DE2333324A1 - Concrete construction reinforcing lattice girder - with structural support chords below lattice apexes and hooked upper sections passing into diagonal struts - Google Patents
Concrete construction reinforcing lattice girder - with structural support chords below lattice apexes and hooked upper sections passing into diagonal strutsInfo
- Publication number
- DE2333324A1 DE2333324A1 DE19732333324 DE2333324A DE2333324A1 DE 2333324 A1 DE2333324 A1 DE 2333324A1 DE 19732333324 DE19732333324 DE 19732333324 DE 2333324 A DE2333324 A DE 2333324A DE 2333324 A1 DE2333324 A1 DE 2333324A1
- Authority
- DE
- Germany
- Prior art keywords
- wire
- lattice
- points
- chords
- lattice structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/01—Reinforcing elements of metal, e.g. with non-structural coatings
- E04C5/06—Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
- E04C5/065—Light-weight girders, e.g. with precast parts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21F—WORKING OR PROCESSING OF METAL WIRE
- B21F27/00—Making wire network, i.e. wire nets
- B21F27/12—Making special types or portions of network by methods or means specially adapted therefor
- B21F27/20—Making special types or portions of network by methods or means specially adapted therefor of plaster-carrying network
Abstract
Description
Patentanwalt DIPL.-PHYS. DR. W. LANGHOFF Rechtsanwalt B. LANGHOFF*Patent attorney DIPL.-PHYS. DR. W. LANGHOFF Attorney B. LANGHOFF *
β MÜNCHEN 81 · WISSMANNSTRASSE 14 · TELEFON 932774 · TELEGRAMMADRESSE: LANGHOFFPATENT MÜNCHENβ MUNICH 81 · WISSMANNSTRASSE 14 · TELEPHONE 932774 · TELEGRAM ADDRESS: LANGHOFFPATENT MUNICH
München, den 29. Juni 1973 Unser Zeichen:12-1246Munich, June 29, 1973 Our reference: 12-1246
Dr. Ing.-Wolfgang Kayessen, Geretsried, Starleiten 6Dr. Ing.-Wolfgang Kayessen, Geretsried, Starleiten 6
Gitterträger und Verfahren zum Herstellen desselbenLattice girder and method of making the same
Die Erfindung betrifft einen Gitterträger zur Bewehrung von Betonkonstruktionen sowie ein Verfahren zum Herstellen desselben.The invention relates to a lattice girder for reinforcing concrete structures and to a method of manufacturing same.
Es sind verschiedene Arten von Gitterträgern für Betonkonstruktionsteile bekannt. Gemäß einer Bauart sind Untergurt und Obergurt eines Gitterträgers durch eine Gitterstruktur miteinander verbunden, welche aus einem durchgehenden Draht hergestellte Diagonalstreben umfaßt, die so verlaufen, daß sie mit den Ober- und Untergurten dreieckige Flächen begrenzen. Eine derartige Konstruktion hat insbesondere bei hohen Trägern den Nachteil, daß für die Gitterstruktur ein verhältnismäßig starker Draht verwendet werden muß, um die erforderliche Biegesteifigkeit der Diagonalstreben, die für die Montage der Gitterträger erforderlich ist, zu erreichen.There are different types of lattice girders for concrete structures known. According to one design, the lower chord and the upper chord of a lattice girder are formed by a lattice structure connected together, which comprises made of a continuous wire diagonal struts which extend so that they delimit triangular surfaces with the upper and lower chords. Such a construction has in particular high carriers the disadvantage that a relatively strong wire must be used for the lattice structure to achieve the required flexural rigidity of the diagonal struts, which is required for the assembly of the lattice girders.
Es ist auch bereits bekannt, den Obergurt an von den Spitzen der Diagonalstreben entfernt liegenden Stellen mit der Gitterstruktur zu verbinden, wenn der Gitterträger keine Biegefestigkeit zu haben braucht. It is also already known to attach the top chord to the lattice structure at points that are remote from the tips of the diagonal struts to be connected if the lattice girder does not need to have flexural strength.
Die Erfindung geht aus von einem Gitterträger zur Bewehrung The invention is based on a lattice girder for reinforcement
• Standiger allgemeiner Vertreter nach § 4« PatAnwO. «ua»»«n ael 4mn Landgerichten München I un* N. • Permanent general representative according to § 4 «PatAnwO. «Ua » »« n ael 4mn regional courts Munich I and * N.
von Betonkonstruktionen, mit mindestens einem Untergurt, mindestens einem parallel im Abstand davon liegenden Konstruktionsstützgurt und mit einer an den Gurten befestigten, aus Draht hergestellten Gitterstruktur mit schräg zwischen den im Abstand voneinander liegenden Gurten verlaufenden Diagonalstreben und hat zur Aufgabe, einen derartigen Gitterträger zu schaffen, der eine vorgegebene Biegesteifigkeit mit geringerem Materialaufwand erzielt als die bekannten Gitterträger bei gleicher Höhe.of concrete structures, with at least one lower chord, at least one parallel and spaced from it Construction support belt and with a lattice structure made of wire attached to the belts diagonal struts running diagonally between the straps located at a distance from one another and has the task of creating a to create such a lattice girder that achieves a predetermined flexural strength with less material than the known lattice girders at the same height.
Die Lösung dieser Aufgabe ist darin zu sehen, daß die Konstruktionsstützgurte in an sich bekannter Weise In einer von den oberen Spitzen der Gitterstruktur entfernt liegenden Ebene angeordnet sind und daß die von den Konstruktionsstützgurten nach oben sich erstreckenden Bereiche der Gitterstruktur aus schleifen- oder hakenförmigen Abschnitten bestehen, die mit ihren Schenkelenden Jeweils im Bereich der Konstruktionsstützgurte in die Diagonalstreben übergehen.The solution to this problem is to be seen in the fact that the construction support belts in a manner known per se in a distance from the upper tips of the lattice structure Plane are arranged and that from the construction support belts upwardly extending areas of the lattice structure consist of loop-shaped or hook-shaped sections, each with their leg ends in the area of Merge construction support belts into the diagonal struts.
Vorzugsweise haben die eng benachbarten Befestigungsstellen der Diagonalstreben an den Kanstruktlonsgurten einen solchen Abstand voneinander, daß die geometrischen Achsen der Diagonalstreben sich in der Axialebene der Konstruktionsgurte schneiden,The closely adjacent fastening points of the diagonal struts on the Kanstruktlonsgurten have such Distance from each other so that the geometric axes of the diagonal struts intersect in the axial plane of the construction chords,
Eine besonders hohe seitliche Biegesteifigkeit läßt sich erzielen, wenn zu beiden Selten der Gitterstruktur je ein Konstruktionsstützgurt angeordnet ist. Diese können auch Profilteile bilden.A particularly high lateral flexural rigidity can be achieved if the lattice structure has one for each of the two Construction support belt is arranged. These can also form profile parts.
Eine vorteilhafte Weiterbildung 1st darin zu sehen, daß die schleifen- oder hakenförmigen Abschnitte nach Ihren Enden hin konvergierende Schenkel aufweisen.An advantageous further development is to be seen in the fact that the loop-shaped or hook-shaped sections towards their ends have converging legs.
Die Gitterstruktur kann aus einem durchgehenden Draht bestehen. The lattice structure can consist of a continuous wire.
Die Erfindung betrifft auch ein Verfahren zum Herstellen der The invention also relates to a method for producing the
401884/0654401884/0654
Gitterstruktur für einen erfindungsgemäßen Gitterträger aus einem durchgehenden Draht, wobei ausgegangen wird von einem Verfahren, gemäß dem zuerst in vorbestimmten Abständen des Drahtes die den mit dem Untergurt in Verbindung kommenden Fußpunkten entsprechenden Biegestellen hergestellt und darnach unter Einspannung des Drahtes ir. Bereich zweier benachbarter Pußpunktbiegestellen der dazwischenliegende Drahtabschnitt im mittleren Bereich seiner Länge normal zur Drahtachse unter Annäherung der Eir.srannstellen des Drahtabschnittes seitlich herausgedrückt wird.Lattice structure for a lattice girder according to the invention made from a continuous wire, it being assumed by a method according to which the wire is first connected to the lower chord at predetermined intervals Bending points corresponding to the coming base points are made and then the wire is clamped ir. Area of two adjacent butt point bending points, the intermediate wire section in the middle area its length normal to the wire axis with the approach of the Eir.srannstellen of the wire section pushed out laterally will.
Ausgehend hiervon besteht das erfindungsgemäße Verfahren darin, daß bei Erreichen etwa der gewünschten Neigung der Drahtabschnittschenkel zur Achse des geraden Drahtes diejenigen Stellen, die in einem Abstand entsprechend etwa dem Abstand des Konstruktionsstützgurtes von den; Untergurt von den Fußrunktbiegestellen liegen, bei der v/eiteren seitlichen Ausdrückbewegung des Drahtabschnittes ortsfest in bezug auf die Einspannstelle der zugeordneten Drahtabschnitthälfte gehalten werden.The method according to the invention is based on this in that when approximately the desired inclination of the wire section legs to the axis of the straight wire is reached those points that are at a distance corresponding approximately to the distance of the construction support belt from the; Lower chord from the Fußrunktbiegestellen lie stationary in the further lateral pushing-out movement of the wire section in be held with respect to the clamping point of the associated wire section half.
Verzugsweise werden zum ortsfesten Halten der Stellen des Drahtabschnittes in der Ausdrückebene schwenkbare Stempel verwendet. Preferably, to keep the locations of the Wire section used in the expression plane pivotable punch.
Sine besonders günstige VerfahrensVariante besteht darin, daß- der Drahtabschnitt nach Beendigung der Bewegung der Hinspannstellen und der Stempel ein weiteres Stück seitlich auswärts gedrückt wird. Hierdurch erfolgt eine Reckung des Drahtes, die zu einer Festigkeitserhöhung führt.A particularly favorable variant of the process consists in that the wire section after the end of the movement of the clamping points and the punch a further piece to the side is pressed outwards. This causes the wire to be stretched, which leads to an increase in strength.
Weiterhin kann dafür gesorgt werden, daß die ortsfest zu haltenden Stellen erst in einer sich überlappenden Laece ortsfest gehalten werden. Dadurch läßt sich die Wirkung des Zurückfecerns der Drahtabschnittschenkel im kräftefreienFurthermore, it can be ensured that the points to be held in place are only in an overlapping laece be kept stationary. As a result, the effect of the fecuring back of the wire section legs can be free of force
409884/0654409884/0654
Zustand ausgleichen.Compensate for the state.
Alternativ kann die Gitterstruktur vor dem Verschweißen mit den Gurten in Längsrichtung abschnittweise oder ganz zusammengedrückt werden.Alternatively, the lattice structure can be partially or completely in the longitudinal direction before being welded to the belts be squeezed.
Die Erfindung ist im folgenden anhand schematischer Zeichnungen an mehreren Ausführungsbeispielen ergänzend beschrieben. The invention is additionally described below with reference to schematic drawings of several exemplary embodiments.
Figur 1 ist eine Seitenansicht eines Längenbereiches eines Gitterträgers nach der Erfindung.Figure 1 is a side view of a length portion of a lattice girder according to the invention.
Figur 2 ist eine Seitenansicht in Richtung des Schnittes II-II von Figur 1.FIG. 2 is a side view in the direction of section II-II of FIG.
Figur 3 zeigt eine Verfahrensstufe des Herstellungsverfahrens nach der Erfindung.FIG. 3 shows a process stage of the production process according to the invention.
Figur 4 zeigt eine spätere Verfahrensstufe des Verfahrens.FIG. 4 shows a later stage of the process.
Figur 5 zeigt den Endzustand des Herstellungsverfahrens .FIG. 5 shows the final state of the manufacturing process .
Der in den Figuren 1 und 2 dargestellte Gitterträger umfaßt zwei Untergurte 1 und 2, die Jeweils einen Stahldraht hoher Festigkeit bilden. Parallel und im Abstand zu den Untergurten liegen zwei Konstruktionsstützgurte 3 und h.The lattice girder shown in Figures 1 and 2 comprises two lower chords 1 and 2, each of which forms a steel wire of high strength. Two construction support chords 3 and h are parallel to and at a distance from the lower chords.
Die Untergurte 1, 2 und die Stützgurte 3, k sind durch eine Gitterstruktur miteinander verbunden, welche aus einem einzigen durchgehenden Draht hergestellt ist.The lower chords 1, 2 and the support chords 3, k are connected to one another by a lattice structure which is made from a single continuous wire.
Die mit den Untergurten 1 und 2 verschweißten Fußpunkte bilden Biegestellen des Drahtes, welche in vertikaler Drauf-The base points welded to the lower chords 1 and 2 form bending points of the wire, which in a vertical plan
4 0 9 8 8 k / Q 6 5 U 4 0 9 8 8 k / Q 6 5 U
sieht auf den Gitterträger U-förmig gestaltet sind und in Längsrichtung des Gitterträgers (siehe Figur 2) bogenförmig gekrümmt sind.looks at the lattice girder U-shaped and in Longitudinal direction of the lattice girder (see Figure 2) are curved in an arc.
Von den Fußpunkten 5 gehen Diagonalstreben 6 aus, und zwar in gerader Richtung bis praktisch zu den Konstruktionsstützgurten 3> ^. Die von den benachbarten Fußpunkten 5 ausgehenden Diagonalstreben 6 nähern sich bis auf einen Abstand a (Figur 1) und gehen dann in einen U-förmigen Abschnitt 7 über, dessen Schenkel 8 zu den Konstruktionsstützgurten 3, ^ hin konvergieren und dessen Basisbereich 9 kreisförmig gebogen ist mit einem Krümmungsradius entsprechend dem fünffachen Durchmesser des Drahtes der Gitterstruktur.From the base points 5 diagonal struts 6 go out, namely in a straight line to practically the construction support belts 3> ^. Those emanating from the neighboring base points 5 Diagonal struts 6 approach up to a distance a (Figure 1) and then go into a U-shaped section 7, the Legs 8 converge towards the construction support belts 3, ^ and the base region 9 of which is curved in a circular manner with a radius of curvature corresponding to five times the diameter of the wire of the lattice structure.
Die Untergurte 1, 2 sowie die Konstruktionsstützgurte 3, ^ sind mittels Schweißstellen 10 mit der Gitterstruktur 11 verbunden. The lower chords 1, 2 and the construction support chords 3, ^ are connected to the lattice structure 11 by means of welds 10.
Man erkennt aus Figur 1, daß die Verlängerungen der geometrischen Achsen 12 der geraden Bereiche der Diagonalstreben 6 sich in einem Punkt schneiden, der in der durch die. Mittelachsen der Konstruktionsstützgurte 3, ^ verlaufenden Ebene liegt.It can be seen from Figure 1 that the extensions of the geometric axes 12 of the straight areas of the diagonal struts 6 are in intersect at a point in the through the. Central axes of the construction support belts 3, ^ extending plane lies.
Eine weitere vorteilhafte Möglichkeit, die in den Zeichnungen nicht dargestellt ist, besteht darin, den Abstand a möglichst klein zu halten, so daß die benachbarten Diagonalstreben sich im Grenzfall berühren. Falls die Diagonalstreben 6 der Gitterstruktur im spannungslosen Zustand derselben in den den Konstruktionsstützguten 3, ^ benachbarten Biegebereichen 13 noch einen Abstand voneinander haben, kann dieser durch Zusammenschieben dieser Bereiche beim Schweißen verkleinert werden.Another advantageous possibility, which is not shown in the drawings, is to reduce the distance a as far as possible to keep small, so that the adjacent diagonal struts touch in the borderline case. If the diagonal struts 6 of the lattice structure in the de-energized state of the same in the structural support goods 3, ^ adjacent bending areas 13 still have a distance from each other, this can be done by pushing together these areas are reduced in size during welding.
Die Figuren 3 und k zeigen in stark schematisierter Ansicht eine Vorrichtung zum Herstellen der Gitterstruktur für einen Gitterträger nach der Erfindung. Die Vorrichtung umfaßt zwei Einspannbacken 14 und 15, zwischen denen eine, bestimmteFigures 3 and k show a highly schematic view of an apparatus for producing the lattice structure for a lattice girder according to the invention. The device comprises two clamping jaws 14 and 15, between which one, certain
409884/0654409884/0654
Länge des Drahtes eingespannt werden kann. In der Witte zwischen den Einspannbacken 1*1,15 befindet sich ein Drückstempel 16, der radial zur Richtung des geraden Drahtes 17 bewegbar ist. Die Vorrichtung umfaßt ferner noch zwei symmetrisch zu dem Drückstempel 16 und parallel zu den Einspannbacken 1*J, 15 bewegbare Biegestempel 17 und 18.Length of wire can be clamped. In the Witte There is a pressure ram between the clamping jaws 1 * 1.15 16, which is movable radially to the direction of the straight wire 17. The device further comprises two Bending punches 17 and 18 that can be moved symmetrically to the pressure punch 16 and parallel to the clamping jaws 1 * J, 15.
Man erkennt in Figur 3 den Ausgangszustand der Vorrichtung, in der der zwischen den Einspannbacken 1*1 und 15 eingespannte Drahtabschnitt 19 noch gerade verläuft.The initial state of the device can be seen in FIG. in which the clamped between the clamping jaws 1 * 1 and 15 Wire section 19 is still straight.
"an erkennt ferner, daß der Draht bereits Biegestellen hat, die den Fußpunkten 5 der fertigen Gitterstruktur entsprechen. Diese Biegestellen befinden sich außerhalb des eingespannten Drahtabschnittes 19»"also recognizes that the wire already has bending points that correspond to the base points 5 of the finished lattice structure. These bending points are located outside of the clamped wire section 19 »
Bei Beginn der Tätigkeit der Biegevorrichtung wird der Drückstempel l6 in Richtung des Pfeiles nach oben bewegt, wobei gleichzeitig die Einspannbacken l*f und 15. einander genähert werden. Die Annäherung der Einspannbacken kann in bekannter V/eise formschlüssig und kraftschlüssig derart erfolgen, daß der Drahtabschnitt 19 unter gleichbleibender oder zunehmender Spannung steht, so daß gleichzeitig eine Reckung des Drahtes in diesem Drahtabschnitt erfolgt, wodurch die Festigkeit desselben erhöht wird.When the bending device starts to work, the ram l6 is moved upwards in the direction of the arrow, while at the same time the clamping jaws l * f and 15 come closer to one another will. The approach of the clamping jaws can take place in a known V / ice positively and non-positively in such a way that the wire section 19 is under constant or increasing tension, so that at the same time a stretching of the wire takes place in this wire section, whereby the strength of the same is increased.
Figur 4 zeigt denjenigen Zustand des Herstellungsverfahrens, in dem die Drahtabschnitthälften 20, 21 in bezug auf den geraden Draht 22 um einen gewünschten Winkelet abgekantet sind. FIG. 4 shows that state of the production process in which the wire section halves 20, 21 are bent at a desired angle with respect to the straight wire 22.
Die Biegestempel 17 und 13 sind z.B. Jeweils mit den Einspannbacken 1*1 bzw. 15 fest verbunden und so angeordnet, daß ihre an den Drahtabschnitthälften angreifenden Enden bei Erreichen des gewünschten DiagonalwinkelscA mit den Drahtabschnitthälften 20 bzw. 21 in Berührung stehen. Wenn der Drückstempel 16 nunmehr noch weiter nach außen bewegt The punches 17 and 13 are, for example, firmly connected to the clamping jaws 1 * 1 and 15 respectively and arranged so that their ends engaging the wire section halves are in contact with the wire section halves 20 and 21 when the desired diagonal angle cA is reached. When the ram 16 now moves even further outward
409884/0654409884/0654
und die Einspannbacken l4, 15 weiter aufeinander zu bewegt werden, verursachen die Biegestempel 17, 18 eine Knickung der Drahtabschnitthälften 20, 21, wie in Figur 5 dargestellt ist, die den Endzustand der Herstellung einer fertigen Schleife der Gitterstruktur zeigt,and the clamping jaws l4, 15 moved further towards one another the bending punches 17, 18 cause the wire section halves 20, 21 to buckle, as in FIG. 5 is shown showing the final stage of making a finished loop of the lattice structure,
Nach der Fertigstellung der Schleife wird ein folgender Drahtabschnitt in die Einspannbacken I1I, 15 eingespannt und der Verfahrenszyklus v/iederholt.After the completion of the loop, a following wire section is clamped in the clamping jaws I 1 I, 15 and the process cycle is repeated.
Um zu erreichen, daß die Eiegeberelche 13 der fertigen Gitterstruktur einander möglichst naheliegen, können die Biegestempel 17, 18 in parallel zueinander versetzten Ebenen angeordnet sein, so daß die Biegebereiche 13 bei der Herstellung übereinander hinweggleiten können, wobei sie bei passender Bemessung dieser überschießenden Stempelbewegung soweit zurückfedern, daß die Eiegeberelche 13 sodann in Draufsicht auf die Gitterstruktur gesehen einander eng benachbart sind, jedoch in der Ebene der Gitterstruktur gesehen mc'glicherweise einen geringen Abstand voneinander haben, d.h., daß die beiden Biegebereiche 13 dann nicht mehr genau in der Ebene der Gitterstruktur liegen. Dieser Zustand läßt sich jedoch beim Schweißen leicht ausgleichen, etx^a, indem die Konstruktionsstützgurte 3, ^ in einem der Dicke der Gitterstruktur entsprechenden Abstand während des Schweißens geführt werden.To achieve that the Eiegeberelche 13 of the finished lattice structure are as close as possible to one another, the bending punches 17, 18 can be arranged in planes offset parallel to one another be, so that the bending areas 13 can slide over one another during manufacture, with them at appropriate dimensioning of this excessive punch movement spring back so far that the Eiegeberelche 13 then in plan view are closely adjacent to one another as seen on the lattice structure, but possibly seen in the plane of the lattice structure have a small distance from each other, i.e. that the two bending areas 13 are then no longer exactly in the Lie level of the lattice structure. However, this condition can easily be compensated for during welding, etx ^ a by the Construction support belts 3, ^ in one of the thickness of the lattice structure appropriate distance during welding.
Eine iXi'.rlichst benachbarte Lage der Biegeberelche 13 läßt sich auch dadurch erreichen, daß der U-förmige Bereich 7 während des Schweigens in Richtung der Konstruktionsstützgurte 3, h zusammengedrückt wird.An extremely adjacent position of the bending elche 13 can also be achieved by compressing the U-shaped region 7 in the direction of the structural support belts 3, h during the silence.
Es ist auch möglich, bei der Befestigung der Fußpunkte 5 an den Untergurten 1, 2 einen solchen Druck auf den betreffenden Teil der Gitterstruktur auszuüben, daß die Biegebereiche 13 einander sehr nahe kommen.It is also possible to use 5 to exert such a pressure on the relevant part of the lattice structure on the lower chords 1, 2 that the Bending areas 13 come very close to one another.
409884/0654409884/0654
Die Biegestempel 17, IS können schwenkbar gelagert sein,
um zu verseiden, daß bei der Abknickung der Drahtabschnitthalften
eine Walkarbeit an denselben geleistet wird.The punch 17, IS can be pivoted,
in order to avoid that when the wire section halves are bent, flexing work is carried out on them.
In dem vorhergehenden Beispiel sind die Drahtabschnittschenkel als Drahtabschnitthälften angenommen'worden. Es liegt jedoch
im Rahmen der Erfindung, die Drahtabschnittschenkel ungleich lang auszubilden, so daß diese also im Endzustand
eine unterschiedliche Neigung gegenüber den noch nicht bearbeiteten Drahtbereichen aufweisen.In the preceding example, the wire section legs are assumed to be wire section halves. However, it is within the scope of the invention to design the wire section legs of unequal length, so that they are in the final state
have a different inclination compared to the wire areas that have not yet been processed.
Der Gitterträger nach der ,Erfindung ist im vorhergehenden
mit schleifenförmigen Abschnitten 7 beschrieben. Es können jedoch auch hakenförmige Abschnitte verwendet v/erden, insbesondere
bei der Herstellung der Diagonalstreben 6 und Abschnitte 7 aus getrennten Drähten von passender Länge. Die
Schenkel 8 des Abschnittes 7 sind sodann oben getrennt und dort jeweils beispielsweise halbkreisförmig gekrümmt.The lattice girder according to the invention is above
described with loop-shaped sections 7. However, hook-shaped sections can also be used, in particular when producing the diagonal struts 6 and sections 7 from separate wires of suitable length. The legs 8 of the section 7 are then separated at the top and each curved there, for example, in a semicircle.
409884/0654409884/0654
Claims (11)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19732333324 DE2333324A1 (en) | 1973-06-29 | 1973-06-29 | Concrete construction reinforcing lattice girder - with structural support chords below lattice apexes and hooked upper sections passing into diagonal struts |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19732333324 DE2333324A1 (en) | 1973-06-29 | 1973-06-29 | Concrete construction reinforcing lattice girder - with structural support chords below lattice apexes and hooked upper sections passing into diagonal struts |
Publications (1)
Publication Number | Publication Date |
---|---|
DE2333324A1 true DE2333324A1 (en) | 1975-01-23 |
Family
ID=5885560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19732333324 Pending DE2333324A1 (en) | 1973-06-29 | 1973-06-29 | Concrete construction reinforcing lattice girder - with structural support chords below lattice apexes and hooked upper sections passing into diagonal struts |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2333324A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102013112482B4 (en) | 2013-01-16 | 2023-06-29 | Franz Filzmoser | Device for bending stirrup wires for lattice girders |
-
1973
- 1973-06-29 DE DE19732333324 patent/DE2333324A1/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102013112482B4 (en) | 2013-01-16 | 2023-06-29 | Franz Filzmoser | Device for bending stirrup wires for lattice girders |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1479842B1 (en) | Hollow section | |
DE4029842A1 (en) | CLAMP | |
WO2005002753A1 (en) | Method for producing from a metal sheet a hollow profile which is longitudinally slotted and provided with several longitudinal segments having different cross sections | |
DE19614656A1 (en) | Manufacture of increased wall thickness on hollow profile, for IC engine exhaust pipe | |
EP0596219B1 (en) | Method for joining the end of conveyor belts and fastening device therefor | |
DE2000354A1 (en) | Rod or tubular construction element | |
CH647167A5 (en) | METHOD FOR PRODUCING A TUBE SHEET. | |
DE3050764C2 (en) | ||
DE2624872A1 (en) | METHOD OF MANUFACTURING UNDIVIDED WHEELS | |
DE2209653B2 (en) | MACHINE FOR THE PRODUCTION OF SHAFTS IN SHEET METAL | |
DE2135038A1 (en) | METHOD OF MANUFACTURING A METAL MEMBER AND METAL MEMBER | |
DE2333324A1 (en) | Concrete construction reinforcing lattice girder - with structural support chords below lattice apexes and hooked upper sections passing into diagonal struts | |
DE2733252C3 (en) | Method and device for producing a lattice girder | |
DE2634515A1 (en) | METHOD FOR MANUFACTURING E.G. UNDIVIDED WHEELS | |
EP1977841A1 (en) | Method and device for manufacturing a reinforcement cage made of a reinforced steel mesh | |
DE3037035A1 (en) | METHOD FOR PRODUCING A METAL PART FOR A SEAT BACK OF A MOTOR VEHICLE OR THE LIKE. | |
DE10306511B3 (en) | Manufacturing method for anchor rail used in construction industry using 2 half shells formed from metal sheet material | |
DE2066024C3 (en) | Bending tool for manufacturing plate links for apron belt conveyors | |
EP3185720B1 (en) | Piece of frame furniture | |
DE102016112481A1 (en) | Method for forming a deformable material strip | |
DE102009048114A1 (en) | Method for producing a support or anchor plate | |
DE3001129C2 (en) | Method of making a curved arch support | |
AT261169B (en) | Reinforcement grid for reinforced concrete components | |
DE1609700C3 (en) | Lattice girders for the reinforcement of concrete components as well as process for its production and device for carrying out the process | |
DE2550617B2 (en) | Device for the production of metal ring blanks |