DE2651454C2 - Device for the production of tested transformers - Google Patents
Device for the production of tested transformersInfo
- Publication number
- DE2651454C2 DE2651454C2 DE19762651454 DE2651454A DE2651454C2 DE 2651454 C2 DE2651454 C2 DE 2651454C2 DE 19762651454 DE19762651454 DE 19762651454 DE 2651454 A DE2651454 A DE 2651454A DE 2651454 C2 DE2651454 C2 DE 2651454C2
- Authority
- DE
- Germany
- Prior art keywords
- station
- measuring
- transformers
- charging
- receiving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F41/00—Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Branching, Merging, And Special Transfer Between Conveyors (AREA)
Description
6565
Die Erfindung bezieht sich auf ein Gerät zur Fertigung geprüfter Transformatoren, bei dem eine Ladestation und eine Montagestation, der eine Zufuhreirrichtung zugeordnet ist, vorgesehen sind und eine Fördereinrichtung schrittweise in gleichbleibender Richtung entlang einer endlosen Förderbahn angetrieben ist und den Transformatoren angepaßte Aufnahmestücke in gleichmäßigem Abstand voneinander in einer Reihe hintereinander trägt sowie von der Ladestation zur Montagestation 1. ansportiert, wobei die Ladestation und die Montagestation in einem dem Abstand zweier Aufnahmestücke voneinander entsprechenden Abstand angeordnet sind und wobei hinter der Montagestation eine Meßstation, der eine mit Kontaktteil versehene Meßeinrichtung zugeordnet ist, vorgesehen ist sowie ein an der Meßstation befindliches Aufnahmestück mit den Transformatoren zugeordneten .yleßkontakten versehen ist, die mit an der Außenseite des Aufnahmestückes vorgesehenen, dem Kontaktteil zugeordneten Anschlußkontakten elektrisch verbunden sind.The invention relates to an apparatus for manufacturing tested transformers, in which a Loading station and an assembly station, to which a feed device is assigned, are provided and one Conveyor driven step by step in a constant direction along an endless conveyor track is and the transformers adapted receiving pieces at an equal distance from each other in a Row one behind the other as well as from the charging station to the assembly station 1 and the assembly station at a distance corresponding to the distance between two receiving pieces from one another Are arranged spaced and behind the assembly station a measuring station, the one with a contact part provided measuring device is assigned, is provided as well as one located at the measuring station Receptacle with the transformers associated .yleßkontakten is provided with on the outside of the receiving piece provided, the contact part associated terminal contacts electrically connected are.
Bei einem auf dem Markt befindlichen, von Seiten des Anmelders hergestellten Gerät dieser Art ist ein Schieber vorgesehen, der ein Aufnahrncstuck trägt, das mittels des Schiebers zu einer Ladestation, bei der ein Spulenkörper von Hand in das Aufnahmestück gelegt wird, bringbar ist. Der Schieber wird dann von Hand derart verschoben, daß das Aufnahmestück zu einer Montagestation gelangt, wo mittels der Zufuhreinrichtung Blechteile zugeiährt und derart an dem Spulenkörper vorgesehen werden, daß der fertige Transformator mit Spulenwicklung vorliegt Das Aufnahmestück wird dann wieder zw Ladestation gebracht, wo der Transformator herausgenommen wird, der dann in ein gesondert angeordnetes Aufnahmestück gelegt wird, an welchem das Kontaktteil der Meßeinrichtung unbeweglich und fest angebracht ist. Dieses Meß-Aufnahmestück ist mit geeigneten Kontakteinrichtungen versehen, um elektrische Werte des Transformators wie Hochspannungsfestigkeit. Dämpfung oder Verluste zu messen.In a device of this type that is on the market and manufactured by the applicant, a slide is provided which carries a receptacle which can be brought by means of the slide to a loading station in which a bobbin is placed in the receptacle by hand. The slide is then moved by hand such that the receiving piece arrives at an assembly station where zugeiährt by means of the supply means sheet metal parts and are so provided on the coil body, that the finished transformer coil winding is present, the receiving piece is then brought zw charging station, where the transformer is removed, which is then placed in a separately arranged receiving piece on which the contact part of the measuring device is immovably and firmly attached. This measuring receptacle is provided with suitable contact devices in order to measure electrical values of the transformer such as high-voltage strength. Measure attenuation or loss.
Eine solche Meßstation läßt sich mit einem bekannten (DD-PS 25 689) Gerät kombinieren. Has Arbeiten mit einem solchen Kombinationsgerät ist mit allzuviel Handarbeit verbunden.Such a measuring station can be combined with a known (DD-PS 25 689) device. Has working with such a combination device involves too much manual labor.
Eine Aufgabe der Erfindung ist es daher, ein Gerät der eingangs genannten Art r.u schaffen, bei dem der Transport der Transformatoren von der Montagestation zur Meßstation vereinfacht ist und Montage und Prüfung mittels eines einheitlichen Gerätes durchführbar sind, indem das Gerät so einfach als möglich ausgebildet ist und ein Transport eines Transformators von einem Aufnahmestück in ein anderes vermieden ist. Die Erfindung ist. diese Aufgabe lösend, dadurch gekennzeichnet, daß die Meßstation im Abstand zweier Ai-fnahmestücke voneinander in Förderrichtung hinter der Montagestation an der Fördereinrichtung vorgesehen und jedes der Aufnahmestücke mit den Meßkontakten und den Anschlußkontakten versehen ist sowie daß das Kontaktteil quer zur Förderrichtung hin- und herbeweglich angetrieben ist und Kontaktteil und die Aufnahmestücke mit zueinander passenden Kontaktstiften und Buchsen versehen sind.It is therefore an object of the invention to provide a device of the type mentioned at the outset in which the Transport of the transformers from the assembly station to the measuring station is simplified and assembly and Testing by means of a uniform device can be carried out by making the device as simple as possible is formed and a transport of a transformer from one receiving piece to another is avoided. The invention is. Solving this problem, characterized in that the measuring station at a distance of two Ai-receiving pieces behind each other in the conveying direction the assembly station provided on the conveyor and each of the receiving pieces with the measuring contacts and the connection contacts is provided and that the contact part back and forth transversely to the conveying direction is driven forward and contact part and the receiving pieces with matching contact pins and sockets are provided.
Bei diesem Gerät bewegt sich ein Aufnahmestück entlang der endlosen Förderbahn, auf der es zu der Ladestation gelangt, wo es z. B. von Hand, mit einem bewickelten Spulenkörper bestückt wird. In einem nächsten Schritt gelangt das Aufnahmestück in die Montagestation, wo mittels einer an sich bekannten Zufuhreinrichtung der bewickelte Spulenkörper mit Blechen versehen wird. In einem nächsten SchrittIn this device, a receiving piece moves along the endless conveyor track on which it is to be Charging station where there is z. B. by hand, is fitted with a wound bobbin. In one the next step is the receiving piece in the assembly station, where by means of a known per se Feeding device of the wound bobbin is provided with metal sheets. In a next step
gelangt das Aufnahmestück erfindungsgemäß zu der MeOstation, wo der fertige Transformator prüfend gemessen wird. Danach wird der Transformator aus dem Aufnahmestück genommen, das nun entlang der Förderbahn weiter wandert, bis es wieder zu der Ladestation gelangt. Für den Transport von der Ladestation zur Meßstation ist Handarbeit nicht erforderlich. Der Spulenkörper wechselt bis zum Vorliegen des fertigen Transformators das Aufnahmestück nicht Montage und Messung erfolgen mit nur einem, recht einfach ausgebildeten Gerät. Eine kontinuierliche, Arbeitskräfte sparende Fertigung von Transformatoren ist ermöglicht.According to the invention, the receiving piece arrives at the MeOstation, where the finished transformer is tested is measured. Then the transformer is taken out of the receiving piece, which is now along the The conveyor track continues to move until it reaches the charging station again. For the transport of the No manual work is required from the charging station to the measuring station. The bobbin changes until When the finished transformer is available, the mounting piece cannot be assembled and measured using only a device with a fairly simple design. A continuous, labor-saving manufacture of transformers is made possible.
Bei der Erfindung wird das Kontaktteil zur Messung nicht unmittelbar mit dem Transformator in Verbindung gebracht, sondern mit dem Aufnahmestück, wodurch der Meßvorgang sicherer und vereinfachter wird. Dabei ist eine whleifende Kontaktierung zwischen dem Kontaktteil und dem Transformator bzw. den Aufnahmestücken vermieden und eine sichere Steckkontaktierung gegeben.In the invention, the contact part for measurement is not directly connected to the transformer brought, but with the receiving piece, whereby the measuring process is safer and easier. Included is a dialing contact between the contact part and the transformer or the receiving pieces avoided and given a secure plug connection.
Besonders zweckmäßig und vorteilhaft ist es sodann, wenn die Aufnahmestücke im Bereich der Lude·. Montage- und Meßstation an Führungsschienen gleiten. Hierdurch ist eine genaue Position der Aufnahmeslücke bei allen drei Stationen gewährleistet, was die Zufuhr der Spulenkörper, das Bestücken mit Blecher, und die Kontaktierung des Kontaktteiles erleichtert und verbessert. It is then particularly expedient and advantageous if the recording pieces in the area of the Lude ·. Assembly and measuring station slide on guide rails. This ensures an exact position of the receiving gap at all three stations, which is the feed the bobbin, the loading with sheet metal, and the Contacting the contact part facilitated and improved.
Besonders zweckmäßig und vorteilhaft ist es dabei, wenn mittig zwischen Führungsschienen eine Förderkeite verläuft und jedes Aufnahmestück mittels eines Ansatzes an einem Glied der Kette befestigt ist. Diese Ausführungsform ist besonders einfach und gewährleistet sichere Führung der Aufnahmestücke durch die Fördereinrichtung.It is particularly expedient and advantageous to if a conveyance runs in the middle between guide rails and each receiving piece by means of a Approach is attached to a link of the chain. This embodiment is particularly simple and guaranteed safe guidance of the receiving pieces through the conveyor.
Die Erfindung siehl auch vor. daß bei der Ladcstation eine Ladeeinrichtung vorgesehen ist und hinter der Meßstafion eine Ablagestation mit einer die Transformatoren aufnehmenden, in zwei verschiedene Stellungen bringbaren Sortiereinrichtung vorgesehen ist Ein derartiges Gerät arbeitet vntüiicchanisch. weil weder die Zufuhr der bewickelten Spulenkörpei in die Aufnahmestücke noch die Entnahme der Transformatoren aus den Aufnahmestücken und das Sortieren nach funktionsfähigen und nichtfunktionsf^higen Transformatoren vor Hand erfolgt.The invention also provides. that at the charging station a charging device is provided and behind the measuring stafion a storage station with one of the transformers receiving sorting device which can be brought into two different positions is provided such a device works vntüiicchanisch. because neither the supply of the wound bobbins into the receiving pieces nor the removal of the transformers from the recording pieces and sorting according to functional and non-functional transformers done before hand.
Besonders zweckmäßig und vorteilhaft ist es dabei, wenn die Ladeeinrichtung eine auf einer Seite der Ladestation angeordnete Zufuhrrutsche mit Positionsplatiform und auf der gegenüberliegenden Seite der Ladestation einen Ladearm in vertikaler und horizontaler Richtung bewegbar vorgesehen aufweist. Diese Ladeeinrichtung ist einfach im Aufbau und arbeitet zuverlässig, indem ai'f der Positionsplattform bereitgestellte bewickelte Spulenkörper vom Ladearm jeweils in eines der AufnahmcMncke gehoben werden.It is particularly expedient and advantageous if the charging device is one on one side of the Loading station arranged feed chute with position platform and on the opposite side of the Charging station has a loading arm movably provided in the vertical and horizontal directions. These Charging device is simple in construction and works reliably by providing ai'f to the position platform wound bobbins are lifted from the loading arm into one of the receiving screws.
Besonders zweck naßig und vorteilhaft ist es auch, wenn die Sortiereinrichtung eine unterhalb einer AblagcMelle vorgesehene, in zwei verschiedene Stellungen bringbare Ruischcinrichtung aufweist. Dies ist eine besonders einfache Sortiereinrichtung, um fehlerhafte Transformatoren von ordnungsgemäßen Transformatoren zu trennen, da die Rutscheinrichtiing in Abhängigkeit von der Meßeinrichtung eingestellt wird.It is particularly useful, wet and advantageous, when the sorting device is provided below a storage cell, in two different positions Has bringable Ruischcineinrichtung. this is a particularly simple sorting device to sort faulty transformers from proper transformers to separate, as the slide device is dependent is set by the measuring device.
In der Zeichnung is· cine bevorzugte Ausführungsform dor Erfindung dargestellt und zeigtThe drawing shows a preferred embodiment dor invention shown and shows
F i g. I eine Draufsicht r.uf ein Gcriit zur FertigungF i g. I a top view of a Gcriit for manufacturing
geprüfter Transformatoren,certified transformers,
Fig. 2 einen Schnitt gemäß Linie H-If in Fig. 1,FIG. 2 shows a section along line H-If in FIG. 1,
F i g. 3 den hinteren Teil des Gerätes gemäß F i g. 1 in einem Schnitt gemäß Linie H-II :n Fig. 1 undF i g. 3 the rear part of the device according to FIG. 1 in a section along line H-II: n Fig. 1 and
F i g. 4 eine Draufsicht auf das in F i g. 3 dargestellte. Ein Gerät gemäß Zeichnung besitzt eine Fördereinrichtung 1, die zwei Paare von Ständern 2 umfaßt, an denen jeweils eine Welle 3 drehbar gelagert ist, die ein Zahnrad 4 trägt Über die beiden Zahnräder 4 ist eine endlose Kette 5 gelegt die ein geradliniges oberes Trumm und geradliniges unteres Trumm bildet Die eine der beiden Wellen 3 wird mittels eines Motors oder pneumatischen Antriebs 6 angetrieben, der die Kette 5 schrittweise in Richtung eines Pfeiles 7 vorwärts bewegt. An der Außenseite der Kette 5 sind mit gleichmäßigem Abstand voneinander mehrere, mehr als drei, nämlich acht Ansätze 8 jeweils an einem Glied der Kette befestigt. Jeder Ansatz 8 trägt eine Platte 9, die an einander gegenüberliegenden, zur Kette 5 parallelen Seiten an Führungsschienen 10 geführt sind, wenn sie sich im Bereich des oberen Trumim d^ Kette bewegen. Im Bereich des unteren Trumms der Kitte sind die Platten 9 ungeführt. Jede Führungsschiene 10 erstreckt sich zwischen zwei Ständern 2.F i g. 4 is a plan view of the FIG. 3 shown. A device according to the drawing has a conveyor device 1, which comprises two pairs of uprights 2, on each of which a shaft 3 is rotatably mounted, which is a Gearwheel 4 carries over the two gearwheels 4 an endless chain 5 is placed which is a straight upper one The one of the two shafts 3 is driven by a motor or Pneumatic drive 6 driven, which the chain 5 step by step in the direction of an arrow 7 forward emotional. On the outside of the chain 5 are evenly spaced several, more than three, namely eight lugs 8 each attached to a link of the chain. Each approach 8 carries a plate 9 on opposite sides parallel to the chain 5 are guided on guide rails 10 when they move in the area of the upper strand of the chain. In the area of the lower run of the putty, the plates 9 are unguided. Each guide rail 10 extends between two stands 2.
Jede Platte S tiägt an ihrer Oberseite ein Aufnahmestück 11, jas mittig eine Ausnehmung 12 aufweist, deren Abmessungen den Abmessungen eines zu verarbeitenden bewickelten .Spulenkörpers 13 entsprechen, im Grund der Ausnehmung 12 sind Meßkontakte 14 vorgesehen, die über im Aufnahmestück 11 angeordnete elektrische Leitungen 15 mit Buchsen 16 verbunden sind, die an den beiden den Führungsschienen 10 zugewendeten Seiten des Aufnahmestückes 11 angeordnet sind.Each plate S tiäge a receiving piece on its top 11, jas has a recess 12 in the middle, whose Dimensions correspond to the dimensions of a wound .Spoolenkörpers 13 to be processed, in The base of the recess 12 is provided with measuring contacts 14 which are arranged in the receiving piece 11 electrical lines 15 are connected to sockets 16 which are attached to the two guide rails 10 facing sides of the receiving piece 11 arranged are.
Entlang dem oberen Trumm der Kette 5 bzw. den Führungsschienen 10 sind nintereinander. mit gleichem Abstand voneinander eine l.adeskition 17. eine Montagestation 18 und eine Meßstation 19 vorgesehen. Hinter der Kette 5 b/w. hinter dem hinteren Zahnrau 4 ist .«xh eine Ablagestation 20 vorgesehen.Along the upper run of the chain 5 or the guide rails 10 are nested. with the same Distance from one another a l.adeskition 17. an assembly station 18 and a measuring station 19 are provided. Behind the chain 5 b / w. behind the rear tooth rough is 4. «xh a storage station 20 is provided.
Bei der Ladestation 17 ist auf der einen Seile der Fördereinrichtung 1 anschließend an die eine Fuhriings schiene 10 eine Positionsplattfin m 21 vorgesehen, auf die jeweils ein bewickelter Spulenkörper über eine Zufuhrrutsche 22 gleiten kann. Die Posiiionsplattform 21 weist Anschläge und Ausnehmungen auf. um den Spulenkörper in derjenigen Lage festzulegen, in welcher er von einem Ladearm 23 ergriffen werden kann, der sich hierzu quer über die Fördereinrichtung I erstreckt. Das hinlere Ende des Ladearmes 23 ist an einem Block 24 befes'igt. der zwischen zwei fiihrungsplatten 25 in horizontaler und in vertikaler Richtung verschiebbar ist. Am vorderen Ende des Ladearmes 23 isi "in .'.n'Jstück 26 vorgesehen, das in den Durchbruch des bewickelten Spulenkörpers paßt Am hinteren Ende des Blockes 24 greif, eine Kolbenstange 27 dirart an. daß der Block gegenüber der Kolbenstange auf- und abbewegbar ist. Die Kolbenstange 27 ist mittels einer nicht gezeigten pneumatischen Kolben Zvlinder-Einrichtung in waagerechter Richtung hm und herverschicbbar. An der Oberseite des Blockes 24 ist eine schür/artige Ausnehmung 28 vorgesehen, die rieh auch über die Oberseite des Ladcarmcs 23 erstreckt. Mit dieser Ausnehmung ist der Ladearm entlang einem Verbreiter*jn '.intercn Endstück einer vertikaler Kolbenstange 29 verschiebbar, die mitteis einer nicht gezeigten pneumatischen Kolben-Zylinder-Einrichtung auf- und abbcwcebar ist.At the loading station 17, one of the ropes of the conveyor 1 is connected to the one Fuhriings Rail 10 a Positionsplattfin m 21 provided on each of which a wound bobbin can slide over a feed chute 22. The position platform 21 has stops and recesses. to fix the bobbin in that position in which it can be gripped by a loading arm 23, which for this purpose extends across the conveyor I extends. The rear end of the loading arm 23 is fastened to a block 24. between two guide plates 25 is displaceable in the horizontal and in the vertical direction. At the front end of the loading arm 23 isi "in. '. n'Jstück 26 is provided, which is in the opening of the wound bobbin fits at the rear end of the block 24, a piston rod 27 directly. that the block can be moved up and down with respect to the piston rod. The piston rod 27 is by means of a not shown pneumatic piston cylinder device in the horizontal direction and can be sent out. At the top of the block 24 is a Schür / like recess 28 is provided, the rieh too extends over the top of the Ladcarmcs 23. With this recess, the loading arm is along a Broader * jn '.intercn end piece of a vertical piston rod 29 displaceable, the middle of a pneumatic piston-cylinder device, not shown is up and down.
Die bei der Montagestation 18 vorgesehene Zuführeinrichtung ist an sich bekannt und braucht daher an sich nicht näher erläutert /u werden. Sie umfaßt zwei beiderseits der Fördereinrichtung I angeordnete Führungen 30. in denen jeweils mittels eines Stempels 31 > Pakete von Blechteilen 32 verschiebbar sind.The feed device provided at the assembly station 18 is known per se and therefore does not need to be explained in more detail per se. It includes two guides 30 arranged on both sides of the conveying device I, in each of which by means of a stamp 31> Packages of sheet metal parts 32 are displaceable.
Der Meßstation 19 ist eine Meßeinrichtung 33 zugeordnet, die jeweils über ein Kabel 34 an zwei Kontaktteile 35 angeschlossen ist. Die beiden Kontaktteile 35 sind beiderseits der Fördereinrichtung 1 m angeordnet. |edes Kontaktteil 35 ist mittels einer nicht gezeigten pneumatischen Kolbcn-Zylindcr-Einrichtung über eine Kolbenstange 36 in einer zur Förderrichtung 7 rechtwinkeligen Richtung hin- und herbewegbar, ledes Kontaktteil 35 weist Kontaktstifte 37 auf. die dem r. Aufnahmestück Il zugewendet sind und bei der Meßstation 19 in die Buchsen 16 des Aufnahmestückes schiebbar bzw. steckbar sind.The measuring station 19 is assigned a measuring device 33, each of which is connected to two via a cable 34 Contact parts 35 is connected. The two contact parts 35 are on both sides of the conveyor 1 m arranged. Each contact part 35 is by means of a pneumatic piston-cylinder device, not shown Can be moved back and forth via a piston rod 36 in a direction at right angles to the conveying direction 7, all of which Contact part 35 has contact pins 37. the r. Recording piece Il are facing and at the Measuring station 19 in the sockets 16 of the receiving piece are slidable or pluggable.
Bei der Ablagestation 22 befindet sich hinter der Fördereinrichtung I, d. h. hinter dem hinteren Umlenk- -" Zahnrad 4 ein Winkelblech 38, das tiefer als die Fördereinrichtung I angeordnet ist. Die von dem Winkelblech gebildete Rutscheinrichtung 38 ist auf zwei Schienen 39 in waagerechter Richtung hin- und herverschiebbar, wozu eine pneumatische Kolben-Zy- ?'-linder-Einrichtung 40 vorgesehen ist. Die Rutscheinrichtung 38 ist in zwei verschiedene Stellungen bringbar, die durch Anschläge 41,42 definiert sind.At the deposit station 22 is located behind the conveyor I, i. H. behind the rear deflection - " Gear 4 an angle plate 38, which is arranged lower than the conveyor I. The one from that Angle plate formed sliding device 38 is back and forth on two rails 39 in the horizontal direction can be pushed out, why a pneumatic piston-cylinder? '- cylinder device 40 is provided. The sliding device 38 can be brought into two different positions are defined by stops 41,42.
Über die Zufuhrrutsche 22 gelangt ein bewickelter Spulenkörper 13 auf die Positionsplattform 21. Dieser in Spulenkörper wird von dem abgesenkten und vorgefahrenen Ladearm 23 ergriffen, der sich dann etwas hebt und soweit /urückfährt. daß der Spulenkörper sich über der Ausnehmung 12 des Aufnahmcsiückes 11 befindet. Sodann senkt sich der Ladearm 23 ab und zieht sich zurück, so daß der Spulenkörper in der Ausnehmung 12 verbleibt. Dns mit dem Spulenkörper bestückte Aufnahmestück wandert nun in einem nächsten Taktschrill von der Ladestation zu der Montagestation 18. Dort wird von beiden Seilen der Fördereinrichtung I her jeweils ein Paket 32 von Blechen über bzw. auf den bewickelten Spulenkörper 13 geschoben. Der nunmehr fertige Transformator wird in einem nächsten Taktschritt in dem gleichen Aufnahmestück 11 zur Meßstation 19 gebracht. Dort werden die KontaktstifteA wound bobbin 13 reaches the position platform 21 via the feed chute 22 The bobbin is gripped by the lowered and advanced loading arm 23, which then rises slightly and as far as / goes back. that the bobbin is located above the recess 12 of the receptacle 11. The loading arm 23 is then lowered and withdrawn so that the coil body is in the recess 12 remains. The receiving piece equipped with the bobbin now moves into a next one Cycle shrill from the loading station to the assembly station 18. There, both ropes of the conveyor I each a package 32 of metal sheets pushed over or onto the wound bobbin 13. The now finished transformer is in a next clock step in the same receiving piece 11 for Measuring station 19 brought. That is where the contact pins are
37 der beiden Kontaktteile 35 in die Buchsen 16 der Aufnahmestücke 11 geschoben. Die Meßeinrichtung 33 mißt den Transformator 43.37 of the two contact parts 35 are pushed into the sockets 16 of the receiving pieces 11. The measuring device 33 measures transformer 43.
Wenn die Meßeinrichtung 33 den Transformator 43 für gut befindet, dann bringt sie die RutscheinrichtunEIf the measuring device 33 finds the transformer 43 to be good, then it brings the slide device
38 in die aus F i g. 3 ersichtliche, durch den Anschlag 41 definierte Position. Wenn sie den Transformator jedoch für schlecht befindet, dann bringt sie die Rutscheinriehtung 38 in die durch den Anschlag 42 definierte Position. Beim nächsten Taktschritt wandert das Aufnahmestück 10 mit dem Transformator 43 zu der Ablagestation 20, wo das Aufnahmestück in eine vertikale Lage gerät, so daß der Transformator aus der Ausnehmung 12 nach unten fa"t. Je nach Stellung der Rutscheinrichtung 38 gleitet der Transformator in F i g. 3 nach links oder nach rechts.38 into the figure shown in FIG. 3 visible by the stop 41 defined position. However, if she thinks the transformer is bad, she'll bring the slide 38 in the position defined by the stop 42. In the next step, the receiving piece moves 10 with the transformer 43 to the storage station 20, where the receiving piece is in a vertical position, see above that the transformer falls out of the recess 12 downwards. Depending on the position of the sliding device 38 the transformer slides in FIG. 3 to the left or to the right.
Hierzu 3 Blatt ZeichnungenFor this purpose 3 sheets of drawings
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19762651454 DE2651454C2 (en) | 1976-11-11 | 1976-11-11 | Device for the production of tested transformers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19762651454 DE2651454C2 (en) | 1976-11-11 | 1976-11-11 | Device for the production of tested transformers |
Publications (2)
Publication Number | Publication Date |
---|---|
DE2651454A1 DE2651454A1 (en) | 1978-05-18 |
DE2651454C2 true DE2651454C2 (en) | 1983-01-20 |
Family
ID=5992903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19762651454 Expired DE2651454C2 (en) | 1976-11-11 | 1976-11-11 | Device for the production of tested transformers |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2651454C2 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2844103A1 (en) * | 1978-10-10 | 1980-04-30 | Grau Erich Stanzwerk Elek | STAMPING MACHINE FOR STAMPING BOBBINS |
DE3031829C2 (en) * | 1980-08-23 | 1985-01-31 | Waasner, Bruno, 8550 Forchheim | Device for loading a bobbin |
JPS6386508A (en) * | 1986-09-30 | 1988-04-16 | Tanaka Seiki Kk | Continuous finishing system of automatic winding |
CN105881005B (en) * | 2016-02-04 | 2018-04-06 | 深圳市海目星激光科技有限公司 | A kind of automatic assembly line for transformer production |
-
1976
- 1976-11-11 DE DE19762651454 patent/DE2651454C2/en not_active Expired
Also Published As
Publication number | Publication date |
---|---|
DE2651454A1 (en) | 1978-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3340744C2 (en) | ||
DE2816141C2 (en) | ||
DE2022163B2 (en) | AUTOMATIC MACHINE FOR THE MANUFACTURE OF ELECTRIC ACCUMULATORS | |
DE2814715C3 (en) | Rotating, continuously working molding device for casting cores | |
DE3104341A1 (en) | "FUEL FILLING DEVICE FILLING DEVICE" | |
DE69520760T2 (en) | Device and method for measuring crimp height | |
DE2167011B2 (en) | Device for feeding wire or cables to a cutting and stripping arrangement | |
DE2838739C2 (en) | Device for cutting bricks from a strand | |
DE2651454C2 (en) | Device for the production of tested transformers | |
DE554542C (en) | Device for row-by-row introduction of the cigarettes coming from a stick cigarette machine into trays | |
DE3123543C2 (en) | Device for testing and sorting semiconductor components | |
DE69703720T2 (en) | Device for the production of cable harnesses | |
DE1473818C3 (en) | Method and device for the automatic testing of the surface contour and the thickness of curved or bent glass panes | |
DE3421177C2 (en) | ||
EP0708508A1 (en) | Process and device for equipping connector housings | |
DE2711474C2 (en) | ||
DE2528442C2 (en) | Apparatus for manufacturing electrically tested transformers | |
DE2756244A1 (en) | PROCEDURE AND DEVICE FOR CHECKING THE FUNCTIONALITY AND FOR ADJUSTING AND CALIBRATING A TESTING DEVICE FOR NON-DESTRUCTIVE ELECTRIC OR MAGNETIC TESTING OF METAL BLANKS | |
DE19852046C1 (en) | Pretzel forming machine in which the dough roll overhangs the conveyor so symmetrically that precise control is possible. | |
DE19631368A1 (en) | Automated device for testing printed circuit boards | |
DE2946535C2 (en) | Device for cutting clay strands or the like. pasty masses in moldings | |
DE1910828A1 (en) | Device for pushing off packs produced on a packaging machine onto a conveyor belt or the like. | |
EP0773611B1 (en) | Transport device for a cable manufacturing machine | |
DE2746194C3 (en) | Arrangement for making boxless sand molds | |
DE3939775C1 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OD | Request for examination | ||
D2 | Grant after examination | ||
8364 | No opposition during term of opposition | ||
8339 | Ceased/non-payment of the annual fee |