DE20308394U1 - Tool box with a basic module with two half shells and with a stacking design via grooves and ribs - Google Patents
Tool box with a basic module with two half shells and with a stacking design via grooves and ribsInfo
- Publication number
- DE20308394U1 DE20308394U1 DE20308394U DE20308394U DE20308394U1 DE 20308394 U1 DE20308394 U1 DE 20308394U1 DE 20308394 U DE20308394 U DE 20308394U DE 20308394 U DE20308394 U DE 20308394U DE 20308394 U1 DE20308394 U1 DE 20308394U1
- Authority
- DE
- Germany
- Prior art keywords
- tool box
- toolbox
- shells
- another
- tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000008878 coupling Effects 0.000 claims description 27
- 238000010168 coupling process Methods 0.000 claims description 27
- 238000005859 coupling reaction Methods 0.000 claims description 27
- 230000037431 insertion Effects 0.000 claims description 6
- 238000003780 insertion Methods 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 4
- 238000000465 moulding Methods 0.000 abstract 1
- 238000001746 injection moulding Methods 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 244000309464 bull Species 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H3/00—Storage means or arrangements for workshops facilitating access to, or handling of, work tools or instruments
- B25H3/02—Boxes
- B25H3/021—Boxes comprising a number of connected storage elements
- B25H3/023—Boxes comprising a number of connected storage elements movable relative to one another for access to their interiors
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H3/00—Storage means or arrangements for workshops facilitating access to, or handling of, work tools or instruments
- B25H3/02—Boxes
- B25H3/021—Boxes comprising a number of connected storage elements
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Workshop Equipment, Work Benches, Supports, Or Storage Means (AREA)
- Details Of Rigid Or Semi-Rigid Containers (AREA)
Abstract
Description
WerkzeugkastenToolbox
Die Erfindung betrifft einen Werkzeugkasten und insbesondere einen Werkzeugkasten mit einer Kupplungsvorrichtung. 5The invention relates to a toolbox and in particular to a toolbox with a coupling device. 5
Durch die Erfindung wird ein Werkzeugkasten geschaffen, der sicher auf einen anderen Werkzeugkasten gleichen Typs gestellt werden kann.The invention creates a toolbox that can be safely placed on top of another toolbox of the same type.
Der Werkzeugkasten weist zwei Schalen auf, die schwenkbar aneinander angeschlossen sind, wobei eine der Schalen mindestens eine Nut definiert und wobei die andere der Schalen zum Einsetzen in der mindestens einen Nut eines anderen Werkzeugkastens mindestens eine an ihr ausgebildete Führung aufweist, wodurch die Werkzeugkästen aufeinander ausgerichtet werden können.The toolbox has two shells pivotally connected to each other, one of the shells defining at least one groove and the other of the shells having at least one guide formed thereon for insertion into the at least one groove of another toolbox, whereby the toolboxes can be aligned with each other.
Weiter wird durch die Erfindung eine Werkzeugkasten-Vorrichtung geschaffen, die fest mit einem anderen Werkzeugkasten in einer Reihe gekuppelt werden kann.Furthermore, the invention provides a tool box device that can be firmly coupled to another tool box in a row.
Die Werkzeugkasten-Einrichtung weist einen Werkzeugkasten und eine Kupplungsvorrichtung auf. Der Werkzeugkasten weist zwei Schalen auf, die schwenkbar aneinander angeschlossen sind. Eine der Schalen weist mindestens eine Ausnehmung auf. Die Kupplungsvorrichtung weist einen Mittelabschnitt zum Einsetzen in mindestens eine Ausnehmung, ein erstes vergrößertes Ende zum Einbauen in den Werkzeugkasten, und ein zweites vergrößertes Ende zum Einbau in einem anderen Werkzeugkasten auf, um die Werkzeugkästen aneinanderzukuppeln.The toolbox assembly includes a toolbox and a coupling device. The toolbox includes two shells pivotally connected to one another. One of the shells includes at least one recess. The coupling device includes a central portion for insertion into at least one recess, a first enlarged end for installation in the toolbox, and a second enlarged end for installation in another toolbox to couple the toolboxes together.
Im Folgenden wird die Erfindung anhand bevorzugter Ausführungsformen mit Bezugnahme auf die Zeichnung erläutert. In der Zeichnung zeigen:In the following, the invention is explained using preferred embodiments with reference to the drawing. In the drawing:
Figur 1 eine perspektivische Draufsicht eines Werkzeugkastens und einer Kupplungsvorrichtung gemäß einer ersten Ausführungsform der Erfindung,Figure 1 is a perspective top view of a tool box and a coupling device according to a first embodiment of the invention,
Figur 2 eine perspektivische Unteransicht des Werkzeugkastens aus Figur 1,Figure 2 is a perspective bottom view of the toolbox of Figure 1,
Figur 3 eine perspektivische Ansicht des Werkzeugkastens aus Figur 1, der an einem erfindungsgemäßen Aufhänger gehängt ist,Figure 3 is a perspective view of the toolbox of Figure 1 suspended from a hanger according to the invention,
Figur 4 eine Draufsicht auf eine Mehrzahl von in Figur 1 gezeigten Werkzeugkästen, die mittels der Werkzeugkasten-Vorrichtung aneinander gekuppelt sind, 15Figure 4 is a plan view of a plurality of tool boxes shown in Figure 1, which are coupled together by means of the tool box device, 15
Figur 5 eine Vorderansicht einer Reihe von aneinander gekuppelten Werkzeugkästen, die auf eine andere Reihe von aneinander gekuppelten Werkzeugkästen gestellt ist,Figure 5 is a front view of a row of coupled tool boxes placed on top of another row of coupled tool boxes,
Figur 6 eine Vorderansicht eines ersten Werkzeugkastens, der geschlossen ist, einen zweiten Werkzeugkasten, der rechts vom ersten Werkzeugkasten angeordnet ist und geöffnet ist, und einen dritten Werkzeugkasten, der auf den ersten Werkzeugkasten gestellt ist und offen ist,Figure 6 is a front view of a first toolbox which is closed, a second toolbox which is arranged to the right of the first toolbox and is open, and a third toolbox which is placed on the first toolbox and is open,
Figur 7 eine Vorderansicht, die Figur 6 entspricht, wobei aber der erste Werkzeugkasten offen ist, der zweite Werkzeugkasten geschlossen ist und der dritten Werkzeugkasten auf den zweiten Werkzeugkasten gestellt ist, undFigure 7 is a front view corresponding to Figure 6, but with the first toolbox open, the second toolbox closed and the third toolbox placed on the second toolbox, and
Figur 8 eine perspektivische Ansicht eines Werkzeugkastens gemäß einer zweiten Ausführungsform der Erfindung.Figure 8 is a perspective view of a tool box according to a second embodiment of the invention.
Mit Bezugnahme auf Figuren 1 und 2 weist eine Werkzeugkasten-Einrichtung gemäß einer ersten Ausführungsform der Erfindung einen Werkzeugkasten 10 und eine Aufhänge-Kupplungsvorrichtung 26 (20+22) auf. Der Werkzeugkasten 10 weist eineWith reference to Figures 1 and 2, a toolbox device according to a first embodiment of the invention comprises a toolbox 10 and a suspension coupling device 26 (20+22). The toolbox 10 comprises a
erste Schale 11 und eine zweite Schale 12 auf. Der hintere Rand der ersten Schale 11 ist an dem hinteren Rand der zweiten Schale 12 schwenkbar angeschlossen. Vorzugsweise ist die erste Schale 11 an die zweiten Schale 12 einstückig mittels Spritzgusses angeschlossen. Der vordere Rand der ersten Schale 11 ist mit zwei Schnallen 13 versehen, die zum Verriegeln an dem vorderen Rand der zweiten Schale 12 einrasten.first shell 11 and a second shell 12. The rear edge of the first shell 11 is pivotally connected to the rear edge of the second shell 12. Preferably, the first shell 11 is integrally connected to the second shell 12 by means of injection molding. The front edge of the first shell 11 is provided with two buckles 13 which engage the front edge of the second shell 12 for locking.
Zwei Nuten 14 sind in der ersten Schale 11 an deren Deckelaußenseite definiert. Jede der Nuten 14 weist zwei offene Enden auf. Eine Öffnung 17 ist in dem Vorderrand der ersten Schale 11 definiert.Two grooves 14 are defined in the first shell 11 on the outside of the lid thereof. Each of the grooves 14 has two open ends. An opening 17 is defined in the front edge of the first shell 11.
Zwei Rippen 15 sind an der zweiten Schale 12 an deren Bodenaußenseite ausgebildet. Drei Ausnehmungen 16 sind in jedem der beiden gegenüberliegenden Querseitenränder der zweiten Schale 12 definiert. Eine Öffnung 17 ist an dem Vorderrand der zweiten Schale 12 definiert.Two ribs 15 are formed on the second shell 12 at the bottom outside thereof. Three recesses 16 are defined in each of the two opposite transverse side edges of the second shell 12. An opening 17 is defined at the front edge of the second shell 12.
Ein Band (nicht gezeigt) kann durch die Öffnungen 17 eingesetzt werden und kann dann zum Verschließen des Werkzeugkastens 10 zugebunden werden.A strap (not shown) can be inserted through the openings 17 and can then be tied to close the tool box 10.
Die Aufhänge-Kupplungsvorrichtung 26 weist einen Aufhänger 20 und drei Kupplungsvorrichtungen 22 auf, die mit dem Aufhänger 20 mittels Spritzguss einstückig hergestellt sind. In dem Aufhänger 20 sind zwei Schlitze oder Öffnungen 21 ausgebildet. Jeder der im Querschnitt I-förmigen Kupplungsvorrichtungen 22 weist einen mittleren Kupplungsabschnitt 220, ein erstes Kupplungs-Ende 221, welches an dem ersten Ende des mittleren Kupplungsabschnitts 220 ausgebildet ist und ein zweites Kupplungs-Ende 222 auf, welches an dem zweiten Ende des mittleren Kupplungsabschnitts 220 ausgebildet ist.The suspension coupling device 26 comprises a hanger 20 and three coupling devices 22 which are manufactured in one piece with the hanger 20 by means of injection molding. Two slots or openings 21 are formed in the hanger 20. Each of the coupling devices 22, which are I-shaped in cross section, has a central coupling section 220, a first coupling end 221 which is formed at the first end of the central coupling section 220 and a second coupling end 222 which is formed at the second end of the central coupling section 220.
Wie aus Figur 3 ersichtlich, ist der mittlere Kupplungsabschnitt 220 jeder Kupplungsvorrichtung 22 in eine der Ausnehmungen 16 der Schale 11 des Werkzeugkastens 10 eingesetzt, wobei das erste Kupplungs-Ende 221 der Kupplungsvorrichtung 22 in den Werkzeugkasten 10 eingesetzt ist, wodurch die Aufhänge-Kupplungsvorrichtung 26 an dem Werkzeugkasten 10 gekuppelt ist. Zwei Haken 30 sind an einer Halterung (ohne Bezugsziffer) angebracht. Die Haken 30 sind in die Schlitze oder Öffnungen 21 eingesetzt, wodurch der Werkzeugkasten 10 an die Halterung gehängt ist.As can be seen from Figure 3, the central coupling portion 220 of each coupling device 22 is inserted into one of the recesses 16 of the shell 11 of the tool box 10, the first coupling end 221 of the coupling device 22 being inserted into the tool box 10, whereby the hanging coupling device 26 is coupled to the tool box 10. Two hooks 30 are attached to a bracket (not numbered). The hooks 30 are inserted into the slots or openings 21, whereby the tool box 10 is hung on the bracket.
Wie aus Figur 4 ersichtlich, kann der Aufhänger 20 durch Abscheren oder Abschneiden von den Kupplungsvorrichtungen 22 getrennt werden. Vier Werkzeugkästen 10 sind in einer Reihe aufeinander ausgerichtet, wobei die Werkzeugkästen an ihren seitlichen Stirnflächen jeweils mittels drei Kupplungsvorrichtungen 22 an den angrenzenden Werkzeugkasten gekuppelt sind, wobei die Kupplungsvorrichtungen 22 in die entsprechenden Ausnehmungen 16 eingesetzt sind.As can be seen from Figure 4, the hanger 20 can be separated from the coupling devices 22 by shearing or cutting it off. Four tool boxes 10 are aligned in a row, the tool boxes being coupled to the adjacent tool box at their lateral end faces by means of three coupling devices 22, the coupling devices 22 being inserted into the corresponding recesses 16.
Gemäß Figur 5 ist eine Reihe von Werkzeugkästen 10, die mittels der Kupplungsvorrichtungen 22 aneinander gekuppelten sind, auf eine andere Reihe von Werkzeugkästen 10 gestellt, die ebenfalls mit den Kupplungsvorrichtungen 22 aneinander gekuppelt sind. Die oberen Werkzeugkästen 10 sind kleiner als die Werkzeugkästen 10 am Boden. Die Rippen 15 der oberen Werkzeugkästen 10 sind in die Nuten 14 der Werkzeugkästen 10 am Boden eingesetzt, wodurch die Reihen von Werkzeugkästen aufeinander ausgerichtet sind.According to Figure 5, a row of tool boxes 10 coupled together by means of the coupling devices 22 is placed on another row of tool boxes 10 also coupled together by means of the coupling devices 22. The upper tool boxes 10 are smaller than the tool boxes 10 on the bottom. The ribs 15 of the upper tool boxes 10 are inserted into the grooves 14 of the tool boxes 10 on the bottom, whereby the rows of tool boxes are aligned with each other.
Figur 6 zeigt einen ersten Werkzeugkasten 10b und einen zweiten Werkzeugkasten 10c, der rechts von dem ersten Werkzeugkastens 10b angeordnet ist. Der erste Werkzeugkasten 10b ist geschlossen. Der zweite Werkzeugkasten 10c ist offen.Figure 6 shows a first tool box 10b and a second tool box 10c, which is arranged to the right of the first tool box 10b. The first tool box 10b is closed. The second tool box 10c is open.
Ein dritter Werkzeugkasten 10a ist auf den ersten Werkzeugkasten 10b gestellt. Der dritte Werkzeugkasten 10a ist offen.A third toolbox 10a is placed on the first toolbox 10b. The third toolbox 10a is open.
• ··
t ·t ·
• ··
• ff · · · ff * • ff · · · ff *
Figur 7 entspricht Figur 6, außer dass der erste Werkzeugkasten 10b offen gezeigt ist, der zweite Werkzeugkasten 10c geschlossen ist und der dritte Werkzeugkasten 10a oben auf den zweiten Werkzeugkasten 10c gestellt ist.Figure 7 corresponds to Figure 6 except that the first tool box 10b is shown open, the second tool box 10c is closed and the third tool box 10a is placed on top of the second tool box 10c.
Figur 8 zeigt einen Werkzeugkasten gemäß einer zweiten Ausführungsform der Erfindung. Die zweite Ausführungsform ist zu der ersten Ausführungsform identisch, außer dass sie vier vorspringende Blöcke 15' anstelle der Rippen 15 aufweist.Figure 8 shows a tool box according to a second embodiment of the invention. The second embodiment is identical to the first embodiment except that it has four projecting blocks 15' instead of the ribs 15.
Zusammenfassend weist ein Werkzeugkasten zwei schwenkbar aneinander angeschlossene Schalen auf, wobei eine der Schalen wenigstens eine Nut definiert, wobei die andere der Schalen mindestens eine an ihr ausgebildete Führung z. B. in Form einer Rippe oder eines Vorsprungs aufweist. Mindestens eine Führung des Werkzeugkastens ist zum Einsetzen in die mindestens eine Nut eines anderen Werkzeugkastens vorgesehen, um die Werkzeugkästen aufeinander auszurichten.In summary, a tool box has two shells pivotally connected to one another, one of the shells defining at least one groove, the other of the shells having at least one guide formed on it, e.g. in the form of a rib or a projection. At least one guide of the tool box is provided for insertion into the at least one groove of another tool box in order to align the tool boxes with one another.
Claims (15)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE20308394U DE20308394U1 (en) | 2003-05-28 | 2003-05-28 | Tool box with a basic module with two half shells and with a stacking design via grooves and ribs |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE20308394U DE20308394U1 (en) | 2003-05-28 | 2003-05-28 | Tool box with a basic module with two half shells and with a stacking design via grooves and ribs |
Publications (1)
Publication Number | Publication Date |
---|---|
DE20308394U1 true DE20308394U1 (en) | 2003-09-04 |
Family
ID=27816432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE20308394U Expired - Lifetime DE20308394U1 (en) | 2003-05-28 | 2003-05-28 | Tool box with a basic module with two half shells and with a stacking design via grooves and ribs |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE20308394U1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3159115A3 (en) * | 2015-10-22 | 2017-07-19 | Adolf Würth GmbH & Co. KG | Wall mount for stackable suitcase with multifunctional fixing structure |
EP3219223A1 (en) * | 2015-08-25 | 2017-09-20 | Kabushiki Kaisha TOPCON | Carrying case |
-
2003
- 2003-05-28 DE DE20308394U patent/DE20308394U1/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3219223A1 (en) * | 2015-08-25 | 2017-09-20 | Kabushiki Kaisha TOPCON | Carrying case |
US10357089B2 (en) | 2015-08-25 | 2019-07-23 | Kabushiki Kaisha Topcon | Carrying case |
EP3159115A3 (en) * | 2015-10-22 | 2017-07-19 | Adolf Würth GmbH & Co. KG | Wall mount for stackable suitcase with multifunctional fixing structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE60128444T2 (en) | DEVICE FOR RECEIVING AND HOLDING TOOLS | |
DE19627434A1 (en) | Kit of a collapsible paper tray | |
DE20108895U1 (en) | Box module for objects | |
DE202005007586U1 (en) | Container with locking connection for receiving heavy objects has locking connection between upper and lower parts consisting of locking tongues and slots | |
DE3780723T2 (en) | CORNER PROTECTOR. | |
DE202019100430U1 (en) | Dividing bar, crossbar and transverse floor for energy guiding chains | |
DE20119519U1 (en) | Foldable tool box | |
DE10103130B4 (en) | needle packing | |
DE20312086U1 (en) | Partitioning device, in particular for a drawer | |
EP3865716B1 (en) | Clamp for a detachable connection of construction elements | |
DE3926062C2 (en) | ||
DE102013107140B4 (en) | toolbox | |
EP0499152A1 (en) | Folder, or the like | |
DE102004006267B4 (en) | toolbox | |
DE10011243A1 (en) | Collapsible box | |
DE20308394U1 (en) | Tool box with a basic module with two half shells and with a stacking design via grooves and ribs | |
DE102017219983B4 (en) | Container receiving device for a vehicle interior | |
DE102006051830B4 (en) | Holder for elongated objects, coupling element, holder system and tool for releasing the holder system | |
EP2671821A1 (en) | Packaging for ordered, aligned storage of objects and method for producing same | |
DE202005018834U1 (en) | Tool holder for housing tools comprises a main body having adjustment component integrated with two fixing clamps for positioning the tools | |
DE20107825U1 (en) | Stand with split footplate for storing flat objects | |
DE202005019311U1 (en) | Retainer for elongated articles e.g. pipes, has square body with side sections formed with slots for receiving coupling elements, in which slots form open channels extending between rear edge areas of slots and major surfaces of square body | |
DE69114085T2 (en) | Fastening housing for electrical device. | |
AT14119U1 (en) | Lid for garbage containers | |
WO1996013036A1 (en) | Storage box for storing a data or sound recording medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R207 | Utility model specification |
Effective date: 20031009 |
|
R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 20060619 |
|
R151 | Utility model maintained after payment of second maintenance fee after six years |
Effective date: 20090623 |
|
R152 | Utility model maintained after payment of third maintenance fee after eight years | ||
R152 | Utility model maintained after payment of third maintenance fee after eight years |
Effective date: 20111112 |
|
R071 | Expiry of right | ||
R071 | Expiry of right |