DE2308847A1 - METHOD OF LOADING A BARK (BARGE) - Google Patents

METHOD OF LOADING A BARK (BARGE)

Info

Publication number
DE2308847A1
DE2308847A1 DE19732308847 DE2308847A DE2308847A1 DE 2308847 A1 DE2308847 A1 DE 2308847A1 DE 19732308847 DE19732308847 DE 19732308847 DE 2308847 A DE2308847 A DE 2308847A DE 2308847 A1 DE2308847 A1 DE 2308847A1
Authority
DE
Germany
Prior art keywords
barge
floating
boxes
loading
ballast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19732308847
Other languages
German (de)
Inventor
Vladimir Khelstovsky
Pierre Sicher
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CIE GENERALE D EQUIPEMENT MARI
Original Assignee
CIE GENERALE D EQUIPEMENT MARI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CIE GENERALE D EQUIPEMENT MARI filed Critical CIE GENERALE D EQUIPEMENT MARI
Publication of DE2308847A1 publication Critical patent/DE2308847A1/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/003Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules

Landscapes

  • Engineering & Computer Science (AREA)
  • Transportation (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Ship Loading And Unloading (AREA)

Description

Verfahren zum Beladen einer Barke (eines Lastkahnes). 2308847 Die vorliegende Erfindung betrifft ein Verfahren zurMethod of loading a barge (a barge). 2308847 The present invention relates to a method for

Erleichterung des Verladens von wenigstens einer sehr schweren und sperrigen Last auf eine schwimmende Barke (Lastkahn), mit der Engstellen wie Schleusen zu durchfahren sind.Facilitating the loading of at least one very heavy and bulky load on a floating barge (barge), with which narrow passages such as locks are to be passed.

Die Herstellung von Gütern mit sehr großem Gewicht oder außergewöhnlichen Abmessungen entwickelt sich in zunehmendem Umfang. Nach der Herstellung ist in den meisten Fällen der Zusammenbau dieser Güteryzum Zweck der Überprüfung unerläßlich.The production of goods with very large weights or unusual dimensions is developing on an increasing scale. After manufacture, in most cases it is essential to assemble these items for inspection.

Sie müssen zerlegt, anschließend in mehreren Elementen befördert und am Bestimmungsort unter großen Kosten wieder zusammengebaut werden, weil der Landtransport solcher Güter sehr schwierig ist. Ihr Gewicht und ihre Abmessungen liegen häufig über den bei Eisenbahnen und Straßen zugelassenen Grenzen wie auch oberhalb der Tragfähigkeit normaler Hebezeuge.They have to be dismantled, then transported in several elements and reassembled at the destination at great expense because the overland transport of such goods is very difficult. Their weight and dimensions are often greater than the limits permitted for railways and roads as well as above the load-bearing capacity of normal hoists.

Der Wasserweg bietet breitere Möglichkeiten, insbesondere bei Kanälen mit Europa-Profil mit Schleusen von 100 m χ 12 m und einer minimalen, freien Durchfahrtshöhe unter den niedrigsten Brücken von 5»25 m bei höchstem Wasserstand.The waterway offers wider possibilities, especially for canals with a European profile with locks of 100 m by 12 m and a minimum, free passage height under the lowest bridges of 5 »25 m at the highest water level.

Es gibt Barken (Lastkähne), die Lasten von 1000 Tonnen und mehr aufnehmen können, jedoch fehlen die zu ihrer Beladung erforderlichen Hebezeuge, deren Verwendung im Falle einer eventuellen Herstellung aus Gründen der zu hohen Herstell- und Bedienungskosten und wegen der auftretenden Transportschwierigkeiten unmöglich wäre.There are barges (barges) that can take loads of 1000 tons and more, but the ones required to load them are missing Lifting equipment, the use of which in the event of a possible manufacture for reasons of excessive manufacturing and operating costs and would be impossible because of the transport difficulties that arise.

Die Erfindung verfolgt das Ziel, den Transport auf dem Wasserweg (Beladen und Befördern) dieser sehr schweren und sperrigen Güter ohne vorhergehendes Zerlegen mit Hilfe bestehender oder ohne besondere technische Schwierigkeiten herstellbarer Einrichtungen (Flußkähne, Schwimmkrane, Kletterhubvorrichtungen großer Tragfähigkeit, Rollwagen .... ) zu ermöglichen.The aim of the invention is to facilitate the transport by water (loading and transport) of these very heavy and bulky Goods without prior dismantling with the help of existing equipment or equipment that can be produced without special technical difficulties (River barges, floating cranes, climbing lifting devices with large lifting capacities, trolleys ...).

In dem Verfahren nach der Erfindung werden längs der beiden Seiten der vorzugsweise senkrecht zum Verladekai angelegten Barke (Lastkahn) paarweise gegenüberliegende Schwimmkasten angebracht, von denen jeder mit mindestens einer in vertikaler Richtung verschieblichen Säule versehen ist, die in Bezug auf den zugehörigen Schwimmkasten unverrückbar festgesetzt werden kann. Nachdem das untere Ende dieser Säulen auf Grund abgestützt worden ist, werden die genannten Schwimmkästen mit der von ihnen getragenen Barke (Lastkahn) soweit angehoben, bis der innere Boden der Barke (Lastkahn) in Höhe der verlängerten Ebene des Verladekais liegt, auf dem sichIn the method according to the invention, along the two sides of the preferably perpendicular to the loading quay are applied Barge (barge) attached in pairs opposite floating boxes, each of which with at least one vertically displaceable Column is provided, which can be fixed immovably in relation to the associated floating box. After that the lower end of these pillars has been supported on the ground, the floating boxes with the barge (barge) carried by them are raised until the inner floor of the barge (barge) is level with the extended level of the loading quay on which it is located

309836/0916309836/0916

die zu verschiffende Last befindet.the load to be shipped is located.

Verschiedene andere Charakteristiken und Vorteile des Verfahrens nach der Erfindung sind im übrigen aus der nachfolgenden, detaillierten Beschreibung ersichtlich.Various other characteristics and advantages of the method according to the invention are moreover apparent from the following, detailed description.

S Eine Ausführungsart des Verfahrens nach der ErfindungS One embodiment of the method according to the invention

ist in seinen Einzelheiten als Beispiel ohne jede Absicht einer Einschränkung beschrieben, wobei auf die beigefügte Zeichnung Bezug genommen wird.
Auf dieser Zeichnung bedeuten
is described in detail by way of example without any intention of limitation, reference being made to the accompanying drawings.
On this drawing mean

- die Abb. 1, 2, 6, 8, und 9 achematische Längsansichten*'- Figs. 1, 2, 6, 8, and 9 achematic longitudinal views * '

und die Abb. 3 bis 5 und 7 Frontansichten, die alle schematisch die aufeinanderfolgenden Phasen des Verfahrens nach der Erfindung beim Laden eines schweren und sperrigen Teiles zeigen. 1 bezeichnet das in Krage kommende Teil,and Figures 3 to 5 and 7 are front views, all of which are schematic show the successive phases of the method according to the invention loading a heavy and bulky part. 1 denotes the part coming into collar,

/15 2,eine Transportbarke (Transportkahn), die eventuell gerade noch auf Wasserstraßen mit Europa-Profil verkehren kann und dazu bestimmt ist, dieses Teil aufzunehmen, wobei sich am Boden und an den Seiteader Barke (Lastkahn) Billasträume und an einem Ende eine wasserdichte Tür 3 befinden,/ 15 2, a transport barge (transport barge), which may just be can still operate on waterways with a European profile and is intended to accommodate this part, being on the ground and at the side of the barge (barge) and at one of the barges At the end of a watertight door 3,

1^ 4, eine Bedienungsbarke (Bedienungskahn), auf der ein Kran 5 für das Versetzen bestimmter Elemente der Ladevorrichtung befestigt ist für den Fall, daß an Land kein Hebezeug vorhanden ist, 1 ^ 4, a service barge on which a crane 5 is attached for moving certain elements of the loading device in the event that no hoist is available on land,

6, Schwimmkasten, die dazu bestimmt sind, provisorisch an den Seiten der Transportbarke 2 (Tran portkahn 2) befestigt zu6, swimming box, which are intended to be provisional on the sides of the transport barge 2 (Tran portkahn 2) attached to

»S" werden und diese hochzuheben,"S" and lift it up,

7 und 8, Kletterhubvorrichtungen^ind Säulen, die in der Barke 2 (Lastkahn 2) mitgeführt oder mit Hilfe eines anderen Transportmittels an den Verladeort des Teiles 1 gebracht werden, 9, Schubschiffe oder Schlepper, die zur Fortbewegung der Barke 2 (Lastkahn 2) oder der Barken 2 (Lastkähne 2) und der Schwimmkasten 6 vorgesehen sind.7 and 8, Kletterhubvorrichtungen ^ ind columns, which in the Barge 2 (barge 2) can be carried or brought to the loading location of Part 1 using another means of transport, 9, push boats or tugs used to move the barge 2 (barge 2) or the barges 2 (barges 2) and the Floating box 6 are provided.

Die Ladevorgänge laufen in folgender Weise ab: - wie aus der Abb.1 hervorgeht, können zwei Einheiten zusammengestellt werden um die verschiedenen AuerüstungsgegenständeThe charging processes are carried out in the following way: - As shown in Fig. 1, two units can be put together around the various pieces of equipment

Iff an den Einsatzort zu befördern; ein erstes Schub- oder Schleppschiff bewegt seohs aneinander gekoppelte Schwimmkasten 6 sowie die Bedienungebarke 4 (Bedienungekahn 4), deren Kranausleger abgesenkt ist. Ein zweites Schubschiff 9 schiebt die Transportbarke 2 (Transportkahn 2) , in der die Kletterhubvorrichtungen 7 und die Säulen verstaut sind;To transport Iff to the place of use; a first push or tugboat moves the floating box 6, which are coupled to one another, as well as the operating barge 4 (operating barge 4), the crane boom of which is lowered. A second push boat 9 pushes the transport barge 2 (transport barge 2) in which the climbing lifting devices 7 and the columns are stowed;

309836/0916309836/0916

- anschließend werden, wie die Abb. 2 bis 4 zeigen,- then, as shown in Figs. 2 to 4,

die Schwimmkasten 6 längsseits der Barke 2 (Lastkahn 2)gebracht und zur Wahrung des Gleichgewichtes an entsprechenden Stellen ihrer Seitenwände angeordnet, wobei jeweils zwei mit Seilen befestigte Schwimmkästen einander gegenüberliegen (Abb. 5). In diesem Zustand befindet sich der Boden der Barke (Lattkahn) oberhalb und entfernt von den unteren Verbindungsmitteln 10, mit denen jeder Schwimmkasten ausgerüstet ist. Die Barke 2 (Lastkahn 2) wird ausreichend mit Ballast versehen (Abb. 4) bis die zugehörigen Verbindungsmittel ihres Bodens in die unteren Verbindungsmittel 10 der Schwimmkasten eingreifen. Daraufhin werden die oberen Befestigungsmittel 11 angebracht um die Verbindung der Schwimmkästen mit dem Bordrand der Barke (Lastkahn) herzustellen, sodaß die genannten Schwimmkästen mit der erwähnten Barke (Lastkahn) zu einer starren Einheit ztxs ammenge fügt sind;the floating box 6 alongside the barge 2 (barge 2) and brought to Maintaining the balance at the appropriate points on their side walls arranged, with two floating boxes attached with ropes facing each other (Fig. 5). In this condition is the bottom of the barge (barge) above and away from the lower connecting means 10 with which each floating box is equipped. The barge 2 (barge 2) is provided with sufficient ballast (Fig. 4) until the associated connecting means their bottom in the lower connecting means 10 of the swimming pool intervention. Then the upper fastening means 11 are attached to the connection of the floating boxes with the board edge of the Barke (barge) to produce so that the mentioned floating boxes with the mentioned barge (barge) to a rigid unit ztxs am quantity adds are;

- mit Hilfe des Kranes 5 werden sodann die Kletterhubvorrichtungen 7 auf> den oberen Flächen der Schwimmkästen 6 befestigt (Abu. 5 u. 6), die Säulen 8 werden, nacheinander- With the aid of the crane 5, the climbing lifting devices 7 are then attached to> the upper surfaces of the floating boxes 6 (Abu. 5 and 6), the columns 8 are, one after the other

auf jeder Seite der Barke2(Lastkahn 2) eingebracht (Abb. 7) wobei, Zo soweit erforderlich, die Schwimmkästen 6 wahlweise mit Ballast zu versehen sind, um die transversale Bordebene während dieses Vorganges weitgehend an der Horizontalen zu halten.Nach dem Einsetzen einer Slüle wird diese durch Betätigung der zugehörigen Kletterhubvorrichtung in ihrer oberen Lage festgehalten;placed on each side of Barke2 (Barge 2) (Fig. 7) where, Zo, the floating boxes 6 are as necessary to optionally provided with ballast to the transverse board level during this process largely to the horizontal to halten.Nach inserting a Slüle this is held in its upper position by actuating the associated climbing lifting device;

Ζζ - die nunmehr mit den Schwimmkästen 6, den Kletterhubvorrichtungen 7 und den Säulen 8 (Abb. 7) ausgerüstete Barke 2 (Lastkahn 2) ist somit beladebereit; Sie wird senkrecht zum Kai 12 und gegen diesen gefahren (Abb. 8). Mittels der Hubvorrichtungen 7 werden die Säulen 8 abgesenkt, bis sie mit ihrem unteren Ende auf dem Grund aufsitzen. Die Barke 2 (Lastkahn 2) und, soweit erforderlich auch die Schwimmkasten 6 werden mit Ballast versehen, um die Säulen 8 vorzubelasten. Diese Vorbelastung muß zumindest dem Maximalgewicht des zu verladenden Teiles 1 entsprechen. Durch Betätigung der KIetterhubvorriohtungen 7» die sioh an den genannten Säulen ÄT emporarbeiten und mit Hilfe der Schwimmkasten 6 wird die Barke 2 (Lastkahn 2) angehoben, bis eich ihr innerer Boden 13 in Höhe der verlängerten Ebene des Verladekais 12 befindet; Ζζ - the barge 2 (barge 2), which is now equipped with the floating boxes 6, the climbing lifting devices 7 and the columns 8 (Fig. 7), is thus ready for loading; It is driven perpendicular to quay 12 and against it (Fig. 8). By means of the lifting devices 7, the columns 8 are lowered until they sit with their lower end on the ground. The barge 2 (barge 2) and, if necessary, the floating boxes 6 are provided with ballast in order to preload the columns 8. This preload must at least correspond to the maximum weight of the part 1 to be loaded. By actuating the KIetterhubvorriohtungen 7 »which work up on the named columns and with the help of the floating box 6, the barge 2 (barge 2) is raised until its inner floor 13 is at the level of the extended level of the loading quay 12;

- nachdem der Ballast der Barke 2 (Lastkahn 2) und gegebenenfalls der Schwimmkörper 6 entfernt worden ist, wird das Teil 1- After the ballast of the bark 2 (barge 2) and possibly the floating body 6 has been removed, the part 1

*K) zum Beispiel mit Hilfe von Rollwagen 14, die sich auf einer am Kai befestigten Rollbahn bewegen, zu der am Ende der Barke (Lastkahn) <* K) for example with the help of trolleys 14, which are located on one on the quay move paved taxiway to the one at the end of the barge (barge) <

309836/0916309836/0916

"befindlichen, durch Entfernung der Tür freigegebenen Öffnung vorgebracht. Mit Hilfe der Hubvorrichtungen 7» deren Typ ein schrittweises Klettern zxim Beispiel durch pneumatische, die Säulen umfassende Manschetten ermöglicht, wird die Barke (Lastkahn) auf ihrer Ladehöhe gehalten. Die Rollwagen 14 befördern das Teil 1^iS in die"located opening released by removing the door. With the help of the lifting devices 7, the type of which is a step-by-step climbing, for example through pneumatic ones, encompassing the columns Enables cuffs, the barge (barge) is held at its loading height. The trolleys 14 convey the part 1 ^ iS in the

Barke 2 (Lastkahn 2). Zwischen dem Boden der letztgenannten und dem erwähnten Teil 1 werden Hubpressen eingebracht, die ein Zurückziehen der Rollwagen 14 und ihren Ersatz durch Unterlagklötze ermöglichen. Diese Hubpressen werden ihrerseits entfernt und die -to wasserdichte Tür 3 verschlossen;Barge 2 (barge 2). Between the bottom of the last-mentioned and the mentioned part 1, lifting presses are introduced, which allow the trolleys 14 to be withdrawn and replaced by washer blocks. These lifting presses are in turn removed and the -to watertight door 3 closed;

- nach Beendigung des Ladevorganges werden die Hubvorrichtungen 7 erneut betätigt, diesmal um die Barke 2 (Lastkahn 2) in ihre Schwimmposition abzusenken und die Säulen 8 in ihre obere Lage hochzufahren;- After completion of the loading process, the lifting devices 7 are operated again, this time around the barge 2 (barge 2) in their Lower the swimming position and the columns 8 in their upper position boot up;

AS - anschließend werden die Säulen nacheinander mit Hilfe des AS - then the columns are successively moved with the help of the

Kranes 5 herausgezogen, wobei die Schwimmkästen 6 zur Wahrung der Horizontalen wahlweise mit Ballast zu versehen sind. Die Hubvorrichtungen 7 werden abmontiert, die oberen Befestigungsmittel 11 entriegelt und die Verbindungsseile zwischen den Schwimmkästen 6 ent- Zo fernt. Die Schwimmkasten werden zum Lösen der unrealen Verbindungsmittel 10 mit Ballast versehen und von der beladenen Barke (Lastkahn) entfernt. Anschließend wird der Ballast entfernt und die Schwimmkasten für den Transport aneinandergekoppelt.Crane 5 pulled out, the floating boxes 6 to be optionally provided with ballast to maintain the horizontal. The lifting devices 7 are removed, the upper attachment means 11 is unlocked and the connecting ropes corresponds between the caissons 6 Zo removed. To release the unreal connection means 10, the floating boxes are ballasted and removed from the loaded barge (barge). The ballast is then removed and the floating boxes are coupled together for transport.

Die Erfindung ist nicht auf die vorhergehend im Detail *G beschriebene Ausführungsart begrenzt, weil an ihr verschiedene Änderungen möglich sind, ohne daß dadurch der Rahmen der Erfindung· verlassen wird.The invention is not limited to the above in detail * G described embodiment, as are possible to various changes without limiting the scope of the invention · is exited.

Das Verfahren nach der Erfindung ist anwendbar für die Portbewegung sehr schwerer und sperriger Ladben unter Benutzung der SO See- und Wasserwege.The method according to the invention is applicable to the port movement of very heavy and bulky cargo using the SO sea and waterways.

30 9836/Or *30 9836 / Or *

Claims (6)

1. Verfahren zur Erleichterung des Verladens von wenigstens einer sehr schweren, sperrigen Last auf eine schwimmende B-rke (Lastkahn), mit der Engstellen wie Schleusen zu durchfa^hren sind, dadurch gekennzeichnet, daß bei der vorzugsweise senkrecht zum Terladekai angelegten Barke (Lastkahn) an den Längsseiten paarweise gegenüberliegende Schwimmkasten angeordnet werden, von denen jeder mit mindestens einer in vertikaler Richtung verschieblichen Säule versehen ist, die in Bezug auf den zugehörigen Schwimmkasten unverrückbar festgesetzt werden kann, wobei das untere Ende der genannten1. Procedure to facilitate the loading of at least a very heavy, bulky load on a floating barge, with which bottlenecks such as locks are to be passed through, characterized in that the preferably perpendicular to the Terladekai moored barge (barge) on the long sides in pairs opposing swimming boxes are arranged, each of which is provided with at least one vertically displaceable column, which is immovable in relation to the associated floating box can be fixed, the lower end of the said JO Säulmauf Grund zu setzen sind und anschließend die Schwimmkästen mit der von ihnen getragenen Barke (Lastkahn) solange angehoben werden, bis der innere Boden der Barke (Lastkahn) in.Höhe der verlängerten Ebene des Verladekais liegt, auf dem sich die zu verschiffende Last befindet. JO column are to be placed on the ground and then the floating boxes with the barge (barge) they carry are raised until the inner floor of the barge (barge) is at the level of the extended level of the loading quay on which the load to be shipped is located . as as 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß2. The method according to claim 1, characterized in that die Barke (Lastkahn) mit Ballast versehen wird, um sie mit dem unteren Ende der Schwimmkasten zu verbinden, wobei anschließend deren oberes Ende am Bordrand ieseSarke (Lastkahn) befestigt wird. the barge (barge) is ballasted in order to connect it to the lower end of the floating box, the upper end of which is then attached to the edge of the board of this sark (barge). 3* Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Schwimmkästen beim Einsetzen der Säulen wahlweise mit Ballast versehen werden, um die transversale Bordebene der Barke (Laatkah) weitgehend in der Horizontalen zu halten.3 * method according to claim 1, characterized in that that the floating boxes optionally with ballast when inserting the columns be provided to the transversal board level of the barque (Laatkah) to be kept largely horizontal. 4· Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Barke (Lastkahn) mit Ballast versehen und mit den Schwimm-4. The method according to claim 1, characterized in that that the barge (barge) is provided with ballast and with the floating *5 kästen an den Säulen hochgehoben wird, um die letztgenannten vorzubelasten. * 5 boxes are lifted up on the pillars to preload the latter. 5· Verfahren nach Anspruch 4, dadurch gekennzeichnet, daß auch die Schwimmkasten mit Ballast versehen werden.5. The method according to claim 4, characterized in that that the floating boxes are also provided with ballast. 6. Verfahren nach Anspruch 1, dadurch gekennzeichnet,6. The method according to claim 1, characterized in that SO daß die gegenseitige, vertikale Verschiebung zwischen den Schwimmkasten und den Säulen mit Hilfe von schrittweise kletternden Hubvorrichtungen bewirkt Wird.SO that the mutual, vertical displacement between the floating boxes and the columns with the help of step-by-step climbing lifting devices is effected. 309836/0916309836/0916
DE19732308847 1972-03-01 1973-02-22 METHOD OF LOADING A BARK (BARGE) Pending DE2308847A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR7207116A FR2174374A5 (en) 1972-03-01 1972-03-01

Publications (1)

Publication Number Publication Date
DE2308847A1 true DE2308847A1 (en) 1973-09-06

Family

ID=9094413

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19732308847 Pending DE2308847A1 (en) 1972-03-01 1973-02-22 METHOD OF LOADING A BARK (BARGE)

Country Status (4)

Country Link
BE (1) BE795606A (en)
DE (1) DE2308847A1 (en)
FR (1) FR2174374A5 (en)
NL (1) NL7302738A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE7416293L (en) * 1974-12-27 1976-06-28 Goetaverken Ab FOR TRANSFER OF HEAVY LOADS INTENDED PRAM
JPS5880430U (en) * 1981-11-25 1983-05-31 日立造船株式会社 Work boat for installing large offshore structures

Also Published As

Publication number Publication date
BE795606A (en) 1973-06-18
NL7302738A (en) 1973-09-04
FR2174374A5 (en) 1973-10-12

Similar Documents

Publication Publication Date Title
DE60126984T2 (en) METHOD AND DEVICE FOR ARRANGING AT LEAST ONE WIND TURBINE ON OPEN WATER
DE3605161A1 (en) METHOD FOR BUILDING THE TOP OF AN OFFSHORE PLATFORM
DE1948985A1 (en) Prefabricated building part and process for its manufacture
DE2451406C3 (en) Transport ship for floating tanks
DE1258888B (en) Method for the production of multi-span bridges od. Like. And device for this
DE2725060A1 (en) Amphibious cargo pontoon, partic. for containers - comprises dismantlable units rigidly coupled by dumb=bell keys
DE1634585A1 (en) System that can be set up on water surfaces
DE2236831A1 (en) LOAD-BEARING FLOATING CONSTRUCTION
EP3428345A1 (en) Foundation for an offshore wind motor
DE2726407A1 (en) METHOD FOR INPUT AND DEPLOYMENT OF HEAVY OBJECTS INTO OR FROM A SHIP, AND DEVICE FOR CARRYING OUT THIS PROCEDURE
DE2700624A1 (en) DOCKING SYSTEM
DE60101160T2 (en) CONVEYOR SYSTEM FOR LOADS
DE2532775A1 (en) FLOAT FOUNDATION IN THE FORM OF A RIVER AND PROCESS FOR ITS MANUFACTURING AND ASSOCIATION WITH A TOWER CONSTRUCTION
DE2457536A1 (en) Offshore drilling platform - vertically floatable to site with foundation (legs), tanks and platform
DE913784C (en) Platform arrangement for water and land use
DE3140469C2 (en)
DE2308847A1 (en) METHOD OF LOADING A BARK (BARGE)
DE102010019492A1 (en) Method for providing a lifting device on a platform
DE2458694A1 (en) SINGLE POINT ANCHORING DEVICE AND METHOD FOR MAKING IT OPERATIONAL
DE2042868A1 (en)
EP1162136B1 (en) Floating pontoon
DE1506334A1 (en) Set up with a lifting, transport or bridging platform
DE1556954C3 (en) Ferry for transfer traffic and the formation of floating bridges
DE2052319A1 (en) Method and device for loading and unloading heavy goods, in particular on inland vessels
DE2352377C2 (en) Manufacturing plant for prefabricated building elements arranged on a floating construction

Legal Events

Date Code Title Description
OHA Expiration of time for request for examination