DE2220177A1 - TRACK OF A TOY RAILWAY - Google Patents

TRACK OF A TOY RAILWAY

Info

Publication number
DE2220177A1
DE2220177A1 DE19722220177 DE2220177A DE2220177A1 DE 2220177 A1 DE2220177 A1 DE 2220177A1 DE 19722220177 DE19722220177 DE 19722220177 DE 2220177 A DE2220177 A DE 2220177A DE 2220177 A1 DE2220177 A1 DE 2220177A1
Authority
DE
Germany
Prior art keywords
track
rail
section
sleeper body
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19722220177
Other languages
German (de)
Inventor
Franz Neumeister
Helmut Roether
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gebr Maerklin and Cie GmbH
Original Assignee
Gebr Maerklin and Cie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gebr Maerklin and Cie GmbH filed Critical Gebr Maerklin and Cie GmbH
Priority to DE19722220177 priority Critical patent/DE2220177A1/en
Publication of DE2220177A1 publication Critical patent/DE2220177A1/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63HTOYS, e.g. TOPS, DOLLS, HOOPS OR BUILDING BLOCKS
    • A63H19/00Model railways
    • A63H19/30Permanent way; Rails; Rail-joint connections

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Description

Gleisstück einer Spielzeugeisenbahn. Track section of a toy train.

Das Gebrauchsmuster betrifft ein Gleisstück eines Zweifahrschienengleises einer Spielzeugeisenbahn.The utility model relates to a section of a two-rail track a toy train.

Je weiter das Ausbauen einer Spielzeuggleisbahn fortschreitet, umso mehr mehrt sich die Anzahl der Gleisstücktypen. Es werden gerade und krumme Gleisstücke aber auch Weichen, Kreuzungen usw. produziert, um die Fahrstrecke spielreizfPördernderweise variieren zu.The further the development of a toy track progresses, the more so the more the number of track section types increases. The track sections are straight and crooked but also switches, crossings, etc. are produced to promote play stimulating the route vary too.

können. Es werden deshalb auch kurze, kürzere, sehr kurze und extrem kurze Gleisstücke angeboten, um sich beim Zusammenstecken des Gleises ergebende LängendiS-ferenzen ausgleichen zu können, so dass Spannungen im Gleis vermieden werden. Oft sind aber auch schon beim Aufbauen von kleinen Gleisstrecken die Längendifferenzen so winzig klein und doch so ärgerlich gross, dass es im von der Industrie bisher angebotenen Sortiment nichts gibt, was den Wunsch nach Zwischenlängen erfüllt.can. There are therefore also short, shorter, very short and extreme short pieces of track offered to result when the track is put together To be able to compensate for differences in length, so that tension in the track is avoided will. Often, however, there are also differences in length when building small tracks so tiny and yet so annoyingly large that it has been used by the industry so far offered range is nothing that fulfills the desire for intermediate lengths.

Andererseits sind die- äuferwünsche (die Industrie ahnt sie gelegentlich voraus) so stark spezialisiert, dass es sich nicht lohnt, für jede verlangte oder erwartete Zwischengrösse ein spezielles Gleis in eine Mengenfertigung aufzunehmen. Die benötigten engen wären zu klein und die Kosten für die kleinen Mengen zu gross.On the other hand, there are buyers' wishes (the industry occasionally suspects them advance) so highly specialized that it is not worth asking or asking for each expected intermediate size to include a special track in volume production. The required narrow ones would be too small and the costs for the small quantities would be too great.

Logisch ist, dass auch schon die Autgabenstellung alt ist, ein Gleisstück ziehharmonikaähnlich längbar auszugestalten. Dabei dachten aber Aufgabenlösungsversuchende daran, die Ausgleiche wie beim Vorbild mit der Zweiteiligkeit von Schonen, also mit Schienenstossüberlappungen bewerkstelligen zu können.It is logical that the task position is also old, a piece of track to make it elongated like an accordion. At the same time, however, those attempting to solve problems thought about the compensations as in the example with the two-part structure of Skåne, that is to be able to accomplish with rail joint overlaps.

Eine ganz andere, überraschend geniale Lösung der Aufgabe bietet sich jedoch durc-h den erfindungsgemässen Vorschlag an, bei dem alle einzelnen Merkmale an sich bekannt sind, mit eines einzigen Ausnahme, nämlich der des Hauptmerkmales der Kombination folgender Merkmale: 1.) Jede Fahrschiene besteht aus drei sich Jeweils an zwei Enden überlappenden Profil-Fahrschienenstükken, von denen das mittlere und überlappende Fahrschienenstück aus Blech gegenüber dem leiterförmigen Schwellenkörper in der Mitte gegen Verschieben in Fahrtrichtung gesichert ist, die beiden anderen Fahrschienenstücke dagegen im Bereich der Gleisstückkupplung.There is a completely different, surprisingly ingenious solution to the task however, by means of the proposal according to the invention, in which all individual features are known per se, with one exception, namely that of the main feature the combination of the following features: 1.) Each rail consists of three each Profile running rail pieces overlapping at two ends, of which the middle and overlapping piece of sheet metal running rail opposite the ladder-shaped sleeper body in the middle is secured against moving in the direction of travel, the other two Rail sections, on the other hand, in the area of the track section coupling.

2.) Das mittlere und überlappende Fahrschienenstück fasst die beiden anderen Bahrschienenstücke z.B.2.) The middle and overlapping rail section holds the two other pieces of rail e.g.

fast mit seiner ganzen Längen zangenförmig. pincer-shaped almost with its entire length.

3.) Der Schwellenkörper ist im Bereich der mittleren Fahrschienenstücke ziehharmonikabalgähnlich längbar mäanderförmig durchschlitzt.3.) The sleeper body is in the area of the middle track sections Like an accordion, it is elongated and slit in a meandering shape.

Das Erstaunliche an dieser Konstrukftion ist, dass sie bis zum Kunden meisterbar ist, ohne dass sich Betriebsmängel nachteilig äussern. Sogar bei Kleinstspuren findet kein Ecken und Stossen und H,üpfen des Fahrzeuges dort statt, wo die Räder bzw. deren Spurkränze an die Blechstösse der Ueberlappungen heranlaufen. Es gehört zur Kunst der Werkzeugbauer, das Ueberschienenstück in Fo:um eines Mantels spiellos eng an die Trägerschiene anzulegen. Die'Erfindung hat demnach alte Vorurteile überwunden und dies darüberhinaus dazuhin mit der Erkenntnis, dass die Rlechschiene als Ueberschienenstück, als Mantel -in der Mitte am Schwellenkörper gegen Verschieben zu sichern ist, so dass der Schwellenkörper darunter längendehnbar und in Fahrtrichtung elastisch verkürzbar ist, wobei die Massivschienenstücke samt Geisstückkupplungen den Längen und Verkürzungen folgen. Dabei wird damit gerechnet, dass die Gleisstückenden an der Gleisstreckenunterlage (Brett oder Kunststofftablett) festgenagelt oder festgeschraubt sind. Es liegt also ein teleskopisch långibares, gelenkloses Ausziehgleis mit einer einzigen Verschiebeverstellfreiheit vor.The amazing thing about this construction is that it extends to the customer can be mastered without operational deficiencies manifesting themselves disadvantageously. Even with the smallest of tracks there is no cornering and bumping and H, checking the vehicle takes place where the wheels or their flanges approach the sheet metal joints of the overlaps. It belongs to the art of the toolmaker, the Ueberschienenstück in Fo: around a jacket without play close to the support rail. The invention has therefore overcome old prejudices and this in addition with the knowledge that the Rlechschiene as a Ueberschienenstück, as a jacket -in the middle of the sleeper body is to be secured against shifting, so that the sleeper body underneath can be stretched in length and elastically shortened in the direction of travel is, the solid rail pieces including Geisstück couplings the lengths and shortenings follow. It is expected that the ends of the track will touch the track underlay (Board or plastic tray) are nailed or screwed on. So it lies a telescopically elongatable, articulated pull-out track with a single freedom of movement before.

Die Zeichnung zeigt ain Ausführungsbeispiel, gemäss Fig 1 in einer Seitenansicht (Gleisstückmittelteil) gemäss Fig 2 in einer Draufsicht (GleistGckmittelteilhälfte) und gemäss Fig 3 mit einem Grundriss des in der Mitte mäanderförmigen, in Fahrtrichtung verkürz- und verlängerbaren Schwellenkörpers (Fahrschienenpratzen weggelassen). Die Pig 4 stellt einen Fahrschienenquerschnitt dar.The drawing shows ain embodiment, according to FIG. 1 in one Side view (middle section of track) according to Fig. 2 in a top view (middle section of track section) and according to 3 with a floor plan of the meander-shaped, sleeper body that can be shortened and lengthened in the direction of travel (rail claws omitted). The Pig 4 represents a rail cross-section.

Das Gleisstück besteht aus den beiden metallenen Ziehvollprofil-Fahrschienenstücken 1, 2; deren kupplungsseitige, nicht gezeigte Enden mit den Enden der in der Mitte mäanderförmigen Schwellenkörper 4 aus einem Thermoplast verbunden sind. Pratzen 5 dieses Schwellenkörpers 4 fassen sowohl die Fahrschienenstücke 1, 2 als auch das Fahrschienenstück 3 aus dünnem Blech, welche die inneren Enden der Fahrschienenstücke 1, 2 zangenförmig übergreifen. Die beiden Fahnen 3a des Fahrschienenstückes 3 greifen in der Weise in den Schwellenkörper 4 ein, dass sich die Fahrscheinen stücke 3 nicht verschieben können, wenn das Gleisstück längsgedehnt oder längsverkürzt wird.The track section consists of the two metal drawn full profile rail sections 1, 2; their coupling-side, not shown ends with the ends of the in the middle meandering threshold body 4 are connected from a thermoplastic. Claws 5 of this sleeper body 4 grasp both the running rail pieces 1, 2 and the Runway piece 3 made of thin sheet metal, which the inner ends of the runway pieces 1, 2 overlap in a pincer-like manner. The two flags 3a of the running rail section 3 grip in such a way in the sleeper body 4 that the tickets pieces 3 are not can move when the track is stretched lengthways or shortened lengthways.

Die Längen der Schlitze und deren Anzahl ergeben sich durch Probieren. Die Fig 3 hat beide Grössen der Deutlichkeit halber übertrieben sross dargestellt. Die Federung des Schwellenkörpers in Fahrtrichtung ist durch Nägel oder Schrauben behrrschbar.The lengths of the slots and their number result from trial and error. For the sake of clarity, FIG. 3 has shown both sizes in an exaggerated manner. The suspension of the sleeper body in the direction of travel is provided by nails or screws controllable.

Claims (3)

Anspruch:Claim: 1.) Gleisstück eines Zweifahrschienengleises einer Spielzeugeisenbahn, gekennzeichnet durch folgende Merkmale, gemeinsam verwendet: 1,) Jede Fahrschiene besteht aus drei sich jeweils an zwei Enden überlappenden Profil-Fahrschienenstucken, (1,2,3), von denen das mittlere und überlappende Bahrschienenstück (3) aus Blech gegenüber dem leiterförmigen Schwellenkörper (4) in der Mitte gegen Verschieben in Fahrtrichtung gesichert ist, die beiden anderen Fahrschienenstücke dagegen im Bereich der Gleisstückkupplung.1.) Track section of a two-rail track of a toy train, characterized by the following features, used in common: 1,) Each running rail consists of three profile rails that overlap at two ends, (1,2,3), of which the middle and overlapping piece of rail (3) made of sheet metal opposite to the ladder-shaped sleeper body (4) in the middle against shifting is secured in the direction of travel, the other two track pieces, however, in Area of the track section coupling. 2.) Das mittlere und überlappende Fahrschienenstück (3) fasst die beiden anderen Fahrschienenstücke @@@@ z.B. 2.) The middle and overlapping rail section (3) holds the two other runway sections @@@@ e.g. mit seiner ganzen Länge zangenförmig. pincer-shaped with its entire length. 3.) Der Schwellenkörper (4) ist im Bereich der mittleren Fahrschienenstücke ziehharmonikabalgähnlich längbar mäanderförmig durchschlitzt. 3.) The sleeper body (4) is in the area of the middle rail sections Like an accordion, it is elongated and slit in a meandering shape. L e e r s e i t eL e r s e i t e
DE19722220177 1972-04-25 1972-04-25 TRACK OF A TOY RAILWAY Pending DE2220177A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19722220177 DE2220177A1 (en) 1972-04-25 1972-04-25 TRACK OF A TOY RAILWAY

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19722220177 DE2220177A1 (en) 1972-04-25 1972-04-25 TRACK OF A TOY RAILWAY

Publications (1)

Publication Number Publication Date
DE2220177A1 true DE2220177A1 (en) 1973-11-29

Family

ID=5843176

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19722220177 Pending DE2220177A1 (en) 1972-04-25 1972-04-25 TRACK OF A TOY RAILWAY

Country Status (1)

Country Link
DE (1) DE2220177A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4223834A (en) * 1978-01-20 1980-09-23 Gebr. Fleischmann K.G. Rail connection for electrical toy model railroads
EP0021248A1 (en) * 1979-06-13 1981-01-07 Atlas Tool Co., Inc. Flexible track section for model railways and method for manufacturing it

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4223834A (en) * 1978-01-20 1980-09-23 Gebr. Fleischmann K.G. Rail connection for electrical toy model railroads
EP0021248A1 (en) * 1979-06-13 1981-01-07 Atlas Tool Co., Inc. Flexible track section for model railways and method for manufacturing it
US4260104A (en) * 1979-06-13 1981-04-07 Atlas Tool Company Curvable track for model railroads

Similar Documents

Publication Publication Date Title
AT216565B (en) Tongue switch for monorail railways
DE3629855A1 (en) SYSTEM FOR TOY CARS
DE4015870C2 (en) sliding door
DE7801529U1 (en) RAIL CONNECTION FOR ELECTRICAL PLAY AND MODEL RAILWAY SYSTEMS
DE611451C (en) Apron conveyor
DE2220177A1 (en) TRACK OF A TOY RAILWAY
DE7215777U (en) Track section of a toy train
DE2254607A1 (en) CONNECTION OF RAILS TO PREVENT WHEEL JOINTS ON THE RAIL CONNECTIONS
DE2636904A1 (en) PLAY BLOCK
DE816370C (en) Track for toy vehicles, in particular toy trains
DE918491C (en) Car head connection for model railways
DE828516C (en) Toy track
DE460138C (en) Climbing pass and return switch that can be opened and accessed in all directions
DE1904541A1 (en) Toy system
DE713887C (en) Toy single-track system with several reversible vehicles
DE816519C (en) Track for toy vehicles, in particular toy trains
DE4117443C2 (en)
DE1478456A1 (en) Large building body for toy building systems
DE634822C (en) Transportable sliding platform for mining operations
DE2100349A1 (en) Chain for chain conveyors
DE879072C (en) Link or unit part for the production of a flexible laying device for sleepers, especially for model railways
DE3402726A1 (en) Ball-rolling track
DE1106047B (en) Track for overhead cranes
DE870672C (en) Flexible rail for play or model railways
DE1137663B (en) Toy train system with vehicles guided by guide pins in guide slots in the roadway