animals caused by this Oxides and other released substances can result. The Regularly occurring odor nuisance depends on Wind direction and wind force uncomfortable or unreasonable.
Bei der Aufhaldung von Bergen ist es in der Vergangenheit nicht möglich gewesen, Berge-Material und noch brennbare Bestandteile so zu trennen, daß ein Brand durch Selbst entzündung hätte vermieden werden können. Der Anteil an brennbarem Material einer Bergehalde ist unterschiedlich, macht jedoch mindestens 50% aus. Bei den vielen Millionen Tonnen Material einer Berge-Halde stellt der brennbare Anteil ein Volumen dar, das im Falle der Zündung mit her kömmlichen Mitteln bislang nicht zu beherrschen ist. Da eine brennende Halde in der Regel Jahrzehnte brennt, ist eine Lösung dieses Problems jedoch von größter Bedeutung.It was in the past when mountains were piled up mountains of material and still flammable Separate components so that a fire by itself inflammation could have been avoided. The share of flammable material of a tailings pile is different, however, makes up at least 50%. With the many millions The combustible provides tons of material from a mountain dump Proportion represents a volume that comes with in the case of ignition conventional means has not yet been mastered. There a burning heap is usually burning for decades a solution to this problem is of paramount importance.
Der Erfindung liegt daher die Aufgabe zugrunde, ein technisch wirksames und wirtschaftlich realisierbares Verfahren der eingangs genannten Art anzugeben.The invention is therefore based on the object technically effective and economically feasible Specify procedures of the type mentioned at the beginning.
Das zur Lösung dieser Aufgabe vorgesehene Verfahren ist erfindungsgemäß dadurch gekennzeichnet, daß um die Halde mit Abstand von der Haldenflanke ein Waschbergering auf gebaut wird, daß der ringförmige Zwischenraum zwischen Haldenflanke und Waschbergering mit einem hydraulischen Abbinder verfüllt wird, und daß die vorgenannten Ver fahrensschritte wiederholt werden, wobei jeder weitere Waschbergering auf dem darunterliegenden Waschbergering aufgebaut wird und in Anpassung an den Böschungswinkel der Halde bzw. des Waschbergerings nach innen versetzt wird.The method provided to accomplish this task is characterized in that around the stockpile a washer ring at a distance from the stockpile flank is built that the annular space between Heap flank and washing ring with a hydraulic Binder is backfilled, and that the aforementioned ver steps are repeated, with each additional Washer ring on the washer ring below is built up and adapted to the slope angle the stockpile or washer ring offset inwards becomes.
Als hydraulischer Abbinder wird vorzugsweise Flugasche oder Füller, Kalksteinmehl, Rehagips oder ähnliches ab dichtendes Material verwendet. Durch Einfüllen des Ab binders zwischen Bergering und Halde ist sowohl bergering seitig als auch haldenseitig ein Injektionseffekt zu be obachten, welcher in hohem Maße die Gewähr für eine gas dichte Ummantelung der Halde bietet. Während somit der Abbinder die brennende Halde in erster Linie gasdicht ab schließt, soll der durch die Waschbergeringe gebildete Mantel für die Wasserdichtheit der Anordnung sorgen.Fly ash is the preferred hydraulic binder or filler, limestone powder, rehab gypsum or similar sealing material used. By filling in the Ab binders between Bergering and Halde is both bergering an injection effect on both sides and on the heap side care, which is to a large extent the guarantee of a gas offers a dense coating of the stockpile. So while the First of all, bind the burning stockpile gas-tight closes, the one formed by the washing rings should Coat ensure the arrangement is watertight.
Ein ganz besonderer Vorteil des erfindungsgemäßen Ver fahrens ist darin zu sehen, daß es mit bergwerkseigenem Abfallmaterial, welches ohnehin aufgehaldet werden müßte, ausgeführt werden kann.A very special advantage of the Ver driving can be seen in the fact that it has a mine Waste material that should be piled up anyway, can be executed.
Gemäß einem weiteren vorteilhaften Merkmal der Erfindung wird jeder einzelne Waschbergering vor Aufbau des nächsten Waschbergerings verdichtet, um die gewünschte Wasser dichtigkeit herzustellen. Je nach verwendetem Material des Waschbergerings kann es für ein Erreichen der ge wünschten Verdichtung oft bereits genügen, den Ring mit schweren Arbeitsmaschinen und Lastwagen zu befahren. According to a further advantageous feature of the invention each individual washer ring will be built before the next one Waschbergerings compacted to the desired water to produce tightness. Depending on the material used of the washing ring can be used to achieve the ge desired compression is often sufficient, the ring with driving heavy machinery and trucks.
Gemäß einem weiteren Erfindungsmerkmal ist vorgesehen, daß zunächst das Erdreich am Fuß der Halde bis zum Er reichen eines standfesten Untergrundes in der Breite des anschließend einzubringenden Ringes aus Waschbergen und hydraulischem Abbinder entfernt wird. In diesem Fall be findet sich das Niveau des untersten Waschbergerings un terhalb des Fußes der Halde.According to a further feature of the invention, that first the soil at the foot of the heap until Er range of a stable subsurface in the width of the Subsequent ring from wash mountains and hydraulic binder is removed. In this case be the level of the lowest washing ring is found below the foot of the heap.
Gemäß einem weiteren vorteilhaften Merkmal der Erfindung wird das obere Ende der Halde, das Halden-Plateau, da durch versiegelt, daß beim Erreichen des Halden-Plateaus ein weiterer Waschbergering aufgebaut wird, dessen Ober seite das Halden-Plateau übersteigt, und daß anschließend der innerhalb des obersten Waschbergeringes liegende Raum mit hydraulischem Abbinder verfüllt wird. Dieser oberste Waschbergering weist vorzugsweise eine Dicke von ca. 3 bis 4 Metern auf. Zweckmäßigerweise kann auf der obersten Schicht von hydraulischem Abbinder noch eine abschließen de Lage von Waschbergen aufgebracht werden.According to a further advantageous feature of the invention the upper end of the stockpile, the stockpile plateau, there sealed by that when reaching the Halden plateau another washer ring is built, the upper side of the Halden plateau, and that afterwards the room located within the uppermost washer ring is filled with hydraulic binder. This top one Waschbergering preferably has a thickness of about 3 to 4 meters up. Conveniently, the top can Complete one layer of hydraulic binder de location of wash mountains.
Weitere vorteilhafte Merkmale der Erfindung ergeben sich aus den übrigen Unteransprüchen in Verbindung mit der nachfolgenden Beschreibung, in der ein Ausführungsbeispiel der Erfindung anhand der Zeichnung näher erläutert wird. Die einzige Figur der Zeichnung erläutert anhand eines Querschnitts durch eine Bergehalde samt Waschbergeringe und Abbinder das erfindungsgemäße Verfahren.Further advantageous features of the invention result from the other subclaims in connection with the following description in which an embodiment the invention is explained in more detail with reference to the drawing. The single figure of the drawing explains using a Cross-section through a dump with washing rings and binders the inventive method.
In der Figur ist die brennende Bergehalde mit der Bezugs ziffer 1 bezeichnet. Sie weist beispielsweise eine Höhe von 80 Metern und einen Fußdurchmesser von 140 Metern auf. Die Halde 1 sei insgesamt etwa kegelstumpfförmig. Der Fuß der Halde ist mit Bezugsziffer 2, das Plateau mit Bezugsziffer 3 und die Flanke mit Bezugsziffer 4 be zeichnet.In the figure, the burning pile of waste is designated by the reference number 1 . For example, it has a height of 80 meters and a foot diameter of 140 meters. The heap 1 is approximately frustoconical. The foot of the stockpile is marked with reference number 2 , the plateau with reference number 3 and the flank with reference number 4 .
Zunächst wird rund um die Halde 1 herum das am Fuß der Halde befindliche Erdreich abgeschoben, bis man einen standfesten Untergrund 5 erreicht. Anschließend wird als erste Lage ein Waschbergering W 1 um die Halde herum ein gebaut. Der Einbau hat hierbei derart zu erfolgen, daß die innere Flanke des Waschbergerings W 1 von der (ver längerten) Flanke 4 (bzw. 4′) der Halde 1 beabstandet ist. Das Material des Waschbergerings W 1 weist beispielsweise eine Körnung von 0 bis 120 mm auf. Durch geeignete Ver dichtung beispielsweise durch Befahren des Waschberge ringes mittels schwerer Arbeitsmaschinen und/oder Last wagen wird der Waschbergering W 1 praktisch wasserdicht gemacht.First, the soil located at the foot of the heap is pushed around the heap 1 until you reach a stable base 5 . Then a washing ring W 1 is built around the heap as the first layer. The installation must be carried out in such a way that the inner flank of the washing ring W 1 is spaced from the (extended) flank 4 (or 4 ' ) of the stockpile 1 . The material of the washing ring W 1 has, for example, a grain size of 0 to 120 mm. By suitable sealing, for example by driving on the washing mountain ring using heavy machinery and / or trucks, the washing ring W 1 is made practically watertight.
Anschließend wird der im Querschnitt etwa trapezförmige ringförmige Zwischenraum 6 zwischen Haldenflanke, Ring flanke und Untergrund mit Flugasche-Suspension 7 ver füllt. Der mit Flugasche gefüllte ringförmige Raum 6 sorgt auch mit seiner Injektionswirkung für eine gas dichte Abschirmung der Haldenflanke 4. Hierdurch wird die Sauerstoffzufuhr von unten nach oben wesentlich verrin gert, so daß fortschreitend mit dem Aufbau der äußeren Ringe eine Eindämmung des Brandes die Folge ist.Then the cross-section approximately trapezoidal annular space 6 between the flank flank, ring flank and underground is filled with fly ash suspension 7 ver. The annular space 6 filled with fly ash also ensures gas-tight shielding of the stockpile flank 4 with its injection effect. As a result, the oxygen supply from the bottom up is substantially reduced, so that progressively with the build-up of the outer rings, the fire is contained.
Im Falle des vorstehenden Ausführungsbeispiels beträgt die Breite des Ringes etwa 10 m. Die Breite des im Quer schnitt trapezförmigen, ringförmigen, mit Flugasche ge füllten Raumes 6 beträgt ca. 0,4-2,5 m. Die Dicke einer Ring lage des Waschbergeringes liegt je nach Verdichtungs fähigkeit des Materials zwischen 1 bis 3 m.In the case of the above exemplary embodiment, the width of the ring is approximately 10 m. The width of the cross-section trapezoidal, ring-shaped, filled with fly ash space 6 is approximately 0.4-2.5 m. The thickness of a ring layer of the washer ring is between 1 and 3 m depending on the compressibility of the material.
Nach Fertigstellung der ersten Lage bestehend aus Wasch bergering W 1 und flugaschegefülltem Raum 6 wird in der vorstehend beschriebenen Weise ein weiterer Waschberge ring W 2 aufgebaut, der entsprechend der Böschung der Halde 1 einen kleineren Durchmesser aufweist als der unterste Waschbergering W 1. Anschließend wird der zwi schen der innenliegenden Flanke des Waschbergerings W 2 und der Flanke 4 der Halde 1 sowie dem Raum 6 ent stehende Raum 6′ wiederum mit Flugaschen-Suspension ver füllt. Das Verfahren wird in der beschriebenen Weise fort gesetzt, bis der oberste Waschbergering W n in etwa die Höhe des Plateaus 3 der Halde 1 erreicht. Anschließend wird hierauf ein letzter Waschbergering W x aufgebaut, der eine Dicke von etwa 3 bis 4 m aufweist. Der innerhalb dieses Waschbergerings W x eingeschlossene, unten durch das Plateau 3 begrenzte Raum 8 wird ebenfalls mit einer Flugaschen-Suspension 7 verfüllt, so daß das Plateau 3 vollständig abgedeckt ist. Hierdurch wird auch im Bereich des Plateaus 3 eine Injektionswirkung erreicht, die eine weitere Gas- und Wasserdichtigkeit bewirkt. Beim Ver füllen des Raumes 8 ist darauf zu achten, daß diese Ver füllung von außerhalb des Plateaus zu erfolgen hat, so daß kein Arbeiter das Plateau betreten muß.After completion of the first layer consisting of tailings ring W 1 and flugaschegefülltem space 6 is in the manner described above, a further tailings ring W 2 constructed, which has a smaller diameter corresponding to the slope of the heap 1 than the lowest tailings ring W1. Then the inter mediate of the inside flank of the washing ring W 2 and the flank 4 of the heap 1 and the room 6 ent space 6 'again filled with fly ash suspension ver. The process is continued in the manner described until the top washing ring W n reaches approximately the height of the plateau 3 of the heap 1 . Then a last washing ring W x is built up, which has a thickness of about 3 to 4 m. The space 8 enclosed within this washer ring W x and delimited below by the plateau 3 is also filled with a fly ash suspension 7 , so that the plateau 3 is completely covered. As a result, an injection effect is achieved in the area of the plateau 3 , which brings about a further gas and water tightness. When filling the room Ver 8 , care must be taken that this filling must take place from outside the plateau, so that no worker has to enter the plateau.
Als letzte Schicht wird abschließend nochmals eine Schicht 10 aus Waschbergen aufgebracht und gegebenenfalls ver dichtet.Finally, as the last layer, another layer 10 of wash mountains is applied and optionally sealed.
Während des Aufbaus der Waschbergeringe an der Halden flanke und später auch auf dem Plateau ist es zweckmäßig, ständig Kohlenstoffmessungen und andere Messungen durch zuführen, um eine Kontrolle über die Dichtigkeit zu haben.During the construction of the washing rings on the dump flank and later on the plateau it is advisable constantly taking carbon measurements and other measurements feed to have control over the tightness.
Unter wirtschaftlichen Gesichtspunkten ist es bei der Abdämmung brennender Bergehalden besonders vorteilhaft, daß die Abdämmung mit bergwerkseigenem Abfallmaterial, welches ohnehin aufgehaldet werden müßte, durchgeführt werden kann.From an economic point of view, it is with the Isolation of burning piles of rock is particularly advantageous, that the insulation with mine waste material, which should be piled up anyway can be.
Es ist darauf hinzuweisen, daß schon während des Aufbaus der Waschbergeringe die Belastung der Umwelt durch Geruch und Rauchgase verringert wird, so daß sie nach und nach nicht mehr wahrgenommen wird.It should be noted that already during construction the washing rings the pollution of the environment by smell and fumes is reduced so that they gradually is no longer perceived.
Es versteht sich, daß anstelle von Flugasche auch andere geeignete bzw. zur Verfügung stehende Abbinder verwendet werden können, wie Kalksteinmehl, Rehagips, Füller oder ähnliches Materi al, durch welches die notwendige Abdichtung erzielt wer den kann.It goes without saying that instead of fly ash, other suitable or available binders can be used such as limestone flour, Rehagips, filler or similar materials al, through which the necessary sealing is achieved that can.
Unter Anwendung des erfindungsgemäßen Grundprinzips, wie es oben unter Bezugnahme auf das Abdämmen eines Berghal denbrandes erläutert wurde, lassen sich auch mit einigen kleinen, dem jeweiligen Fall entsprechenden Änderungen Müllhaldenbrände bzw. andersartige Großflächenbrände be herrschen.Using the basic principle of the invention, such as it above with reference to the tamping of a berghal denbrandes was explained, can also be with some small changes appropriate to the case Garbage dump fires or other large-scale fires to rule.
Claims (13)
- a) daß um die Halde (1) mit Abstand von der Halden flanke (4) ein Waschbergering (W 1) aufgebaut wird,
- b) daß der ringförmige Zwischenraum (6) zwischen Haldenflanke und Waschbergering mit einem hydrau lischen Abbinder (7) verfüllt wird, und
- c) daß die Verfahrensschritte a) und b) wiederholt werden, wobei jeder weitere Waschbergering auf dem darunterliegenden Waschbergering aufgebaut wird und in Anpassung an den Böschungswinkel der Halde bzw. des Waschbergerings nach innen ver setzt wird.
- a) that a washing ring ( W 1 ) is built up around the stockpile ( 1 ) at a distance from the stockpile flank ( 4 ),
- b) that the annular space ( 6 ) between the slope flank and washing ring with a hy metallic binder ( 7 ) is filled, and
- c) that the process steps a) and b) are repeated, with each additional washing ring being built up on the washing ring underneath and being adjusted inwards in adaptation to the slope angle of the stockpile or the washing ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19863642786 DE3642786A1 (en) | 1986-12-15 | 1986-12-15 | Process for damming-off burning heaps |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19863642786 DE3642786A1 (en) | 1986-12-15 | 1986-12-15 | Process for damming-off burning heaps |
Publications (1)
Publication Number | Publication Date |
---|---|
DE3642786A1 true DE3642786A1 (en) | 1988-06-23 |
Family
ID=6316217
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19863642786 Withdrawn DE3642786A1 (en) | 1986-12-15 | 1986-12-15 | Process for damming-off burning heaps |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE3642786A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10110831A1 (en) * | 2001-03-06 | 2002-09-12 | Stockhausen Chem Fab Gmbh | Fire-prevention and -fighting with paper, plastics and metal waste stored in incinerator bunker uses jetted quencher which is water-in-oil or water-in-water polymer dispersion |
EP1649943A1 (en) * | 2004-10-22 | 2006-04-26 | Kügler, Jost-Ulrich, Dipl.-Ing. | Process for treating burning landfills |
CN107725051A (en) * | 2017-10-09 | 2018-02-23 | 北京科技大学 | A kind of municipal solid wastes deep-well closing and filling mining method |
-
1986
- 1986-12-15 DE DE19863642786 patent/DE3642786A1/en not_active Withdrawn
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10110831A1 (en) * | 2001-03-06 | 2002-09-12 | Stockhausen Chem Fab Gmbh | Fire-prevention and -fighting with paper, plastics and metal waste stored in incinerator bunker uses jetted quencher which is water-in-oil or water-in-water polymer dispersion |
EP1649943A1 (en) * | 2004-10-22 | 2006-04-26 | Kügler, Jost-Ulrich, Dipl.-Ing. | Process for treating burning landfills |
CN107725051A (en) * | 2017-10-09 | 2018-02-23 | 北京科技大学 | A kind of municipal solid wastes deep-well closing and filling mining method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0292941B1 (en) | Arrangement for retaining contaminants from contaminated landfill leachates with an inorganic sealing layer and method of manufacturing said layer | |
DE3005366A1 (en) | PROCESS FOR THE BREAKAGE OF MIGHTY COALS IN AT LEAST TWO BENCHES AND STRENGTHENING SOLUTION TO CARRY OUT IT | |
EP0303775B1 (en) | Method for making a tunnel by using a driving shield | |
DE3642786A1 (en) | Process for damming-off burning heaps | |
EP0591630B1 (en) | Method for saving place in a dump by compacting waste by tamping | |
DE4131391A1 (en) | Sealing system for steeply sloping dumps - has inner sealing membrane with reinforcements and special surface texture, drainage layer, and outermost covering of suitable material | |
DE3425788A1 (en) | Landfill site for recovering decomposition gases | |
DE3604940A1 (en) | Method and apparatus for placing an impervious layer under a landfill site | |
EP0214359A1 (en) | Posterior sealing employing mining techniques | |
DE102012004980A1 (en) | Method for stabilizing subsoil of road and building, for use in removal of e.g. building load in stable region, involves compressing and moving jacket tube to floor material installation site, while holding sheath at lower end of soil | |
DE19632154C5 (en) | Heap cover and method of making the same | |
DE19721833C1 (en) | Covering for artificially formed salt slag heap | |
DE4107023C2 (en) | METHOD FOR THE INTERIM STORAGE OF PLASTIC WASTE | |
DE4312267C2 (en) | Segment shaft for landfills and other high deposits | |
DE3827441C2 (en) | ||
AT391637B (en) | METHOD FOR STRENGTHENING AND / OR SEALING OLD DESTINATIONS OF WASTE | |
EP3633143B1 (en) | Methods and materials for producing a closure structure | |
DE680722C (en) | Method and device for sintering and roasting ores u. like | |
DE4025329A1 (en) | METHOD AND DEVICE FOR EXCHANGING FLOORS, ESPECIALLY IN ADDITION TO TRAFFIC PATHS AND CONSTRUCTIONS | |
EP1649943B1 (en) | Process for treating burning landfills | |
DE8608549U1 (en) | Reinforced concrete container for a container landfill | |
DE2326071A1 (en) | PROCESS FOR THE INSULATION OF VERTICAL AND HORIZONTAL BUILDING FLOOR, WALL AND CEILING SURFACES BY USING A PRESS CHAMBER, IN PARTICULAR WITH STRUCTURAL FLOORS THAT ARE TRAFFIC TO TRAFFIC | |
DE3006662C2 (en) | Process for the dumping of bulk material from the extraction of hard coal, preferably from mountains | |
DE3929530C2 (en) | Formwork to be arranged around a vertical shaft and method for manufacturing the formwork | |
DE4240236A1 (en) | Biodegradable soil stabilising system which can be fully planted over - inclined stabilising elements consisting of waste timber, packing materials etc. preferably attached to flexible strip are set into banks, etc.. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8139 | Disposal/non-payment of the annual fee |