DE2911440A1 - Bulk material vertical conveyor for open:cast mining - has endless belts following parallel C=shaped paths, between which material is carried upwards - Google Patents

Bulk material vertical conveyor for open:cast mining - has endless belts following parallel C=shaped paths, between which material is carried upwards

Info

Publication number
DE2911440A1
DE2911440A1 DE19792911440 DE2911440A DE2911440A1 DE 2911440 A1 DE2911440 A1 DE 2911440A1 DE 19792911440 DE19792911440 DE 19792911440 DE 2911440 A DE2911440 A DE 2911440A DE 2911440 A1 DE2911440 A1 DE 2911440A1
Authority
DE
Germany
Prior art keywords
conveyor
conveyor belt
conveying
bulk material
belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19792911440
Other languages
German (de)
Inventor
Hans-Wolfgang Dipl Schellhorn
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fried Krupp AG
Original Assignee
Fried Krupp AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fried Krupp AG filed Critical Fried Krupp AG
Priority to DE19792911440 priority Critical patent/DE2911440A1/en
Publication of DE2911440A1 publication Critical patent/DE2911440A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G63/00Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
    • B65G63/008Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for bulk material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G15/00Conveyors having endless load-conveying surfaces, i.e. belts and like continuous members, to which tractive effort is transmitted by means other than endless driving elements of similar configuration
    • B65G15/10Conveyors having endless load-conveying surfaces, i.e. belts and like continuous members, to which tractive effort is transmitted by means other than endless driving elements of similar configuration comprising two or more co-operating endless surfaces with parallel longitudinal axes, or a multiplicity of parallel elements, e.g. ropes defining an endless surface
    • B65G15/12Conveyors having endless load-conveying surfaces, i.e. belts and like continuous members, to which tractive effort is transmitted by means other than endless driving elements of similar configuration comprising two or more co-operating endless surfaces with parallel longitudinal axes, or a multiplicity of parallel elements, e.g. ropes defining an endless surface with two or more endless belts
    • B65G15/14Conveyors having endless load-conveying surfaces, i.e. belts and like continuous members, to which tractive effort is transmitted by means other than endless driving elements of similar configuration comprising two or more co-operating endless surfaces with parallel longitudinal axes, or a multiplicity of parallel elements, e.g. ropes defining an endless surface with two or more endless belts the load being conveyed between the belts
    • B65G15/16Conveyors having endless load-conveying surfaces, i.e. belts and like continuous members, to which tractive effort is transmitted by means other than endless driving elements of similar configuration comprising two or more co-operating endless surfaces with parallel longitudinal axes, or a multiplicity of parallel elements, e.g. ropes defining an endless surface with two or more endless belts the load being conveyed between the belts between an auxiliary belt and a main belt
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/04Bulk

Abstract

The mechanism is intended for lifting bulk material from a low-level conveyor on to a higher-level one while the conveyor assembly is movable. Particular application is in open-cast mining operations. The conveyors are carried by a frame which contains two endless conveyor belts following a C-shaped parallel path over part of their lengths. The low-level conveyor deposits the material near the lower end of this path, from where it is carried upwards between the belts and discharged at the higher level on the other conveyor which may be carried by a swivelable outrigger.

Description

Einrichtung zum Hochfördern von Schüttgut Device for conveying up bulk material

Die Erfindung bezieht sich auf eine Einrichtung zum Hochfördern von Schüttgut vermittels Rückbarer Bandförderer, insbesondere für Tagebaue In Tagebauen, in denen z.B. Kohle aus einem oder mehreren Flözen aus geringer Tiefe gefördert wird, sind bisher zum Transport des Schüttguts neben Lastkraftwagen Förderbänder eingesetzt worden, die zum Uberbrücken von Höhenunterschieden auf rückbaren Verb in dungsbandbrücken angeordnet sind. Da die,Steigung der Förderbänder dieser Verbindungsbandbrücken begrenzt ist, müssen sie, um einen größeren Höhenunterschied zu überwinden, schräg zur Böschungskante angeordnet werden und erhalten dadurch eine erhebliche Länge. Damit wird auch die Manövrierbarkeit dieser auch als Schrägbandbrücken bezeichneten Einrichtungen sehr behindert. Insbesondere ist es aber äußerst schwierig und meistens nicht möglich, Gewinnungsgeräte auf der obersten Fördersohle zusammen mit einer Verbindungsbandbrücke arbeiten zu lassen.The invention relates to a device for conveying up Bulk goods by means of reversible belt conveyors, especially for opencast mines In opencast mines, in which, for example, coal is extracted from one or more seams from a shallow depth is, are so far for the transport of bulk goods in addition to trucks conveyor belts been used, which to bridge height differences on shiftable verb are arranged in dungsbandbrücken. Since the, slope of the conveyor belts of these connecting belt bridges is limited, they have to be inclined in order to overcome a greater difference in height be arranged to the edge of the slope and thus get a considerable length. This means that the maneuverability of these is also referred to as inclined ribbon bridges Facilities very handicapped. In particular, however, it is extremely difficult and mostly not possible, extraction devices on the topmost conveying level together with a To let work connecting ribbon bridge.

Der in den kennzeichnenden Merkmalen des Anspruchs 1 wiedergegebenen Erfindung liegt daher die Aufgabe zugrunde, unter Vermeidung der geschilderten Nachteile der bekannten Einrichtungen eine Einrichtung zu schaffen, die insbesondere in Tagebauen auf engem Raum Schüttgut über eine größere Höhe, z.B. 25 bis 30 m, zu fördern.The reproduced in the characterizing features of claim 1 The invention is therefore based on the object while avoiding the disadvantages outlined of the known facilities to create a facility that is particularly useful in opencast mines on tight Room bulk goods over a greater height, e.g. 25 to 30 m to promote.

Der bei der Einrichtung nach der vorliegenden Erfindung eingesetzte bekannte CFörderer ist bereits für die Entladung von Schiffsladeräumen vorgeschlagen worden (DE-AS 21 61 440). Wie die den C-Förderer tragende und ggf. transportierende Einrichtung gestaltet ist, ist diesem Stand der Technik jedoch nicht zu entnehmen.The one used in the device according to the present invention known C conveyor has already been proposed for unloading ship holds been (DE-AS 21 61 440). Like the one carrying and possibly transporting the C-conveyor Facility is designed, but this prior art is not to be inferred.

Auch für eine bekannte Schüttguthaufenabtragsvorrichtung (DE-AS 12 62 164) ist bereits ein C-Förderer eingesetzt worden. Dabei ist erin einem Wagen eines Brückengeräts angeordnet und wird an seinem unteren Ende über eine Schäleinrichtung mit Schüttgut beschickt. Das Schüttgut gelangt nach dem Verlassen des C-Förderers auf das übliche, brückeneigene abfördernde Förderband, das nur wenige Meter über dem Planum angeordnet ist. Eine Anregung zum Einsatz eines C-Förderers zum Hochfördern von Schüttgut über eine Böschung vermittelt diese bekannte Vorrichtung daher nicht.Also for a known bulk material heap removal device (DE-AS 12 62 164) a C-conveyor has already been used. He's in a car of a bridge device and is at its lower end over a peeling device loaded with bulk material. The bulk material arrives after leaving the C-conveyor on the usual conveyor belt, which is only a few meters above the bridge the subgrade is arranged. A suggestion for the use of a C-conveyor for high conveying This known device therefore does not convey bulk material over an embankment.

Die neue Einrichtung hat gegenüber den bekannten Verbindungsbandbrücken zudem noch den Vorteil, daß sie weniger aufwendig und vielseitig einsetzbar istr So kann siez.B. auch als Absetzer im Tagebau eingesetzt werden. burch die kurzen Förderstrecken dieser Einrichtung werden Zeitverluste infolge von Umschaltungen von Kohleförderung auf Abraumförderung und umgekehrt erheblich verringert, wodurch alle eingesetzten TagebaugerAte dementBprechend besser ausgenutzt werden. Auch das Umsetzen der neuen Einrichtung erfordert nur einen minimalen Zeitaufwand.The new facility has opposite the well-known connecting ribbon bridges also the advantage that it is less expensive and versatile For example, it can can also be used as spreader in opencast mines. burch the short ones Conveyor lines of this facility are time losses due to switchovers considerably reduced from coal extraction to overburden extraction and vice versa, whereby All open-pit mining equipment used can accordingly be better utilized. That too Relocating the new facility takes a minimal amount of time.

Weitere vorteilhafte Ausgestaltungen der Erfindung sind in den Ansprüchen 2 bis 6 wiedergegeben.Further advantageous refinements of the invention are given in the claims 2 to 6 reproduced.

In der nachfolgend näher erläuterten Zeichnung sind zwei Ausführungsbeispiele der Einrichtung nach der Erfindung schematisch dargestellt; Es zeigen Fig. 1 einen Querschnitt-durch eine Tagebau-Grube und darin angeordnet eine Ausführungsform der neuen Einrichtung in Ansicht und Fig. 2 eine andere Ausführungsform der Einrichtung in entsprechender Darstellung.In the drawing explained in more detail below, there are two exemplary embodiments the device according to the invention shown schematically; 1 shows a Cross-section through an opencast mine and an embodiment of the new device in view and FIG. 2 shows another embodiment of the device in the corresponding representation.

Die auf der Sohle 1 einer Tagebau-Grube stehende Einrichtung 2 besteht aus einem Gestell 3, in welchem die beiden Fördergurte 4 und 5 eines C-Förderers angeordnet sind. Das Gestell 3 stützt sich über ein 6 schwenkbares Zweiraupen-Fahrwerk auf dem Planum ab.The facility 2 standing on the floor 1 of an opencast mine exists from a frame 3 in which the two conveyor belts 4 and 5 of a C-conveyor are arranged. The frame 3 is supported by a 6 swiveling two-caterpillar undercarriage on the subgrade.

Am oberen Ende des Gestells 3 ist ein um eine Achse 7 schwenkbarer Bügel 8 angeordnet, der einen heb- und senkbaren Ausleger 9 für ein abförderndes Förderband 10 tragt (Fig. 1).At the upper end of the frame 3 is a pivotable about an axis 7 Arranged bracket 8, which has a liftable and lowerable arm 9 for a conveying Conveyor belt 10 carries (Fig. 1).

Das Schüttgut gelangt über ein zuförderndes Förderband 11, welches mit dem Gestell 3 verbunden ist, über eine Aufgabeschurre 12 auf das untere Ende 93 des Fördergurts 4 welches gegenüber dem unteren Ende des Fördergurts 5 vorsteht. Nach dem Hochfördern wirft der Fördergurt 5 des C-Förderers es auf das Förderband 10 im Bereich der Achse 7 ab, Am anderen Ende des Förderbandes 10 ist an dem Ausleger 9 eine Aufgabeschurre 14 befestigt, über die das Schüttgut auf das Förderband eines Auslegers 15 eines Bandwagens 16 gelangt. Uber ein weiteres -Förderband eines nach der anderen Seite des Bandwagens 16 auskragenden Auslegers 17 wird das Schüttgut dann auf eine rückbare, etwa parallel zur Böschung 20 verlaufende Förderbandstraße 18 abgeworfen. Eine parallel zur Förderbandstraße 18 verlaufende entsprechende Förderbandstraße 19 dient der Aufnahme eines anderen Schüttguts, z.B.The bulk material arrives on a conveying conveyor belt 11, which is connected to the frame 3, via a feed chute 12 to the lower end 93 of the conveyor belt 4 which protrudes from the lower end of the conveyor belt 5. After conveying up, the conveyor belt 5 of the C-conveyor throws it onto the conveyor belt 10 in the area of the axis 7, at the other end of the conveyor belt 10 is on the boom 9 a feed chute 14 attached, through which the bulk material on the conveyor belt of a Boom 15 of a belt carriage 16 arrives. About another conveyor belt one after the other side of the belt carriage 16 cantilevered boom 17 will the bulk material then on a retractable, approximately parallel to the slope 20 running Conveyor belt line 18 dropped. One that runs parallel to the conveyor belt line 18 corresponding conveyor belt line 19 is used to pick up another bulk material, e.g.

Kohle. Zum Beschicken der Förderbandstraße 19 wird der Ausleger 17 entsprechend verschwenkt. Der kusleger 15 ist wie der Ausleger 10 um eine im Bandwagen 16 bzw, im Gestell 3 liegende horizontale Achse schwenkbar, so daß die Enden der beiden Ausleger jeweils den für die Schüttgutübergabe geeigneten Abstand erhalten.Money. To feed the conveyor belt line 19, the boom 17 pivoted accordingly. The kusleger 15 is like the boom 10 around one in the conveyor belt 16 or, lying in the frame 3 horizontal axis pivotable so that the ends of the both booms are each given the appropriate distance for the bulk material transfer.

Die Einrichtung 2 nach Fig, 2 weist einen C-Förderer auf, dessen innerer Fördergurt 21 an seinem oberen Ende 22 derart verlängert ist, daß ein besonderes Förderhand,-wie das Förderband 10 der Einrichtung nach Fig. 1 entfällt. Das obere Ende 22 des Gurts'21, das in einem am Gestell 3' starr befestigten Ausleger 23 gelagert ist, ist am äußeren Ende mit einem Aufgabetisch 24 versehen, über welchen das Schüttgut auf eine Aufgabeschurre 25 des höhenverstellbaren Förderbandes 26 einer fahrbaren Bandbrücke 27 gelangt. Am anderen Ende der Bandbrücke 27 wirft das Förderband 26 über einen Aufgabetisch 28 auf eine Förderbandstraße 29 ab. Der Aufgabetisch 24 kann mitvder Aufgabeschurre 25 mechanisch oder auf andere- Weise, z.B. durch entsprechende Fahrsteueruns verbunden sein, wodurch sich eine sichere Übergabe ergibt. Das untere Ende des Gestells 3' ist wieder mit einem zufördernden Förderband 11 verbunden, welches in einem tragenden Ausleger gelagert, um eine Achse 30, welche durch die Aufgabeschurre 12 des Fördergurts 4 geht, schwenkbar ist. Die Aufgabe auf den Aufgabetisch 12 erfolgt über einen Aufgabetisch 31 und einen zwischen- geschalteten, das Schüttgut zerkleinernden Durchlaufbrecher 32, falls ein solcher erwünscht oder erforderlich ist.The device 2 according to Fig, 2 has a C-conveyor, the inner Conveyor belt 21 is extended at its upper end 22 so that a special Conveyor hand, like the conveyor belt 10 of the device according to FIG. 1, is omitted. The top End 22 of Gurts'21, which is mounted in a bracket 23 rigidly attached to the frame 3 ' is, is provided at the outer end with a feed table 24, over which the bulk material on a feed chute 25 of the height-adjustable conveyor belt 26 of a mobile Belt bridge 27 reached. At the other end of the belt bridge 27, the conveyor belt 26 throws via a feed table 28 onto a conveyor belt line 29. The feed table 24 can be mechanically or in some other way with the feed chute 25, e.g. by appropriate Fahrsteueruns be connected, which results in a safe handover. The lower The end of the frame 3 'is again connected to a conveying conveyor belt 11, which is mounted in a supporting boom, about an axis 30 which is through the Feed chute 12 of the conveyor belt 4 is pivotable. The task on the task table 12 takes place via a feed table 31 and an intermediate switched, the bulk material comminuting through breaker 32, if such is desired or is required.

Die Verbindung zwischen dem Zweiraupenfahrwerk 6 und dem Gestell 3' weist ein kugelbewegliches Gelenk auf, das es ermöglicht, daß das Gestell 3' durch Steuerung einer Horizontiereinrichtung ständig die normale senkrechte Lage beibehält. Die Verwendung derartiger bekannter Einrichtungen ist insbesondere für den Fall vorgesehen, in welchem das Planum- größere Unebenheiten aufweist.The connection between the two-crawler chassis 6 and the frame 3 ' has a ball-and-socket joint which enables the frame 3 'through Control of a leveling device constantly maintains the normal vertical position. The use of such known devices is particularly for the case provided, in which the subgrade has major unevenness.

Das zufördernde Förderband 11 kann auch Bestandteil des Grabegeräts, z.B. eines Schaufelradbaggers, sein.The conveying conveyor belt 11 can also be part of the digging device, e.g. a bucket wheel excavator.

Das Gestell 3 bzw. 3' ist in Fachwerkkonstruktion gestaltet.The frame 3 or 3 'is designed in a framework construction.

Der Schwenkbereich des zufördernden Förderbandes 11.The swivel range of the conveying conveyor belt 11.

wird vergrößert, wenn der Aufgabetrichter der Aufgabeschurre 12 aus dem Gestell 3 bzw. 3' herausgeführt ist. Für den gleichen Zweck kann aber auch zwischen den Fördergurt 4 und das Förderband 11 ein gesondertes, verhältnismäßig kurzes Förderband geschaltet werden. In ähnlicher Welse kann auch zwischen das Förderband 10 bzw. 21 und das Förderband 15 bzw. 26 der Bandbriicke 16 bzw. 27 ein am Ausleger 9 bzw. 23 schwenkbar befestigter Abwurfausleger geschaltet sein.is enlarged when the feed hopper of the feed chute 12 off the frame 3 or 3 'is led out. For the same purpose, however, you can also choose between the conveyor belt 4 and the conveyor belt 11 a separate, relatively short conveyor belt be switched. A similar catfish can also be placed between the conveyor belt 10 or 21 and the conveyor belt 15 or 26 of the belt bridge 16 or 27 a on the boom 9 or 23 pivotably mounted discharge boom be switched.

Claims (6)

Ansprüche: 1. Einrichtung zum Hochfördern von Schüttgut, vermittels rückbarer Bandförderer, insbesondere für Tagebaue, d a d u r c h g e k e n n z e i c h -n e t, daß ein einen C-Förderer tragendes mit einem Fahrwerk od. dgl. versehenes Gestell (3, 3') an seinem oberen Ende ein abförderndes Förderband (10) aufweist und an seinem unteren Ende mit einem zufördernden Förderband (11) verbunden ist. Claims: 1. Device for conveying up bulk material, mediating Movable belt conveyor, especially for opencast mines, d u r c h e k e n n z e i c h -n e t that a C-conveyor carrying a chassis od. The like. Provided Frame (3, 3 ') has a conveying conveyor belt (10) at its upper end and is connected at its lower end to a conveying conveyor belt (11). 2. Einrichtung nach Anspruch 1 t dadurch gekennzeichnet, daß das abfördernde Förderband (10) an einem am oberen Ende des Gestells (3) schwenkbar angelenkten Ausleger (9) angeordnet ist 2. Device according to claim 1 t, characterized in that the conveying-off Conveyor belt (10) on a pivotably articulated at the upper end of the frame (3) Boom (9) is arranged 3. Einrichtung nach Anspruch 1, dadurch gekennzeichnet, daß das ab fördernde Förderband durch eine Verlängerung (22) des abfördernden Gurts (21) des C-Förderers gebildet ist.3. Device according to claim 1, characterized in that that from the conveying conveyor belt by an extension (22) of the conveying belt (21) of the C-conveyor is formed. 4. Einrichtung nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß das Fahrwerk ein vorzugsweise schwenkbares Raupenfahrwerk (6) ist.4. Device according to one of claims 1 to 3, characterized in that that the chassis is a preferably pivotable crawler chassis (6). 5. Einrichtung nach einem der vorhergehenden Ansprüche, insbesondere nach Anspruch 4r dadurch gekennzeichnet, daß das Gestell (3, 3') auf dem Fahrwerk (6) so gelagert ist, daß es - von einer Horizontiereinrichtung gesteuert - ständig die gleiche Lage beibehält.5. Device according to one of the preceding claims, in particular according to claim 4r, characterized in that the frame (3, 3 ') is on the chassis (6) is so stored that it - controlled by a leveling device - constantly maintains the same position. 6. Einrichtung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß das abfördernde Förderband (10; 22) über eine Aufgabeschurre (14; 25) mit einer mit mindestens einem höhenverstellbaren Förderband (26; 15) ausgerüsteten fahrbaren Bandbrücke (27) o.dgl.6. Device according to one of the preceding claims, characterized in that that the conveying conveyor belt (10; 22) via a feed chute (14; 25) with a mobile ones equipped with at least one height-adjustable conveyor belt (26; 15) Belt bridge (27) or the like. verbunden ist. connected is.
DE19792911440 1979-03-23 1979-03-23 Bulk material vertical conveyor for open:cast mining - has endless belts following parallel C=shaped paths, between which material is carried upwards Withdrawn DE2911440A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19792911440 DE2911440A1 (en) 1979-03-23 1979-03-23 Bulk material vertical conveyor for open:cast mining - has endless belts following parallel C=shaped paths, between which material is carried upwards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19792911440 DE2911440A1 (en) 1979-03-23 1979-03-23 Bulk material vertical conveyor for open:cast mining - has endless belts following parallel C=shaped paths, between which material is carried upwards

Publications (1)

Publication Number Publication Date
DE2911440A1 true DE2911440A1 (en) 1980-09-25

Family

ID=6066228

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19792911440 Withdrawn DE2911440A1 (en) 1979-03-23 1979-03-23 Bulk material vertical conveyor for open:cast mining - has endless belts following parallel C=shaped paths, between which material is carried upwards

Country Status (1)

Country Link
DE (1) DE2911440A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3544555A1 (en) * 1985-12-17 1987-06-19 Krupp Gmbh SCHUETTGUT-DURF- AND / OR RECORDING DEVICE, IN PARTICULAR STORAGE SPACE DEVICE

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3544555A1 (en) * 1985-12-17 1987-06-19 Krupp Gmbh SCHUETTGUT-DURF- AND / OR RECORDING DEVICE, IN PARTICULAR STORAGE SPACE DEVICE

Similar Documents

Publication Publication Date Title
DE2834987C2 (en) Mobile crushing plant
DE1278349B (en) System for storing and removing bulk goods
DE3827037C2 (en)
DE10252585A1 (en) Device to build and reclaim ring tips for bulk goods, e.g. limestone consists of turning central column with support and traveling to support platform on ring rail track, and boom dredger
DE2231268B2 (en) RECOVERY DEVICE FOR ROUND, PREFERABLY CONE-SHAPED BUMPER STACKS
DE2911440A1 (en) Bulk material vertical conveyor for open:cast mining - has endless belts following parallel C=shaped paths, between which material is carried upwards
DE3532182C2 (en)
DE3217745C2 (en) Movable incline conveyor
DE3303059A1 (en) CONNECTION FEEDER
DE968798C (en) Open pit mine with an excavator, in particular a bucket wheel excavator, and with a loading system
DE813374C (en) Storage arrangement with loading and unloading system
DE568296C (en) Overburden recovery and conveyor system
DE2943525A1 (en) Connecting element in conveyor system - has gantry supported at top on conveyor belt truck gantry
DE1173843B (en) Device for the continuous removal of the material that has been dumped in a pile
DE1229913B (en) Disposal and pick-up device for bulk goods
DE4040618A1 (en) Constantly moving ship unloader system - has turning platforms and jibs unloading directly on quay
DE2949864C2 (en) Bulk material discharge or bulk material receiving device
DE3331359A1 (en) Bucket wheel bridge unit
DE3519208A1 (en) Bridge device for removing dumps of loose material
DE448304C (en) Device for conveying bulk goods
DE3412829A1 (en) FOURDERGUT-CHARGER
DE971210C (en) Bucket wheel excavator
DE3050550C2 (en) Device for the hanging transport of completely assembled longwall construction frames
DE697451C (en) System for feeding the overburden to the dropping point in the opencast mine
DE672283C (en) Bucket wheel excavator with a bucket wheel boom that can be raised and lowered and moved against the impact of the excavator and with two bucket hoppers arranged next to one another for loading conveyor trains traveling next to one another

Legal Events

Date Code Title Description
OD Request for examination
8130 Withdrawal