DE2400527A1 - PROCEDURE FOR DETERMINING INSULATION FAULTS IN ELECTRICAL DISTRIBUTION NETWORKS - Google Patents

PROCEDURE FOR DETERMINING INSULATION FAULTS IN ELECTRICAL DISTRIBUTION NETWORKS

Info

Publication number
DE2400527A1
DE2400527A1 DE2400527A DE2400527A DE2400527A1 DE 2400527 A1 DE2400527 A1 DE 2400527A1 DE 2400527 A DE2400527 A DE 2400527A DE 2400527 A DE2400527 A DE 2400527A DE 2400527 A1 DE2400527 A1 DE 2400527A1
Authority
DE
Germany
Prior art keywords
transmission lines
coincidence
transmission line
pulses
currents
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE2400527A
Other languages
German (de)
Inventor
Joergen Elkaer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KNUDSEN NORDISK ELECT
Laur Knudsen Nordisk Elektricitets Selskab AS
Original Assignee
KNUDSEN NORDISK ELECT
Laur Knudsen Nordisk Elektricitets Selskab AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KNUDSEN NORDISK ELECT, Laur Knudsen Nordisk Elektricitets Selskab AS filed Critical KNUDSEN NORDISK ELECT
Publication of DE2400527A1 publication Critical patent/DE2400527A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/26Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to difference between voltages or between currents; responsive to phase angle between voltages or between currents
    • H02H3/265Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to difference between voltages or between currents; responsive to phase angle between voltages or between currents responsive to phase angle between voltages or between currents
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/58Testing of lines, cables or conductors

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Locating Faults (AREA)

Description

Verfahren zur Ermittlung von Isolationsfehlern an elektrischen Verteilungsnetzen.Procedure for the determination of insulation faults in electrical distribution networks.

Die vorliegende Erfindung betrifft Verfahren zur Ermitt-. The present invention relates to methods for determining.

lung einer von Isolationsfehler betroffenen Ubertragungsleitung eines elektrischen Verteilungsnetzes mit mindestens drei Ubertragungsleitungen. Die. Erfindung ist insbesondere für Hochspannungsanlagen verwendbar, um zu ermitteln, an welcher von den von einer Station ausgehenden Ubertragungsleitungen der Fehler liegt und ist vor allem für solche Hochspannungsanlagen verwendbar, bei denen ein Mehr-,phasennetz, z.B. ein'Dreiphasennetzmit seinem neutralen Punkt, dem Nullpunkt, vom Erdpotential isoliert, jedoch durch eine Erdschlussspule, eine sogenannte Petersen-Spule oder Löschspule geerdet, betrieben wird, wobei die Petersen-Spule derart bemessen ist, dass Ihre induktive Reaktant im grossen und ganzen der kapazitiven Reaktanz zwischen den Leitern der Hochspannungsanlage und dem Erdpotential entspricht, d.h. dass die beiden Impedanzen einen Schwingungskreis in Resonanz bei einer von der Systemffequenz nicht wesentlich abweichenden Frequenz bilden.development of a transmission line affected by an insulation fault electrical distribution network with at least three transmission lines. The. invention is particularly suitable for high-voltage systems to determine which of the transmission lines going out from a station the fault is and is particularly suitable for high-voltage systems in which a multi-phase network, E.g. a three-phase network with its neutral point, the zero point, from the earth potential isolated, but by a ground fault coil, a so-called Petersen coil or The quenching coil is grounded, operated, the Petersen coil being dimensioned in such a way that that your inductive reactant is by and large the capacitive reactance between corresponds to the conductors of the high-voltage system and the earth potential, i.e. that the two impedances an oscillation circuit in resonance at one of the system frequency do not form a significantly different frequency.

Bei derartigen Verteilungsanlagen oder -netzen lässt sich ein etwaiger zwischen einem der Phasenleiter und Erde entstandener Isolationsfehler ohne Schwierigkeiten feststellen, weil dann sofort ein Strom, durch die Petersen-Spule fliesst, und es ist mit keinerlei Komplikationen verbunden, diesen Strom oder die Spannung, die der er über/Petersen-Spule erzeugt, zu messen. Es ist ebenfalls bekannt durch diesen Strom oder diese Spannung ein einfaches Relais zu betätigen, welches ein Warnsignal für das Benachungspersonal abgibt. In the case of such distribution systems or networks, a possible Insulation fault between one of the phase conductors and earth without difficulty determine, because then immediately a current flows through the Petersen coil, and it is not associated with any complications, this current or the voltage that which it generates via / Petersen coil. It is also known from this one Current or this voltage to operate a simple relay, which gives a warning signal for the notifying staff.

Es lässt sich indessen nicht ohne weiteres erkennen, an welcher von mehreren, von einer Vers orgungs station ausgehenden Ubertragungsleitungen dieser Isolationsfehler liegt.However, it cannot be easily recognized by which of several, outgoing from a Vers orgungs station these transmission lines Insulation fault lies.

In einer Dreiphasen-Anlage in guten Isolationszustand wird die an den drei Phasenleitern liegende Spannung gegenüber Erde von gleichem Effektivwert sein, und da eine gute Ausführung des Netzes auch mit sich führt, dass die 'apazitanzender drei Ubertragungsleiter gegen Erde symmetrisch sind, d.h. so gut wie gleich sind, wird folglich die Vektorsumme der drei kapazitiven Strö NNgleich Null sein, und dasgleiche wird atich bei del cirei Belastungsströme der Fall sein, was ein sogenannt symmetrisches Dreiphasen-Syste charakterisiert. Durch Messung der drei Ströme in den drei Leitern und Bildung der Vektorsumme in bekannter Weise wird man demnach falls alles in bester Ordnung ist, dies dadurch feststellen können, dass die Summe gleich Null ist. Erhält man nun eine Verschiebung der Spannungsverhältnisse, so dass die drei Spannungen nicht langer symmetrisch zum Erdpotential sind, werden auch die kapazitiven StYöme nicht länger symmetrisch zum Erdpotential sein, und das wird sich für sämtliche ausgehenden Ubertragungsleitungen dadurch zeigen, dass die Ströme in den einzelnen Leitern einer Ubertragungsleitung nicht länger gleich Null sind, sondern einen endgültigen Wert, den Residualstrom, haben. Dies gilt indessen für sämtliche Ubertragungsleitungen, ganz gleich wo der Fehler liegt, der die Unsymmetrie der Spannung verhältnisse verursacht. Die Grösse der Residualströme an sich ist deshalb keine Angabe darüber, wo am Netz der eigentliche Fehler liegt, aber dennoch geben diese Residualströme eine Information über den Fehlerort. In a three-phase system with good insulation, the The voltage between the three phase conductors and earth has the same effective value and since a good execution of the network also entails that the 'apacitance three transmission conductors are symmetrical with respect to earth, i.e. are as good as the same, consequently the vector sum of the three capacitive currents NN is zero be, and the same will atich be the case with del cirei load currents, what a so-called symmetrical three-phase system characterized. By measuring the three One becomes currents in the three conductors and formation of the vector sum in a known manner accordingly, if everything is in the best order, this can be determined by the fact that the sum is zero. If you now get a shift in the tension, so that the three voltages are no longer symmetrical about the earth potential also the capacitive currents are no longer symmetrical to the earth potential, and this will be shown for all outgoing transmission lines by the fact that the currents in the individual conductors of a transmission line are no longer the same Are zero but have a final value, the residual current. This is true, however for all transmission lines, regardless of where the error lies, the asymmetry causing tension. The size of the residual flows in itself is therefore no information about where the actual fault is on the network, but still these residual currents give information about the fault location.

Im Idealfall von Resonanz werden die resultierenden 'Ströme gegenzudie Kapazitanzen der Xbertragungsleitungengegenphasig zu dem durch die Petersen-Spule fliessenden Strom sein, und die Spannung über der Petersen-Spule wird vektoriell senkrecht zu diesen stehen. In the ideal case of resonance, the resulting 'currents will counteract the Capacitance of the transmission lines in phase opposition to that through the Petersen coil flowing current, and the voltage across the Petersen coil becomes vectorial stand perpendicular to them.

In der Praxis treten verschiedene Verluste auf die - abweichend vom erwähnten Idealfall -~~nderungen des Phasenwinkels zwischen dem durch die Petersen-Spule fliessenden Strom auch Zöschspulenstrom genannt, und dem Residualstrom der betreffenden Ubertragungsleitungen bewirken. Für eine fehlerbetroffene Ubertragungsleitung wird die genannte Anderung des Phasenwinkels zwischen dem Löschspulenstrom und dem Residualstrom gegenüber entsprechenden Anderungen auf den fehlerfreien Ubertragungsleitungen markant sein. Wenn man deshalb das Produkt zwischen der Spannung über der Petersen-Spule,dem Residualstrom und Kosinus zum Winkel zwischen diesen beiden Grössen in den verschiedenen Ubertragungsleitungen bildet, wird das Vorzeichen dieses Produktes zur Identifikation der fehlerbetroffenen Ubertragungsleitung verwendet werden können.In practice, there are various losses that differ from The ideal case mentioned - ~~ changes in the phase angle between that caused by the Petersen coil flowing current also called Zöschspulenstrom, and the residual current of the relevant Effect transmission lines. For a transmission line affected by errors said change in the phase angle between the quenching coil current and the residual current compared to corresponding changes on the error-free transmission lines be. Therefore, if one considers the product between the voltage across the Petersen coil, the Residual current and cosine to the angle between these two quantities in the different Forms transmission lines, the sign of this product is used for identification the transmission line affected by the fault can be used.

Dieses Verhältnis wird bei bekannten Verfahren dafür verwendet, ausfindig zu machen, an welcher von einer Anzahl Ubertragungsleitungen der Isolationsfehler liegt. Es ist aber ohne weiteres ersichtlich, dass da es sich hier um das Produkt zweier elektrischen Zeitvektoren handelt, die fast senkrecht zueinander stehen, keine besonders grossen Fehler an den wegen der hohen Spannungen erforderlichen Strom- oder Spnr'ngstrans formatorcn aufzutreten brauchen5 bevor dieser Information nur zweifelhafter Wert zugelegt werden kann. This ratio is used in known methods for finding out to make which of a number of transmission lines the insulation fault lies. But it can be seen without further ado that this is the product is two electrical time vectors that are almost perpendicular to each other, no particularly large errors in the ones required because of the high voltages Current- or voltage transformers need to appear before this information only doubtful value can be added.

Der vorliegenden Erfindung liegt die Aufgabe zugrunde, ein Verfahren anzugeben, durch das diese Information in solcher Weise erhalten werden kann, dass man die erwähnten Nachteile vermeidet und zugleich noch weitere Vorteile erreicht, die aus der folgenden Beschreibung hervorgehen werden. The present invention is based on the object of a method indicate by which this information can be obtained in such a way that one avoids the disadvantages mentioned and at the same time achieves further advantages, which will emerge from the following description.

Das erfindungsgemässe Verfahren ist dadurch gekennzeichnet, dass ein Phasenverglelch der Grundtöne der Residualströme der einzelnen Ubertragungsleitungen miteinander vorgenommen wird. Es wird also nur ein Vergleich von den gegenseitigen Phasenverhältnissen der Residualströme und nicht von deren Grössen vorgenommen, und es wird kein Vergleich der Residualströme in einer Ubertragungsleitung mit der Spannung über der Petersen-Spule oder mit dem durch die Petersen-Spule fliessenden Strom vorgenommen. The method according to the invention is characterized in that a phase comparison of the fundamental tones of the residual currents of the individual transmission lines is made with each other. So it will just be a comparison of each other Phase relationships of the residual currents and not of their sizes, and there is no comparison of the residual currents in a transmission line with the Voltage across the Petersen coil or with the one flowing through the Petersen coil Electricity made.

Dadurch dass man lediglich einen Vergleich der resultierenden Ströme in den einzelnen Ubertragungsleitungen miteinander durchführt, wird erzielt, dass etwaige Phasenfehler an den Stromtransformatoren sich nicht mit ihrem vollen Wert, sondern nur durch etwaige sich zwischen den Stromtransformatoren der einzelnen Ubertragungsleitungen ergebende Unterschiede erkennbar machen, und bei praktischen Anlagen sind diese Unterschiede im Verhältnis zum totalen Fehler äusserst gering. This means that you can only compare the resulting currents performs with each other in the individual transmission lines, it is achieved that any phase errors on the current transformers do not show their full value, but only through any intermingling between the current transformers of the individual transmission lines Make the resulting differences recognizable, and in practical systems these are The differences in relation to the total error are extremely small.

Bei einer besonders vorteilhaften Ausführungsform des erfindungsgemässen Verfahrens erfolgt der Phasenvergleich durch einen Vergleich der Zeitpunkte des Nulldurchgangs der Residualströme. Wo früher ein auf dem Vektorbegriff beruhender Vergleich durchgeführt wurde, ist beim erfindungsgemässen Verfahren allein der Zeitpunkt für den Nulldurchgang'des Grundtons der Residualströme entscheidend. In a particularly advantageous embodiment of the inventive The phase comparison is carried out by comparing the times of the procedure Zero crossing of the residual currents. Where there used to be one based on the vector concept Comparison has been carried out, is only the point in time in the method according to the invention decisive for the zero crossing of the fundamental of the residual currents.

Nach der Theorie wird der Grundton der Residualströme aus nicht fehlerbetroffenen Ubertragung3leitugen zu annähernd gleichen Zeitpunkt ihren Nullwert passiere-' während der Grundton des Residualstroms aus der fehlerbetroffenen Ubertragungsleitung zu einem davon abweichenden Zeitpunkt Null passieren wird. According to the theory, the keynote of the residual currents is from those not affected by errors Transfer 3 pass their zero value at approximately the same point in time the keynote of the residual current from the fault-affected transmission line will happen at a point in time deviating therefrom.

Damit ist die Aufgabe darauf beschränkt worden, diejenige Ubertragungsleitung zu finden, bei der der resultierende Strom zu einem Zeitpunkt durch Null passiert, der von dem für die anderen Ubertragungsleitungen geltenden Zeitpunkt abweicht. Es ist deshalb eine Voraussetzung für die Anwendung des erfindungsgemässen Verfahrens, dass mindestens drei Ubertragungleitungen vorhanden sind, unter denen gewählt werten kann, und das Vei-fahren löst somit nie 4 das Problem in Fällen, bei denen nur zwei Ubertragungsleitungen vGlwendet werden. Der Fall mit nur einer Ubertragungsleitung ist belanglos. Der Fall mit nur zwei Ubertragungsleitungen liegt übrigens sel-. The task has thus been limited to that transmission line to find where the resulting current passes through zero at a point in time, which deviates from the time applicable to the other transmission lines. It is therefore a prerequisite for the application of the method according to the invention, that at least three transmission lines are available, under those chosen, and driving thus never 4 solves the problem in cases in which only two transmission lines are used. The case with only one Transmission line is irrelevant. The case with only two transmission lines lies by the way, sel-.

ten vor und ist deshalb von keinem wesentlichen Interesse. Sowohl das Interesse darüber Klarheit zu schaffen, welche Ubertragungsleitung von einem Fehler betroffen ist, als auch die Schwierigkeiten beim bisher bekannten Verfahren nehmen bei einer steigenden Anzahl von Ubertragungs leitungen entsprechend zu.ten and is therefore of no material interest. As well as the interest to clarify which transmission line of a Error is concerned, as well as the difficulties with the previously known method increase with an increasing number of transmission lines.

Weitere Ausführungsbeispiele des erfindungsgemässen Verfahrens gehen aus den Unteransprüchen hervor und die besonderen Vorteile sind in der nachfolgenden Beschreibung angegeben. Further embodiments of the method according to the invention go from the subclaims and the particular advantages are in the following Description given.

In der nachfolgenden Beschreibung ist an Hand der Zeichnung eine praktische Verwendung des Verfahrens näher erläutert. In the following description is based on the drawing practical use of the method explained in more detail.

Es zeigen: Fig. 1 schematisch ein elektrisches Hochspannungsradialnetz mit einer Anzahl von einer Station ausgehender Ubertragungsleitungen, Fig. 2 schematisch ein Ausführungsbeispiel einer Anordnung zur Ermittlung einer von Isolationsfehler betroffenen Ubertragungsleitung eines solchen Netzes beim erfindungsgemässen Verfahren. They show: FIG. 1 schematically an electrical high-voltage radial network with a number of transmission lines originating from a station, FIG. 2 schematically an embodiment of an arrangement for determining an insulation fault affected transmission line of such a network in the method according to the invention.

Auf der Zeichnung bezeichnet 1 einen Hochspannungstransformator, der über eine Sammelschienenanlage 6 Energie an eine Anzahl allgemein mit 7 bezeichneter Versorgungsleitungen I, II, III ... N liefert, die von der Sammelschiene ausgehen. 2 bezeichnet eine Petersen-Spule, die zwischen dem neutralen Punkt des Transformators und Erde 3 geschaltet ist. 4 bezeichnet eine Anordnung zur Messung der Nullpunktspannung, d.h. die Spannung über der Petersen-Spule. Diese kann unmittelbar über die Petersen-Spule oder aber an anderen Orten des Netzes gemessen werden, z.B. mittels einphasiger Transformatoren, deren Sekundärseiten in offener Dreieckschaltung geschaltet sind. 5 bezeichnet Einrichtungen zur Messung des Residualstroms in den ausgehenden Ubertragungsleitungen. Die Einrichtungen 5 können z.B., jeweils einer Ubertragungsleitung zugeordnete und sämtliche Leiter der betreffenden Ubertragungsleitung umschliessende Transformatoren order andere bekannte Organe sein. In the drawing, 1 denotes a high-voltage transformer, the power to a number of generally designated 7 via a busbar system 6 Supply lines I, II, III ... N, which originate from the busbar. 2 denotes a Petersen coil, which is between the neutral point of the transformer and earth 3 is connected. 4 denotes an arrangement for measuring the zero point voltage, i.e. the voltage across the Petersen coil. This can be done directly via the Petersen coil or measured at other locations in the network, e.g. by means of single-phase Transformers whose secondary sides are connected in an open delta connection. 5 denotes devices for measuring the residual current in the outgoing transmission lines. The devices 5 can, for example, each be assigned to a transmission line and transformers surrounding all conductors of the relevant transmission line or other known organs.

Fig. 2 zeigt eine Anordnung bestehend aus einer gemeinsamen Grundeinheit 13 und einer Anzahl Ubertragungsleitungs-Einheiten 8 für die ausgehenden Ubertragungsleitungen, wobei nur die zur tJbertragungsleitung I gehörende -Ubertragungsleitungs-Einheit 8 gezeigt ist. Der Residualstror i für siedeUbectragungsleitung wird durch 0 einen Eingangsteil 9 der betreffenden Ubertragungsleitungs-Einhei. 8 erkannt. Die höheren Harmonischen werden mittels Filter lo abfiltriert. Durch ein Erfassen der Nulldurchgänge des Grundtons in einer Einheit 12 werden Impulse in einer Einheit 11 erzeugt, und in einem Impulsverlänger lla wird die Impulsdauer geregelt. Impulsfolgen aus sämtlichen Ubertragungsleitungen werden an zugeordnete Eingänge einer Anzahl Ubertragungsleitungstore 19 geleitet, die durch Signale der Grundeinheit 13 impulsgesteuert werden. An einem Eingangsteil 14 in der Grundeinheit 13 wird die Spannung u0 über der Petersen-Spule festgestellt. In Filtern 15 werden die höheren Harmonischen abfiltriert, und in einer Einheit 16 wird die Amplitude des ankommenden Signals überwacht, und nur insofern die Spannung einen vorgegebenen Schwellenwert übersteigt, wird das Signal weitergeleitet. In einem Gleichrichter 17 erfolgt eine Einweggleichrichtung, und in einem Imlpulsformer 18 wird zu einen wohldefinierten Zeitimpuls impulsgeformt, der zur Steuerung der erwähnten Ubertragungsleitungstore 19 verwendet wird. 20 bezeichnet eine Einheit, in der ein zyklischer Vergleich der von den Ubertragungsleitüngs-Einheiten und durch die zugeordneten impulsgesteuerten Ubertragungs leitungstore kommenden Informationen vorgenommen wird. Die Ubertragungsleitung I wird mit der Ubertragungsleitung II, II mit III uss.w., N-1 mit N, und N mit 1 verglichen Wo dieser Vergleich Koinzidenz der Impulse zeigt, sind die betreffenden Übertragungsleitungen ohne Fehler, aber im Falle eines Isolationsfehlers wird bei den zwei Vergleichen, die die fehlerbetroffene Ubertragungsleitung betreffen, wegen der Phasensverschiebung des Residualstroms der fehlerbetroffenen Ubertragungsleitung mangelnde Koinzidenz festgestellt, und diese Information kann in vielerlei Weisen zur Identifikation der fehlerbetroffenen Ubertragungsleitung verwendet werden. Fig. 2 shows an arrangement consisting of a common base unit 13 and a number of transmission line units 8 for the outgoing transmission lines, where only the transmission line unit belonging to the transmission line I. 8 shown is. The residual current i for the management of the survey becomes through 0 an input part 9 of the relevant transmission line unit. 8 recognized. The higher harmonics are filtered off by means of filter lo. By a detection of the zero crossings of the fundamental tone in a unit 12 are pulses generated in a unit 11, and in a pulse stretcher lla the pulse duration regulated. Pulse trains from all transmission lines are assigned to Inputs of a number of transmission line gates 19 routed by signals from the Base unit 13 are pulse-controlled. On an input part 14 in the base unit 13 the voltage u0 across the Petersen coil is determined. In filters 15 become the higher harmonics are filtered off, and in a unit 16 the amplitude of the incoming signal is monitored, and only insofar as the voltage is a given Exceeds the threshold value, the signal is forwarded. In a rectifier 17 there is a one-way rectification, and in a pulse shaper 18 becomes one well-defined time pulse, which is used to control the aforementioned transmission line gates 19 is used. 20 denotes a unit in which a cyclical comparison of the from the transmission line units and by the associated pulse-controlled Transmission line gates coming information is made. The transmission line I becomes with the transmission line II, II with III etc., N-1 with N, and N with 1 compared Where this comparison shows coincidence of the impulses are those in question Transmission lines without faults, but in the event of an insulation fault, at because of the two comparisons that relate to the transmission line affected by the error the phase shift of the residual current of the fault-affected transmission line lack of coincidence is noted and this information can be in many ways can be used to identify the transmission line affected by the error.

21 bezeichnet Ausgangsrelais, die betätigt werden, wenn an den zugehörigen Ubertragungsleitungen Fehler auftreten.21 designates output relays that are actuated when connected to the associated Transmission lines errors occur.

Die an den Bauelementen 11 und lla in der Ubertragungsleitungs-Einheit 8 gezeigte Verlängerung des Impulses soll sicherstellen, dass geringfügige Unterschiede in den fehlerfreien Ubertragungsleitungen nicht als mangelnde Koinzidenz und damit als falsche Anzeige erscheinen. Durch die Einstellbarkeit der Impulsbreite hat man ein vorteilhaftes Instrument erhalten, mit dem die Empfindlichkelt des Verfahrens-in Bezug auf den festzustellenden Zeitunterschied und damit also die Unempfindlichkeit des Verfahrens in Bezug auf Unterschiede in den fehlerfreien Ubertragungsleitungen oder deren Strommessgeräten eLngestel.lt werden kann. The on the components 11 and 11a in the transmission line unit The elongation of the pulse shown in Figure 8 is intended to ensure that there are slight differences in the error-free transmission lines not as a lack of coincidence and thus appear as a false display. Due to the adjustability of the pulse width one has get an advantageous instrument with which the sensitivity of the procedure-in Relation to the time difference to be determined and thus the insensitivity of the procedure with regard to differences in the error-free transmission lines or whose ammeters can be adjusted.

- Da das erfindztngslrelnässc \'erfalrer? die Ermittlung von elilerbetroffenen Ubertragungsleitungen bezweckt, ist ausser im Falle von Fehlern die Verwendung des Verfahrens unnötig. Es liegt deshalb im Rahmen der Erfindung dieses Verfahren mit dem in der Einleitung erwähnten und schon bekannten Verfahren, nämlich einen auftretenden Isolationsfehler dadurch festzustellen, dass über den Klemmen der Petersen-Spule ein Spannungsunterschied besteht, zu kombinieren.- Since the invention is required? the determination of those affected by elil The purpose of transmission lines is to use the Procedure unnecessary. It is therefore within the scope of the invention to use this method the already known method mentioned in the introduction, namely one that occurs Isolation faults can be determined by the fact that the terminals of the Petersen coil there is a tension difference to combine.

Eine praktische Ausführungsform kann deshalb vorzugsweise eine An ordnung sein, bei der die vom Eingangsteil 14 in der Grundeinheit 13 abgefastete Spannung an den Klemmen der Petersen-Spule über einem vorgegebenen Wert von z.B. 20% der mittels der Einheit 16 einstellbare Wert sein soll, bevor der erwähnte Vergleich der Impulszeiten untereinander anfängt.A practical embodiment can therefore preferably be an An be order in which the chamfered from the input part 14 in the base unit 13 Voltage at the terminals of the Petersen coil above a predetermined value, e.g. 20% of the value adjustable by means of the unit 16 should be before the mentioned comparison the pulse times begin with each other.

Da es ferner vorkommen kann, dass im Netz vorübergehende elektrische Vorgänge auftreten, die beim hier angegebenen Verfahren irrtümlicherweise als Anzeige eines Erdungsfehlers oder eines sonstigen Isolationsfehler aufgefasst werden können, gehort es zur guten Praxis-, im Einzelfall von mangelnder Koinzidenz eine derartige Reaktion. nicht zur Anzeige kommen zu lassen, und es ist deshalb erfindungsgemass vorgesehen, die eingegangenen Meldungen über mangelnde Koinzidens in einem Zählwerk zu summieren, und erst bei einer vorgegebenen Anzahl Meldungen die Information als konklusiv weiterzugeben. Dies kann z.B. Since it can also happen that the network has temporary electrical Processes occur that are mistakenly indicated in the procedure given here an earthing fault or any other insulation fault can be perceived, it is part of good practice, in the individual case of a lack of coincidence such Reaction. not to be displayed, and it is therefore according to the invention provided for the received messages about lack of coincidences in a counter to sum up, and only when a specified number of messages is reached, the information as to pass on conclusively. This can e.g.

dadurch erfolgen, dass die aufeinanderfolgenden Fällen von mangelnder Koinzidenz aufgezählt werden, und die Information erst nach einer vorgegebenen Anzahl Fällen oder nach einer vorgegebenen Zeit eitergegeben wird.be done by making successive cases of lack of Coincidence are enumerated, and the information only after a predetermined number Cases or after a given period of time.

Da das beschriebene Verfahren in der Theorie auf schnell reagierenden Bauelementen sowie auf sinusförmigen Strömen und Spannungen beruht, können in der Praxis gewisse Komplikationen wegen der höheren Harmonischen entstehen. Vorzugsweise werden daher die gezeigten Filter lo und 15 verwendet, weil elektronische logische Einrichtungen durch solche in unberechenbarer Weise gestört werden kann nen. Because the method described is in theory responsive to Components as well as sinusoidal currents and voltages can be used in the Practice certain complications arise because of the higher harmonics. Preferably therefore the filters shown lo and 15 are used, because electronic logic Facilities can be disrupted by such in an unpredictable manner.

Das beschriebene Verfahren und das Ausführungsbeispiel einer Anordnung zur Durchführung des Verfahrens sind im vorstehenden ausgehend von einem mittels einer Petersen-Spule geerdeten Hochspannungsnetz erläutert worden, weil bei solchen Netzen das Problem der Lokalisierung der fehlerbetroffenen Ubertragungsleitung an grössten ist. The method described and the exemplary embodiment of an arrangement to carry out the method are based on a means above a Petersen coil grounded high-voltage network has been explained because with such Networks the problem of localizing the faulty transmission line largest is.

Es geht aber aus dem beschriebenen Verfahren hervcr, dass es selbst betrachtlichen Abweichungen von der korrekten Abstimmung der Petersen-Spule gegenüber nicht kritisch ist, was von wesentlichem Vorteil für den Betrieb derartiger Anlagen ist. Diese Unabhängigkeit von der enauigkeit der Abstimmung deckt sogar auch den Fall, bei dem die Petersen-Spule ganz weggelassen ist, also bei einem völlig isolierten Hochspannungsnetz, d.h. dass sowohl das Verfahren als auch die darauf basierende Anordnung universal einsetzbar sind. Die Erfindung ist an sich auch nicht auf Hochspannungsnetze beschränkt, obwohl sie un Bereich von 1 bis etwa 200 kV ihre grösste Verwendung findet.However, it can be seen from the procedure described that it itself considerable deviations from the correct tuning of the Petersen coil is not critical, which is essential for the company of such facilities. This independence from the accuracy of the vote covers even the case in which the Petersen coil has been omitted entirely, i.e. one fully isolated high-voltage network, i.e. that both the method and the arrangement based on it can be used universally. The invention is in itself Nor is it limited to high voltage networks, although they range from 1 to about 200 kV finds its greatest use.

Claims (8)

Pa t e n t å n s p r ü c h e;Pa t e n t å n s p r ü c h e; Verfahren zur Ermittlung von einer von Isolationsfehler betroffenen Leitung eines Verteilungsnetzes mit mindestens drei Ubertragungsleitungen, dadurch gekennzeichnet, dass ein Phasenvergleich der Grundtöne der Residualströme der einzelnen Ubertragungsleitungen miteinander vorgenommen wird. Procedure for identifying one affected by an insulation fault Management of a distribution network with at least three transmission lines, thereby characterized that a phase comparison of the fundamental tones of the residual currents of each Transmission lines is made with each other. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass der Phasenvergleich durch einen Vergleich der Zeitpunkte des Nulldurchgangs der Residualströme erfolgt. 2. The method according to claim 1, characterized in that the phase comparison is done by comparing the times at which the residual currents cross zero. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass dem Phasenvergleich Koinzidenz gegenüber Nicht-Koinzidenz von vorgegebener Dauer und anfangend beim Nulldurchgang der zu vergleichenden Ströme zugrundegelegt wird. 3. The method according to claim 1 or 2, characterized in that the phase comparison of coincidence versus non-coincidence of a given duration and starting at the zero crossing, the currents to be compared are used as a basis. 4. Verfahren nach Anspruch 3, dadurch gekennzeichnet, dass die Dauer der durch den Nulldurchgang der Residualströme erzeugten impulse hinreichend lang eingestellt wird, um Koinzidenz zwischen Impulsen von mehreren Ubertragungsleitungen zu sichern, jedoch aber so kurz, dass keine Koinzidenz zwischen einem Impuls von einer Coertragungsleitung mit Isolationsfehler und Impulsen von anderen Ubertragungsleitungen ohne Fehler entsteht. 4. The method according to claim 3, characterized in that the duration the pulses generated by the zero crossing of the residual currents are long enough is set to allow coincidence between pulses from multiple transmission lines secure, however, so briefly that no coincidence between an impulse of a transmission line with insulation faults and pulses from other transmission lines arises without errors. 5. Verfahren nach Anspruch 3 oder 4, dadurch gekennzeichnet, dass zur Feststellung, aus welcher Ubertragungsleitung die mit den Impulsen aus den anderen Ubertragungsleitungen nicht koinzidierenden Impulse kommen, ein zyklischer Vergleich der aus den verschiedenen Ubertragungsleitungen empfangenen Impulse vorgenommen wird. 5. The method according to claim 3 or 4, characterized in that to determine from which transmission line the one with the impulses from the other Transmission lines do not get coincident pulses, a cyclical comparison the pulses received from the various transmission lines will. 6. Verfahren nach einem oder mehreren der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass der Vergleich nur dann vorgenommen wird, wenn die Unsymmetrie zwischen den Spannungen gegen Erde einen vorgegebenen Wert überschreitet. 6. The method according to one or more of claims 1 to 5, characterized indicated that the comparison is only made if the asymmetry between the voltages to earth exceeds a specified value. 7. Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass eine Aufzählung der aufeinander folgenden Fällen von mangelnder Koinzidenz vorgenommen wird, und dass die Information erst nach Aufzählung einer vorgegebenen Anzahl von Fällen als konklusiv weitergegeben wird. 7. The method according to any one of claims 1 to 6, characterized in that that an enumeration of the consecutive cases of lack of coincidence is made, and that the information is only provided after listing a given Number of cases passed as conclusively. 8. Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass die Information erst als konklusiv weitergegeben wird, nachdem mangelnde Koinzidenz in einem vorgegebenen Zeitinterval vorgekommen ist. 8. The method according to any one of claims 1 to 6, characterized in that that the information is passed on as conclusive only after a lack of coincidence occurred in a given time interval. LeerseiteBlank page
DE2400527A 1973-01-08 1974-01-07 PROCEDURE FOR DETERMINING INSULATION FAULTS IN ELECTRICAL DISTRIBUTION NETWORKS Withdrawn DE2400527A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DK8673*#A DK131524C (en) 1973-01-08 1973-01-08 PROCEDURE FOR DETERMINING INSULATION ERRORS IN ELECTRICAL DISTRIBUTION NETWORKS

Publications (1)

Publication Number Publication Date
DE2400527A1 true DE2400527A1 (en) 1974-08-15

Family

ID=8089575

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2400527A Withdrawn DE2400527A1 (en) 1973-01-08 1974-01-07 PROCEDURE FOR DETERMINING INSULATION FAULTS IN ELECTRICAL DISTRIBUTION NETWORKS

Country Status (3)

Country Link
DE (1) DE2400527A1 (en)
DK (1) DK131524C (en)
SE (1) SE396144B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0083306A1 (en) * 1981-12-22 1983-07-06 Elektrizitätswerke des Kantons Zürich Process and device to control at least one compensation coil in a polyphase network
FR2682190A1 (en) * 1991-10-07 1993-04-09 Electricite De France METHOD FOR THE SELECTIVE DETECTION OF A RESISTANT FAULT IN AN ELECTRIC POWER DISTRIBUTION NETWORK AND DEVICE FOR IMPLEMENTING SAME.
FR2685779A1 (en) * 1991-12-30 1993-07-02 Simplex Appareils Fault detector for a multiphase overhead electricity distribution network

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0083306A1 (en) * 1981-12-22 1983-07-06 Elektrizitätswerke des Kantons Zürich Process and device to control at least one compensation coil in a polyphase network
FR2682190A1 (en) * 1991-10-07 1993-04-09 Electricite De France METHOD FOR THE SELECTIVE DETECTION OF A RESISTANT FAULT IN AN ELECTRIC POWER DISTRIBUTION NETWORK AND DEVICE FOR IMPLEMENTING SAME.
EP0537066A1 (en) * 1991-10-07 1993-04-14 Electricite De France Method for the selective detection of resistive defects in power-distribution networks and device for carrying out this method
FR2685779A1 (en) * 1991-12-30 1993-07-02 Simplex Appareils Fault detector for a multiphase overhead electricity distribution network

Also Published As

Publication number Publication date
SE396144B (en) 1977-09-05
DK131524B (en) 1975-07-28
DK131524C (en) 1976-02-16

Similar Documents

Publication Publication Date Title
WO2010106059A1 (en) Method and device for the isolation monitoring of an it network
EP0642027A1 (en) Method and device for detecting earth faults of the conductors in a electrical machine
DE102018126235A1 (en) Process for measuring insulation resistance in inverters with multi-point topology and inverters with multi-point topology
EP0045113B1 (en) Process and device for locating a ground fault
DE102017007252B3 (en) A monitoring apparatus and method for continuous and backwash independent flow monitoring of the integrity of the traction return return conductors of a traction power supply system and return system having a return line and a monitor for monitoring the integrity of the return line return conductors
EP0665625B1 (en) Method for obtaining an impedance value and for processing in a distance protection device
EP0696830A1 (en) Locating earth faults in electric networks with grounding coil
DE2400527A1 (en) PROCEDURE FOR DETERMINING INSULATION FAULTS IN ELECTRICAL DISTRIBUTION NETWORKS
DE102013202868A1 (en) Error- or load flow detecting device for low- or high voltage system, has voltage-measuring device with reference voltage measuring device, whose measuring point is located in different field or on busbar
EP0069790B1 (en) Method and device for locating earth faults of power line networks
DE2845155A1 (en) Current measurement in medium voltage switch-gear installation - using three coils adjacent to conductor line and with combination with potentiometers and integrators
EP1348970A1 (en) Check for plausibility of current transformers in substations
DE102021112016B3 (en) Method and device for determining a ground fault direction
DE2115807A1 (en) Earth fault protection device for electrical devices with star-connected windings
DE935803C (en) Method and arrangement for determining the location of faults on electrical lines
CH148529A (en) Transducer.
EP0745862A2 (en) Method and apparatus for determining insulating properties of test objects
DE4429310C2 (en) Method and device for locating earth faults in three-phase networks
DE69737182T2 (en) Device for fault detection and measurement on electrical supply lines
EP3879280B1 (en) Method for measuring ground loop impedance
CH619545A5 (en)
DE432982C (en) Display device for selective detection of a branch line of a high-voltage network with an earth fault
DE3220014C2 (en)
DE506295C (en) Method for indicating the location of short circuits in high voltage lines
DE1934207C (en) Method for earth fault monitoring in a compensated network

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8130 Withdrawal