DE3110920C2 - Method for anchoring the bottom of an underwater structure against buoyancy - Google Patents

Method for anchoring the bottom of an underwater structure against buoyancy

Info

Publication number
DE3110920C2
DE3110920C2 DE19813110920 DE3110920A DE3110920C2 DE 3110920 C2 DE3110920 C2 DE 3110920C2 DE 19813110920 DE19813110920 DE 19813110920 DE 3110920 A DE3110920 A DE 3110920A DE 3110920 C2 DE3110920 C2 DE 3110920C2
Authority
DE
Germany
Prior art keywords
clamping
water
ground anchor
jack
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19813110920
Other languages
German (de)
Other versions
DE3110920A1 (en
Inventor
Helmut 6800 Mannheim Hilbert
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bilfinger SE
Original Assignee
Bilfinger und Berger Bau AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bilfinger und Berger Bau AG filed Critical Bilfinger und Berger Bau AG
Priority to DE19813110920 priority Critical patent/DE3110920C2/en
Publication of DE3110920A1 publication Critical patent/DE3110920A1/en
Application granted granted Critical
Publication of DE3110920C2 publication Critical patent/DE3110920C2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Description

4040

3030th

Die Erfindung betrifft ein Verfahren zur Verankerung der Sohle eines Unte^wasser^aukörpers gegen Auftrieb mit von oberhalb des Wasserspiegels durch die Sohle hindurch in den Baugrund eingebrachten, aus dem J5 Wasser ragenden Erdankern, die mittels von einem über Wasser gelegenen Steuerstand bedienbarer Spannpressen vorgespannt werden.The invention relates to a method for anchoring the bottom of an underwater body against buoyancy with ground anchors protruding from the water above the water level and protruding from the water, which are pretensioned by means of jacks that can be operated from a steering position above the water .

Die Sohle eines unter Wasser herzustellenden Baukörpers, z. B. eines in offener Bauweise zu erstellenden Tunnels muß vor der Absenkung des Wassers über der Sohle gegen die darunter anstehenden Auftriebskräfte gesichert sein.The sole of a structure to be produced under water, e.g. B. one in an open design The tunnel to be created must before the lowering of the water above the floor against the one below Buoyancy forces must be secured.

Bei diesem bekannten Verfahren zur Herstellung einer gegen Auftrieb gesicherten Unterwasserbetonsohle nach der DE-PS 20 22 787 werden die als Erdanker dienenden Zugpfähle, nach der Herstellung der Unterwasserbetonsohle eingebaut und über einen sich gegen die Unterwasserbetonsohle abstützenden Spannstuhl mit einer oberhalb des Wasserspiegels angeordneten Spannpresse gespannt. Die aufgebrachte Vorspannung wird dann gegen die Unterwasserbetonsohle durch Andrehen einer Mutter unter Wasser mit einem Spezialschlüssel von der Arbeitsbühne aus festgelegt.In this known method for producing an underwater concrete base secured against buoyancy According to DE-PS 20 22 787, the tension piles serving as ground anchors are after manufacture built into the underwater concrete base and over a supporting against the underwater concrete base Tensioning chair tensioned with a tensioning press arranged above the water level. The angry Prestressing is then applied against the underwater concrete base by turning a nut underwater using it a special key from the work platform.

Dieses Verfahren erfordert aufwendige umsetzbare Stützkonstruktionen, mit denen die Spannpresse über Wasser gegen die Bauwerkssohle abgestützt wird, und es ist nur mit Erdankern mit einem Gewindekopf anwendbar.This method requires complex convertible support structures with which the jack over Water is propped up against the base of the structure, and it is only possible with ground anchors with a threaded head applicable.

Bei Kenntnis der bisher vorhandenen Nachteile liegt der Erfindung die Aufgabe zugrunde, die zur Sicherung einer Unterwasserbetonsohle von oberhalb des Wasserspiegels aus durch sie hindurch eingebrachten Erdanker in einfacher Weise gegen die Oberfläche der Unterwasserbetonsohle zu spannen und zu verankern.With knowledge of the previously existing disadvantages, the invention is based on the object of securing an underwater concrete base from above the water level from ground anchors inserted through it to clamp and anchor in a simple manner against the surface of the underwater concrete base.

Die Aufgabe wird mit den im kennzeichnenden Teil der Patentansprüche angegebenen Verfarc-ensschritten gelöst.The task is accomplished with the process steps indicated in the characterizing part of the patent claims solved.

Das Verfahren nach der Erfindung hat den Vorteil daß das Vorspannen und das Verankern der Erdanker an der Sohle des Unterwasserbaukörpers ohne die Umleitung der Stützkräfte bis über den Wasserspiegel und ohne die hierfür erforderlichen Hilfskonstruktionen direkt an der Bauwerksohle erfolgen kann.The method according to the invention has the advantage that the prestressing and anchoring of the ground anchors at the bottom of the underwater structure without diverting the supporting forces to above the water level and can be carried out directly on the base of the building without the auxiliary structures required for this.

Die Erfindung wird nachstehend anhand eines in der Zeichnung dargestellten Ausführungsbeispiels darge stellt. Es zeigtThe invention is illustrated below with reference to an embodiment shown in the drawing represents. It shows

F i g. 1 einen Schnitt durch die Baugrube undF i g. 1 a section through the excavation and

F i g. 2 eine Seitenansicht des Spannkopfes.F i g. 2 is a side view of the clamping head.

Die Baugrübe ist begrenzt durch Spundwände 1 und die unter Wasser eingebrachte Betonsohle 2 des Bauwerks. Erdanker 3 sind in üblicher Weise durch die Betonsohle 2 hindurch geführt und im Erdreich verankert. Eine Druckverteilerplatte 4, ein Spannkopf 5 für Keilverankerung mit eingesetz;en Keilen 6 und eine Spannpresse 7 sind auf einen Erdanker 3 aufgeschoben und beispielsweise mittels Bindedraht 8 miteinander derart verbunden, daß der Bindedraht während des Vorspannens aufreißen muß.The pit is limited by sheet piling 1 and the concrete base 2 of the structure, which was brought under water. Ground anchors 3 are in the usual way by the Concrete base 2 passed through and anchored in the ground. A pressure distribution plate 4, a clamping head 5 for wedge anchoring with inserted wedges 6 and one Clamping jacks 7 are pushed onto a ground anchor 3 and are connected to one another, for example by means of binding wire 8 connected in such a way that the binding wire must tear open during pretensioning.

Dazu wird der Bindedraht 8 zwischen der Druckverteilerplatte 4 und dem beim Vorspannen ausfahrenden Teil 9 der Spannpresse 7 angeordnet. Die Spannpresse 7 ist mit einem Seil 10 verbunden, mit dem sie gemeinsam mit der angehängten Druckverteilerplatte 4 und dem Spannkopf 5 entlang dem Erdanker 3 bis auf die Oberfläche der Betonsohle 2 abgelassen wird. Alle zum Spannen des Erdankers 3 erforderlichen Funktionen der Spannpresse 7 wie das Festhaken des Erdankers 3, das Spannen des Erdankers 3, das Einpressen der Keile 6 in den Spannkopf 5 und das anschließende Lösen der Festhaltung des Erdankers 3 werden von einem über Wasser angeordneten Steuerstand 11 ausgeschaltet. Danach wird die Spannpresse 7 mit dem Seil 10, mit dem die Spannpresse über Druckschläuche 15 verbunden ist, über Wasser hochgezogen und wie beschrieben auf den nächsten Erdanker umgesetzt. Zur Unterfütterung der Druckverteilerolatte 4 wird wahlweise ein ringförmiger, mit Zement gefüllter Jutebeutel 12 über den Erdanker 3 auf die Oberfläche der Betonsohle 2 abgelassen (F i g. 2). Beim Spannen des Erdankers 3 wird dieser Jutebeutel 12, in den Wasser eindringen kann, zwischen der Betonsohle 2 und der Druckverteilerplatte 4 zerquetscht und ergibt so einen Ausgleich etwa vorhandener Unebenheiten auf der Oberfläche der Betonsohle 2. Zum Ausgleich solcher Unebenheiten kann auch ein kugeliger Ankerkopf 13, der in einer Pfanne 14 gelagert ist, verwendet werden.For this purpose, the binding wire 8 is inserted between the pressure distribution plate 4 and the one that extends during the pretensioning Part 9 of the clamping jack 7 is arranged. The clamping jack 7 is connected to a rope 10 with which it is common with the attached pressure distribution plate 4 and the clamping head 5 along the ground anchor 3 except for the Surface of the concrete base 2 is drained. All of the functions required for tensioning the ground anchor 3 Tensioning press 7 such as the hooking of the ground anchor 3, the tensioning of the ground anchor 3, the pressing in of the wedges 6 in the clamping head 5 and the subsequent loosening of the holding of the ground anchor 3 are carried out by an over Water-arranged steering position 11 switched off. Then the jack 7 with the rope 10, with the the jack is connected via pressure hoses 15, pulled up over water and as described on the next ground anchor implemented. For lining the pressure distribution plate 4, an annular, Jute bag 12 filled with cement is lowered over the ground anchor 3 onto the surface of the concrete base 2 (FIG. 2). When tensioning the ground anchor 3, this jute bag 12, into which water can penetrate, between the Concrete base 2 and the pressure distribution plate 4 are crushed and thus compensates for any existing ones Unevenness on the surface of the concrete base 2. To compensate for such unevenness, a spherical anchor head 13, which is mounted in a pan 14, can be used.

Hierzu 2 Blatt ZeichnungenFor this purpose 2 sheets of drawings

Claims (2)

Patentansprüche:Patent claims: 1. Verfahren zur Verankerung der Sohle eines Unterwasserbaukörpers gegen Auftrieb mit von oberhalb des Wasserspiegels durch die Sohle ; hindurch in den Baugrund eingebrachten, aus dem Wasser ragenden Erdankern, die mittels von einem über Wasser gelegenen Steuerstand bedienbarer Spannpressen vorgespannt werden, dadurch gekennzeichnet, daß eine Druckverteilerplatte (4), ein Spannkopf (5) für Keilverankerungen mit lose eingesetzten Keilen (6) und eine in allen Funktionen fernsteuerbare Spannpresse (7) auf den über Wasser ragenden Teil jedes Erdankers (3) aufgeschoben und miteinander lösbar verbünde a t5 werden, dann gemeinsam mittels eines Seils (10) auf die Unterwasserbetonssohle (2) abgelassen, daß danach von dem Steuerstand (11) aus das Spannen und Verkeilen des Erdankers (3) erfolgt und anschließend die Spannpresse (7) vom Spannkopf (5) gelöst wird und daß danach die Spannpresse (7) wieder über den Wasserspiegel hochgezogen wird.1. A method for anchoring the sole of an underwater structure against buoyancy from above the water level through the sole ; Ground anchors protruding out of the water which are brought through into the subsoil and are prestressed by means of clamping jacks which can be operated from a control station located above the water, characterized in that a pressure distribution plate (4), a clamping head (5) for wedge anchors with loosely inserted wedges (6) and one in all functions remotely controllable clamping jack (7) on the protruding over water part of each ground anchor (3) pushed and releasably connected to each other a t5, then lowered together by means of a rope (10) on the underwater concrete floor (2), that then from the control station (11) from the clamping and wedging of the ground anchor (3) takes place and then the clamping jack (7) is released from the clamping head (5) and that then the clamping jack (7) is pulled up again above the water level. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß vor dem Ablassen der Druckverteilerplatte (4) ein ringförmiger, mit Zement gefüllter ,5 Jutebeutel (12) über den Erdanker (3) auf die Oberfläche der Betonsoh!-; (2) abgelassen wird.2. The method according to claim 1, characterized in that before the discharge of the pressure distribution plate (4) an annular, cement-filled, 5 Jute bag (12) over the ground anchor (3) on the surface of the Betonsoh! -; (2) is drained.
DE19813110920 1981-03-20 1981-03-20 Method for anchoring the bottom of an underwater structure against buoyancy Expired DE3110920C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19813110920 DE3110920C2 (en) 1981-03-20 1981-03-20 Method for anchoring the bottom of an underwater structure against buoyancy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19813110920 DE3110920C2 (en) 1981-03-20 1981-03-20 Method for anchoring the bottom of an underwater structure against buoyancy

Publications (2)

Publication Number Publication Date
DE3110920A1 DE3110920A1 (en) 1982-09-30
DE3110920C2 true DE3110920C2 (en) 1982-12-02

Family

ID=6127818

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19813110920 Expired DE3110920C2 (en) 1981-03-20 1981-03-20 Method for anchoring the bottom of an underwater structure against buoyancy

Country Status (1)

Country Link
DE (1) DE3110920C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19604523A1 (en) * 1996-02-08 1997-09-04 Bauer Spezialtiefbau Elevated sealing bed manufactured by high pressure injection or submerged concrete

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1316341A (en) * 1962-02-28 1963-01-25 Process intended for the construction of the foundations of structures below the level of the liquid table in a dry excavation
DE2022787C3 (en) * 1970-05-09 1974-03-21 Philipp Holzmann Ag, 6000 Frankfurt Process for the production of an underwater concrete base secured against buoyancy
DE2354172A1 (en) * 1973-10-30 1975-05-15 Brueckner Grundbau Gmbh Anchoring for preventing buoyancy lift of structures - uses temporary tensioning members operated above ground water level
FR2373645A1 (en) * 1976-12-13 1978-07-07 Ingemer Prestressed sea-bed base for anchoring large structure - comprises plate, indented underneath for concrete, drilled for tie-rods penetrating sea-bed and prestressing jacks

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19604523A1 (en) * 1996-02-08 1997-09-04 Bauer Spezialtiefbau Elevated sealing bed manufactured by high pressure injection or submerged concrete
DE19604523C2 (en) * 1996-02-08 1998-07-02 Bauer Spezialtiefbau High-lying waterproofing sole with thickening

Also Published As

Publication number Publication date
DE3110920A1 (en) 1982-09-30

Similar Documents

Publication Publication Date Title
DE2365445C2 (en) Process for producing a sand drain and vibrating ram for carrying out the process
DE3889631T2 (en) Method and device for setting a foundation by forming a mass consisting of the soil itself.
DE3110920C2 (en) Method for anchoring the bottom of an underwater structure against buoyancy
DE2022787C3 (en) Process for the production of an underwater concrete base secured against buoyancy
DE2806840C3 (en) Method and device for removing a grouting anchor
DE68903583T2 (en) METHOD FOR ESTABLISHING HYDROELECTRIC STRUCTURES, LIKE MOLEN, HARBOR INSULATION AND THE LIKE.
DE2354172A1 (en) Anchoring for preventing buoyancy lift of structures - uses temporary tensioning members operated above ground water level
DE69002007T2 (en) Method and device for anchoring the scales of a reinforced earth wall.
DE2526889A1 (en) LINING FOR A BUMPER CAP AND PROCEDURES AND TOOLS FOR REMOVING THIS LINING
DE2830264C2 (en) Process for the production of a self-supporting concrete wall to be installed directly flush with a neighboring building in the subsoil
DE2240935B2 (en) Underwater concrete slab anchored against uplift - has stretched anchor rod held on slab by anchor heads
DE48870C (en) Grave stamp
DE1212005B (en) Locking device that can be clamped in a driving pipe for the production of in-situ concrete piles
DE2619431A1 (en) On site concrete pile prodn. - has casing with releasable ram foot rammed into soil and pipe filled with setting concrete
DE1409608C (en) Procedure for the foundation of a floating tank with driven piles
DE893922C (en) Method and device for the production of in-situ concrete piles or pillars
DE34942C (en) Process for the production of solid stoppers in floating mountains
DE873979C (en) Procedure for the foundation of structures with floating boxes on piles
DE2543322A1 (en) Undersea structure foundation of granular material - is piled around structure anchors and sloping additional anchor plates
DE555579C (en) Device for tightening the turnbuckle for sheet pile anchors lying under water
DE1409606C (en) Procedure for the foundation of a floating tank with driven piles
DE1948985C (en) Method for erecting a multi-storey building according to the lifting ceiling construction method and device for carrying out the method
DE2414420C3 (en) Anchor bolts for adhesive bonds and method for setting the anchor bolt
DE306149C (en)
DE2131501C3 (en) Procedure for the foundation of a structure under water

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
D2 Grant after examination
8320 Willingness to grant licences declared (paragraph 23)
8339 Ceased/non-payment of the annual fee