DE29514127U1 - Gutter stone - Google Patents

Gutter stone

Info

Publication number
DE29514127U1
DE29514127U1 DE29514127U DE29514127U DE29514127U1 DE 29514127 U1 DE29514127 U1 DE 29514127U1 DE 29514127 U DE29514127 U DE 29514127U DE 29514127 U DE29514127 U DE 29514127U DE 29514127 U1 DE29514127 U1 DE 29514127U1
Authority
DE
Germany
Prior art keywords
element according
paving
stone
stones
paving stones
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE29514127U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kombilith Entwicklung und Verwertung De GmbH
Original Assignee
Studio Schroeder & Partner
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Studio Schroeder & Partner filed Critical Studio Schroeder & Partner
Priority to DE29514127U priority Critical patent/DE29514127U1/en
Publication of DE29514127U1 publication Critical patent/DE29514127U1/en
Priority to DE29614953U priority patent/DE29614953U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
    • E01C11/229Shallow gutters, i.e. gutters forming a minor pothole
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/02Paving elements having fixed spacing features
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/04Paving elements consisting of natural stones and a binder
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/06Sets of paving elements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/06Sets of paving elements
    • E01C2201/065Sets of paving elements specially for coverings around manhole-shafts or the like
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/16Elements joined together

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Walking Sticks, Umbrellas, And Fans (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)
  • Table Devices Or Equipment (AREA)
  • Dowels (AREA)
  • Polishing Bodies And Polishing Tools (AREA)

Description

DIPL.-ING. LOTHAR Df^J . ; ;..:DIPL.-ING. LOTHAR Df^J . ; ;..:

Patentanwalt! · · · · * ..*...*Patent attorney! · · · · * ..*...*

58095 hagsn, stresemannstr. 1558095 Hagsn, Stresemannstr. 15

TELEFON (0 23 31) 916 30TELEPHONE (0 23 31) 916 30

Telefax (02331) 31280 Q1 _ September 1995Fax (02331) 31280 Q1 _ September 1995

Anwaltsakte 95059/JAttorney file 95059/J

Gebrauchsmuster-Anmeldung
Anmelder: Studio Schröder und Partner
Utility model application
Applicant: Studio Schröder and Partner

Rinnenstein Die Erfindung betrifft ein Element zur Herstellung von Ablaufrinnen aus Beton.Gutter stone The invention relates to an element for the production of drainage channels made of concrete.

Ablaufrinnen befinden sich an Rändern von Straßen und Wegen. Sie dienen zum Auffangen von Wasser, das von Straßen und Wegen abläuft. Die Ablaufrinnen sind in der Regel gepflastert und weisen einen gewölbten Querschnitt auf. In die Ablaufrinnen sind in regelmäßigen Abständen Rinneneinläufe eingebracht. Mit Hilfe der Ablaufrinnen wird das Wasser den Rinneneinläufen zugeführt, durch die es in die Kanalisation gelangt.Drainage channels are located at the edges of streets and paths. They are used to collect water that runs off streets and paths. The drainage channels are usually paved and have a curved cross-section. Gutter inlets are installed in the drainage channels at regular intervals. The drainage channels are used to guide the water to the gutter inlets, through which it flows into the sewer system.

Das Pflastern der Ablaufrinnen stellt eine aufwendige Arbeit dar. Die Pflastersteine müssen einzeln in einen vorbereiteten Untergrund eingesetzt werden. Dabei ist darauf zu achten, daß die Pflastersteine fest in dem Untergrund verankert sind, so daß sie bei starkem Wasseraufkommen nicht aus dem Untergrund herausgespült werden. Darüber hinaus müssen die Steine dem Einsatz von Kehrmaschinen standhalten. Des weiteren ist beim Pflastern darauf zu achten, daß die SteinePaving the drainage channels is a laborious job. The paving stones must be placed individually in a prepared subsoil. It is important to ensure that the paving stones are firmly anchored in the subsoil so that they are not washed out of the subsoil in the event of heavy water. In addition, the stones must be able to withstand the use of sweepers. Furthermore, when paving, it is important to ensure that the stones

derart angeordnet werden, daß die Oberseite der Rinne konkav ausgebildet ist. Diese Anforderungen können nur mit großem Einsatz an Personal und Zeit erreicht werden, was zu hohen Kosten führt.be arranged in such a way that the top of the channel is concave. These requirements can only be met with a great deal of effort in terms of personnel and time, which leads to high costs.

Die Erfindung vermeidet diese Nachteile. Ihr liegt die Aufgabe zugrunde, ein Element zu schaffen, das ein einfaches und zugleich stabiles Erbauen von Ablaufrinnen ermöglicht. Gemäß der Erfindung wird diese Aufgabe dadurch gelöst, daß das Element aus mehreren, vorzugsweise aus drei Pflastersteinen besteht, die in einer Reihe angeordnet und unlösbar miteinander verbunden sind.The invention avoids these disadvantages. Its aim is to create an element that enables drainage channels to be constructed easily and at the same time stably. According to the invention, this aim is achieved in that the element consists of several, preferably three, paving stones that are arranged in a row and are inseparably connected to one another.

Das Element zur Herstellung von Rinnensteinen nach der Erfindung ist einfach zu verlegen. Darüber hinaus ermöglicht es die Erfindung, Personal- und Zeitaufwand beim Pflastern zu reduzierenThe element for producing gutter stones according to the invention is easy to lay. In addition, the invention makes it possible to reduce the amount of personnel and time required for paving

In vorteilhafter Ausgestaltung der Erfindung weist das Element in seinem Vertikalschnitt auf der seinem Boden abgewandten Seite einen konkaven Querschnitt auf. Dadurch ist die Form einer Rinne automatisch beim Verlegen der Elemente erreicht, ohne daß der Untergrund gesondert vorbereitet werden muß oder der Arbeiter die Pflastersteine unter einem Winkel in den Untergrund einsetzen muß.In an advantageous embodiment of the invention, the element has a concave cross-section in its vertical section on the side facing away from the ground. This means that the shape of a channel is automatically achieved when laying the elements, without the subsoil having to be prepared separately or the worker having to insert the paving stones into the subsoil at an angle.

In einer weiteren Ausgestaltung der Erfindung ist der mittlere von zum Beispiel drei einen annähernd rechteckigen Querschnitt aufweisenden Pflastersteinen in Rinnenachse versetzt angeordnet. Mit Hilfe des sich dadurch an einer Längsseite des Elementes ausbildenden Vorprungs und der sich auf der anderen Längsseite ausbildenden Aussparung können die Elemente einfach und schnell aneinandergesetzt werden. Außerdem ist dadurch eine Verzahnung der Elemente untereinander erreicht, wodurch die Stabilität der Rinne erhöht ist.In a further embodiment of the invention, the middle of, for example, three paving stones with an approximately rectangular cross-section is arranged offset in the channel axis. With the help of the projection that is thus formed on one long side of the element and the recess that is formed on the other long side, the elements can be easily and quickly placed together. In addition, this results in the elements interlocking with one another, which increases the stability of the channel.

In Weiterbildung der Erfindung kommen in Richtung der Rinnenachse unterschiedlich lange Pflastersteine in jeweils einem Element zum Einsatz. Diese sind so miteinander verbunden, daß der mittlere bzw. die beiden äußeren Rechtecksteine auf einer der beiden Längsseiten vorstehen. Auf der anderen Längsseite des Elements sind keine Vorsprünge ausgebildet. Die so ausgestalteten Elemente stellen Anfangs- bzw. Endelemente einer Rinne dar. Dadurch besteht die Möglichkeit, die Elemente an Rinneneinläufe oder Wände zu legen, ohne die Elemente zurechtschneiden zu müssen.In a further development of the invention, paving stones of different lengths are used in one element in the direction of the channel axis. These are connected to one another in such a way that the middle or the two outer rectangular stones protrude on one of the two long sides. There are no projections on the other long side of the element. The elements designed in this way represent the start or end elements of a channel. This makes it possible to lay the elements on channel inlets or walls without having to cut the elements to size.

In einer anderen Weiterbildung der Erfindung weisen die in einem Element angeordneten Pflastersteine die Form eines Kreisringabschnittes auf. Des weiteren kann die Steinbreite in Richtung der Rinnenachse von einem äußeren über den mittleren zum anderen äußeren Pflasterstein zunehmen. Dadurch entsteht ein Bogenelement, mit dem auf einfache Weise Bögen im Straßen- oder Wegeverlauf nachgebildet werden können.In another development of the invention, the paving stones arranged in an element have the shape of a circular ring section. Furthermore, the stone width can increase in the direction of the channel axis from one outer paving stone to the middle one to the other outer paving stone. This creates an arched element with which arches in the course of a street or path can be easily reproduced.

Ausführungsbeispiele sind in der Zeichnung dargestellt und werden im folgenden näher beschrieben.
Es zeigen:
Examples of embodiments are shown in the drawing and are described in more detail below.
Show it:

Fig. 1 ein Element zur Herstellung von Rinnensteinen in verkleinerterFig. 1 an element for the production of gutter stones in reduced size

isometrischer Darstellung;
Fig. 2 einen Vertikalschnitt durch ein Element in verkleinerter
isometric representation;
Fig. 2 a vertical section through an element in reduced

Darstellung;
Fig. 3 die Draufsicht auf zwei benachbarte Elemente zur Herstellung von
Depiction;
Fig. 3 the top view of two adjacent elements for the production of

Rinnensteinen in verkleinerter Darstellung; Fig. 4 die Draufsicht auf ein Anfangs- und ein Endelement inGutter stones in a reduced view; Fig. 4 the top view of a start and an end element in

verkleinerter Darstellung;
Fig. 5 die Draufsicht auf ein Bogenelement rechts und ein Bogenelement
reduced representation;
Fig. 5 the top view of an arch element on the right and an arch element

links in verkleinerter Darstellung;
Fig. 6 einen beispielhaften Verlauf einer Abiaufrinne mit Anfangs-, End-
left in reduced view;
Fig. 6 an example of a drainage channel with start, end

und Bogenelementen sowie einem Rinneneinlauf.and arched elements as well as a gutter inlet.

Ein Pflasterelement weist in der Regel drei Pflastersteine 1 auf. Diese sind in ihrem dem Untergrund zugewandten Bereich derart von einem Bindemittel 2 umgeben, daß die Steine 1 nicht aus diesem herauslösbar sind. In Abwandlung dieser Art der Herstellung ist es auch möglich, ein Element vollständig aus Bindemittel zu gießen und die Form der Pflastersteine 1 nachträglich aus dem Gußkörper zu erstellen.A paving element usually has three paving stones 1. These are surrounded by a binding agent 2 in the area facing the subsurface in such a way that the stones 1 cannot be removed from it. In a variation of this type of production, it is also possible to cast an element completely from binding agent and to subsequently create the shape of the paving stones 1 from the cast body.

Zwischen den einzelnen Pflastersteinen 1 sind Fugen 3 ausgebildet. Wie in Fig. 2 dargestellt, weisen die Elemente entlang eines Vertikalschnitts auf ihrer dem Untergrund abgewandten Seite eine Wölbung in Richtung der dem Untergrund zugewandten Seite auf, wodurch die Form einer Rinne erzielt wird.Joints 3 are formed between the individual paving stones 1. As shown in Fig. 2, the elements have a curvature along a vertical section on their side facing away from the ground in the direction of the side facing the ground, thereby creating the shape of a gutter.

In der Normalausführung der Elemente kommen quadratische Pflastersteine 11 zum Einsatz - Fig. 3 -. Die Steine 11 sind in einer Reihe angeordnet. Der mittlere Stein ist zur Seite versetzt angeordnet. Dadurch bildet sich an einer Längsseite eine Aussparung 4 aus. In dieser Aussparung 4 ist das Bindemittel 2 derart verfestigt, daß die Aussparung 4 einen trapezförmigen Grundriß erhält. Auf der der Aussparung 4 gegenüberliegenden Längsseite bildet sich ein Vorsprung 5 aus, der durch eine gezielte Formgebung des Bindemittels 2 trapezförmig ist. Im eingebauten Zustand zweier Elemente greift der Vorsprung 5 des einen Elements in die Aussparung 4 des anderen Elements. Dadurch ist ein paßgenauer Einbau der Elemente ermöglicht und durch die trapezförmige Verzahnung eine hohe Stabilität erreicht.In the standard design of the elements, square paving stones 11 are used - Fig. 3 -. The stones 11 are arranged in a row. The middle stone is arranged offset to the side. This creates a recess 4 on one long side. In this recess 4, the binding agent 2 is solidified in such a way that the recess 4 has a trapezoidal outline. On the long side opposite the recess 4, a projection 5 is formed, which is trapezoidal due to a targeted shaping of the binding agent 2. When two elements are installed, the projection 5 of one element engages in the recess 4 of the other element. This enables the elements to be installed with a precise fit and a high level of stability is achieved thanks to the trapezoidal interlocking.

Durch die Verwendung von in Richtung der Rinnenachse ungleich langen Pflastersteinen entstehen Anfangs- und Endelemente - Fig. 4 -.By using paving stones of unequal length in the direction of the channel axis, start and end elements are created - Fig. 4 -.

Zur Hersteilung eines Anfangselements kommt an Stelle eines in Richtung der Rinnenachse kürzeren Pflastersteins 11 in der Mitte ein in Richtung der Rinnenachse längerer Pflasterstein 12 zum Einsatz. Die kürzere der beiden Kantenlängen des Steins 12 kann gleich der Kantenlänge der Steine 11 sein. Auf einer der beiden Längsseiten fluchten die drei Steine. Auf der anderen Längsseite ragt der Stein 12 hervor. Dadurch ist ein Vorsprung 5 ausgebildet, der die gleichen Ausmaße sowie den gleichen Grundriß aufweist wie bei den Normalelementen.To produce a starting element, a paving stone 12 that is longer in the direction of the channel axis is used in place of a paving stone 11 that is shorter in the direction of the channel axis. The shorter of the two edge lengths of the stone 12 can be the same as the edge length of the stones 11. The three stones are aligned on one of the two long sides. The stone 12 protrudes on the other long side. This creates a projection 5 that has the same dimensions and the same floor plan as the standard elements.

Endelemente bestehen aus zwei in Richtung der Rinnenachse längeren Steinen 12 an den Enden und einem in Richtung der Rinnenachse kürzeren Stein 11 in der Mitte. Auf einer der beiden Längsseiten fluchten die drei Steine. Auf der anderen Längsseite ragen die Steine 12 hervor. Dadurch ist zwischen den hervorragenden Teilen der Steine 12 eine Aussparung 4 ausgebildet, die von den Ausmaßen und dem Grundriß gleich derjenigen der Normalelemente ist.End elements consist of two stones 12 that are longer in the direction of the channel axis at the ends and one stone 11 that is shorter in the direction of the channel axis in the middle. The three stones are aligned on one of the two long sides. The stones 12 protrude on the other long side. This creates a recess 4 between the protruding parts of the stones 12, which is the same size and layout as the standard elements.

Bogenelemente - Fig. 5 - bestehen aus drei Pflastersteinen 13, die die Form eines Kreisringabschnittes aufweisen. Die Länge der Steine 13 in Richtung der Rinnenachse nimmt von einem äußeren über den mittleren zum anderen äußeren Stein zu. Der mittlere der drei Steine 13 ist in Richtung der Rinnenachse versetzt angeordnet. Dadurch ist auf einer der Längsseiten eine Aussparung 4 ausgebildet. Auf der anderen Längsseite ist ein Vorsprung 5 ausgebildet. Aussparung 4 und Vorsprung 5 weisen den gleichen Grundriß auf wie bei Normalelementen. DieArched elements - Fig. 5 - consist of three paving stones 13, which have the shape of a circular ring section. The length of the stones 13 in the direction of the channel axis increases from one outer stone to the middle stone to the other outer stone. The middle of the three stones 13 is offset in the direction of the channel axis. This creates a recess 4 on one of the long sides. A projection 5 is formed on the other long side. Recess 4 and projection 5 have the same layout as normal elements. The

• · t ·· t ·

Bogenelemente zur Gestaltung von Rechts- bzw. ünksbögen sind entlang der Längsmittellinie spiegelsymmetrisch.Arch elements for the design of right or left arches are mirror-symmetrical along the longitudinal center line.

Claims (13)

DIPL.-ING. LOTHAR DdRf^ER,! ^ · 5\.J . '..&Idigr;***,DIPL.-ING. LOTHAR DdRf^ER,! ^ · 5\.J . '..&Idigr;***, PATENTANWALT &idigr; &idigr; · " · · - ö - ..*»..*PATENT ATTORNEY &idigr;&idgr; · " · · - ö - ..*»..* 58095 HAGEN, STRESEMANNSTR. 15
TELEFON (0 23 31) 916 30
58095 HAGEN, STRESEMANNSTR. 15
TELEPHONE (0 23 31) 916 30
Telefax (02331)31280 01. September 1995Fax (02331)31280 01 September 1995 Anwaltsakte 95059/JAttorney file 95059/J Gebrauchsmuster-Anmeldung
Anmelder: Studio Schröder und Partner
Utility model application
Applicant: Studio Schröder and Partner
SchutzansprücheProtection claims 1. Element zur Herstellung von Ablaufrinnen aus Beton, gekennzeichnet durch mehrere Pflastersteine (1), die in einer Reihe angeordnet und unlösbar miteinander verbunden sind.1. Element for the production of drainage channels made of concrete, characterized by several paving stones (1) which are arranged in a row and are inseparably connected to one another.
2. Element nach Anspruch 1, dadurch gekennzeichnet, daß drei Pflastersteine (1) in einer Reihe angeordnet und unlösbar miteinander verbunden sind.2. Element according to claim 1, characterized in that three paving stones (1) are arranged in a row and are permanently connected to one another. 3. Element nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Pflastersteine (1) an ihrem dem Boden zugewandten Bereich von einem Binde- mittel (2) umgeben sind.3. Element according to claim 1 or 2, characterized in that the paving stones (1) are surrounded by a binding agent (2) in their area facing the ground. 4. Element nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß zwischen den Pflastersteinen {1) Fugen (3) ausgebildet sind.4. Element according to one of claims 1 to 3, characterized in that joints (3) are formed between the paving stones (1). 5. Element nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß das Element in seinem Vertikalschnitt auf der seinem Boden abgewandten Seite einen konkaven Querschnitt aufweist.5. Element according to one of claims 1 to 4, characterized in that the element has a concave cross-section in its vertical section on the side facing away from its base. 6. Element nach einem der Ansprüche 2 bis 5, dadurch gekennzeichnet, daß die drei Pflastersteine (11) einen annähernd rechteckigen Grundriß aufweisen und der mittlere Stein in Richtung der Rinnenachse versetzt ist.6. Element according to one of claims 2 to 5, characterized in that the three paving stones (11) have an approximately rectangular outline and the middle stone is offset in the direction of the channel axis. 7. Element nach einem der Ansprüche 2 bis 5, dadurch gekennzeichnet, daß in der Draufsicht die beiden äußeren Pflastersteine (11) in Richtung der Rinnenachse kürzer als der mittlere Pflasterstein (12) sind, wobei der mittlere Pflasterstein (12) bezogen auf die äußeren Pflastersteine (11) an einer Längsseite bündig ist, an der gegenüberliegenden Längsseite vorsteht.7. Element according to one of claims 2 to 5, characterized in that in the top view the two outer paving stones (11) are shorter in the direction of the channel axis than the middle paving stone (12), the middle paving stone (12) being flush with the outer paving stones (11) on one long side and protruding on the opposite long side. 8. Element nach einem der Ansprüche 2 bis 5, dadurch gekennzeichnet, daß in der Draufsicht die beiden äußeren Pflastersteine (12) in Richtung der Rinnenachse länger als der mittlere Pflasterstein (11) sind, wobei die äußeren Pflastersteine (12) bezogen auf den mittleren Pflasterstein (11) an einer Längsseite bündig sind, an der gegenüberliegenden Längsseite vorstehen.8. Element according to one of claims 2 to 5, characterized in that in the top view the two outer paving stones (12) are longer in the direction of the channel axis than the middle paving stone (11), the outer paving stones (12) being flush with the middle paving stone (11) on one long side and protruding on the opposite long side. 9. Element nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß die Pflastersteine (13) die Form eines Kreisringabschnittes aufweisen.9. Element according to one of claims 1 to 5, characterized in that the paving stones (13) have the shape of a circular ring section. 10. Element nach Anspruch 9, dadurch gekennzeichnet, daß die Länge der Pflastersteine (13) in Richtung der Rinnenachse von dem einen äußeren über die oder den mittleren zu dem anderen äußeren Pflasterstein zunimmt.10. Element according to claim 9, characterized in that the length of the paving stones (13) increases in the direction of the channel axis from one outer paving stone through the middle one to the other outer paving stone. 11. Element nach Anspruch 9 oder 10 in Verbindung mit Anspruch 2, dadurch gekennzeichnet, daß der mittlere Stein (13) in Richtung der Rinnenachse versetzt ist.11. Element according to claim 9 or 10 in conjunction with claim 2, characterized in that the middle stone (13) is offset in the direction of the channel axis. 12. Element nach einem der Ansprüche 6, 8 oder 11, dadurch gekennzeichnet, daß zwischen den beiden äußeren Steinen eine Aussparung (4) ausgebildet ist, die in der Draufsicht einen trapezförmigen Querschnitt aufweist.12. Element according to one of claims 6, 8 or 11, characterized in that a recess (4) is formed between the two outer stones, which has a trapezoidal cross-section in plan view. «&ogr;«&ogr; 13. Element nach einem der Ansprüche 6, 7, 11 oder 12, dadurch gekennzeichnet, daß an dem mittleren Stein ein Vorsprung (5) ausgebildet ist, der in der Draufsicht einen trapezförmigen Querschnitt aufweist.13. Element according to one of claims 6, 7, 11 or 12, characterized in that a projection (5) is formed on the central stone, which has a trapezoidal cross-section in plan view. • ·· · i • ·· · i
DE29514127U 1995-09-02 1995-09-02 Gutter stone Expired - Lifetime DE29514127U1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE29514127U DE29514127U1 (en) 1995-09-02 1995-09-02 Gutter stone
DE29614953U DE29614953U1 (en) 1995-09-02 1996-08-28 Paving stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE29514127U DE29514127U1 (en) 1995-09-02 1995-09-02 Gutter stone

Publications (1)

Publication Number Publication Date
DE29514127U1 true DE29514127U1 (en) 1995-11-02

Family

ID=8012554

Family Applications (2)

Application Number Title Priority Date Filing Date
DE29514127U Expired - Lifetime DE29514127U1 (en) 1995-09-02 1995-09-02 Gutter stone
DE29614953U Expired - Lifetime DE29614953U1 (en) 1995-09-02 1996-08-28 Paving stone

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE29614953U Expired - Lifetime DE29614953U1 (en) 1995-09-02 1996-08-28 Paving stone

Country Status (1)

Country Link
DE (2) DE29514127U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20115271U1 (en) * 2001-09-15 2003-02-06 Sp Beton Gmbh & Co Kg Flooring element to form a floor channel
LU91187B1 (en) * 2005-07-22 2007-01-23 Kronimus Ag Stone packing

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2334044C (en) * 1998-02-10 2006-05-31 Marshalls Mono Ltd Block paving
DE59913604D1 (en) * 1999-10-02 2006-08-03 Kombilith Gmbh Entwicklung & Verwertung Enwässerungsrinne and gutter element for this
FR2839989B1 (en) * 2002-05-23 2004-12-10 Claude Demaegdt CONCRETE CHANNEL
DE20305267U1 (en) * 2003-04-02 2003-07-03 Kombilith Gmbh Entwicklung & Verwertung Gutter / strip element, this kit and manufactured gutter / strip
DE202006016026U1 (en) * 2006-08-25 2007-02-22 Kronimus Ag Gutter stone system, has two shaped stones with one upper surface including downpipe that conducts liquid flowing into gutter to right or left side surfaces of one shaped stone in downpipe direction
DE102010000021A1 (en) 2009-01-12 2010-07-22 Lithonplus Gmbh & Co. Kg Drainage gutter paving-stone, has central partial stone shifted forward in longitudinal direction by rear side that exhibits upper side with penetration depth, where penetration depth lies between specific values
DE102013003727A1 (en) * 2013-03-05 2014-09-11 Detlef Schröder Stone element for the creation of multi-line gutters, plaster strips etc. and gutter, plaster strips

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20115271U1 (en) * 2001-09-15 2003-02-06 Sp Beton Gmbh & Co Kg Flooring element to form a floor channel
EP1293607A2 (en) 2001-09-15 2003-03-19 UNI-International Bausysteme GmbH & Co. Surface covering element for forming a drainage channel
LU91187B1 (en) * 2005-07-22 2007-01-23 Kronimus Ag Stone packing

Also Published As

Publication number Publication date
DE29614953U1 (en) 1996-11-14

Similar Documents

Publication Publication Date Title
EP0648291B1 (en) Block with lateral spacers
DE2900852A1 (en) ASSEMBLY KIT
DE3210222C2 (en) Curb
EP0428762B1 (en) Slab-shaped paving element
DE29514127U1 (en) Gutter stone
WO2006133688A1 (en) Set of paving blocks
DE3743035A1 (en) Concrete paving stone for paved areas
DE3133420A1 (en) LIMITING ELEMENT
EP1088941B1 (en) Gutter and gutter element therefor
DE3500271A1 (en) Drainage element
DE10062711C2 (en) Plastic grid plate for fastening street banquets
DE3722683A1 (en) Shaped block made of concrete or similar material for covering ground areas
EP1293607A2 (en) Surface covering element for forming a drainage channel
DE8716701U1 (en) Concrete paving stone for paving areas
DE3218898A1 (en) RINNENSTEIN
DE29609029U1 (en) Artificial stone element
EP1181413B1 (en) Shaped block
DE29712833U1 (en) Concrete form stone for drainage paving in the composite
DE3148779C2 (en) Shaped stone dressing, especially for paving paths
DE9111552U1 (en) Concrete block
DE202023002316U1 (en) Concrete paving stone
DE202022104878U1 (en) Paved road and road surface slab
DE29619461U1 (en) Pavement gutter consisting of shaped stones
DE29820015U1 (en) Transitional curb
DE202022102506U1 (en) System consisting of a plastic infiltration grid and at least one paving stone

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 19951214

R150 Utility model maintained after payment of first maintenance fee after three years

Effective date: 19990316

R151 Utility model maintained after payment of second maintenance fee after six years

Effective date: 20011210

R081 Change of applicant/patentee

Owner name: KOMBILITH GMBH ENTWICKLUNG UND VERWERTUNG, DE

Free format text: FORMER OWNER: STUDIO SCHROEDER & PARTNER, SEMIONE, CH

Effective date: 20020403

R152 Utility model maintained after payment of third maintenance fee after eight years

Effective date: 20031119

R071 Expiry of right
R082 Change of representative

Representative=s name: HAUCK PATENT- UND RECHTSANWAELTE, DE