DE2614993A1 - Plasterboard cladded solid wall sound insulation - has plaster pumped into rear spaces as backfilling using compressed air - Google Patents
Plasterboard cladded solid wall sound insulation - has plaster pumped into rear spaces as backfilling using compressed airInfo
- Publication number
- DE2614993A1 DE2614993A1 DE19762614993 DE2614993A DE2614993A1 DE 2614993 A1 DE2614993 A1 DE 2614993A1 DE 19762614993 DE19762614993 DE 19762614993 DE 2614993 A DE2614993 A DE 2614993A DE 2614993 A1 DE2614993 A1 DE 2614993A1
- Authority
- DE
- Germany
- Prior art keywords
- plasterboard
- backfilling
- compressed air
- sound insulation
- plaster
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009413 insulation Methods 0.000 title abstract description 6
- 239000011505 plaster Substances 0.000 title abstract description 4
- 239000007787 solid Substances 0.000 title abstract description 3
- 238000005253 cladding Methods 0.000 claims abstract description 8
- 238000009418 renovation Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 7
- 238000009415 formwork Methods 0.000 description 7
- 229910052602 gypsum Inorganic materials 0.000 description 6
- 239000010440 gypsum Substances 0.000 description 6
- 238000005429 filling process Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 238000007711 solidification Methods 0.000 description 2
- 230000008023 solidification Effects 0.000 description 2
- OSGAYBCDTDRGGQ-UHFFFAOYSA-L calcium sulfate Inorganic materials [Ca+2].[O-]S([O-])(=O)=O OSGAYBCDTDRGGQ-UHFFFAOYSA-L 0.000 description 1
- ZOMBKNNSYQHRCA-UHFFFAOYSA-J calcium sulfate hemihydrate Chemical compound O.[Ca+2].[Ca+2].[O-]S([O-])(=O)=O.[O-]S([O-])(=O)=O ZOMBKNNSYQHRCA-UHFFFAOYSA-J 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 239000011507 gypsum plaster Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 150000002923 oximes Chemical class 0.000 description 1
- 238000010926 purge Methods 0.000 description 1
- 238000009419 refurbishment Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/82—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to sound only
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/02—Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
- E04F21/06—Implements for applying plaster, insulating material, or the like
- E04F21/08—Mechanical implements
- E04F21/085—Mechanical implements for filling building cavity walls with insulating materials
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Acoustics & Sound (AREA)
- Electromagnetism (AREA)
- Building Environments (AREA)
Abstract
Description
Oberbegriff desGeneric term of
Unteranspruches: Einschlägige Werkmaschinen und Schalinaterial zur werkgerechten Ausführung der Hinterfüllungsarbeiten.Subclaim: Relevant work machines and formwork material for correct execution of the backfilling work.
Kennzeichnender Teil des Unteranspruches -siehe Zeichnung: 1. Druckkessel 2. demontierbare DruekschlauchverschraubunO 3. Verschraubung der Schaltafeln mit der Wand Durch einen Luftkompressor bis zu io atu (1) wird über einen Preßluftschlauch (2) Druckluft in einen Druckbehälter (3) gepreßt.Characteristic part of the dependent claim - see drawing: 1. Pressure vessel 2. Removable pressure hose screw connection 3. Screw connection of the formwork panels with the wall By an air compressor up to io atu (1) is via a compressed air hose (2) Compressed air is pressed into a pressure vessel (3).
Der Druckluftbehälter ist mit der zu h.interfüllenden Masse bis auf eine kleine Luftblase angefüllt. Die Masse wird durch ein Rührwerk im Druckbehälter laufend gemischt.The compressed air tank is with the mass to be backfilled except for a small air bubble filled. The mass is moved by an agitator in the pressure vessel constantly mixed.
Durch die Druckluft wird durch die untere Öffnung im Druckbehälter (3) über einen Druckschlauch (4) der Gipsbrei durch das Ventil (5) hinter die Vorsatzschalen gepreßt, und zwar bis zum oberen Rand der zu hinterfüllenden Gipskartonplatte. Die entweichende Luft kann durch eine vorher zu erstellende Öffnung unter der Decke solange austreten, bis der Zwischenraum zwischen Wand und Gipskartonplatte gefüllt ist und der Gipsbrei aus der Luftöffnung nachdrückt. Zu diesem Zeitpunkt ist der püllvorgang zu stoppen.The compressed air flows through the lower opening in the pressure vessel (3) Via a pressure hose (4) the gypsum paste through the valve (5) behind the cladding pressed, up to the upper edge of the plasterboard to be backfilled. the Escaping air can pass through an opening under the ceiling that has to be created beforehand Exit until the space between the wall and plasterboard is filled and the gypsum paste pushes out of the air opening. At this point the stop the purging process.
ger Druckluftschlauch (4) kann abgeschraubt werden. Das Ventil (5) bleibt bis zur Erstarrung der zu hinterfüllenden Masse mit der Wand verschraubt, so daß erst nach dem Erstarrungszeitpunkt das Ventil (5) welches nach dem Füllvorgang zu schließen ist, abgenommen wird. Um ein Loslösen der Gipskartonplatten während des Füllvorganges zu verhindern, werden Schaltafeln (6) auf die Gipskartonplatten geschraubt und diese Schrauben werden gleichzeitig mit der Wand verbunden. Die halten die Gipskartonplatten bis zum Erstarrungszeitpunkte fest.The compressed air hose (4) can be unscrewed. The valve (5) remains screwed to the wall until the mass to be backfilled solidifies, so that only after the time of solidification the valve (5) which after the filling process is to close is removed. To a loosening of the plasterboard To prevent during the filling process, formwork panels (6) are placed on the plasterboard screwed and these screws are connected to the wall at the same time. They hold the plasterboard until the point of solidification.
um ein Austreten der Fullmasse am Sockel zu verhindern, wird ein elastischer Winkel (7) an der Sockelleiste verschraubt.in order to prevent the filling compound from escaping at the base, an elastic one is used Angle (7) screwed to the skirting board.
Beschreibung Titel: Schallschutzsanierung von biegesteifen Vorsatzschalen (Gipskartonplatten) Anwendungsgebiet: Durch das punktweise Verkleiden von rassivbauteilen (wände aus mauerwerk oder Beton) mit biegesteifen Vorsatzschalen (Gipskartonplatten) wurde der Schallschutz nach DIN 4109 so reduziert, daß diese Bauteile die erforderlichen Schallschutzbestimmungen, welche sie ohne diese yerkleidung hätten, verlieren. In der Praxis wurden hunderttausende von Quadratmetern Wand fläche mit Gipskartonplatten verkleidet. Nach Auskunft der Bayerischen Landesgewerbeanstalt Nürnberg war es bisher nicht möglich, eine ausreichende Sanierung wirtschaftlich zu erzielen. Vo diesem Institut wurden Versuche unternommen, z.B. Hinterfüllen des Zwischenraumes, der etwa 1,00 bis 1,50 cm zwischen Wand und Gipskartonplatte beträgt, mit trockenem sand. Diese Methode war ungeeignet.Description Title: Soundproofing renovation of rigid facing shells (Plasterboard) Area of application: Through the point-by-point cladding of solid building components (walls made of masonry or concrete) with rigid facing shells (plasterboard) the sound insulation according to DIN 4109 has been reduced so that these components have the necessary Noise protection regulations that you would have without this clothing lose. In in practice, hundreds of thousands of square meters of wall space were covered with plasterboard disguised. According to the Bavarian State Trade Organization in Nuremberg, it was so far not possible to achieve a sufficient renovation economically. Before this Institute, attempts were made, e.g. backfilling the space, the about 1.00 to 1.50 cm between the wall and plasterboard, with dry sand. This method was unsuitable.
zweck: Durch das Hinterfüllen der Gipskartonplatten bei gleichzeitigem Anpressen der Gipskartonplatten durch Dübelschrauben von außen mit einem Gipsbrei in einem Mischungsverhältnis von ca. 1 Gewichtsteil, Wasser zu 1 Gewichtsteil Gips werden sämtliche Hohlräume ausgefüllt und die vorhandenen Resonanzfrequenzen im Bereich von 200 bis 1600 Hz vermieden.Purpose: By backfilling the plasterboard at the same time The plasterboard is pressed on from the outside using dowel screws with a plaster paste in a mixing ratio of approx. 1 part by weight, water to 1 part by weight gypsum all cavities are filled and the existing resonance frequencies in Avoid the range from 200 to 1600 Hz.
Durch das Ausgießen werden auch teilweise offene Fugen, welche durch unsauberes Mauern entstehen, vollfugig vergossen. The pouring also creates partially open joints, which through unclean walls arise, fully grouted.
Stand der Technik mit Fundstellen und Kritik des Standes der Technik: Bisher war es llur möglich, die durch Jis Gipskartonplatten schalltechnisch ungenügend gewordenen Bauteile in der Form zu sanieren, indem man die angeklebten Gipsplatten entfernte und durch Naßputz ersetzte oder indem man auf die vorhendenen Gipskartonplatten biegeweiche vorsatzschalen in einer stärke von ca. 5 cm aufklebte.State of the art with references and criticism of the state of the art: Up to now it was only possible to sound technically inadequate due to Ji's plasterboard to renovate the building components in the form by removing the glued plasterboard removed and replaced by wet plaster or by putting on the existing plasterboard Flexible cladding panels approx. 5 cm thick were glued on.
Die erste Method lt mit enormen Unkosten und Verschmutzung der Wohnung, die zweite mit Wohnflächenverlust und ebenfalls enormen Unkosten verbunden. The first method involves enormous costs and pollution of the apartment, the second is associated with a loss of living space and also enormous costs.
Aufgabe: Der Erfindung liegt die Aufgabe zugrunde, eine wirtschaftliche Sanierung der vorhandenen Gipskartonplatten, welche im Punktklebeverfahren in Abständen von ca. 1,5 cm vor Wänden als biegesteife Vorsatzschalen angebracht sind, entsprechend den schallschutztechnischen Vorschriften durchzuführen.Task: The invention is based on the task of an economical Refurbishment of the existing plasterboard panels, which are spot-glued at intervals 1.5 cm in front of the walls are attached as rigid cladding panels, accordingly to comply with the sound insulation regulations.
Lösun: Die Aufgabe wird erfindungsmäßig dndurch gelöst, d der Gipsbrei in der jeweils erforderlichen Konsistenz in die Hohlraume verfüllt wird, oxime daß durch den Abbindevorgang des Gipses und seiner damit verbundenen Ausdehnung die Gipskartonplatte aufgeweicht und von der Wand abgedrückt wird. Gleichzeitig wird durch den vollflächigen Verbund mit der Wand ein homogenes Gefüge erzielt, welches die schallschutztechnischen Eigenschaften der an sich schalltechnisch ausreichenden grand nicht nur wieder herstellt, sondern noch verbessert.Solution: According to the invention, the object is achieved by the gypsum slurry is filled into the cavities in the required consistency, oxime that by the setting process of the plaster of paris and its associated expansion the Plasterboard softened and from the Wall is pressed. Simultaneously a homogeneous structure is achieved through the full-surface bond with the wall, which the soundproofing properties of the soundproof sufficient grand not only restores, but improves it even further.
Weitere Ausgestaltung der Erfindung: Der Gipsbrei wird in der Weise in die Zwischenräume zwischen Gipskartonplatte und Wand eingebracht, indem er in einen Druckbehälter eingefüllt wird; aus dem Druckbehälter führt an der Unterseite ein schlauch Dieser Schlauch ist über eine zu erstellende Öffnung in der Gipskartonplatte fest mit einem Schlauchflansch iiber der Öffnung mit der Wand verbunden.Further embodiment of the invention: The gypsum slurry is in the way placed in the spaces between the plasterboard and the wall by inserting into a pressure vessel is filled; from the pressure vessel leads to the bottom a hose This hose is through an opening to be made in the plasterboard firmly connected to the wall with a hose flange above the opening.
anschließend wird mit Druckluft von ca.5-6 atü der Gipsbrei in die Hohlräume zwischen Gipskartonplatte und Wand gepreßt. um bei diesem Vorgang ein Ablösen der Gipskartonplatte zu verhindern, werden auf die Gipskartonplatten in Abständen Schaltafeln bis zu 2/3 Höhe der zu sanierenden Wand geschraubt, deren schraubenenden in die Wand hineinragen und die schaltafeln fest mit der Wand verbinden. Nach dem Abbindevorgang werden die schrauben herausgeschraubt und die Schraublöcher verspachtelt.then the gypsum paste is poured into the Pressed voids between the plasterboard and the wall. to help with this process To prevent the plasterboard from peeling off, put the plasterboard in Spacing formwork panels screwed up to 2/3 height of the wall to be renovated, their The screw ends protrude into the wall and firmly connect the formwork panels to the wall. After the setting process, the screws are unscrewed and the screw holes filled.
Um eine restlose Hinterfüllung der zwischenräume zu gewährleisten, wird an den Schaltafeln ein leichter Außenrüttler angebrachte Erzielbare Vorteile: Die mit der Erfindung erzielbaren Vorteile bestehen insbesondere darin, daß Wände, welche an und für sich den schalltechnischen Vorschriften entsprechen und deren Schallschutz durch das Vorblenden biegesteifer Vorsatzschalen gemindert wurde, nit einfachen Mitteln saniert werden können. Bei geringer Verschmutzung der Wohnung und verhältnismäßig geringem Kostenaufwand (die Wohnung muß nicht geräumt werden) können die Wände saniert werden. Darüber hinaus ist keine Verringerung der Wohnfläche, wie es bei Verwendung einer biegeweichen Vorsatzschalung der pall wäre, hinzunehmen.To ensure that the spaces in between are completely backfilled, a light external vibrator is attached to the formwork panels Achievable Advantages: The advantages that can be achieved with the invention are, in particular, that walls, which in and for themselves comply with the acoustic regulations and their sound insulation is reduced by the front-facing of rigid cladding panels could not be refurbished with simple means. If the Apartment and relatively low cost (the apartment does not have to be vacated the walls can be renovated. In addition, there is no reduction in Living space, as it would be if a pliable facing formwork was used on the pall, to accept.
Durch die Bayerische Bandesgewerbeanstalt Nürnberg wird eine Messung einer zu sanierenden Wand vor und nach der Sanierung durchgeführt, so daß die schalltechnischen Werte nachgeliefert werden können.A measurement is carried out by the Bayerische Bandesgewerbeanstalt Nürnberg a wall to be renovated before and after the renovation, so that the acoustical Values can be delivered later.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19762614993 DE2614993A1 (en) | 1976-04-07 | 1976-04-07 | Plasterboard cladded solid wall sound insulation - has plaster pumped into rear spaces as backfilling using compressed air |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19762614993 DE2614993A1 (en) | 1976-04-07 | 1976-04-07 | Plasterboard cladded solid wall sound insulation - has plaster pumped into rear spaces as backfilling using compressed air |
Publications (1)
Publication Number | Publication Date |
---|---|
DE2614993A1 true DE2614993A1 (en) | 1977-10-20 |
Family
ID=5974669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19762614993 Pending DE2614993A1 (en) | 1976-04-07 | 1976-04-07 | Plasterboard cladded solid wall sound insulation - has plaster pumped into rear spaces as backfilling using compressed air |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2614993A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4430840A (en) * | 1982-06-23 | 1984-02-14 | Sealed Air Corporation | Foam, composition and method useful for retrofit insulation |
EP0167233A1 (en) * | 1984-05-09 | 1986-01-08 | Imperial Chemical Industries Plc | Flow rate measurement |
CN112502404A (en) * | 2020-11-26 | 2021-03-16 | 成艳秋 | Processing system is used in construction of building outer wall heat insulation wall structure |
-
1976
- 1976-04-07 DE DE19762614993 patent/DE2614993A1/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4430840A (en) * | 1982-06-23 | 1984-02-14 | Sealed Air Corporation | Foam, composition and method useful for retrofit insulation |
EP0167233A1 (en) * | 1984-05-09 | 1986-01-08 | Imperial Chemical Industries Plc | Flow rate measurement |
CN112502404A (en) * | 2020-11-26 | 2021-03-16 | 成艳秋 | Processing system is used in construction of building outer wall heat insulation wall structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2614993A1 (en) | Plasterboard cladded solid wall sound insulation - has plaster pumped into rear spaces as backfilling using compressed air | |
DE3104955A1 (en) | Production of moisture-resistant, especially thin structural panels or boards | |
DE10108316A1 (en) | Building service shafts break sealing uses low volumetric weight ceramic-based grout plus lost shuttering plate and foam sealing collars round pipes etc. | |
DE2348301C3 (en) | ||
DE817034C (en) | Tile board | |
DE4030407A1 (en) | Acoustically insulating building wall - has inner panels of mineral wool or glass fibres and outer panels of plaster-board | |
DE2509909B2 (en) | Method for producing a channel bottom in an inspection shaft and plate for carrying out the method | |
WO1997040239A1 (en) | Wall panel for producing walls | |
DE2534815A1 (en) | Timber frame house walls - using plastic foam filling in frame cavities between board panels | |
DE802592C (en) | Process for the production of a house in cast construction | |
DE806348C (en) | Process for the production of fibrous boards provided with a hard covering to increase the stability | |
DE4404182A1 (en) | Anhydrite based liquid flooring material | |
DE2046393C3 (en) | Ceramic multi-perforated stone used as a sound-absorbing element | |
AT165930B (en) | Procedure for erecting mass concrete bodies and building panels for this | |
DE803421C (en) | Permanent cladding for ceilings, walls, concrete floors or the like. | |
AT224870B (en) | Method of repairing masonry and vaults | |
DE278736C (en) | ||
DE940424C (en) | Method and device for the production of a ready-to-install tile partition and the tile partition produced with it | |
DE7130630U (en) | Prefabricated damp-proof panel for structural, civil and prefabricated construction | |
DE1972239U (en) | HOLLOW FORMWORK FOR CASING CONCRETE CONSTRUCTION. | |
DE2212381A1 (en) | WALL ELEMENT | |
DE354892C (en) | Process for creating accessible suspended ceilings under beam ceilings | |
DE2316744A1 (en) | PROCESS FOR MANUFACTURING PLASTERED CEILINGS OR WALLS AND APPARATUS | |
DE8005298U1 (en) | COMPONENT FOR SUPPORTING A SOLID CONCRETE CEILING TO THE EDGE SIDES | |
DE4408306A1 (en) | Manufacturing process for prefabricated walls |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OHJ | Non-payment of the annual fee |