DE265802C - - Google Patents

Info

Publication number
DE265802C
DE265802C DENDAT265802D DE265802DA DE265802C DE 265802 C DE265802 C DE 265802C DE NDAT265802 D DENDAT265802 D DE NDAT265802D DE 265802D A DE265802D A DE 265802DA DE 265802 C DE265802 C DE 265802C
Authority
DE
Germany
Prior art keywords
time
counter
voltage
meter
during
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DENDAT265802D
Other languages
German (de)
Publication of DE265802C publication Critical patent/DE265802C/de
Active legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/46Electrically-operated clockwork meters; Oscillatory meters; Pendulum meters

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Measurement Of Unknown Time Intervals (AREA)

Description

KAISERLICHESIMPERIAL

PATENTAMT.PATENT OFFICE.

PATENTSCHRIFTPATENT LETTERING

-JVi 265802-KLASSE 21 e. GRUPPE-JVi 265802-CLASS 21 e. GROUP

Patentiert im Deutschen Reiche vom 19. November 1912 ab.Patented in the German Empire on November 19, 1912.

Die Erfindung betrifft eine Einrichtung, durch die beim Ausbleiben des elektrischen Stromes in einem oder mehreren Polen des Nebenschlußstromkreises von Drehstromzählern, vor allen'Dingen Hochspannungszählern mit Spannungswandlern in den Erregerstromkreisen, der eine oder andere von zwei Zeitzählern in Gang gesetzt wird, je nachdem die Unterbrechung einer oder mehrerer LeitungenThe invention relates to a device by which if there is no electrical Current in one or more poles of the shunt circuit of three-phase meters, Above all, high-voltage meters with voltage converters in the excitation circuits, one or the other of two time counters is started, depending on the Interruption of one or more lines

ίο bewirkt, daß der Zähler nur etwa die Hälfte der entnommenen Energie registriert oder zum Stillstand kommt. Das Ausbleiben der Spannung kann z. B. davon herrühren, daß in den Spannungsstromkreisen Sicherungen schmelzen.ίο causes the counter to only be about half registers the withdrawn energy or comes to a standstill. The lack of tension can e.g. B. result from the fact that fuses melt in the voltage circuits.

Fig. ι stellt eine Ausführung für Pendelzähler dar. a, b und c seien die Niederspannungsklemmen eines Meßtransformators, Z die schematische Darstellung eines Pendelzählers, av S1 und C1 die Klemmen für den Nebenschlußerregerstrom des Zählers, A der elektrische Aufzug des Zählers.Fig. Ι shows an embodiment for pendulum counters. A, b and c are the low-voltage terminals of a measuring transformer, Z is the schematic representation of a pendulum counter, a v S 1 and C 1 the terminals for the shunt excitation current of the meter, A is the electric elevator of the meter.

Von a, b und c führen Leitungen nach av I1 und C1, außerdem von α und c nach Magnet M1, von α und b nach Magnet M2. Lines lead from a, b and c to a v I 1 and C 1 , also from α and c to magnet M 1 , and from α and b to magnet M 2 .

Stehen nun die Klemmen a, b und c unter Spannung, so fließt auch der Strom durch die Wicklungen der Magnete. Hierdurch wird bewirkt, daß von M1 Hebel H1 und von M2 Hebel H2 an die Kerne der Spulen gezogen werden; infolgedessen wird von H1 der Zeitzähler U1, z. B. dessen Unruhe, und von H2 der Zeitzähler U2 gesperrt.If the terminals a, b and c are now live, the current also flows through the windings of the magnets. This has the effect that M 1 pulls lever H 1 and M 2 pulls lever H 2 against the cores of the coils; As a result of 1 H, the time counter U 1, z. B. its unrest, and the timer U 2 is blocked by H 2.

Wird nun δ spannungslos, so zeigt der Zähler nur etwa die Hälfte der entnommenen Energie an, zugleich zieht aber Feder F2 den Hebel H2 von U2 ab, und der Zeitzähler beginnt zu registrieren. Durch die Schrauben R1 und R2 wird die Abreißspannung der Federn F1 und F2 eingestellt.If δ is now de-energized, the counter shows only about half of the energy drawn, but at the same time spring F 2 pulls lever H 2 off U 2 , and the time counter begins to register. The tension of the springs F 1 and F 2 is adjusted by means of the screws R 1 and R 2.

Bleibt hingegen die Spannung in α oder c, in α und b, in b und c aus, so steht der Zähler still, da an den Klemmen ax und C1 der Aufzug liegt; außerdem wird H1 von U1 abgehoben, und der Zeitzähler U1 registriert nun die Zeit, in welcher der Zähler stillsteht. Damit aber nicht beide Zählwerke zu gleicher Zeit in Gang kommen können, ist H1 durch Verbindungsstange V mit H3 verbunden ; wird aber H1 von U1 abgehoben, so wird zugleich H3 den Zähler U2 sperren.If, on the other hand, there is no voltage in α or c, in α and b, in b and c, the counter stands still because the elevator is connected to terminals a x and C 1; in addition, H 1 is lifted from U 1 , and the time counter U 1 now registers the time in which the counter stands still. So that both counters cannot start at the same time, H 1 is connected to H 3 by connecting rod V; but if H 1 is lifted from U 1 , H 3 will block the counter U 2 at the same time.

Fig. 2 gibt ein Ausführungsbeispiel für einen. Motorzähler wieder.Fig. 2 gives an embodiment for a. Engine counter again.

a, b und c seien die Niederspannungsklemmen eines Meßtransformators, M die schematische Darstellung eines Motorzählers mit getrennt geführtem Erregerstrom, av δχ und C1 die Klemmen des Zählers für den Erregerstromkreis. a, b and c are the low-voltage terminals of a measuring transformer, M is the schematic representation of a motor counter with separately conducted excitation current, a v δ χ and C 1 are the terminals of the counter for the excitation circuit.

Von a, b und c führen Leitungen nach av b1 und C1, außerdem von α und c nach Magnet M1, von a, b und c nach Magnet M2. Stehen die Klemmen a, b und c unter Spannung, so werden die Hebel H1 und H2 von den Kernen der Spulen M1 und M2 angezogen und die Zeitzähler U1 und U2 arretiert.Lines lead from a, b and c to a v b 1 and C 1 , also from α and c to magnet M 1 , and from a, b and c to magnet M 2 . Are the terminals a, b and c under tension, the handle H 1 and H 2 are attracted to the cores of the coils M 1 and M 2 and the time counter U 1 and U 2 is locked.

Wird nun α oder c spannungslos, so zieht die Feder F1 den Hebel H1 von dem Magnet M1 ab, und der Zähler U1 wird frei; wird b spannungslos, dann fließt durch die Spulen des Magneten M2 infolge ihrer Hintereinanderschal- If α or c is now de-energized, the spring F 1 pulls the lever H 1 off the magnet M 1 , and the counter U 1 becomes free; If b is voltage-free, then flows through the coils of the magnet M 2 due to their sequential switching

tung nur halb so viel Strom als vorher, und der Magnetismus wird so weit geschwächt, daß die entsprechend abgeglichene Feder F2 den Hebel H2 von dem Magneten M2 abzieht und infolgedessen das Zählwerk U1 freigegeben wird. In beiden Fällen registriert der Zeitzähler U1 die Zeit, in welcher der Drehstromzähler nur etwa die Hälfte des entnommenen Stromes anzeigt. Bleibt hingegen die Spannung in α und b, in α und c, in b und c oder in a, b und c aus, so werden die Hebel H1 und H2 durch ihre Federn von den Magneten abgezogen und der Zähler U2 wird freigegeben. Dieses Zählwerk registriert die Zeit, in welcher der Drehstromzähler stillsteht. Durch die Bewegung der Hebel H1 und H2 wird der Hebel H3 in eine solche Lage gebracht, daß er das Zählwerk U1 sperrt.tung only half as much current as before, and the magnetism is weakened so far that the corresponding balanced spring F 2 draws the lever H 2 from the magnet M 2, and consequently the counter U 1 is released. In both cases, the time counter U 1 registers the time in which the three-phase current meter shows only about half of the current drawn. If, on the other hand, there is no voltage in α and b, in α and c, in b and c or in a, b and c, the levers H 1 and H 2 are pulled off the magnets by their springs and the counter U 2 is released . This counter registers the time in which the three-phase energy meter is idle. By moving the levers H 1 and H 2 , the lever H 3 is brought into such a position that it blocks the counter U 1.

Claims (1)

Patent-Anspruch:
Einrichtung zum Registrieren der Zeit, während welcher in einer oder mehreren Nebenschlußleitungen eines Drehstromzählers die Spannung ausbleibt, gekennzeichnet durch zwei die Sperrung zweier Zeitzähler überwachende Elektromagnete, deren Erregerwicklungen derart an die drei Leitungen der Spannungsstromkreise des Drehstromzählers gelegt sind, daß der eine Zeitzähler während der Zeit freigegeben wird, während welcher der Drehstromzähler infolge Ausbleibens der Spannung nur etwa die Hälfte der verbrauchten Energie registriert, und der andere Zeitzähler während der Zeit freigegeben wird, während welcher der Drehstromzähler infolge Ausbleibens der Spannung stillsteht.
Patent claim:
Device for registering the time during which there is no voltage in one or more shunt lines of a three-phase meter, characterized by two electromagnets monitoring the blocking of two time meters, the excitation windings of which are connected to the three lines of the voltage circuits of the three-phase meter that one time meter during the time is released, during which the three-phase meter registers only about half of the energy consumed due to the lack of voltage, and the other time meter is released during the time during which the three-phase meter stands still due to the lack of voltage.
Hierzu ι Blatt Zeichnungen.For this purpose ι sheet of drawings.
DENDAT265802D Active DE265802C (en)

Publications (1)

Publication Number Publication Date
DE265802C true DE265802C (en)

Family

ID=523005

Family Applications (1)

Application Number Title Priority Date Filing Date
DENDAT265802D Active DE265802C (en)

Country Status (1)

Country Link
DE (1) DE265802C (en)

Similar Documents

Publication Publication Date Title
DE265802C (en)
DE466375C (en) Device for testing electromagnetic cores with regard to their remanence
DE556598C (en) Fault location display device for three-phase systems with distance time relays in each phase
DE673673C (en) Feedback device for displaying the position of a plurality of adjustable organs
DE246263C (en)
DE218867C (en)
DE117523C (en)
DE641719C (en) Method and device for converting the vibrations of an electrically excited, polarized, mechanical vibration system into electrical quantities
DE102010052799A1 (en) Apparatus for determining position of rotor of electrical machine, calculates rotational position of rotor affected by magnetic field of core based on measurement signals indicating magnetization degree of core wound with pole winding
DE382473C (en) Device for measuring multiphase currents
DE276035C (en)
DE698119C (en) Relative current receiver for remote pointer
DE120874C (en)
AT67581B (en) Device for electromagnetic counter drive for DC motor meters.
DE317798C (en)
DE297281C (en)
DE516564C (en) Procedure for fault location determination in alternating current networks
DE397420C (en) Rotating field direction indicator with a three-coil magnet system with copper winding, the size of a pocket watch
DE114068C (en)
DE665833C (en) Device for measuring the quotient of two quantities given by electrical currents or voltages with the help of a measuring mechanism with a rotating armature
DE871843C (en) Method for measuring the tensile force of electromagnets, especially of electromagnetic rail brakes
DE749163C (en) Device for reporting earth faults in power supply systems
DE375663C (en) Electricity meter
AT112075B (en) Excitation device for the turning field of series collector machines.
DE537350C (en) Second stopwatch with synchronous motor