DE2233400A1 - PREFABRICATED COMPONENTS FOR CREATING WALLS IN THE SOIL - Google Patents

PREFABRICATED COMPONENTS FOR CREATING WALLS IN THE SOIL

Info

Publication number
DE2233400A1
DE2233400A1 DE2233400A DE2233400A DE2233400A1 DE 2233400 A1 DE2233400 A1 DE 2233400A1 DE 2233400 A DE2233400 A DE 2233400A DE 2233400 A DE2233400 A DE 2233400A DE 2233400 A1 DE2233400 A1 DE 2233400A1
Authority
DE
Germany
Prior art keywords
components
locking element
component
prefabricated
walls
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE2233400A
Other languages
German (de)
Other versions
DE2233400C2 (en
Inventor
Pierre Seguy
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SIF ENTREPRISE
Original Assignee
SIF ENTREPRISE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SIF ENTREPRISE filed Critical SIF ENTREPRISE
Publication of DE2233400A1 publication Critical patent/DE2233400A1/en
Application granted granted Critical
Publication of DE2233400C2 publication Critical patent/DE2233400C2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • E02D5/12Locking forms; Edge joints; Pile crossings; Branch pieces

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Revetment (AREA)

Description

Dipl.-ing. WILFRID RAECKDipl.-ing. WILFRID RAECK

PATENTANWALTPATENT ADVOCATE

7 STUTTGART!, MOSERSTRASSE 8 . TELEFON (0711) 244005-22334007 STUTTGART !, MOSERSTRASSE 8. TELEPHONE (0711) 244005-2233400

6. Juli 1972 / k - S 68 -July 6, 1972 / k - S 68 -

SOiNiDAGES INJECTIONS FORAGES "S. I.F." ENTREPRISE BACHY, 11, Avenue .du Colonel-Bonnet, 75 Paris / FrankreichSOiNiDAGES INJECTIONS FORAGES "S. I.F." ENTREPRISE BACHY, 11, avenue du Colonel-Bonnet, 75 Paris / France

Vorgefertigte Bauelemente zur Erstellung von Wänden im ErdreichPrefabricated components for creating walls in the ground

Es ist bekannt, Wände im Erdreich mit Hilfe vorgefertigter Bauelemente herzustellen, die im wesentlichen die Form eines Parallelepipeds oder einer Tafel besitzen und die man in eine zuvor in den Boden eingebrachte Ausschachtung einsetzt und einerseits mit Hilfe einer Zementmischung oder unter Verwendung eines Betonsockels an das Erdreich anschließt und andererseits untereinander mit Hilfe von ' Einrichtungen verbindet, die von der Art der verwendeten Bauelemente,abhängen. Die Herstellung solcher Wände im Boden erfolgt insbesondere dort, wo eine Oberfläche der Wand später freigelegt werden soll, d.h. wo die Wand als Abstützung oder zum Schutz einer Baugrube dient.It is known to produce walls in the ground with the help of prefabricated components, which essentially the shape of a parallelepiped or a slab and which can be found in an excavation previously made in the ground begins and on the one hand with the help of a cement mixture or using a concrete base to the ground and on the other hand with each other with the help of ' Connects facilities that depend on the type of components used. The manufacture of such walls in the Soil takes place in particular where a surface of the wall is to be exposed later, i.e. where the wall as Is used to support or protect a construction pit.

Bei der Anwendung vorgefertigter Bauelemente zur Herstellung einer Wand innerhalb dss Erdreiches besteht eine der grundlegenden Schwierigkeiten darin, die Bauelemente nacheinander in der Ausschachtung zu positionieren, denn es ist in derWhen using prefabricated structural elements to create a wall within the ground, there is one of the most fundamental Difficulty in positioning the components one after the other in the excavation because it is in the

209883/0109209883/0109

Tat unbedingt erforderlich, die gegenseitige Ausrichtung genau und auch wirtschaftlich durchzuführen.It was absolutely essential to carry out the mutual alignment precisely and economically.

Die Anwendung von Vorrichtungen, die im Prinzip den Verschlüssen zum Verklammern von Spundbohlen entsprechen, erscheint für diese Aufgabe unzweckmäßig, da Gewicht und Abmessungen der vorgefertigten Bauelemente die Anwendung solcher Vorrichtungen schwierig und kostspielig machen würden.The use of devices, which in principle correspond to the fasteners for clamping sheet piles, appears inexpedient for this task, since the weight and dimensions of the prefabricated components make the application would make such devices difficult and costly.

In der französischen Patentschrift 1 586 267 ist vorgeschlagen, vorgefertigte Bauelemente, die an ihren Stirnseiten Einschnitte oder Nuten enthalten, mit Hilfe von senkrechten Stützen zu führen und eine gegenseitige Führung zwischen einem aufzustellenden Bauelement und einem bereits an Ort und Stelle befindlichen Bauelement zu bewerkstelligen, indem man vorgefertigte Bauelemente mit Ausfalzungen oder Zusatzprofilen, an ihren seitlichen Enden verwendet. Die Erfahrung zeigt jedoch, daß allein mit Hilfe solcher Einrichtungen keine Sicherheit dafür gegeben ist, daß zwei aufeinanderfolgende Bauelemente kein gegenseitiger Versatz entsteht. Im übrigen ist es unter Berücksichtigung der Tatsache, daß die verwendeten vorgefertigten Bauelemente im allgemeinen eine große Höhe besitzen, sehr schwierig, von der Oberfläche aus die Positionierung des Elementes in der Tiefe mit einfachen und schnell einsetzbaren Einrichtungen herzustellen und somit auch eine Fehlausfluchtung festzustellen. Es handelt sich dabei um echte Schwierigkeiten, da jeglicher Versatz die Qualität des Gesamtbauwerkes infrage stellen kann.In the French patent 1 586 267 it is proposed that prefabricated components, which on their end faces Incisions or grooves contain, with the help of vertical supports to guide and a mutual guide between one component to be erected and one already on site and place located building element to accomplish by prefabricated building elements with rabbets or additional profiles, used at their lateral ends. Experience shows, however, that with the help of such facilities alone none It is certain that two successive components will not be offset against one another. Furthermore it is taking into account the fact that the prefabricated building elements used are generally a large one It is very difficult to position the element in depth from the surface with simple and to produce quickly deployable devices and thus detect misalignment. It is about real difficulties, since any misalignment can call into question the quality of the entire structure.

Der Erfindung liegt die Aufgabe zugrunde, Maßnahmen anzugeben, um aneinander anzuschließende vorgefertigte Bauelemente genau an Ort und Stelle einsetzen und positionieren zu können, nach dem einmal das erste Bauelement exakt aufgestellt worden ist.The invention is based on the object of specifying measures for precisely connecting prefabricated components to be able to use and position on the spot after the first component has been set up exactly.

209883/010 9"209883/010 9 "

Lösung dieser Aufgabe enthält jedes vorgefertigte Bauelement nach der Erfindung im unteren Bereich einer seiner Seitenwände ein positives Riege!element und im unteren Bereich der gegenüberliegenden Seitenwand ein negatives liiegelelement, wobei beide Riegelelemente derart ausgebildet sind, daß das positive Riegelelement eines vorgefertigten Bauelementes um das negative Riegelelement eines anderen vorgefertigten Bauelementes verschwenkbar ist.Solution to this problem contains each prefabricated component according to the invention in the lower area of one of its Side walls a positive Riegel! Element and in the lower Area of the opposite side wall a negative liiegelelement, both locking elements formed in this way are that the positive locking element of a prefabricated component to the negative locking element of a other prefabricated component is pivotable.

Vorteilhafterweise können die vorgefertigten Bauelemente außerdem an ihren Seitenwänden mit Einrichtungen versehen sein, welche die Führung des Bauelementes beim Einbringen in die Ausschachtung im Erdreich vereinfachen.Advantageously, the prefabricated components also be provided on their side walls with devices that guide the component when it is introduced simplify the excavation in the ground.

Die Erfindung ist nachfolgend anhand in der Zeichnung dargestellter Ausführungsbeispiele näher erläutert. Es ZeigtThe invention is illustrated below with reference to the drawing Embodiments explained in more detail. It shows

Fig. 1 eine Äusführungsform für vorgefertigte Bauelemente nach der Erfindung in einer Teilansicht von unten,Fig. 1 shows an embodiment for prefabricated components according to the invention in a partial view from below,

Fig. 2 einen Teilschnitt nach der Linie II-II in Fig. 1>Fig. 2 is a partial section along the line II-II in Fig. 1>

Fig. 3 eine andere Ausfuhrungsform vorgefertigter Bauelemente nach der Erfindung in einer Teilansicht von unten und3 shows another embodiment of prefabricated components according to the invention in a partial view from below and

Fig* 4 einen Teilsehnitt nach der Linie IV-IV in Fig. 3.FIG. 4 shows a partial section along the line IV-IV in FIG. 3.

Entsprechend Fig. 1 und 2 sind Teile der Bödenbereiche zweier vorgefertigter Bauelemente la und Ib nach der Erfindung gezeigt, bevor sie aneinander angefügt und gegenein1-ander ausgerichtet sind. Die Bauelemente -enthalten in an sich bekannter Weise in ihren senkrechten Stirnwänden senkrechte Nuten 2a und 2b. Aufgrund der konkaven Ausbildung der Stirnwände handelt es sich somit um beiderseits genutete Bauelemente. Die Bauelemente la'und Ib enthalten außerdem beispielsweise im unteren Bereich oder an £er Basis ihrer in der Figur rechten Stirnwand einen Querzapfen 3, der dasAccordingly, FIGS. 1 and 2, parts of the bottoms ranges of two prefabricated components la and Ib shown according to the invention before they are added together and gegenein 1 -ander aligned. The components contain, in a manner known per se, vertical grooves 2a and 2b in their vertical end walls. Due to the concave design of the end walls, there are components that are grooved on both sides. The components 1 a 'and 1 b also contain, for example, in the lower area or at the base of their end wall on the right in the figure, a transverse pin 3, which

209883/ 0 109209883/0 109

negative Riegelelement bildet, und an ihrer linken Stirnwand einen C>uerzapfen 4, auf dem ein metallischer Haken 5 gehaltert ist/ der am Boden der Rinne oder Nut 2b anliegt und das positive Riegelelement bildet.negative locking element, and on its left end wall a C> uerzapfen 4, on which a metallic hook 5 is held / which rests on the bottom of the channel or groove 2b and forms the positive locking element.

Die gegenseitige Ausrichtung solcher Bauelemente in der Ausschachtung für eine Wand kann wie folgt durchgeführt werden:The mutual alignment of such components in the excavation for a wall can be carried out as follows will:

Es sei angenommen, daß sich das Bauelement la bereits in der Ausschachtung an Ort und Stelle befindet; es kann sich dabei um das erste Bauelement einer zu einer Wand zu vereinigenden Folge handeln oder um ein zuvor ausgerichtetes Bauelement. Das Bauelement Ib wird an ein Hebezeug angehängt und seitlich neben dem Bauelement la so ausgerichtet, daß der Haken 5 in die Nut 2a des Bauelementes la eingreift und am Grund dieser Nut mit Reibung anliegt. Dazu ist es notwendig, daß der Haken 5 aus dem Bauelement Ib über eine Länge vorsteht, die etwas größer ist als die Tiefe der Nut 2a. Anschließend läßt man das Bauelement Ib in die Ausschachtung ab, wobei der Haken 5 und die Nut 2a zusammenwirken, um das Bauelement bei der Ablaßbewegung zu führen. Falls erforderlich, kann man die Anlagekraft des Hakens 5 auf dem Boden der Nut 2a dadurch verstellen, daß man den Aufhängungspunkt des Bauelementes Ib etwas aus der Mitte nimmt und dies mit seinem "Fuß" etwas gegen das Bauelement la verschwenkt, und/oder indem man die STellung des Hebezeuges derart verändert, daß das Bauelement Ib mit einem gewissen Moment gegen das Bauelement la angedrückt wird. Das Bauelement Ib wird soweit abgelassen, bis der Haken 5 sich über den Zapfen 3 gelegt hat. Anschließend reicht es aus, das Element Ib mit dem Element la an der Oberfläche auszufluchten und es zu diesem Zweck um den Zapfen 3 zu verschwenken. Man geht in der gleichen Weise vor, um die folgenden Bauelemente in die Ausschachtung einzubringen.It is assumed that the component la is already in place in the excavation; it can act around the first component of a sequence to be combined to form a wall or a previously aligned one Component. The component Ib is attached to a hoist and aligned laterally next to the component la so that that the hook 5 engages in the groove 2a of the component la and rests against the base of this groove with friction. For this it is necessary that the hook 5 protrudes from the component Ib over a length which is slightly greater than the depth of the groove 2a. Subsequently, the component Ib is lowered into the excavation, the hook 5 and the groove 2a cooperating in order to achieve the To guide the component in the discharge movement. If necessary, you can apply the force of the hook 5 on the ground adjust the groove 2a by taking the suspension point of the component Ib slightly from the center and this with his "foot" slightly pivoted against the component la, and / or by changing the position of the hoist in such a way, that the component Ib is pressed against the component la with a certain moment. The component Ib is Lowered until the hook 5 has placed itself over the pin 3. Then it is sufficient to use the element Ib align the element la on the surface and pivot it about the pin 3 for this purpose. One goes in proceed in the same way to insert the following components into the excavation.

2 09883/01092 09883/0109

Selbstverständlich, kann man auch einen Haken 5 verwenden, der aus dem Bauelement Ib über eine Länge vorsteht, die gleich oder etwas kleiner ist als die Tiefe der Nut 2a, wobei man dieses Bauelement senkrecht absenkt und ein bestimmtes Spiel zwischen den Bauelementen la und Ib beläßt, so daß der Haken 5 das Bauelement während seiner Absenkbewegung durch Berührung an den Seitenwänden der Nut 2a führt. Das Spiel zwischen den Bauelementen ist im oberen Abschnitt des Bauwerkes einstellbar oder mit Merkzeichen versehen, so daß man den Fortgang des Einbringens des Bauelementes genau verfolgen kann.Of course, you can also use a hook 5, which protrudes from the component Ib over a length that is equal to or slightly smaller than the depth of the groove 2a, this component being lowered vertically and a certain Game between the components la and Ib leaves, so that the hook 5, the component during its lowering movement by touching the side walls of the groove 2a. The play between the components is in the upper part Section of the structure adjustable or marked so that you can see the progress of the introduction of the component can track closely.

Auch andere Methoden zum Positionieren der vorgefertigten Bauelemente nach der Erfindung sind möglich., so daß die Erfindung nicht auf die beiden nur zur Erläuterung vorbeschriebenen Ausfluchtungsmethoden beschränkt ist.Other methods of positioning the prefabricated components according to the invention are also possible, so that the Invention not to the two just described above for explanation Alignment methods is limited.

Die Zapfen 3 und 4 können abnehmbar sein, so daß man nach Belieben ein negatives Verriegelungselement in ein positives Verriegelungselement umwandeln kann> indem man auf den jeweiligen Zapfen einen Haken 5 aufsetzt.. Auf diese Weise ist es möglich, die Art des Verriegelungselementes ,erst endgültig beim Einbringen und Versetzen der vorgefertigten Bauelemente zu bestimmen., und zwar in Abhängigkeit vom Fortgang der Arbeiten, die entsprechend Fig. 1 und 2 von links nach rechts weitergeführt werden.The pins 3 and 4 can be detachable so that a negative locking element can be turned into a positive one at will Can convert locking element> by placing a hook 5 on the respective pin .. On this Way, it is possible to change the type of locking element only when the prefabricated one is introduced and moved To determine components., Depending on the progress of the work, which according to FIG. 1 and 2 are continued from left to right.

Die Verankerungsstelle an der Basis der vorgefertigten Bauelemente macht es außerdem möglich, in den beschränkten -Raum zwischen den beiden Nuten 2a und 2b entweder ein zusätzliches Abdichtelement (bekannt unter der Handelsbezeichnung "water stop") aus Kautschuk, Kunststoff oder Metall einzusetzen, aas mit einer in die Ausschachtung eingebrachten Zementbrühe eingebunden wird, oder einen Federkeil (Paßfeder) aus beton, armiertem Beton oder Metall-, um die. Verbindung zwischen zv/ei benachbarten vorgefertigten Bauelementen zu verstärken..The anchoring point at the base of the prefabricated structural elements also makes it possible to use either an additional space between the two grooves 2a and 2b in the restricted space Use sealing element (known under the trade name "water stop") made of rubber, plastic or metal, aas is tied into the excavation with a cement broth, or a spring wedge (feather key) made of concrete, reinforced concrete or metal to the. link to be reinforced between zv / ei neighboring prefabricated structural elements.

S 68 - 6 -S 68 - 6 -

Das gleiche Verankerungs- und Verbindungsprinzip kann auch bei vorgefertigten Bauelementen zur Anwendung kommen, die an einer Stirnwand ein vorstehendes bzw. Federprofil und an der gegenüberliegenden Stirnwand ein Nutprofil besitzen. Ein derartiges Ausführungsbeispiel ist in Fig. 3 und 4 dargestellt. In diesem Fall besitzen die vorgefertigten Bauelemente 10a, 10b in an sich bekannter Weise z.B. an ihrer rechten Stirnwand (entsprechend der Figur) ein liutprofil 11 und z.B. an ihrer linken Stirnwand ein Federprofil 12. Die Bauelemente 10a, 10b enthalten ferner im unteren Bereich aer rechten Stirnwand einen Zapfen 13, der ein negatives Verriegelungselement bildet, und am unteren Ende der linken Stirnwand einen angeformten Haken 14, der sich unterhalb des Federprofils 12 befindet, das dort unterbrochen ist, um den notwendigen Platz für den Haken 14 zu lassen.The same anchoring and connection principle can also be used for prefabricated components that have a protruding or tongue profile on one end wall and a groove profile on the opposite end wall. Such an embodiment is shown in FIGS. In this case, they own the prefabricated components 10a, 10b in a manner known per se, e.g. on their right end wall (according to the figure) a line profile 11 and, for example, a tongue profile 12 on its left end wall. The components 10a, 10b also contain in the lower area aer the right end wall a pin 13, which forms a negative locking element, and at the lower end of the left End wall an integrally formed hook 14, which is located below the spring profile 12, which is interrupted there to to leave the necessary space for the hook 14.

Die gegenseitige Ausrichtung und das Aneinanderfügen der Bauelemente kann in der gleichen Weise erfolgen wie dies im Zusammenhang mit Fig. 1 und 2 beschrieben ist. Das Vorhandensein eines Fixpunktes für die Verankerung und für das Verschwenken beider vorgefertigter Bauelemente in ihrem Bodenbereich ermöglicht es, in gleicher Weise wie bei den vorgefertigten Platten mit beiderseitigem Nutprofil, eine zusätzliche Abdichteinrichtung anzuordnen, um die Verbindung zwischen den beiden Bauelementen auch hinsichtlich der Abdichtung zu vervollkommnen.The mutual alignment and joining of the components can be done in the same way as this in connection with FIGS. 1 and 2 is described. The presence of a fixed point for anchoring and for the pivoting of the two prefabricated components in their bottom area makes it possible in the same way as with the Prefabricated panels with a groove profile on both sides to arrange an additional sealing device to make the connection between the two components to perfect the seal.

Zu diesem Zweck kann man am Grund des Nutprofils eine Dichtung aus Kautschuk, Kunststoff oder einem anderen verformbaren iVLaterial vorsehen, die gegebenenfalls mit dem entsprechenden Bauelement fest verbunden ist. Die Dichtung wird anschließend durch das Federprofil im Boden der Nut .zusammengexirückt, nachdem das nachfolgende Bauelement durch Verschwenkung um den unteren Fixpunkt in der Ebene der Wand in seine endgültige Fluchtstellung hineingedreht worden ist, so .daß die Mxälnht- For this purpose, a seal made of rubber, plastic or another deformable iV material can be provided at the base of the groove profile, which seal is optionally firmly connected to the corresponding component. The seal is then .zonggexirrückt by the tongue profile in the bottom of the groove, after the following component has been rotated into its final alignment position by pivoting around the lower fixed point in the plane of the wall, so .that the Mxälnht-

2 0 9 ;^ 8 3/010 9 ~y~ 2 0 9; ^ 8 3/010 9 ~ y ~

wirkung der bereits durch Vergaßen entstehenden Verbindung erhöht wird.effect of the connection already created by forgetting is increased.

Diese Ausführungsmethode dient nur als Beispiel und kann weitgehend abgeändert, insbesondere durch gleichwirkende Mittel ersetzt werden. Das vorbeschriebene Verankerungsprinzip der Vorgefertigten Bauelemente kann auch bei
Elementen anderer Formen angewendet werden, da der Grundgedanke darin besteht f zur Verstellung der Lage eines
vorgefertigten Bauelementes während des Ausrichtungsvorganges einen Festpunkt für eine Schwenkbewegung vorzusehen, der sich am Grund des zuvor an Ort und Stelle gebrachten Bauelementes befindet.
This method of execution serves only as an example and can be largely modified, in particular replaced by means with the same effect. The anchoring principle of the prefabricated components described above can also be used with
Elements of other shapes are used, since the basic idea is to adjust the position of a f
prefabricated component to provide a fixed point for a pivoting movement during the alignment process, which is located at the bottom of the component previously put in place.

2 0 9 8 8 3/0-TO 92 0 9 8 8 3/0-TO 9

Claims (4)

Dipl.-ING. WILFRID RAECKDipl.-ING. WILFRID RAECK PATENTANWALT
7 STUTTGART 1, MOSERSTRASSE 8 · TELEFON (0711) 244003 2233400
PATENT ADVOCATE
7 STUTTGART 1, MOSERSTRASSE 8 TELEPHONE (0711) 244003 2233400
SONDAGES INJECTIONS FORAGES Q SONDAGES INJECTIONS FORAGES Q "S.I.F." ENTREPRISE BACHY*"S.I.F." ENTREPRISE BACHY * Paris / Frankreich 6. Juli 1972Paris / France July 6, 1972 - S 68 Patentansprüche - S 68 patent claims Vorgefertigte Bauelemente, insbesondere zur Erstellung
von Wänden im Erdreich, die im wesentlichen die Form eines Parallelepipeds aufweisen, dadurch gekennzeichnet, daß die Bauelemente (la, Ib, 10a, 1Ob)' im unteren Bereich einer ihrer Stirnwände mit einem negativen Riegelelement (3;13) und im unteren Bereich der gegenüberliegenden Stirnwand mit einem positiven Riegelelement (5$14) versehen sind, wobei die Riegelelemente derart ausgebildet sind, daß das positve Riegelr element um das negative Riegelelement verschwenkbar ist.
Prefabricated components, in particular for creation
of walls in the ground, which essentially have the shape of a parallelepiped, characterized in that the components (la, Ib, 10a, 10b) 'in the lower region of one of their end walls with a negative locking element (3; 13) and in the lower region of the opposite end wall are provided with a positive locking element (5 $ 14), wherein the locking elements are designed such that the positive locking element is pivotable about the negative locking element.
2. Bauelemente nach Anspruch 1, dadurch gekennzeichnet, daß sie an ihren seitlichen Stirnwänden mit zusätzlichen Profilen (2a,2b;11,12) versehen sind, welche die Führung der Bauelemente beim Ausricht- und einsetzvorgang erleichtern.2. Components according to claim 1, characterized in that they have additional profiles on their side end walls (2a, 2b; 11,12) are provided, which guide the components facilitate the alignment and insertion process. 3. Bauelemente nach Anspruch 2, dadurch gekennzeichnet, daß bei an sich bekannter Ausbildung der Bauelemente mit Nut- und Federprofilen im Innern des Nutprofils (11) ein zusätzliches Abdichtelement (15) vorgesehen ist.3. Components according to claim 2, characterized in that with a known design of the components with groove and Tongue profiles in the interior of the groove profile (11) an additional sealing element (15) is provided. 4. Bauelemente nach Anspruch 1, dadurch gekennzeichnet, daß das negative Riegelelement aus einem Querzapfen (3;13) und das positive Riegelelement aus einem Haken (5;14) besteht.4. Components according to claim 1, characterized in that the negative locking element consists of a transverse pin (3; 13) and the positive locking element consists of a hook (5; 14). 209883/0109209883/0109
DE2233400A 1971-07-13 1972-07-07 Connection device for prefabricated structural elements that can be inserted into a trench Expired DE2233400C2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR7125659A FR2145813A5 (en) 1971-07-13 1971-07-13

Publications (2)

Publication Number Publication Date
DE2233400A1 true DE2233400A1 (en) 1973-01-18
DE2233400C2 DE2233400C2 (en) 1983-12-22

Family

ID=9080301

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2233400A Expired DE2233400C2 (en) 1971-07-13 1972-07-07 Connection device for prefabricated structural elements that can be inserted into a trench

Country Status (9)

Country Link
AT (1) AT346775B (en)
AU (1) AU475182B2 (en)
BE (1) BE786175A (en)
CH (1) CH556448A (en)
DE (1) DE2233400C2 (en)
FR (1) FR2145813A5 (en)
GB (1) GB1378542A (en)
NL (1) NL167488C (en)
OA (1) OA04132A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2616970A1 (en) * 1976-04-17 1977-10-20 Wayss & Freytag Ag Sectioned trench of reinforced concrete parts - has space between visible faces of finished parts and soil filled with gravel

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2156885A (en) * 1984-03-13 1985-10-16 Watershield Limited Coastline protection
GB2181206B (en) * 1985-10-01 1989-12-20 E C C Quarries Limited Juxtaposed elements
CN106436691A (en) * 2016-10-11 2017-02-22 上海市政工程设计研究总院(集团)有限公司 Prefabricated underground continuous wall vertical assembly method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD3006A (en) *
FR1013864A (en) * 1950-03-06 1952-08-05 Entpr Fougerolle Pour Travaux Process for waterproofing the joints of metal sheet pile curtains and prefabricated concrete or reinforced concrete elements
FR1586267A (en) * 1968-10-07 1970-02-13

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD3006A (en) *
FR1013864A (en) * 1950-03-06 1952-08-05 Entpr Fougerolle Pour Travaux Process for waterproofing the joints of metal sheet pile curtains and prefabricated concrete or reinforced concrete elements
FR1586267A (en) * 1968-10-07 1970-02-13

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2616970A1 (en) * 1976-04-17 1977-10-20 Wayss & Freytag Ag Sectioned trench of reinforced concrete parts - has space between visible faces of finished parts and soil filled with gravel

Also Published As

Publication number Publication date
OA04132A (en) 1979-11-30
AU475182B2 (en) 1976-08-12
NL167488B (en) 1981-07-16
GB1378542A (en) 1974-12-27
AT346775B (en) 1978-11-27
NL167488C (en) 1981-12-16
DE2233400C2 (en) 1983-12-22
AU4377772A (en) 1974-01-03
BE786175A (en) 1973-01-12
ATA600372A (en) 1978-03-15
FR2145813A5 (en) 1973-02-23
NL7208989A (en) 1973-01-16
CH556448A (en) 1974-11-29

Similar Documents

Publication Publication Date Title
DE2229264A1 (en) Method and device for Her put prefabricated houses or other buildings
DE3543958A1 (en) METHOD FOR THE PRODUCTION OF PRESERVED CONCRETE PILLARS AT THE SITE
DE2101084A1 (en) Procedure for erecting a structure
DE2656178A1 (en) DEVICE FOR CONNECTING PONTONS
DE2545572C3 (en) Foundation in subsoil susceptible to subsidence, especially for a dam
DE2167029A1 (en) PROCESS FOR MANUFACTURING CONCRETE STRUCTURES, SUCH AS DITCH FACES MADE OF LIQUID CONCRETE OR SIMILAR
DE3234742C2 (en) Steel chamber for enclosing explosions
DE1955760A1 (en) Building construction element made from prefabricated concrete parts
DE2233400A1 (en) PREFABRICATED COMPONENTS FOR CREATING WALLS IN THE SOIL
DE1947249A1 (en) Foundation or civil engineering structure and process for its production
DE2824562A1 (en) ARTICULATED DEVICE FOR STRENGTHENING THE WALLS OF BUILDING DITCHES, PIPE DITCHES, etc.
DE2645910C2 (en) Formwork for erecting funnel-shaped or conical concrete structures
DE2650292C3 (en) Construction work
EP3696320A1 (en) Bridge abutment with connection between wall reinforcement and wing wall element
DE1684213C3 (en) Buildings with frames made from individual parts
DE2158489C3 (en) Process for the production of a multi-purpose pavilion in prefabricated construction as well as a steel column with an anchoring leg for carrying out the process
DE2752303A1 (en) DOUBLE-SIDED SHAPING WALL
DE2034220A1 (en) Deep foundation processes for structures as well as prefabricated piles to carry out this process
EP1210485A1 (en) Reinforced concrete part for producing foundations of buildings
DE2128548C3 (en) Device for the point-by-point support of prefabricated prestressed concrete slabs. <
DE2332678A1 (en) Wall assembly building building blocks - have pair of right triangular ribs spaced apart on top and vertical ends
DE68902465T2 (en) ENCLOSURE A FINISHING OF A SECTION OF A SLOT WALL.
DE3328003C1 (en) Formwork for concreting walls with a curved surface
DE1813344A1 (en) Device for the production of prefabricated rectangular building blocks
DE3833943C2 (en) Sole shell

Legal Events

Date Code Title Description
OD Request for examination
D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee