DE2035883C3 - Process of solidifying molten sulfur - Google Patents

Process of solidifying molten sulfur

Info

Publication number
DE2035883C3
DE2035883C3 DE2035883A DE2035883A DE2035883C3 DE 2035883 C3 DE2035883 C3 DE 2035883C3 DE 2035883 A DE2035883 A DE 2035883A DE 2035883 A DE2035883 A DE 2035883A DE 2035883 C3 DE2035883 C3 DE 2035883C3
Authority
DE
Germany
Prior art keywords
sulfur
conveyor belt
cooling
upper run
molten
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE2035883A
Other languages
German (de)
Other versions
DE2035883A1 (en
DE2035883B2 (en
Inventor
Ernest Ralph Ellithorpe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of DE2035883A1 publication Critical patent/DE2035883A1/en
Publication of DE2035883B2 publication Critical patent/DE2035883B2/en
Application granted granted Critical
Publication of DE2035883C3 publication Critical patent/DE2035883C3/en
Expired legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C01INORGANIC CHEMISTRY
    • C01BNON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
    • C01B17/00Sulfur; Compounds thereof
    • C01B17/02Preparation of sulfur; Purification
    • C01B17/0216Solidification or cooling of liquid sulfur

Landscapes

  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Inorganic Chemistry (AREA)
  • Moulding By Coating Moulds (AREA)
  • Laminated Bodies (AREA)
  • Processing Of Solid Wastes (AREA)
  • Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)

Description

Die Erfindung bezieht sich auf ein Verfahren, geschmolzenen Schwefel zum Erstarren zu bringen, indem er an einer oder vorzugsweise mehreren aufeinanderfolgenden Stellen bzw. mehreren Schichten dem oberen Trum eines endlosen Förderbandes fortlaufend zugeführt wird, das entlang eines in einem Be hälter befindlichen Kühlbadcs aus einem wässerigen Medium im wesentlichen in Berührung mit diesem Bad geführt wird.The invention relates to a method of solidifying molten sulfur by he dem at one or preferably several successive points or several layers upper run of an endless conveyor belt is continuously fed, which runs along one in a loading Container located Kühlbadcs from an aqueous medium essentially in contact with this Bathroom is run.

Bei einer bekannten Anlage der vorgenannten Art (USA.-Patentsehrift 1 419 911) läuft das obere Trum eines Förderbandes entlang der Oberfläche eines in einem Behälter befindlichen Kühlbades, so daß es von unten gekühlt wird. In diesem Trum des umlaufenden Förderbandes wird an in Förderrichtung aufeinanderfolgenden Stellen geschmolzener Schwefel in solcher Menge zugeführt, daß sich hinter jeder Zuführdüse je eine dünne Schwefelschicht auf dem Förderband bzw. auf der vorher gebildeten Schwefelschicht bildet. An der Oberseite der Schwefelschichten kann zusätzlich Kühlung durch Aufblasen von Preßluft bewirkt werden, die aber beim Aufbringen mehrerer Schichten hintereinander von je etwa 3 mm Dicke nur wenig zur Kühlung beitragen kann.In a known system of the aforementioned type (USA.-Patentsehrift 1 419 911) the upper run runs a conveyor belt along the surface of a cooling bath in a container so that it is cooled from below. In this strand of the revolving conveyor belt there is successive in the conveying direction Make molten sulfur fed in such an amount that is behind each feed nozzle a thin layer of sulfur on the conveyor belt or on the previously formed sulfur layer forms. On top of the sulfur layers, additional cooling can be provided by blowing Compressed air can be brought about, but when several layers are applied one after the other, each of about 3 mm Thick can contribute little to cooling.

Ein ähnliches Kühlverfahren erfolgt bei einer Anlage (v^'i. Chemical Engincering Progress Volume 49, No. 5, S. 19 und 22), bei der ein Förderband aus Stahl auf den Seitenrändern eines länglichen Kühlbehälters gleitet, dem Wasser zugeführt wird, das über diese Ränder nach außen in Sammelbehälter abfließt. Der geschmolzene Schwefel wird der Oberfläche des von oben fortlaufend zugeführt.A similar cooling process takes place in a plant (v ^ 'i. Chemical Engineering Progress Volume 49, No. 5, pp. 19 and 22), with a steel conveyor belt on the side edges of an elongated cooling container slides, the water is supplied, which flows over these edges to the outside into the collecting tank. The molten sulfur is continuously fed to the surface of the from above.

Es ist auch bekannt, ein in der erstgenannten Art der Oberfläche eines Kühlbades entlanglaufendes 1 orderband in einzelne vertiefte, in Förderrichtung aufeinanderfolgende Taschen aufzuteilen, in die der geschmolzene Schwefel eingeführt wird (vgl. USA.-Patentschrift 1 454 344).It is also known to use a conveyor belt of the first-mentioned type that runs along the surface of a cooling bath into individual recessed ones, one after the other in the conveying direction To divide pockets into which the molten sulfur is introduced (cf. USA.-Patent 1 454 344).

Schließlich ist auch bekannt, Schwefelblocke mit Hilfe von Gießformen herzustellen, die mittels eines umlaufenden Förderbandes nacheinander unter einenFinally, it is also known to produce sulfur blocks with the aid of casting molds, which by means of a circulating conveyor belt one after the other under one

ίο Zufluß für geschmolzenen Schwefel gebracht und gefüllt werden und die am unteren Trum des Förderbandes nach Erstarren des Schwefels entleert werden. ίο Inflow for molten sulfur brought and filled and which are emptied on the lower run of the conveyor belt after the sulfur has solidified.

Allen diesen Verfahren und Vorrichtungen, geschmolzenen Schwefel zum Erstarren zu bringen, ist gemeinsam, daß die Kühlung auf Grund der starken Isoliereigenschaften des Schwefels verhältnismäßig langsamerfolgt und deshalb sehr lange Kühlbänder und Kühlbäder und insgesamt sehr aufwendige große Kühlanlagen bei gegebenem Schwefeldurchsatz erforderlich sind.All of these methods and devices, melted To solidify sulfur has in common that the cooling due to the strong The insulating properties of sulfur are relatively slow and therefore very long cooling belts and cooling baths and, overall, very complex, large cooling systems are required for a given sulfur throughput are.

Der Erfindung liegt die Aufgabe zugrunde, diesem Übelstand abzuhelfen und bei gegebenem Schv.efeldurchsatz mit wesentlich kürzeren Kühlstrecken auszukommen. Die Erfindung geht dabei von der Erkenntnis aus, daß den bekannten Kühlvorrichtungen gemeinsam der Mangel anhaftet, daß der geschmolzene Schwefel entlang der Kühlstrecke nur in eine Richtung bewegt wird, nämlich entlang der EbeneThe invention is based on the object of remedying this drawback and with a given Schv.efeld throughput get by with much shorter cooling distances. The invention is based on the knowledge from that the known cooling devices have the common defect that the molten Sulfur is only moved in one direction along the cooling section, namely along the plane

des oberen Trums eines Förderbandes und zugleich entlang der Oberfläche des Kühlbades, aber nicht quer zu dieser Bewegungseinrichtung oder entlang der und relativ zur Oberfläche <_js oberen Trums des Förderbandes.of the upper run of a conveyor belt and at the same time along the surface of the cooling bath, but not across this movement device or along and relative to the surface <_js upper run of the Conveyor belt.

Im Verfolg dieser Erkenntnis wird das Ziel der Erfindung beim Verfahren der eingangs genannten An. dadurch erreicht, daß dem oberen fium des Förderbandes mit dem darauf befindlichen Schwefel an bestimmten, über seine Länge verteilten Stellen wiederholt die Schwefelbewegung beeinflussende Auslenkungen abwechselnd nach oben und unten durch seitliches Kippen an diesen Stellen oder durch längslaufende Wellenbewegung erteilt werden. Dadurch wird die Kühlwirkung auf den geschmolzenen Schwefel örtlich erhöht.In pursuit of this finding, the aim of the invention becomes in the method of the type mentioned at the beginning. achieved in that the upper fium of the conveyor belt repeated with the sulfur on it at certain points distributed over its length the sulfur movement influencing deflections alternately up and down lateral tilting at these points or by longitudinal wave movement. Through this the cooling effect on the molten sulfur is locally increased.

Bei einer Ausführung der Erfindung kann diese Wellenbewegung des oberen Trums des Förderbandes unter wiederholtem Eintauchen des mitgeführten Schwefels in das Bad ausgeführt werden.In one embodiment of the invention, this wave movement of the upper run of the conveyor belt with repeated immersion of the sulfur carried along in the bath.

Statt dessen kann die periodische Bewegung eine quer zur Förderrichtung des Förderbandes verlaufende Auf- und Kippbewegung sein, bei der der geschmolzene Schwefel seitwärts zur Förderrichtung strömt und dadurch relativ heiße Teile des geschmolzenen Schwefels einer verstärkten Kühlung ausgesetzt werden.Instead, the periodic movement can be one running transversely to the conveying direction of the conveyor belt Be up and down motion in which the molten sulfur sideways to the conveying direction flows and thereby exposed relatively hot parts of the molten sulfur to an increased cooling will.

Das Anhaften des Schwefels auf dem Förderband kann durch Aufbringen eines dünnen Films von Wasser auf die Oberfläche des Förderbandes ve.rhindert werden.The adherence of the sulfur on the conveyor belt can be prevented by applying a thin film of Water on the surface of the conveyor belt can be prevented.

Nachstehend werden bevorzugte Ausführungsformen der Erfindung beispielsweise an Hand der Zeichnungen beschrieben, und zwar zeigtPreferred embodiments of the invention are described below, for example, with reference to the Drawings described, namely shows

F i g. 1 schematisch die Gesamtanordnung und Aufbau einer Ausführungsform der Erfindung, der für das Kippen eines Bandes in Querrichtung verwendet wird,F i g. 1 schematically shows the overall arrangement and construction of an embodiment of the invention, the is used to tilt a belt in the transverse direction,

F i g. 2 a und 2 b in gleicher Weise das beweglicheF i g. 2 a and 2 b the movable in the same way

unti f unti f

u.-kipptc Band der Ausiühi uniform n;id f PP ' u.-kipptc Band der Ausiühi uniform n; id f PP '

ρ Λ schematich cine Darstellung de·, Verfall-V iind der Vorrichtung nach der Hriindiiuu. das cmc Schleudervorrichtung 29. die aus einem mil h»- her Geschwmdi.keit umlaufenden Γ-orderband be Mehl, das den Schwefel, wenn er auf dem Hanu crMarrt .M. über Fnlfernungen von z. H. _-.■■ρ Λ schematich a representation de ·, Verfall-V iind of the device after the Hriindiiuu. the cmc spinner 29 which consists of a mil h "- revolving ago Geschwmdi.keit Γ-conveyor belt be flour, sulfur, setting it to the Hanu crMarrt .M. over distances of e.g. H. _-. ■■

SCp". Tcinc sduiuhildliche DarsK-lli™ ui„c, Λ,,- SC p ". Tcinc sduiuhildliche DarsK-lli ™ ui" c, Λ ,, -

shl "' 1 s hl "' 1

„„cm Zraand. der in."" Cm Zraand. the in.

»!'f "Ki"«" "''fi" fc»! 'F" Ki "« ""''fi"fc

?:rTv-h lolzcne Schwefel strömen kann. tlepV 1 zeigt eine lei.erförmiee Kühlanlage des SCiWcL die? als Ganzes mit 10 I, -oichnc« ist und ^so ausgebildet ist. daß sie d,:, geschmolzenen . £hwcfel von Zufuhr- oder Ahgabeleitungen .· .S aus üher bekannte Einrichtungen autn.mmt. I- lst ersichtlich, daß die Kühltreppe lft mn Abzug.kanakn Z jeder Stufe der Treppe versehen ,st. die als War- ^1u,i;isse dienen. Eine zusätzliche Kühlung des ge-X,!,enen Schwefels kann in dieser Stu., des erfindunL-suemäßen Verfahrens dadurch bewH.t werf d η daß man Kühlluft in gewünschter Menec auf den «uv.chmolzencn Schwefel aufblast. Der geschmol-Se"Schwefel strömt dann durch sein Eigensucht ν on der Kühltreppe 10 in einen Aufnahmebehälter ρ Ϊ „ie Schwcfelpumpe 13 ist so angeordnet, daß sie den geschmolzenen Schwefel durch eine Leitung pum^t. Der geschmolzene Schwefel kann mittels eines \bgabeventils 15 oder 15« zu einer wehrart,-cTübedaufvorrichtung 16 bzw. 16« abgegeben werden. Die übcrlaufvomchtungen 16 und 16 α s.nd so ausgebildet, daß sie ein vorgegebenes \ olumen an Schwefel aufnehmen und den flüssigen Schwefel auf die Oberfläche eines bewegbaren bzw. antre.bbaren Bandes abgeben, das unter dem Auslaut der Lber-?: r Tv-h wooden sulfur can flow. tle pV 1 shows a lei.erförmiee cooling system of the SCiWcL which? as a whole with 10 I, -oichnc «and ^ is formed in this way. that they d, : , melted. £ hwc fel of supply or outlet lines. · .S autn.mmt from previously known devices. I- lst seen that the cooling steps lft mn Abzug.kanakn Z each step of the staircase is provided, st. which as war- ^ 1u , i ; isse to serve. Additional cooling of the Ge-X,!, Enes sulfur can in this Stu., BewH.t characterized who d f η that cooling air inflates the erfindunL-suemäßen process in the desired Menec on the "uv.chmolzencn sulfur. The molten sulfur then flows through its intrinsic nature on the cooling staircase 10 into a receptacle ρ the sulfur pump 13 is arranged so that it pumps the molten sulfur through a line or 15 "wehrart to be delivered -cTübedaufvorrichtung 16 or 16". the übcrlaufvomchtungen 16 and 16 α s.nd so formed to a predetermined \ olume record of sulfur and a movable or antre the liquid sulfur to the surface . give off a practicable tape, which under the sound of the liver

gliche Band 17 gek.ppt werdesame volume 17 will be edited

währleisten, daß der geschmolzene Sensure that the melted S

selnd in entgegengesetzter Ricn ung bezeichnet in F, g^ b unten ^^ ^ F and denoted in the opposite direction in F, g ^ b below ^^ ^ F

Schmu nach de, Lin .l^undSchmu after de, Lin .l ^ and

nach der L me B-B d., h ,. - · χ kon.after the L me BB d., h,. - · χ con .

sehen. In do Zc h ^ mcIU ü^t an/uhcbcn und see. In do Zc h ^ mcIU ü ^ t an / uhcbcn and

sm.kuonen dienen dazu- das Hand ^sm.kuonen serve this purpose - the hand ^

ao oder auf den gewu sei ι ,NN .^^ ■ |crstlind-ao or on the gewu sei ι, NN. ^^ ■ | crstlind -

s.nd ^?^η*™^^ Jcr Schwefel abkühlt hch e^vunscht tlaB — γ^ηη acr ^ __s.nd ^? ^ η * ™ ^^ J cr sulfur cools hch e ^ vunscht tlaB - γ ^ ηη acr ^ __

und s.ch m starke em M -J^ o(]cr s,eller and s.ch m strong em M -J ^ o (] cr s , eller

beim ,'PP0"^0 f/(f. ν'ΐ'\; Ausmaß der Kühlwu- *5 emstellbar ist "™ ?^ b^.inXch können z.B. die Rung zu c™*™^^™^ , fortschreitend Kippabschnitte 26 -7 -JK dt fe Schwenk,age an in ihrer Hohe am s|o, 1 unk ^ ^ ^_at, 'PP 0 "^ 0 f / ( f. ν ' ΐ '\; the extent of the cooling * 5 can be emulated" ™? ^ b ^. in X ch, for example, the Rung to c ™ * ™ ^^ ™ ^ , progressive tilting sections 26 -7 -JK dt fe pivot , age an in their height am s | o, 1 un k ^ ^ ^ _

der Kante des Bandes 17 u " ^ ,ichcn Nei.the edge of the band 17 u "^, icn Nei .

nehmen. Fi g. - a U"J Γ J , ic sie als praktisch guiigswm e ^ ^mJ ^ hmolzencl1 to take. Fi g. - a U "J Γ J, ic them as practically guiigswm e ^ ^ mJ ^ hmolzencl1

" ichtunü auf dem Band strömen zu rr.cn P " ichtunü on the tape stream to rr.cn P

lassen. , ,\Usführungsform gemäß F i g. 3leave. ,, \ U s execution form according to FIG. 3

35 ^^£« während das obere v,irdI de ecscnm Längs.ichtung wellen-35 ^^ £ «while the upper v, irdI de e cscnm longitudinal direction wave-

einer Wasserzufuhrquelle gespeist, und das Wasser kann mittels einer Pumpe 19 durch e.ne Lc.tung 20 in einen Wasserkühler 21 gefordert und in Umlauf gesetzt werden. Das gekühlte Wasser kann dann durch eine weitere Leitung 22 zu emer Befeuchtungvorrichtung 23 gefördert werden, die über der Oberfläche des angetrieben m Bandes 17 angebracht «t Auf diese Weise kann sehr einfach ein Film von Wasscr auf die Oberfläche des Bandes aufgebracht Sen. Die höherliegenden bzw. angehobenen Teile 24, 25, 26, 27 und 28 des sich bewegenden Bandes 17 sollen die im Abstand voneinander vorgesehenen Kippabschnitte des Bandes 17 veranschauhcheru die dazu dienen, den geschmolzenen Schwefel in Querrichtung -abwechselnd in entgegengesetzter R ich-,ung - über das Band hinwegstromen zu lasser, während er im übrigen in Längsrichtung auf dem Band 17 strömt. Die in F i g. 1 gezeigte Anlage sieht zwei voneinander getrennte Fördereinrichtungen ur den Zufluß geschmolzenen Schwefels über überlaufvorrichtungen 16 und 16 α vor. Diese voneinander getrennten Fördereinrichtungen erlauben es eine zweite Schicht aus geschmolzenem Schwefel auf der ersten Schwefelschicht, diese überlappend, aufzubringen und auf diese Weise ein folienartiges oder la-a water supply source, and the water can be fed by means of a pump 19 through e.ne Lc.tung 20 Required in a water cooler 21 and put into circulation. The chilled water can then be conveyed through a further line 22 to emer humidification device 23, which is above the surface of the driven belt 17 attached In this way a film of water can very easily be applied to the surface of the belt Sen. The higher lying or raised parts 24, 25, 26, 27 and 28 of the moving belt 17 should be those provided at a distance from one another Tilt portions of the belt 17 illustrate the serve to move the molten sulfur in the transverse direction - alternately in the opposite direction - to let flow over the belt, while he otherwise in the longitudinal direction on the Volume 17 flows. The in F i g. 1 system shown sees two separate conveyors ur the inflow of molten sulfur via overflow devices 16 and 16 α. These separate conveyors allow one to apply a second layer of molten sulfur to the first layer of sulfur, overlapping it and in this way a film-like or la-

melliertes blättriges Gebilde aus Schwefel zu erzeugen. Wenn erwünscht, können natürlich weitere Schwefelschichten aufgebracht werden. F 1 g. 1 zeigtto produce mottled, leafy structure from sulfur. Of course, additional layers of sulfur can be applied if desired. F 1 g. 1 shows

*er enthalt. odcr lamcllierte * he contains. or lamellated

f^dur E hersteller, daß man mittels wefel7ufuhr-Vorrichtungen, wie sief ^ dur E manufacturer that one means feeding devices like them

« in F^.g.3 nur sehe ^nmol.enem Schwefel"In Fig. 3 only see ^ nmol.enem sulfur

satz!icht ^mf h;cht aus geschmolzenemsentence! icht ^ m f h ; cht from molten

auftrmg . D.e tr m Maße gckuhl ir_application. De tr m dimensions gckuhl ir _

Sch™ ma. . Uchc zusätzliche und uberladen sein daß 5J-J^ die an den steilen 31Sch ™ ma . . Uchc additional and overloaded that 5 JJ ^ those on the steep 31

50 S^d« ^Ι ζ^ Sn, aufnehmen und tradem B»d 1J Z1£ ^ 32 ist dafür eingerichtet Wasgen kann Lim. £un, Wasserkühler 3450 S ^ d «^ Ι ζ ^ Sn, record and tradem B» d 1 J Z1 £ ^ 32 is set up for Wasgen can Lim. £ un, water cooler 34

ser durc! em Le unt ^ ^ 35 ser through! em Le unt ^ ^ 35

u f°r«rn' der kan welchcr das Kühlen des Wassers 55 χ rschen em^k , Wasser wird dann zuruf ° r "rn" of the kan welchcr the cooling of the water 55 ruffles χ ^ em k, water is then used to

^^νεηαιιη| durch eine Leitung 36 dem Was-W edervei^d " efuhrt. schneidvorrichtungen^» serbadI 31^ w.eae B der Schweiclstücke sind^^ νεηαιιη | By J h are a line 36 to the what-W edervei ^ d "efuhrt. cutters ^» ^ 31 serbadI w.eae B of Schweiclstücke

zu^Beme sunS^ ehe um den erstarrten oderzu ^ Beme sun S ^ before around the frozen or

gemäß F ^ fe efd zu Schwefe|geb.k,en * ° according to F ^ fe efd to sulfur | g eb.k, en

tejweise ver,^ ^ ^ zerschneide Dl abcm * vorg g elstücke werden dann durch d.epartially ver, ^ ^ ^ cut up Dl abcm * vorg el pieces are then by de

|^^;d l ervorrichtung 29 auf einen Schwc elvor-Sch'_euJ^ chleudert, der für gewöhnlich in _im-| ^^; d l 2 9 ervorrichtung a Schwc elvor Sch'_-eu J ^ ert chleud which usually in _im-

65 rats,btape g ^ ^ Vornch 65 rats, btape g ^ ^ anterior

mute ^r ^ und jn der pra h mute ^ r ^ and jn der pra h

tung 1^ ß der Schwefel vorteilhaft auf d.etion 1 ^ ß the sulfur advantageous on de

nerausgesieii ,nerausgesieii,

Kühltreppe 10 aufgegeben wird, um ihn vorläulig zu der gewünschten Dicke möglich macht. Die Schichtkühlen, bevor er dem Erstarrungsvorgang auf dem bildung durch Lamcllierung des Schwefels ist gemäß Band 17 unterzogen wird. Während "der Schwefel der Erfindung nicht unbedingt erforderlich. Es wurde durch sein Eigengewicht die Stufen der Kühltreppe festgestellt, daß man eine befriedigende Kühlung mit 10 herabströmt und schließlich in den Behälter 12 :> dem in F i g. 1 dargestellten Verfahren erreichen allgegeben wird, rindet eine schnelle Wärmeabgabe kann. Ix-i dem man eine Querströmung des Schwefels statt." 1st der geschmolzene Schwefel in diesem Zeit- herheiluii:· Wenn es jedoch erwünscht ist, die lamelpunkt. in dem"der geschmolzene Schwefel den Behäl- horten Schichien zu bilden, ist Vorsorge zu treffen, ter 12 erreicht, noch zu heiß, so kann der Schwefel den geschmolzenen Schwefel in einer Vielzahl von für einen zweiten Durchgang zur Kühltreppe 10 und io Filmen auf das Band abzugeben. Bei der Ausfühiiber diese hinweg geleitet werden, bevor er der Er rungsform nach Fig. 1 können z.B. zwei getrennte Marrungsbehandlung unterzogen wird. Man kann Schichlfilmc vorteilhaft dadurch auf das Band abge- und wiVd sich für"die Rückführung des Schwefels geben werden, daß man den von den Ventilen 15 und entscheiden, wenn dieser bei der Abgabe in den Bc- 15« kommenden Schwcfclstrom zu den Überlaufvorhältei 12 z.B. eine Temperatur von mehr als etwa iS richtungen 16 bzw. 16« entsprechend einstellt oder 130° ( besitzt. Vorteilhaft sollte der geschmolzene regelt. In gleicher Weise stellt man bei der Ausfiih Schwefel soweit als möglich abgekühlt sein, bevor er rungsform nach F i g. 3 den Schvvcfelstrom an den Ab auf das Band 17 überführt wird. Wenn nämlich dem gabestcllen 31. die über die Länge des sich bcwcgcn-Sehwelel eine größere Wärmemenge entzogen wird. den Bandes 17 verteilt sind, entsprechend nach bevor er das Band 17 erreicht, so" ist er leichter zu 20 Wunsch geregelt ein.Cooling staircase 10 is abandoned to make it provisionally to the desired thickness possible. The layer cooling before it is subjected to the solidification process on the formation by lamination of the sulfur according to Volume 17. While "the sulfur of the invention is not absolutely necessary. It was determined by its own weight up the steps of the cooling staircase that a satisfactory cooling with 10 flows down and finally into the container 12 : rindet a rapid heat emission can. Ix-i which one takes a cross flow of sulfur. " If the molten sulfur in this time- herheiluii: · If it is desired, however, the lamelpunkt. In the "the molten sulfur to form the Behäl- horten Schichien, care is to be taken, ter 12 reached, still too hot, so the sulfur can the molten sulfur in a variety of for a second pass to the cooling stairs 10 and io films on the When it is carried out over this, before it is subjected to the form of FIG. 1, two separate marring treatments can be used. That one decides that from the valves 15 and when this high flow coming into the Bc- 15 "coming to the overflow reservoir 12, for example, a temperature of more than about i S directions 16 or 16" is correspondingly set or 130 ° (. In the same way, the sulfur should be cooled as much as possible before the sulfur stream is discharged as shown in Fig. 3 is transferred to the belt 17. If, namely, a greater amount of heat is withdrawn from the given 31st, which over the length of the cwcgcn-vision world. the band 17 are distributed according to before it reaches the band 17, so "it is easier to regulate a 20 wish.

behandeln und zur Erstarrung zu bringen. Deshalb Wird der geschmolzene Schwefel auf dem Band 17treat and freeze. Therefore, the molten sulfur on the belt 17

sollte dem Schwefel so viel Wärme als möglich ent- befördert und zu einer Violzahl von sich überlappenshould remove as much heat as possible from the sulfur and overlap by a number of violations

zogen werden, bevor er aiii das Band überführt wird. den gesonderten Schichten geformt und läßt man du:be pulled before he aiii the tape is transferred. formed into the separate layers and let you:

Der geschmolzene Schwefel wird gewöhnlich mit Abkühlung jeweils zwischen der Auftragstellc jeduThe molten sulfur is usually cooled down between each application

einer Ausgangstemperatur von 1IS vveilerbehan- 25 der Schichun bis zur nächsten und bis zum Ende di ·an initial temperature of 1IS veilerbehan- der Schichun until the next and until the end of the

delt. Für die Zwecke der praktischen Durchführung Bandes vor sich gehen, so ergibt sich, daß ein grö(.i<_delt. For the purposes of the practical implementation of the tape, it follows that a large (.i <_

kann gemäß F i g. 3 ein Band aus rostfreiem Stahl rer Teil des Schwefels zu amorphem Zustand ccan according to FIG. 3 a stainless steel band rer part of the sulfur to amorphous state c

oiler ähnlichem Werkstoff verwendet werden: es ist starrt. F.s ist auch anzunehmen, daß die in der Längs-Oiler-like material can be used: it is rigid. It can also be assumed that the longitudinal

leilocii für die Ausüjiuuiigsiorrn nach Fig.! no!- richtung des K:md< <s 17 auftretende Schrumpfung desleilocii for the Ausüjiuuiigsiorrn according to Fig.! no! - direction of K: md < <s 17 occurring shrinkage of the

wendig, daß das Band aus einem biegsameren Mate- 30 Schwefels dazu beiträgt, den crstariton Schwefel \>»manoeuvrable that the band of a more flexible material 30 sulfur contributes to the crstariton sulfur \> »

lial. z. B. zähem und vvärinel'estem Gummi, ist. Es ist der Oberfläche des Bandes abzulösen. Wird jedoJilial. z. B. tough and värinel'estem rubber is. It is peeled off the surface of the tape. Will jedoJi

klar, daß der für das Band nach F i g. 1 verwendete ein dünner Film aus Wasser oder sonstigem wälinit is clear that the one for the tape according to FIG. 1 used a thin film of water or some other material

Werkstoff die Eigenschaft haben muß. in dem Maße gen Kühlmittel auf das Band aufgebracht und daMaterial must have the property. to the extent that coolant is applied to the tape and there

biegsam zu sein, daß die angehobenen oder geneig! Verfahren der F i g. 1 angewendet, Qucrströmunger·to be pliable that the raised or inclined! Method of FIG. 1 applied, cross flow

eingestellten Abschnitte des Bandes, wie sie in 35 des Schwefels zu erzeugen, so verhindert der Wasscadjusted sections of the tape, as they produce in 35 of the sulfur, so prevents the water

Fig. 2 a und 2 b gezeigt sind, gebildet werden kön- film jegliche nennenswerte Anhaftung des erstarrici.2a and 2b are shown, any appreciable adhesion of the solidified film can be formed.

neu. um die Querbewegung des geschmolzenen Schwefels an dom Band 17. Außerdem trägt dieNew. about the transverse movement of the molten sulfur on dom volume 17. In addition, the

Schwefel·, auf dem Band herbeizuführen. Schrumpfung des erstarrten Schwefels hierbei b-i.Sulfur · to induce on the tape. Shrinkage of the solidified sulfur here b-i.

Es wurde gefunden, daß es für die Durchführung den erstarrten Schwefel von dem Band abzulösen,It has been found that it is necessary to detach the solidified sulfur from the tape for the implementation,

der Erfindung befriedigende Ergebnisse erbringt, 40 Wenn eine lameilierte Schicht von Schwefel gebildetthe invention gives satisfactory results, 40 when a laminated layer of sulfur is formed

wenn man durchschnittlich K) bis 11 t'Stunde mit werden soll, so werden die Ventile 15 und 15 κif you are to be with an average of K) up to 11 t'hour, the valves 15 and 15 are κ

einer Bandgeschwindigkeit von 19,8 m Sek. verarbei- zweckmäßig so eingestellt, daß sie Schichten von jea belt speed of 19.8 m sec. Processing expediently set so that they are layers of each

tot. Mit dieser Geschwindigkeit wurden Versuche etwa 3 mm auf dem sich bewegenden Band 17 crzeu-dead. At this speed, tests were made about 3 mm on the moving belt 17.

während ungefähr Ki4 Stunden durchgeführt, und es gen. Wendet man das Verfahren nach F i g. 3 an, dencarried out for about Ki4 hours, and it is enough. Applying the method of FIG. 3 on, the

trat dabei praktisch kein Verlust an Schwefel auf. 45 Schwefel aufeinanderfolgend in Kühlbäder cinzutau-there was practically no loss of sulfur. 45 Sulfur cinzutau-

Dic Bchandlungszeit vom Beginn der Zufuhr des chen. so wird jede der Schichten durch dns Eintau-The working time from the beginning of the feeding of the chen. so each of the layers is

Schwefels bis zur Gewinnung der festen geformten chen in eines der Bäder 30 gekühlt, bevor die nächsteSulfur is cooled in one of the baths 30 before the next to obtain the solid shaped surfaces

Schwelelstücke betrug ungefähr 1,5 Minuten, dir Schicht in Überlappung auf die vorausgehendeSmoldering pieces took about 1.5 minutes, the layer overlapping the previous one

Länge der erfindungsgemäßen Bänder 17 betrug un- Schicht aufgetragen wird. Auf diese Weise kann einLength of the tapes 17 according to the invention was un- layer is applied. That way one can

gefahr 30.4 m. und die Breite betrug etwa 91 cm. Es 50 lamelliertes Band von erstarrtem Schwefel in einerdanger 30.4 m. and the width was about 91 cm. It has 50 laminated tape of solidified sulfur in one

wurde gefunden, daß zweckmäßig 3,8 l'Minute an Dicke von etwa 9,5 mm erzeugt werden. Es ist vorzu-it has been found that it is expedient to produce 3.8 minutes in thickness of about 9.5 mm. It is to-

Wasscr verwendet werden, und daß bei geregelter ziehen, Sorge zu tragen, daß das Band 17 stets inWasscr are used, and that with regulated pull, care must be taken that the belt 17 is always in

Zufuhr ein Wasserfilm von etwa 0.4 mm Dicke oder zweckentsprechender Weise mit einem dünnen FilmSupply a film of water approximately 0.4 mm thick or, appropriately, with a thin film

weniger auf der Oberfläche des sich bewegenden von Wasser oder sonstigem wäßrigen Mittel befeuch·less moisten on the surface of the moving water or other aqueous agent

Bandes erzeugt. 55 tet ist. Wäre ein solcher Film nicht vorhanden, stBand generated. 55 tet is. If such a film were not available, st

In Fig. 1 ist ersichtlich, daß die Ventile 15 und könnte ein Temperaturanstieg in dem Band verur·In Fig. 1 it can be seen that the valves 15 and could cause a temperature rise in the belt.

15« so eingestellt werden, daß sie einen Schwefelzu- sacht werden, wenn es aus Gummi oder einem ähnli15 «can be adjusted in such a way that they become sulphurous if it is made of rubber or something similar

strom zu den Überlaufvorrichtungen 16 bzw. 16 a in chen Werkstoff bestände und dadurch ein Anhaftercurrent to the overflow devices 16 or 16 a in chen material stocks and thus an adherent

der Weise erlauben, daß diese auf die gewünschte zwischen dem Schwefel und dem Gummi herbeigethus allowing this to come between the sulfur and the gum in the desired manner

Überlaufhöhe gefüllt bleiben. Der Überschuß an ge- 60 führt werden und verhindern, daß das Band befriediOverflow height remain filled. The excess of lead and prevent the tape from satisfying

schmolzenem Schwefel fließt über den Rand des gend von dem Schwefel wieder befreit wird.Molten sulfur flows over the edge of the area from which sulfur is freed again.

Überlaufwehres 16 bzw. 16 a und strömt als gleich- Da der erstarrte Schwefel während der SchichtenOverflow weir 16 or 16 a and flows as the same- As the solidified sulfur during the layers

mäßig dünner Film aus geschmolzenem Schwefel auf bildung sehr hohe Wärmeisolierungseigenschafteimoderately thin film of molten sulfur to form very high thermal insulation properties

das sich bewegende darunter angeordnete Band 17. besitzt, so verhindert die erste Schicht aus verfestigHas the moving belt 17 underneath it, thus preventing the first layer from solidifying

Um gute Ergebnisse zu erhalten, sollte die Strömung 65 tem Schwefel in z. B. 3 mm Dicke, daß eine großFor good results, the flow should 65 tem sulfur in z. B. 3 mm thick that a great

des geschmolzenen Schwefels konstant gehalten wer- von den nachfolgenden Schichten kommende Wätof the molten sulfur are kept constant from the subsequent layers

den und sollte die Geschwindigkeit des Bandes 17 so memenge in das Band 17 eintritt und dieses beschäthe and should the speed of the belt 17 so memenge enters the belt 17 and damaging it

bemessen werden, daß sie die Bildung eines Filmes diet. Der auf diese Weise durch die erste Schicht gcdimensioned to diet the formation of a film. The in this way through the first layer gc

7 87 8

schaffene Schutz beseitigt die vorgenannten Schwie- können, diese Wärme aus dem Kühlwasser abzüfüh-The protection created eliminates the aforementioned difficulties in removing this heat from the cooling water.

rigkeiten des Wärmegefälles zwischen dem Schwefel ren und außerdem das Produkt in der angegebenenrabilities of the heat gradient between the sulfur and also the product in the specified

und dem Band. Dieses Problem ist jedoch bei der Weise zu trocknen.and the tape. However, this problem is with the way to dry.

Ausführung nach F i g. 1 mit Querströmung des Die Größe des Schwefcldurchsatzes ist bei der ErSchwefels nicht als wesentlich anzusehen. Bei diesem 5 findung durch die Breite des Bandes bestimmt. AIl-Verlahren wird die Masse des Schwefels in Querrich- gemein gesagt, ergibt sich, daß ein Band mit einer turig bewegt und wird ein beträchtlicher Teil dieser Breite von 122 cm eine Aufnahmefähigkeit von etwa Masse schnell der Berührung mit der Luft ausgesetzt, 20,2 t/Stunde für geschmolzenen Schwefel bei Temso daß die Hitze des Schwefels schneller nach außen peraturen von 122 bis 160° C besitzt. Der Bedarf an abgegeben wird und hierdurch praktisch keine we- ίο Wasser oder sonstigem Kühlmittel würde dabei dersentliche Erhitzung des Bandes eintritt. jenige sein, wie er notwendig wäre, um normale VerWenn der Schwefel erstarrt ist, kann er einem Ab- dampfung zu verhindern.Execution according to FIG. 1 with cross flow of the The size of the sulfur throughput is with the ErSchulfels not to be regarded as material. In this 5 finding is determined by the width of the tape. AIl proceedings If the mass of the sulfur is said in crosswise terms, it follows that a band with a turig moves and a considerable part of this width of 122 cm will have a capacity of about Mass quickly exposed to air, 20.2 t / hour for molten sulfur at Temso that the heat of the sulfur has faster outside temperatures of 122 to 160 ° C. The need for is released and thereby practically no we- ίο water or other coolant would thereby change Heating of the belt occurs. be the one that would be necessary to normal use If the sulfur has solidified, it can prevent evaporation.

»chneid-Vorgang unterzogen werden, z. B. mittels der Bei manchen Anlagen kann das Verfahren und die Schneid-Vorrichtung 38, durch die die Größenab- Vorrichtung nach der Erfindung in einer Umgebung messung dieser Schwefelstücke hergestellt wird. In 15 betrieben werden, die zur Atmosphäre hin offen ist, dieser Stufe des Verfahrens befindet sich der Schwe- z.B. nicht windgeschützt. Wenn geeignete Verhältfei im amorphen Zustand. Es liegt also praktisch nisse vorliegen, kann diese Betriebsweise vorteilhaft keine Kristallisation vor, und es entstehen bei dem sein, um das Abkühlen des Schwefels zu erleichtern, Schneidvorgang keine nennenswerten Mengen von z. B. wenn ein kühler Wind von geringer Geschwin-Staub oder Feinteilchen. Der Schwefel hat in dieser a° digkeit bläst. Wenn jedoch die Anlage in unmittelba-Verfahrensstufe noch eine beachtliche Temperatur, rer Bestrahlung durch heißes Sonnenlicht betrieben befindet sich aber in einem Stadium der Verfesti- wird, stellt sich eine deutlich hemmende Einwirkung gung, so daß er für das Abschneiden und das Abför- auf den Kühlvorgang des Schwefels ein, und das dem der Schwefelstücke, z.B. durch die Schleuder- Verfahren hat einen geringeren Wirkungsgrad und vorrichtung 29 zu einem nahegelegenen Vorrats- 25 wird kostspieliger. In manchen Fällen ist es daher als Stapel geeignet ist. In F i g. 3 ist ersichtlich, daß die vorteilhaft anzusehen, die in F i g. 1 und 3 gezeigte abgeschnittenen Schwefelstücke auf einem ansteigen- Vorrichtung in ein Gehäuse oder Haus einzuschlieden Abschnitt 39 des Bandes 17 aufwärts wandern, Ben, das die Vorrichtung gegen die Elemente der äu-SvT daß jeglicher Überschuß an Wasser abtropfen ßeren Atmosphäre schützt, so daß die Vorrichtung in kann. Für zusätzliche Trocknung ist ein Ventilator 3° einer kontrollierten Umgebung arbeitet. Das Ge-35 unmittelbar oberhalb des ansteigenden Abschnit- häuse kann auch so ausgebildet sein, daß es an dei tes des Bandes 17 angebracht, um die restliche Seite des Gehäuses Platz für die Bedienungspersonen Feuchtigkeit aus dem Schwefel zu entfernen. der Anlage läßt.»Are subjected to cutting process, z. B. by means of In some systems, the method and the Cutting device 38, through which the size down device according to the invention in an environment measurement of these pieces of sulfur is produced. Operated in 15 that is open to the atmosphere, At this stage of the procedure, there is no shelter, e.g. not sheltered from the wind. If suitable ratios in the amorphous state. So it is practically nits available, this mode of operation can be advantageous no crystallization before, and there will be in order to facilitate the cooling of the sulfur, Cutting process no significant amounts of z. B. when a cool wind of low speed dust or fine particles. The sulfur has blown in this drowsiness. However, if the plant is in the immediate process stage still operated at a considerable temperature, rer irradiation by hot sunlight but is in a stage of solidification, there is a clearly inhibiting effect supply, so that he is responsible for the cutting and removal on the cooling process of the sulfur, and that that of the sulfur pieces, e.g. through the centrifugal process, has a lower efficiency and device 29 to a nearby supply 25 becomes more expensive. In some cases it is therefore called Stack is suitable. In Fig. 3 it can be seen that the advantageous to be seen in FIG. 1 and 3 shown Enclose clipped pieces of sulfur on an ascending device in a housing or house Hike section 39 of the band 17 upwards, Ben that the device against the elements of the äu-SvT that any excess of water drip off ßeren atmosphere protects, so that the device in can. For additional drying, a 3 ° fan is working in a controlled environment. The Ge-35 directly above the rising section housing can also be designed in such a way that it is tes of the tape 17 attached to the remaining side of the housing for the operators To remove moisture from the sulfur. the plant leaves.

Wie vorstehend schon erwähnt wurde, kann das Das Verfahren und die Vorrichtung nach der Ervon dem Bad 37 zugeführte Wasser ständig durch 35 findung beheben beträchtliche wirtschaftliche Nacheinen Kühler 34 gepumpt werden, um die Wärme ab- teile und Gefahren der bekannten Anlagen zui zuführen, die das Kühlwasser aus dem Schwefel auf- Schwefelbehandlung und liefern für diese ein Verfall genommen hat. Es ist ersichtlich, daß der Kühler 34 ren und eine Vorrichtung, die sich industriell allge und der Ventilator 35 dem doppelten Zweck dienen mein mit Vorteil anwenden läßt.As already mentioned above, the method and the device according to the Ervon the water supplied to the bath 37 constantly remedied by finding considerable economic inconsistencies Cooler 34 are pumped to divide the heat and add to the dangers of the known systems that supply the cooling water from the sulfur to sulfur treatment and provide for this a decay took. It can be seen that the cooler 34 Ren and an apparatus that is industrially general and the fan 35 serve the dual purpose of my use with advantage.

Hierzu 1 Blatt Zeichnungen 1 sheet of drawings

Claims (3)

Patentansprüche:Patent claims: 1. Verfahren, geschmolzenen Schwefel zum Erstarren zu brinaen. indem er an einer oder vorzugsweise mehreren aufeinanderfolgenden Stellen in einer bzw. mehreren Schichten dem oberen Trum eines endlosen Förderbandes fortlaufend zugeführt wird, das entlang eines in einem Behälter befindlichen Kühlbadcs aus einem wäßrigen Medium im wesentlichen in Berührung mit diesem Bad geführt wird, dadurch gekennzeichnet, daß dem oberen Trum des Förderbandes mit dem darauf befindlichen Schwefel an bestimmten, über seine Länge verteilten Stellen wiederholt die Schwefelbewegung beeinflussende Auslenkungen abwechselnd nach oben und unten durch seitliches Kippen an diesen Stellen oder durch längslaufende Wellenbewegung erteilt wird.1. Procedure, molten sulfur to solidify to brinaen. by placing it in one or, preferably, several consecutive locations Continuously in one or more layers along the upper run of an endless conveyor belt is fed along a cooling bath located in a container from an aqueous Medium is essentially brought into contact with this bath, characterized in that that the upper run of the conveyor belt with the sulfur on it at certain points distributed over its length repeats the deflections influencing the sulfur movement alternately upwards and downwards issued by tilting to the side at these points or by longitudinal wave movement will. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Wellenbewegung des oberen Trums des Förderbandes (17) unter wiederholtem Eintauchen des mitgeführten Schwefels in das Bad ausgeführt wird.2. The method according to claim 1, characterized in that that the wave movement of the upper run of the conveyor belt (17) under repeated Immersion of the sulfur carried along in the bath is carried out. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß auf die obere Oberfläche des oberen Trums de- Förderbandes (17) ein dünner Film von Wasser in solcher Dicke aufgebracht wird, daß er das Anhaften de-, geschmolzenen Schwefels an dem Förderband verhindert.3. The method according to claim 1 or 2, characterized in that on the upper surface of the Upper run of the conveyor belt (17) a thin film of water applied in such a thickness becomes that he is clinging de-, melted Prevents sulfur on the conveyor belt.
DE2035883A 1969-11-21 1970-07-20 Process of solidifying molten sulfur Expired DE2035883C3 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA68054 1969-11-21

Publications (3)

Publication Number Publication Date
DE2035883A1 DE2035883A1 (en) 1971-06-03
DE2035883B2 DE2035883B2 (en) 1973-03-08
DE2035883C3 true DE2035883C3 (en) 1973-10-04

Family

ID=4085965

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2035883A Expired DE2035883C3 (en) 1969-11-21 1970-07-20 Process of solidifying molten sulfur

Country Status (7)

Country Link
US (1) US3684005A (en)
BE (1) BE759232A (en)
CA (1) CA859612A (en)
DE (1) DE2035883C3 (en)
FR (1) FR2056372A5 (en)
GB (1) GB1301937A (en)
NL (1) NL7009702A (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3760872A (en) * 1972-01-10 1973-09-25 Allis Chalmers Structural member having differential temperature control means and combination of such structural member with horizontal stripper for grate conveyor
US4133669A (en) * 1977-04-20 1979-01-09 Agri-Prassco Joint Venture Process for pelletizing a sulphur-bentonite clay mixture and the product formed thereby
US4730667A (en) * 1986-06-04 1988-03-15 Alex Chevion Liquid to solids heat exchanger
ITMI20061737A1 (en) * 2006-09-12 2008-03-13 Snam Progetti PROCEDURE FOR THE TRANSPORT OF SULFUR TO LOW RISK AND TO ZERO EMISSION FROM SOLID SULFUR DEPOSITS IN BLOCKS OF CONSIDERABLE DIMENSIONS
CA2711132A1 (en) * 2008-08-27 2010-03-04 Edward Mierzewski Structurally reinforced sulfur blocks and processes of making
IT1403903B1 (en) * 2011-01-25 2013-11-08 Saipem Spa METHOD FOR SOLIDIFYING A MASS OF LIQUID AND RELATIVE SULFUR BLOCK OF SOLID SULFUR OBTAINABLE WITH SUCH A METHOD
CN105668522A (en) * 2016-04-15 2016-06-15 贵阳铝镁设计研究院有限公司 Anti-splashing flow guiding device free of blockage under continuous molten sulfur discharging

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1419911A (en) * 1921-05-31 1922-06-20 Texas Gulf Sulphur Co Solidifying sulphur
US2808236A (en) * 1953-04-29 1957-10-01 Diamond Alkali Co Crystallizing apparatus

Also Published As

Publication number Publication date
NL7009702A (en) 1971-05-25
CA859612A (en) 1970-12-29
FR2056372A5 (en) 1971-05-14
BE759232A (en) 1971-04-30
DE2035883A1 (en) 1971-06-03
DE2035883B2 (en) 1973-03-08
GB1301937A (en) 1973-01-04
US3684005A (en) 1972-08-15

Similar Documents

Publication Publication Date Title
DE69322695T2 (en) METHOD AND DEVICE FOR FREEZING
DE1134578B (en) Device for one or both sides of sheet material, in particular paper or cardboard
CH663327A5 (en) METHOD AND SYSTEM FOR TAKING OUT SOLUBLE SUBSTANCES FROM TOBACCO.
DE3015672A1 (en) METHOD AND DEVICE FOR IMPROVING THE QUALITY OF RAIL-SHAPED MATERIALS
DE1652329A1 (en) Method and device for applying a liquid to a surface
DE2035883C3 (en) Process of solidifying molten sulfur
DE2631012A1 (en) HIGH SPEED FREEZING SYSTEM
DE69805557T2 (en) Curtain coating method and apparatus having means for removing liquid from the edge of the curtain
DE2510823A1 (en) METHOD OF APPLICATION OF PLASTICS
DE2537556A1 (en) METHOD AND DEVICE FOR MANUFACTURING OR TREATMENT OF FLAT GLASS
DE60009458T2 (en) Apparatus and method for producing co-extruded foods
DE4334405C2 (en) Transport device
DE2454376C3 (en) Method and device for impregnating cardboard sheets
DE2457717C3 (en) Method and device for the production of a cardboard or board product coated with a solidifiable liquid material
DE1779992A1 (en) PROCESS FOR IMPROVING THE QUALITY OF A POLYAMIDE FILM
DE3224552A1 (en) METHOD AND DEVICE FOR PRODUCING GRANULAR-LIKE PECH OR TEAR PARTICLES OR GRAINS AND PARTICLES OR GRAIN PRODUCED BY THE PROCESS
DE1804471C3 (en) Process for preventing the formation of longitudinal waves and longitudinal corrugations in the production of oriented, heat-stabilized, thermoplastic plastic films and apparatus for carrying out the process
DE2247118A1 (en) Leather/hide drier - using multi-stage heating in free and forced air
DE3032146A1 (en) METHOD FOR PRODUCING RAILS FROM THERMOPLASTIC MATERIAL OR FROM HEAT-RESISTABLE RESIN, AND DEVICE FOR CARRYING OUT THE METHOD
DE2852815C2 (en)
DE1935707A1 (en) Coating of printed circuits on both sides with flux and - with solder in one operation
EP0253068B1 (en) Method and apparatus for producing continuous sheets
EP0604929B1 (en) Apparatus for slicing thin planks from squared timber
DE4041670C1 (en)
AT116060B (en) Method and device for the production of leaves, skins or films from cellulose ester or cellulose ether compositions.

Legal Events

Date Code Title Description
C3 Grant after two publication steps (3rd publication)