DE2343260A1 - Curbstone made of synthetic resin and quartz sand - has trapezoid-shaped opening running longitudinally on underside - Google Patents
Curbstone made of synthetic resin and quartz sand - has trapezoid-shaped opening running longitudinally on undersideInfo
- Publication number
- DE2343260A1 DE2343260A1 DE19732343260 DE2343260A DE2343260A1 DE 2343260 A1 DE2343260 A1 DE 2343260A1 DE 19732343260 DE19732343260 DE 19732343260 DE 2343260 A DE2343260 A DE 2343260A DE 2343260 A1 DE2343260 A1 DE 2343260A1
- Authority
- DE
- Germany
- Prior art keywords
- curb
- longitudinal direction
- synthetic resin
- head end
- trapezoidal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/221—Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
- E01C11/222—Raised kerbs, e.g. for sidewalks ; Integrated or portable means for facilitating ascent or descent
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
Description
j NACHGE^ZKJi-JT Jj AFTER ^ ZKJi-JT J
Anmelder: Firma intergranit gmbh, 859o Marktredwitz Applicant: company intergranit gmbh, 859o Marktredwitz
Patentanmeldung KUNSTHARZBETONRANDSTEINEPatent application RESIN CONCRETE EDGE STONES
I.I.
Die von uns konstruierten Betonrandsteine werden wie die bereits bekannten Konstruktionen eines anderen Herstellers aus Kunstharz und Quarzsand hergestellt. Sie unterscheiden sich aber von den bereits bekannten Produkten in ihrer Ausgestaltung und wirtschaftlichen Verwendbarkeit. Das gilt vor allem hinsichtlich der Benutzung des Randsteines als Schmutzwasser-Abflußrohr , die in der Beschreibung desschon bekannten Produkts vorgesehen ist; eine solche Benutzung ist für dieses Produkt jedoch nicht durchführbar und zwar aus folgenden Gründen:The concrete kerbstones constructed by us will be like the already known ones Constructions from another manufacturer made from synthetic resin and quartz sand. But they differ from those already known Products in their design and economic usability. This is especially true with regard to the use of the curb as a waste water drainage pipe included in the description of the already known product; however, such use is not feasible for this product for the following reasons:
a) Jeder Randstein wird auf noch flüssigem bzw. nassem Transportbeton verlegt; der nasse Beton quetscht sich automatisch in die auf der Innenseite vorhandenen Hohlräume. Der verbleibende Hohlraum ist dann zu gering für einen Wasserabfluss.a) Each kerbstone is placed on ready-mixed concrete that is still liquid or wet relocated; the wet concrete automatically squeezes into the cavities on the inside. The remaining cavity is then too little for water to run off.
b) Die Randsteine müssen mit einem Abstand von 1 cm (Dehnungsfähigkeit des Unterbaus und des Oberbaus) aneinandergereiht versetzt werden. Die entstehenden Fugen sind nach dem Verlegen mit Beton oder einem anderen Dehnungsmaterial auszufüllen. Die Verfugung muß die gesamte Höhe und Breite des Steines ausmachen, wodurch der Durchfluss automatisch unterbrochen wird.b) The curbs must be lined up with a distance of 1 cm (expansion capacity of the substructure and the superstructure). The resulting joints must be filled with concrete or another expansion material after laying. The grouting must be total height and width of the stone make up the flow is automatically interrupted.
c) Der bei dem bekannten Produkt vorgesehene Einlauf schlitz für Schmutz-Wasser kann aus technischen Gründen (Belastbarkeit) nur sehr klein gehalten werden und sich auch nicht auf die gesamte Län ge eines Steinesc) The inlet slot for dirty water provided in the known product can only be kept very small for technical reasons (load capacity) and also not cover the entire length of a stone
509810/0U3509810 / 0U3
-A--A-
erstrecken. Das bewirkt automatisch, daß nur ein sehr geringer Anteil des Schmutzwassers in den Schlitz eindringen kann. Bei fallendem Laub wird sich dieser Schlitz sehr schnell verstopfen und nicht mehr die ihm zugedachte Funktion ausüben können.extend. This automatically ensures that only a very small proportion of the dirty water can penetrate into the slot. at falling leaves will block this slot very quickly and will no longer be able to perform its intended function.
d) Dazu kommt, daß das im Hohlraum des Steines angestaute Wasser im Winter gefriert mit der Folge, daß der Stein deformiert oder sogar eine Lösung vom Unterbau hervorgerufen werden kann. Bei Verwendung von Streusalz erhöht sich diese Gefahr noch mehr, da dabei der chemische Umwandlungsprozeß sich noch sehr negativ auswirkt.d) In addition, the water accumulated in the cavity of the stone freezes in winter with the result that the stone is deformed or even a solution from the substructure can be brought about. When using road salt, this risk increases even more, because while the chemical conversion process still has a very negative effect.
Demgegenüber sind die Vorteile der von uns entwickelten Formen (Zeichnungen 1-5) ganz wesentlich. Im einzelnen werden folgende besondere Merkmale für unsere Konstruktion als neu beansprucht:In contrast, the advantages of the forms we have developed (drawings 1-5) is very important. In detail, the following special features are claimed as new for our construction:
1) Die Steine sind in der inneren Form - die äußere Form ist entsprechend den DIN-Vorschriften unverändert - so gestaltet, daß sie mit relativ einfachen Formen in jedem Betrieb hergestellt werden können. Dadurch ist die Wirtschaftlichkeit und somit die eigentliche prakti- * sehe Verwendbarkeit verbessert.1) The inner shape of the stones - the outer shape is unchanged in accordance with DIN regulations - is designed so that they can be produced with relatively simple shapes in any company . As a result, the economy and thus the actual practicability is improved.
2) Die äußere Wandung ist in einer Stärke gestaltet, die die max. Belastbarkeit sichert (DIN-Vorschriften).2) The outer wall is designed in a thickness that the maximum load capacity secures (DIN regulations).
) Die von uns konstruierten Kunstharzbetonrandsteine, Form 1 - 3, unterscheiden sich in der Innenraumgestaltung wesentlich von dem bekannten Produkt. Die Eisenform, in der später dasfertige Produkt gegossen werden muß, ist so unkompliziert gestaltet, daß) Differentiate between the synthetic resin concrete curbs, shapes 1 - 3, that we have constructed The interior design differs significantly from the familiar product. The iron mold in which the finished product will later be poured must is designed so straightforward that
a) die Form sich vom gegossenen Stück sofort ohne Komplikation lösen kann;a) the shape can be released from the cast piece immediately without complication;
b) die Form ohne größeren Aufwand von jedermann hergestellt werden kann. , .b) the shape can be produced by anyone without great effort . ,.
509810/0143509810/0143
4) Bei unserer Konstruktion entfallen durch eine wesentlich andere Gestaltung des inneren Hohlraumes die bei dem bereits bekannten Produkt störenden inneren Längs- und Quaerverstrebungen, Die Bruchgefahr des Steines wird so nahezu ausgeschlossen.4) In our construction, a significantly different one is omitted Design of the inner cavity the internal longitudinal and transverse struts, which are disturbing in the already known product, The risk of the stone breaking is almost eliminated.
Der Stein kann sofort nach der Ausformung zur Baustelle gebracht werden, da nicht die Gefahr der Beschädigung oder Zerstörung von Längs- und Querverstreifungen besteht, die sonst zu einer Verminderung der erforderlichen Druckfestigkeit führt oder einen Nachguß erforderlich macht.The stone can be brought to the construction site immediately after shaping, as there is no risk of damage or destruction there is longitudinal and transverse striations, which otherwise lead to a reduction in the required compressive strength or makes a refill necessary.
5) Die Druckfestigkeit wird bei unseren Steinen wesentlich gesteigert.5) The compressive strength of our stones is significantly increased.
Nach den DIN-Vor schritten ist für jeden Randstein eine gewisse Druckfestigkeit vorgeschrieben. Diese wird bereits bei unserem Stein nach der Form No. 1 erreicht. Die erhöhte Druckfestigkeit, die die Bauämter für gewisse mit Schwerfahrzeugen besonders stark befahrenen Straßen vorschreiben, erreichen unsere Konstruktionen gemäß den Formen No. 2 und No. 3.According to the DIN-Vor steps, there is a certain amount for every curb Compressive strength prescribed. This is already done with our stone according to the shape no. 1 reached. The increased compressive strength, which the building authorities stipulate for certain roads with particularly heavy traffic with heavy vehicles reach our constructions according to the forms No. 2 and No. 3.
6) Ein weiterer Vorteil der von uns konstruierten Steine (No. 1-12) liegt darin, daß ihr Versetzen auf der Baustelle äußerst einfach und unkompliziert ist. Die Zeit- und Kostenersparnis ist erheblich, da die Versetzkolonne im Gegensatz zu dem bekannten Produkt den noch nassen Transportbeton auf der Straße so anbringen kann, daß unsere Steine schnell und ohne Berücksichtigung des Wasserablaufs, der bei dem bekannten Produkt vorgesehen ist, in den noch nassen Beton drücken können. Eine Rücksichtnahme auf dünnwandige Längs- und Querrippen entfällt.6) Another advantage of the stones we have constructed (No. 1-12) lies in the fact that it is extremely simple and straightforward to move them on the construction site. The time and cost savings are considerable, there In contrast to the well-known product, the transfer column can place the still wet ready-mixed concrete on the street in such a way that ours Stones quickly and without taking into account the water drainage that occurs in the known product is provided, press into the still wet concrete can. There is no need to consider thin-walled longitudinal and transverse ribs.
II.
Beschreibung zu Abbildung 2 II.
Description of Figure 2
509810/0U3509810 / 0U3
13 U J ι 6 U 1 3 U J ι 6 U
Im normalen Arbeitsablauf wird die obere Hälfte des Steines mit drei Betoneisen armiert.In the normal workflow, the upper half of the stone is reinforced with three concrete irons.
Neu ist, daß die Armierungseisen hier auf die Länge vorgefertigt sein können, da die Steine normalerweise in gleichmäßigen Längen gefertigt werden«What is new is that the reinforcement bars are prefabricated to length here can be, as the stones are usually of even lengths to be manufactured "
III.III.
Beschreibung zu Abbildung 3 und 4
Arbeitsbaluf und Vorteil genau wie bei Form No. 2. Description of Figures 3 and 4
Work baluf and advantage just like with Form No. 2.
Ein weiterer Vorteil entsteht durch Einfügung eines für Kunstharz geeigneten Vliesstoffes. Wie bereits aus anderen Industriezweigen hinreichend bekannt, erhöht ein Vliesstoff in Verbindung mit Kunstharz sehr wesentlich die Druckfestigkeit des fertigen Produktes.Another advantage arises from the inclusion of a non-woven fabric suitable for synthetic resin. As in other branches of industry It is well known that a nonwoven fabric in conjunction with synthetic resin increases the compressive strength of the finished product very significantly.
Abbildung No. 4 stellt in der Innenraumgestaltung eine Variation zu Form No. 1 dar; sonst keine Änderung. Figure No. 4 is a variation on Form No. 1 represents; otherwise no change.
I V.
Beschreibung zu Abbildung 5 I V.
Description of Figure 5
Dünnwandige, innen eckig geschlossene Kunstharzbetonrandsteine, bei denen die Köpfe zugleich als Falz an der einen Seite und als Überlappung an der anderen Kopfseite ausgebildet sind. Neu ist auch hier wiederum die äußerst einfache und praktikable Herstellung sowohl der Gußform als auch des fertigen Produktes.Thin-walled synthetic resin concrete kerbstones, square on the inside, at where the heads are designed as a fold on one side and as an overlap on the other side of the head. Again, the new is here extremely simple and practicable production of both the mold and of the finished product.
V .
Beschreibung zu Abbildung 6-9 V.
Description of Figure 6-9
509810/0143509810/0143
Die Steine sind mit Falz am linken Kopfende und Überlappung am rechten K opfende au sgestattet.The stones are with a fold on the left head end and an overlap on the right Head end equipped.
Nou ist hier der Vorteil, der darin liegt, daß die einzelnen Steine übereinanderlappen und somit das nachträgliche Verfugen nur mehr durch Ausgießen des oberen, wenige mm verbleibenden Randes bedingen. Erzielt wird dadurch wesentliche Zeitersparnis und wesentliche Ersparnis von Fugenmaterial. Nou is the advantage here, which lies in the fact that the individual stones overlap one another and therefore the subsequent grouting is only necessary by pouring out the upper edge that remains a few mm. Achieved This saves a lot of time and saves a lot of grout.
VI.VI.
Herstellung eines Steines mit einer kreisrunden Öffnung in der Innenseite, die sicli auf die Gesamtlänge des Steines bewegt.Making a stone with a circular opening in the inside, the sicli moves along the entire length of the stone.
Der von uns konstruierte Kunstharzbetonrandstein kann auch mit einem bereits auf dem Markt befindlichen Klebestoff direkt auf die fertiggestellte Fahrbiihn aufgeklebt werden. Dadurch entfallen alle Betonarbeiten und die Straße kann in einem Zug fertiggestellt werden.The synthetic resin concrete curb constructed by us can also be used with an already Adhesive on the market can be glued directly onto the completed roadway. This eliminates all concrete work and the Road can be completed in one go.
Neu ist die Herstellung der Randsteine, verbunden mit offener Abwasserrinnenplatte un'einem Hohlraum gemäß Zeichnung No. 1 — lo. Die Abwasserrinnenplatte kann in der Breite beliebig hergestellt werden un<ijederzeit den örtlichen Gegebenheiten bzw. den Vorschriften der Straßenbauämter angepaßt werden.The production of the curbs, combined with an open sewer slab, is new in a cavity according to drawing no. 1 - lo. The sewer plate can be produced in any width and at any time be adapted to the local conditions or the regulations of the road construction authorities.
Die Randsteine mit Abwasserrinnenplatte können zusätzlich mit Falz und Überlappung hergestellt werden (Abbildung No. 12).The kerbstones with sewer plate can also be folded and Overlap can be made (Figure No. 12).
509810/0143509810/0143
Die aufgezeigten Neuheiten und Vorteile unserer Konstruktionen bedeuten einen wesentlichen Fortschritt sowohl in der Herstellung als auch in der praktischen Anwendung gegenüber den bisher bekannten Modellen. Mit unseren Konstruktionen sind alle Ziele des derzeit möglichen Fortschrittes erreicht.The presented innovations and advantages of our constructions mean a significant advance both in production and in practical use compared to the previously known models. With our constructions all goals of the currently possible progress have been achieved.
Marktredwitz, den 2o. Junil972Marktredwitz, the 2o. Junil972
intergranit gmbhintergranit gmbh
ORISSNAL iiiSFECTEDORISSNAL iiiSFECTED
509810/0U3509810 / 0U3
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19732343260 DE2343260A1 (en) | 1973-08-28 | 1973-08-28 | Curbstone made of synthetic resin and quartz sand - has trapezoid-shaped opening running longitudinally on underside |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19732343260 DE2343260A1 (en) | 1973-08-28 | 1973-08-28 | Curbstone made of synthetic resin and quartz sand - has trapezoid-shaped opening running longitudinally on underside |
Publications (1)
Publication Number | Publication Date |
---|---|
DE2343260A1 true DE2343260A1 (en) | 1975-03-06 |
Family
ID=5890878
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19732343260 Pending DE2343260A1 (en) | 1973-08-28 | 1973-08-28 | Curbstone made of synthetic resin and quartz sand - has trapezoid-shaped opening running longitudinally on underside |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2343260A1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3240331A1 (en) * | 1982-10-30 | 1984-05-10 | ACO Severin Ahlmann GmbH & Co KG, 2370 Rendsburg | Structure delimitation |
FR2538675A1 (en) * | 1982-12-31 | 1984-07-06 | Sauvegrain Serge | Device for protection against the growth of grass, particularly for parks and gardens |
FR2709139A1 (en) * | 1993-08-19 | 1995-02-24 | Stradal Ind | Modular element for producing a traffic divider kerb |
GB2409699A (en) * | 2004-03-20 | 2005-07-06 | Brabco 329 Ltd | Kerbstone |
DE102019133058A1 (en) * | 2019-12-04 | 2021-06-10 | Olaf Kruse | Method for repairing a pool edge of a swimming pool and repair stone for renovating the pool edge of a swimming pool |
-
1973
- 1973-08-28 DE DE19732343260 patent/DE2343260A1/en active Pending
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3240331A1 (en) * | 1982-10-30 | 1984-05-10 | ACO Severin Ahlmann GmbH & Co KG, 2370 Rendsburg | Structure delimitation |
FR2538675A1 (en) * | 1982-12-31 | 1984-07-06 | Sauvegrain Serge | Device for protection against the growth of grass, particularly for parks and gardens |
FR2709139A1 (en) * | 1993-08-19 | 1995-02-24 | Stradal Ind | Modular element for producing a traffic divider kerb |
GB2409699A (en) * | 2004-03-20 | 2005-07-06 | Brabco 329 Ltd | Kerbstone |
WO2005090682A2 (en) * | 2004-03-20 | 2005-09-29 | Durakerb Limited | Synthetic kerbs and method of installation |
WO2005090682A3 (en) * | 2004-03-20 | 2005-11-17 | Durakerb Ltd | Synthetic kerbs and method of installation |
GB2409699B (en) * | 2004-03-20 | 2008-01-09 | Brabco 329 Ltd | Synthetic kerbs and method of installation |
DE102019133058A1 (en) * | 2019-12-04 | 2021-06-10 | Olaf Kruse | Method for repairing a pool edge of a swimming pool and repair stone for renovating the pool edge of a swimming pool |
DE102019133058B4 (en) | 2019-12-04 | 2021-12-23 | Olaf Kruse | Method for the repair of a pool edge of a swimming pool and repair stone for the renovation of the pool edge of a swimming pool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2545572B2 (en) | Foundation in subsoil susceptible to subsidence, especially for a dam | |
DE2343260A1 (en) | Curbstone made of synthetic resin and quartz sand - has trapezoid-shaped opening running longitudinally on underside | |
DE3243210A1 (en) | Method and device for making slotted grooves for drainage of traffic areas | |
DE7214478U (en) | Resin concrete curbs | |
DE2307007C3 (en) | Road body | |
DE2363501A1 (en) | Element of wall form assembly blocks - with channels empty on building side and reinforcing rods drawn through other channels | |
DE3436271C2 (en) | ||
DE872959C (en) | Road paving made of blocks and their production | |
DE4428482A1 (en) | Gutter stone for drainage of surface water | |
AT162712B (en) | Concrete block for the production of a road surface | |
CH308515A (en) | Concrete road. | |
DE559337C (en) | Artificial paving stone with grooves arranged in the vertical side walls | |
AT281896B (en) | GRID TILE MADE OF PLASTIC | |
DE102017114361A1 (en) | Form stone for a roadable pavement in the composite, as well as multi-layer block and method for producing a multi-layer block. | |
AT134654B (en) | Concrete pavement. | |
AT246388B (en) | Shuttering block | |
DE4136610C2 (en) | Method for widening a route, in particular a waterway | |
AT122318B (en) | Interchangeable post holder. | |
AT121777B (en) | Process for the production of stamped concrete ceilings for roads u. like | |
DE909771C (en) | Skeleton wall | |
DE10106628B4 (en) | Surface beams as a composite covering | |
AT116890B (en) | Construction element for the production of roofs. | |
DE535966C (en) | Block-shaped plaster insert made of a metal frame with mineral filler | |
AT377811B (en) | METHOD FOR DRYING UNDERGROUND PARTS OF CONSTRUCTIONS, ESPECIALLY BASEMENT WALLS | |
AT371173B (en) | WEARING LAYER FOR ROADS OR PARTS THEREOF |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OHA | Expiration of time for request for examination |