DE202015101806U1 - Renewable Energy Plant and Renewable Energy Park - Google Patents

Renewable Energy Plant and Renewable Energy Park Download PDF

Info

Publication number
DE202015101806U1
DE202015101806U1 DE202015101806.1U DE202015101806U DE202015101806U1 DE 202015101806 U1 DE202015101806 U1 DE 202015101806U1 DE 202015101806 U DE202015101806 U DE 202015101806U DE 202015101806 U1 DE202015101806 U1 DE 202015101806U1
Authority
DE
Germany
Prior art keywords
plant
voltage
power
parking
transformer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE202015101806.1U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maschinenfabrik Reinhausen GmbH
Maschinenfabrik Reinhausen Gebrueder Scheubeck GmbH and Co KG
Original Assignee
Maschinenfabrik Reinhausen GmbH
Maschinenfabrik Reinhausen Gebrueder Scheubeck GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maschinenfabrik Reinhausen GmbH, Maschinenfabrik Reinhausen Gebrueder Scheubeck GmbH and Co KG filed Critical Maschinenfabrik Reinhausen GmbH
Priority to DE202015101806.1U priority Critical patent/DE202015101806U1/en
Publication of DE202015101806U1 publication Critical patent/DE202015101806U1/en
Expired - Lifetime legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/28The renewable source being wind energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Abstract

Erneuerbare-Energie-Anlage (10), umfassend
– eine Energieerzeugungseinheit (11), die elektrischen Wechselstrom erzeugen kann;
– einen Anlagentransformator (12) mit einstellbarem Übersetzungsverhältnis, dessen Primärseite an die Energieerzeugungseinheit (11) angeschlossen ist und dessen Sekundärseite an ein Stromnetz (20) angeschlossen werden kann;
– ein Anlagensteuersystem (13), das an den Anlagentransformator (12) angeschlossen und derart ausgebildet ist, dass es das Übersetzungsverhältnis des Anlagentransformators (12) in Abhängigkeit von einer Anlagenblindleistung und/oder von einer Anlagenblindleistungsvorgabe und/oder von einer primärseitigen Anlagenspannung und/oder von einer primärseitigen Anlagenspannungsvorgabe und/oder von einer sekundärseitigen Anlagenspannung und/oder von einer sekundärseitigen Anlagenspannungsvorgabe und/oder von einem Betriebspunkt der Energieerzeugungseinheit (11) und/oder von einem Betriebspunkt der Anlage (10) einstellen kann.
Renewable Energy Plant (10), comprising
A power generation unit (11) capable of generating AC electrical power;
- An equipment transformer (12) with adjustable transmission ratio, whose primary side is connected to the power generation unit (11) and whose secondary side to a power supply (20) can be connected;
- A plant control system (13) connected to the plant transformer (12) and is designed such that it the transmission ratio of the plant transformer (12) in response to a plant reactive power and / or a plant blind output specification and / or from a primary-side plant voltage and / or from a primary-side plant voltage specification and / or from a secondary-side plant voltage and / or from a secondary-side plant voltage specification and / or from an operating point of the energy production unit (11) and / or from an operating point of the plant (10).

Figure DE202015101806U1_0001
Figure DE202015101806U1_0001

Description

Die Erfindung betrifft eine Erneuerbare-Energie-Anlage, insbesondere eine Windenergieanlage oder Photovoltaikanlage, und einen Erneuerbare-Energie-Park, insbesondere Windpark und/oder Solarpark.The invention relates to a renewable energy system, in particular a wind turbine or photovoltaic system, and a renewable energy park, in particular wind farm and / or solar park.

DE 10 2008 018 748 A1 beschreibt eine Windenergieanlage mit einem Rotor, einem davon angetriebenen Generator mit einem Umrichter zur Erzeugung elektrischer Leistung, die über einen Transformator, für den eine Spannungsüberwachung vorgesehen ist, in ein Netz abgegeben wird, und einem Steuersystem, das eine Umrichtersteuerung umfasst, wobei das Steuersystem ein Stellsignal für eine Blindkomponente an den Umrichter anlegt, wobei eine Spannungsmesseinrichtung am Transformator angeordnet ist, deren Spannungssignal an einen Eingang eines zustandsabhängigen Sollwertschiebers angelegt ist, dessen Ausgangssignal an ein Begrenzungsmodul für die auf den Umrichter wirkende Blindkomponente angelegt ist. DE 10 2008 018 748 A1 describes a wind turbine with a rotor, a generator driven therefrom with an inverter for generating electrical power, which is delivered via a transformer, for which a voltage monitoring is provided in a network, and a control system, which comprises a converter control, wherein the control system Applying control signal for a reactive component to the inverter, wherein a voltage measuring device is arranged on the transformer whose voltage signal is applied to an input of a state-dependent setpoint shifter whose output signal is applied to a limiting module for acting on the inverter reactive component.

Dieses Dokument beschreibt außerdem ein Verfahren zum Betreiben der Windenergieanlage mit einem Einstellen eines Stellsignals für eine Blindkomponente der abgegebenen Leistung, Messen einer Spannung am Transformator, Bestimmen eines Korrektursignals für das Blindleistungsmaß mittels eines zustandsabhängigen Sollwertschiebers, und Verwenden dieses verschobenen Signals zur Begrenzung des Stellsignals der Blindkomponente.This document also describes a method of operating the wind turbine with adjusting an output signal for a reactive component of the output power, measuring a voltage on the transformer, determining a correction signal for the reactive power measure using a state-dependent setpoint shifter, and using this shifted signal to limit the control signal of the reactive component ,

DE 10 2008 048 258 A1 beschreibt einen Windpark mit einer Übergabestation, an der in dem Windpark erzeugte elektrischen Energie von einem windparkinternen Netz an ein externes Netz übergeben wird, einem Stufenschalter zum Einstellen des Übersetzungsverhältnisses zwischen der Spannung in dem windparkinternen Netz und der Spannung in dem externen Netz und einem Windparkregler, der dem Stufenschalter ein Übersetzungsverhältnis vorgibt, wobei der Windparkregler dem Stufenschalter das Übersetzungsverhältnis in Abhängigkeit von der elektrischen Auslastung einer Windenergieanlage des Windparks vorgibt. In einem Kennfeldspeicher ist ein U-Q-Kennfeld hinterlegt. Eine Windenergieanlage des Windparks umfasst ein Logikmodul, das die Spannung U und die Blindkomponente Q der von der Windenergieanlage abgegebenen elektrischen Energie mit dem U-Q-Kennfeld vergleicht. Der Windparkregler umfasst ein Logikmodul, das die Spannung U und die Blindkomponente Q des windparkinternen Netzes mit dem U-Q-Kennfeld vergleicht. Der Windparkregler umfasst ein Bewertungsmodul, das anhand der aktuellen Wirkleistungsabgabe und/oder eines Spannungsmittelwertes und/oder einer Zustandsgröße des Stufenschalters darüber entscheidet, ob der Stufenschalter umgeschaltet wird. Der Stufenschalter ist dazu ausgelegt, in einem Schaltvorgang einen Wechsel über mehrere Schaltstufen durchzuführen. DE 10 2008 048 258 A1 describes a wind farm with a transfer station, where electric power generated in the wind farm is transferred from an internal wind park network to an external grid, a tap changer for setting the transmission ratio between the voltage in the wind farm internal network and the voltage in the external grid, and a wind farm controller; the stepper switch sets a gear ratio, the wind farm governor specifies the gear ratio as a function of the electrical load of a wind turbine of the wind farm. In a map memory, a UQ map is stored. A wind turbine of the wind farm comprises a logic module which compares the voltage U and the reactive component Q of the electrical energy emitted by the wind turbine with the UQ map. The wind farm controller comprises a logic module which compares the voltage U and the reactive component Q of the wind park-internal network with the UQ map. The wind farm controller comprises an evaluation module that decides on the basis of the current active power output and / or a voltage mean value and / or a state variable of the tap changer on whether the tap changer is toggled. The tap changer is designed to perform a change over several switching stages in a switching operation.

Dieses Dokument beschreibt außerdem ein Verfahren zum Betreiben eines Windparks, bei dem in dem Windpark erzeugte elektrische Energie über ein windparkinternes Netz zu einer Übergabestation transportiert wird und bei dem die elektrische Energie vor der Übergabe an ein externes Netz auf eine Spannung transformiert wird, die um ein wählbares Übersetzungsverhältnis höher ist als die Spannung in dem windparkinternen Netz, mit den Schritten: a) Ermitteln der elektrischen Auslastung einer Windenergieanlage des Windparks; und b) Einstellen des Übersetzungsverhältnis in Abhängigkeit von der elektrischen Auslastung der Windenergieanlage. Die elektrische Auslastung der Windenergieanlage wird durch Vergleich von Spannung U und einer Blindkomponente Q der in der Windenergieanlage erzeugten elektrischen Energie mit einem U-Q-Kennfeld ermittelt. Anhand des U-Q-Kennfelds wird eine Blindleistungsreserve der Windenergieanlage ermittelt. Bei einer Änderung des Übersetzungsverhältnisses werden neue Sollwerte für die Spannung und/oder die Blindkomponente an die Windenergieanlagen des Windparks vorgegeben.This document also describes a method for operating a wind farm, in which electrical energy generated in the wind farm is transported via a wind farm internal network to a transfer station and in which the electrical energy is transformed before being transferred to an external network to a voltage that by a selectable transmission ratio is higher than the voltage in the wind farm internal network, comprising the steps of: a) determining the electrical load of a wind turbine of the wind farm; and b) setting the transmission ratio as a function of the electrical load of the wind turbine. The electrical load of the wind turbine is determined by comparing voltage U and a reactive component Q of the electrical energy generated in the wind turbine with a U-Q map. Based on the U-Q map, a reactive power reserve of the wind turbine is determined. When the transmission ratio changes, new setpoint values for the voltage and / or the reactive component are predefined to the wind energy installations of the wind farm.

In diesem Dokument wird beschrieben, dass die elektrische Auslastung der Windenergieanlage dadurch ermittelt wird, dass die Spannung U und eine Blindkomponente Q der in der Windenergieanlage erzeugten elektrischen Energie mit einem U-Q-Kennfeld verglichen werden, wobei Blindkomponente als Oberbegriff zu verstehen ist, der die verschiedenen Darstellungsmöglichkeiten wie Blindstrom, Blindleistung, Phasenwinkel etc. umfasst. Unter einem U-Q-Kennfeld ist folgendes zu verstehen. Der Generator einer Windenergieanlage erzeugt die elektrische Energie bei kleinen Spannungen, die zumeist zwischen 400 V und 6 kV liegen. Vor der Übergabe an das windparkinterne Netz wird die elektrische Energie mit einem zu der Windenergieanlage gehörigen Transformator auf eine mittlere Spannung von beispielsweise 20 kV gebracht. Durch den Transformator der Windenergieanlage wird sowohl die Wirkkomponente als auch die Blindkomponente der elektrischen Energie übertragen. Es ist bekannt, dass die Fähigkeit des Transformators zur Übertragung der Blindkomponente davon abhängt, mit welcher Spannung der Transformator betrieben wird. An einem Ende des zulässigen Spannungsbereichs kann die Windenergieanlage ohne Einschränkung kapazitive Blindkomponente erzeugen (übererregter Betrieb), während sie bei der Übertragung einer induktiven Blindkomponente (untererregter Betrieb) schneller an ihre Systemgrenzen stößt. Am anderen Ende des zulässigen Spannungsbereichs kann die Windenergieanlage gut eine induktive Blindkomponente erzeugen, während sie bei der Übertragung einer kapazitive Blindkomponente schneller an ihre Systemgrenzen stößt. Dieser Zusammenhang ist im Detail beschrieben in DE 10 2008 018 748 . Betrachtet man ein aus dieser Erkenntnis abgeleitetes U-Q-Kennfeld, so fehlen im Vergleich zu der Rechteckform, die man erwarten würde, wenn die Fähigkeit zur Übertragung der Blindkomponente über den gesamten zulässigen Spannungsbereich gleich wäre, zwei Ecken. Die Form des U-Q-Kennfelds nähert sich dadurch an einen Rhombus an. Betrachtet man das U-Q-Kennfeld auf der Seite des windparkinternen Netzes, so ist bei hoher Spannung die Fähigkeit zur Einspeisung von kapazitiver Blindkomponente und bei niedriger Spannung die Fähigkeit zur Einspeisung von induktiver Blindkomponente vermindert. Auf der Seite des Generators sind die Vorzeichen umgekehrt. Die Spannung U wird vorzugsweise auf der Seite des windparkinternen Netzes betrachtet, eine Betrachtung auf der Generatorseite ist jedoch ebenfalls möglich. Das U-Q-Kennfeld ändert sich je nachdem, wie viel Leistung die Windenergieanlage abgibt. So kann bei geringerer Wirkleistung ein größerer Anteil an Blindleistung eingespeist werden. Die rhombusähnliche Form des U-Q-Kennfelds bleibt aber erhalten. Nimmt man den durch die Spannung U und die Blindkomponente Q definierten Arbeitspunkt der Windenergieanlage und vergleicht diesen mit dem U-Q-Kennfeld, so kann von einer geringen elektrischen Auslastung der Windenergieanlage ausgegangen werden, wenn der Arbeitspunkt von allen Grenzen des U-Q-Kennfelds weit entfernt ist. Die elektrische Auslastung wird grösser, wenn sich der Arbeitspunkt einer Grenze des U-Q-Kennfelds annähert. Nähert sich der Arbeitspunkt dort an eine Grenze des U-Q-Kennfelds an, wo im Vergleich zum Rechteck eine Ecke fehlt, so wäre es die klassische Reaktion, die Blindkomponente Q zu vermindern und in Kauf zu nehmen, dass die Windenergieanlage die Blindleistungsvorgabe nicht mehr erfüllen kann. Im Rahmen der aus diesem Dokument bekannten Erfindung kann stattdessen durch eine Änderung des Übersetzungsverhältnisses die Spannung im windparkinternen Netz geändert werden. Der Arbeitspunkt der Windenergieanlage entfernt sich dadurch von den Grenzen des U-Q-Kennfelds und die elektrische Auslastung der Windenergieanlage wird vermindert. Der so gewonnene Spielraum kann genutzt werden, um die Blindkomponente Q zu erhöhen, so dass die Blindleistungsvorgabe wieder erfüllt wird.In this document it is described that the electrical utilization of the wind turbine is determined by comparing the voltage U and a reactive component Q of the electrical energy generated in the wind turbine with a UQ map, where reactive component is to be understood as the generic term Representation options such as reactive current, reactive power, phase angle, etc. includes. A UQ map is to be understood as follows. The generator of a wind turbine generates the electrical energy at low voltages, which are usually between 400 V and 6 kV. Before the transfer to the wind farm's internal network, the electrical energy is brought to a mean voltage of, for example, 20 kV with a transformer belonging to the wind turbine. Through the transformer of the wind turbine both the active component and the reactive component of the electrical energy is transmitted. It is known that the ability of the transformer to transmit the reactive component depends on the voltage with which the transformer is operated. At one end of the allowable voltage range, the wind turbine can generate capacitive reactive components without restriction (over-excited operation), while it reaches its system limits more quickly when transmitting an inductive reactive component (under-excited operation). At the other end of the allowable voltage range, the wind turbine may well generate an inductive reactive component while transmitting a reactive current capacitive reactive component reaches its system limits more quickly. This relationship is described in detail in DE 10 2008 018 748 , Considering a UQ map derived from this finding, two corners are missing compared to the rectangular shape that would be expected if the ability to transmit the dummy component were the same over the entire allowable voltage range. The shape of the UQ map thus approximates to a rhombus. Looking at the UQ map on the side of the wind park's internal network, the capacity to inject capacitive reactive components at high voltage and the capacity to inject inductive reactive components at low voltages are reduced. On the generator side, the signs are reversed. The voltage U is preferably considered on the side of the wind park-internal network, however, a view on the generator side is also possible. The UQ map changes depending on how much power the wind turbine delivers. Thus, a smaller proportion of reactive power can be used to feed in a larger proportion of reactive power. The rhombus-like shape of the UQ map remains intact. If one takes the operating point of the wind energy plant defined by the voltage U and the reactive component Q and compares this with the UQ characteristic map, it can be assumed that the wind energy plant has a low electrical load if the operating point is far away from all limits of the UQ characteristic map. The electrical load increases as the operating point approaches a limit of the UQ map. If the operating point approaches a boundary of the UQ map where there is no corner compared to the rectangle, it would be the classic reaction to reduce the reactive component Q and accept that the wind turbine can no longer meet the reactive power specification , Within the scope of the invention known from this document, the voltage in the wind farm internal network can instead be changed by changing the transmission ratio. The operating point of the wind turbine thereby moves away from the limits of the UQ map and the electrical load of the wind turbine is reduced. The margin thus gained can be used to increase the reactive component Q, so that the reactive power specification is met again.

Dieser bekannte Windpark umfasst eine Mehrzahl von Windenergieanlagen. Jede Windenergieanlage umfasst einen Rotor, dessen Rotation über einen Generator in elektrische Energie umgewandelt wird. Die von dem Generator mit einer Spannung von z. B. 690 V erzeugte elektrische Energie wird bereits in der Windenergieanlage auf eine Mittelspannung von 20 kV transformiert. Mit der Spannung von 20 kV wird die elektrische Energie in ein windparkinternes Netz eingespeist und über das windparkinterne Netz zu einer Übergabestation geleitet. Die Abschnitte des windparkinternen Netzes haben jeweils auch die Wirkung einer Induktivität, einer Kapazität und eines Widerstands. In der Übergabestation ist ein Transformator mit einem Stufenschalter vorgesehen, mit dem die elektrische Energie von der 20 kV-Mittelspannung auf eine Hochspannung von 110 kV übersetzt wird. In der Übergabestation wird die elektrische Energie an ein externes Netz übergeben. Das externe Netz ist normalerweise ein öffentliches Energieverteilungsnetz, über das die elektrische Energie zu den Verbrauchern verteilt wird. Der Windparkregler wird mit verschiedenen Informationen über den Zustand des Windparks versorgt. Die Informationen umfassen die tatsächliche Spannung und den tatsächlichen Strom im windparkinternen Netz, Vorgaben von außen für die Spannung und die Blindleistung, mit der die elektrische Energie an das externe Netz übergeben werden soll, sowie Informationen über den Zustand der Windenergieanlagen. Der Windparkregler verarbeitet diese Informationen und errechnet daraus Vorgaben, die an die Komponenten des Windparks übermittelt werden. So erhält der Stufenschalter eine Vorgabe für das Übersetzungsverhältnis. Den Windenergieanlagen werden Vorgaben für die Spannung und die Blindleistung gemacht.This known wind farm includes a plurality of wind turbines. Each wind turbine includes a rotor whose rotation is converted into electrical energy by a generator. The of the generator with a voltage of z. B. 690 V generated electrical energy is already transformed in the wind turbine to a medium voltage of 20 kV. With the voltage of 20 kV, the electrical energy is fed into a wind farm-internal network and routed via the wind farm's internal network to a transfer station. The sections of the wind park's internal network also each have the effect of an inductance, a capacitance and a resistance. In the transfer station, a transformer is provided with a tap changer, with which the electrical energy is translated from the 20 kV medium voltage to a high voltage of 110 kV. In the transfer station, the electrical energy is transferred to an external network. The external network is normally a public power distribution network through which electrical energy is distributed to consumers. The wind farm controller is supplied with various information about the condition of the wind farm. The information includes the actual voltage and current in the wind park's internal grid, external requirements for the voltage and reactive power with which the electrical energy is to be transferred to the external grid, as well as information about the condition of the wind turbines. The wind farm controller processes this information and uses it to calculate specifications that are transmitted to the components of the wind farm. Thus, the tap changer receives a specification for the transmission ratio. The wind turbines are given specifications for the voltage and the reactive power.

Dieses Dokument zeigt ein in 6 der vorliegenden Anmeldung wiedergegebenes U-Q-Kennfeld, das den Arbeitsbereich anzeigt, innerhalb dessen eine Windenergieanlage elektrische Energie in das windparkinterne Netz einspeisen kann. In dem U-Q-Kennfeld ist auf der einen Achse in normierten Einheiten die Spannung U angegeben, wobei ein Wert von 1,00 Nennspannung entspricht. Auf der anderen Achse ist ebenfalls in normierten Einheiten die Blindkomponente Q aufgetragen, wobei Strom und Spannung bei einem Wert von Q = 0,0 in Phase sind. Bei Q = 0,0 wird also nur Wirkleistung übertragen, die Blindkomponente ist 0. Bei positiven Werten Q wird kapazitive Blindleistung eingespeist, bei negativen Werten Q induktive Blindleistung. Wäre die Windenergieanlage über den gesamten zulässigen Spannungsbereich zwischen 0,95 und 1,06 in gleichem Masse in der Lage, Blindleistung zur Verfügung zu stellen, so hätte das U-Q-Kennfeld die Form eines Rechtecks. Wie oben erläutert ist jedoch bei niedrigen Spannungen die Fähigkeit zum Einspeisen von induktiver Blindleistung vermindert. Hingegen ist bei Spannungen am oberen Ende des zulässigen Bereichs die Fähigkeit zum Einspeisen von kapazitiver Blindleistung vermindert. Im Vergleich zu einem Rechteck fehlen deswegen die Ecke links unten und die Ecke rechts oben, das Kennfeld ist der Form eines Rhombus angenähert.This document shows an in 6 reproduced in the present application UQ map indicating the work area within which a wind turbine can feed electrical energy into the wind farm's internal network. In the UQ characteristic field, the voltage U is specified on one axis in standardized units, a value of 1.00 corresponding to nominal voltage. On the other axis, the reactive component Q is also plotted in normalized units, with current and voltage in phase at a value of Q = 0.0. At Q = 0.0, therefore, only active power is transmitted, the reactive component is 0. For positive values Q, capacitive reactive power is fed in, for negative values Q inductive reactive power. If the wind turbine were able to provide reactive power to the same extent over the entire permitted voltage range between 0.95 and 1.06, the UQ characteristic map would have the shape of a rectangle. However, as explained above, at low voltages, the ability to inject inductive reactive power is reduced. On the other hand, in the case of voltages at the upper end of the permissible range, the ability to supply capacitive reactive power is reduced. Compared to a rectangle, the corner on the bottom left and the corner on the top right are missing, the map is approximating the shape of a rhombus.

Ermittelt man die Spannung U und die Blindkomponente Q, mit der die Windenergieanlage elektrische Energie in das windparkinterne Netz einspeist, so lässt sich in dem U-Q-Kennfeld der 6 der Arbeitspunkt einzeichnen, an dem die Windenergieanlage arbeitet. Allgemein deutet ein Arbeitspunkt in der Mitte des U-Q-Kennfelds eher auf eine geringe elektrische Auslastung der Windenergieanlage hin. Ein Arbeitspunkt nahe der Grenze des U-Q-Kennfelds ist ein Hinweis auf eine hohe elektrische Auslastung der Windenergieanlage. Die dargestellte Figur gilt für eine hohe oder normale Wirkleistungsabgabe. Für den Bereich der niedrigen Wirkleistungsabgabe würde eine andere Grenzfunktion herangezogen werden, bei der z. B. der Arbeitsbereich des U-Q-Diagramms nach links und rechts vergrößert sind. In dem U-Q-Kennfeld der 6 ist ein möglicher Arbeitspunkt 116 einer Windenergieanlage eingezeichnet. Die Spannung U liegt bei 1,04 der Nennspannung, und es wird so viel kapazitive Blindleistung eingespeist, dass der Arbeitspunkt direkt an der Grenze des U-Q-Kennfelds liegt. Der Arbeitspunkt 116 kann beibehalten werden, wenn die Windenergieanlage gerade so viel Blindleistung liefern kann, wie gefordert ist. In einem anderen Fall müsste die Windenergieanlage eigentlich mehr Blindleistung liefern, um die Blindleistungsvorgabe zu erfüllen, wegen hoher elektrischer Auslastung kann sie dies jedoch nicht. Eine Erhöhung der Blindleistungskomponente hätte einen Arbeitspunkt außerhalb U-Q-Kennfelds und damit außerhalb des zulässigen Bereichs zur Folge. In diesem Fall macht die Windenergieanlage eine Meldung über ihre hohe elektrische Auslastung an den Windparkregler. Der Windparkregler kann gemäß dem erfindungsgemäßen Verfahren reagieren, indem der Stufenschalter um eine Stufe geschaltet wird, so dass die Spannung im windparkinternen Netz absinkt. Der Arbeitspunkt 116 wird zum Arbeitspunkt 116a. Der Regler der Windenergieanlage stellt fest, dass die elektrische Auslastung der Windenergieanlage am Arbeitspunkt 116a im Vergleich zum Arbeitspunkt 116 gesunken ist. Sollte die kapazitive Blindleistung am Arbeitspunkt 116a nicht ausreichen, so würde der Regler der Windenergieanlage den Arbeitspunkt 124 einstellen. Am Arbeitspunkt 124 ist die Windenergieanlage also anders als am Arbeitspunkt 116 in der Lage, einer Forderung nach erhöhter kapazitiver Blindleistung nachzukommen. Zugleich ist die elektrische Auslastung am Arbeitspunkt 124 geringer als am Arbeitspunkt 116, weil der Arbeitspunkt 124 noch einen Abstand zu den Grenzen des U-Q-Kennfelds hat. Durch die Betätigung des Stufenschalters wird also der Arbeitspunkt der Windenergieanlage zunächst so verschoben, dass sich die elektrische Auslastung verringert. Ein Teil des dadurch gewonnenen Spielraums wird genutzt, um mehr kapazitive Blindleistung einzuspeisen.If one determines the voltage U and the reactive component Q with which the wind energy system feeds electrical energy into the wind farm's internal network, the UQ characteristic map of the wind energy system can be used 6 Draw the working point at which the wind turbine works. In general, an operating point in the middle of the UQ map indicates a low electrical load on the wind turbine. An operating point near the boundary of the UQ map is an indication of a high electrical load of the wind turbine. The figure shown applies to a high or normal active power output. For the range of low active power output another limit function would be used, in which z. For example, the work area of the UQ diagram is enlarged left and right. In the UQ map of the 6 is a possible working point 116 drawn a wind turbine. The voltage U is at 1.04 of the rated voltage and so much capacitive reactive power is supplied that the operating point is directly at the boundary of the UQ map. The working point 116 can be maintained if the wind turbine can deliver just enough reactive power as required. In another case, the wind turbine would actually have to deliver more reactive power to meet the reactive power requirement, but because of high electrical load, it can not do so. An increase in the reactive power component would result in an operating point outside the UQ map and thus outside the permissible range. In this case, the wind turbine sends a message about its high electrical load to the wind farm controller. The wind farm controller can respond according to the inventive method by the tap changer is switched by one stage, so that the voltage in the wind park internal network drops. The working point 116 becomes the working point 116a , The controller of the wind turbine determines that the electrical load of the wind turbine at the operating point 116a in comparison to the operating point 116 has sunk. Should the capacitive reactive power at the operating point 116a insufficient, then the controller of the wind turbine would be the operating point 124 to adjust. At the working point 124 So the wind energy plant is different than at the working point 116 able to meet a demand for increased capacitive reactive power. At the same time, the electrical load is at the operating point 124 less than at the operating point 116 because of the working point 124 still has a distance to the boundaries of the UQ map. By operating the tap changer so the operating point of the wind turbine is initially shifted so that reduces the electrical load. Part of the resulting space is used to feed more capacitive reactive power.

Die Anforderungen für den Betrieb von Windenergieanlagen und Windparks sowie allgemein auch von anderen Erneuerbare-Energie-Anlagen und Erneuerbare-Energie-Parks werden von den Netzbetreibern in Netzanschlussregeln definiert und immer weiter verschärft. Solche Netzanschlussregeln sind in Deutschland beispielsweise in der von dem BDEW Bundesverband der Energie- und Wasserwirtschaft e. V. herausgegebenen BDEW-Richtlinie „Erzeugungsanlagen am Mittelspannungsnetz”, Ausgabe Juni 2008 (MSR 2008) und der ”Vierten Ergänzung” von Januar 2013 (4. Ergänzung zur MSR 2008) enthalten. Diese Richtlinie gilt für Planung, Errichtung, Betrieb und Änderung von Erzeugungsanlagen, die an das Mittelspannungsnetz eines Netzbetreibers angeschlossen und parallel mit diesem Netz betrieben werden. Sie gilt auch, wenn der Netzanschlusspunkt der Erzeugungsanlage im Niederspannungsnetz, der Verknüpfungspunkt mit dem öffentlichen Netz aber im Mittelspannungsnetz liegt. Hiermit sind z. B. Erzeugungsanlagen gemeint, die an ein Niederspannungsnetz angeschlossen sind, das über einen separaten Kundentransformator mit dem Mittelspannungsnetz des Netzbetreibers verbunden ist und an das keine Kunden der allgemeinen Versorgung angeschlossen sind. Für Erzeugungsanlagen, deren Netzanschlusspunkt zwar im Mittelspannungsnetz, deren Verknüpfungspunkt aber im Hochspannungs- oder Höchstspannungsnetz liegt, sind die entsprechenden Technischen Anschlussregeln anzuwenden. Für Erzeugungsanlagen, die ihren Netzanschlusspunkt und ihren Verknüpfungspunkt im Niederspannungsnetz haben, gilt dagegen die VDEW-Richtlinie „Eigenerzeugungsanlagen am Niederspannungsnetz” . Erzeugungsanlagen im Sinne dieser Richtlinie sind zum Beispiel Windenergieanlagen, Wasserkraftanlagen, BHKW (z. B. Biomasse-, oder Biogas- oder Erdgaskraftwerke) und Photovoltaikanlagen. Eine Erzeugungsanlage kann aus einem einzelnen Generator oder aus mehreren Erzeugungseinheiten bestehen (z. B. Windpark). Die elektrische Energie kann von Synchronoder Asynchrongeneratoren mit oder ohne Umrichter oder von Gleichstromgeneratoren (z. B. Solarzellen von Photovoltaikanlagen) mit Wechselrichtern erzeugt werden.The requirements for the operation of wind turbines and wind farms as well as in general also of other renewable energy plants and renewable energy parks are defined by the grid operators in grid connection rules and tightened ever further. Such grid connection rules are in Germany, for example, in the by the BDEW Bundesverband der Energie- und Wasserwirtschaft e. V. issued BDEW Guideline "Generation Plants on the Medium-Voltage Grid", June 2008 issue (MSR 2008) and the "Fourth supplement" of January 2013 (4th supplement to the MSR 2008) contain. This Directive applies to the design, construction, operation and modification of generation plants connected to the medium-voltage grid of a grid operator and operated in parallel with that grid. It also applies if the grid connection point of the generating plant in the low-voltage grid is the point of connection to the public grid but in the medium-voltage grid. Hereby z. B. generating plants, which are connected to a low-voltage network, which is connected via a separate customer transformer to the medium voltage network of the network operator and to which no customers of the general supply are connected. For generating plants whose grid connection point is in the medium-voltage grid but whose point of connection is in the high-voltage or extra-high-voltage grid, the corresponding technical connection rules must be applied. However, for generating plants having their grid connection point and their point of connection in the low - voltage grid, the VDEW guideline "Generating plants on the low-voltage grid" , Generating plants within the meaning of this guideline are, for example, wind turbines, hydropower plants, CHP plants (eg biomass or biogas or natural gas power plants) and photovoltaic plants. A generating plant can consist of a single generator or several generating units (eg wind farm). The electrical energy can be generated by synchronous or asynchronous generators with or without converters or by DC generators (eg solar cells of photovoltaic systems) with inverters.

Die bekannten Windenergieanlagen, Windparks, Photovoltaikanlagen und Solarparks können jedoch die laut den aktuell gültigen Netzanschlussregeln, die durch die besagte 4. Ergänzung zur MSR 2008 mit Wirkung zum Januar 2013 verschärft wurden, bereitzustellende Blindleistung bei Unterspannung im Netz nicht oder nur mit Mühe und Aufwand beispielsweise durch Wirkleistungsreduzierung bereitstellen oder müssen gar vom Netz genommen werden. Dies gilt insbesondere für Windenergieanlagen ohne Vollumrichter, z. B. mit doppeltgespeister Asynchronmaschine. Bekannte Windenergieanlagen mit Vollumrichter können dies durch die Integration von leistungselektronischen Zusatzschränken in der Windenergieanlage, allerdings sind derartige Vollumrichter und leistungselektronischen Zusatzschränke sehr teuer.The well-known wind turbines, wind farms, photovoltaic systems and solar parks can, however, according to the current grid connection rules, by the said 4. Supplement to the MSR 2008 with effect from January 2013 have been tightened, to be provided reactive power at low voltage in the network or only with difficulty and effort, for example, by active power reduction provide or even need to be taken off the grid. This is especially true for wind turbines without full inverter, z. B. with double-fed asynchronous machine. Known wind turbines with full converter can do this by the integration of power electronic auxiliary cabinets in the wind turbine, however, such full converter and power electronic additional cabinets are very expensive.

Vor diesem Hintergrund schlägt die Erfindung die Gegenstände der unabhängigen Ansprüche vor. Vorteilhafte Weiterbildungen und Ausführungsformen der Erfindung sind in den abhängigen Ansprüchen beschrieben.Against this background, the invention proposes the subject matters of the independent claims in front. Advantageous developments and embodiments of the invention are described in the dependent claims.

Die Erfindung schlägt gemäß einem ersten Aspekt eine Erneuerbare-Energie-Anlage, insbesondere eine Windenergieanlage oder Photovoltaikanlage, vor, umfassend oder aufweisend

  • – eine Energieerzeugungseinheit, die elektrischen Wechselstrom, insbesondere Drehstrom erzeugen kann;
  • – einen Anlagentransformator mit einstellbarem Übersetzungsverhältnis, dessen Primärseite an die Energieerzeugungseinheit angeschlossen ist und dessen Sekundärseite an ein Stromnetz angeschlossen werden kann;
  • – ein Anlagensteuersystem, das an den Anlagentransformator angeschlossen und derart ausgebildet ist, dass es das Übersetzungsverhältnis des Anlagentransformators in Abhängigkeit von einer Anlagenblindleistung oder einer aktuellen Blindleistung, die die Anlage liefert, und/oder von einer Anlagenblindleistungsvorgabe oder einer vorbestimmten Blindleistung, die die Anlage, insbesondere gemäß einer Forderung eines Netzbetreibers, an das Stromnetz liefern soll, und/oder von einer primärseitigen Anlagenspannung oder einer aktuellen Spannung, die an der Primärseite des Anlagentransformators anliegt, und/oder von einer primärseitigen Anlagenspannungsvorgabe oder einer vorbestimmten Spannung, die an der Primärseite des Anlagentransformators anliegen soll, und/oder von einer sekundärseitigen Anlagenspannung oder einer aktuellen Spannung, die an der Sekundärseite des Anlagentransformators anliegt, und/oder von einer sekundärseitigen Anlagenspannungsvorgabe oder einer vorbestimmten Spannung, die an der Sekundärseite des Anlagentransformators, insbesondere gemäß einer Forderung eines Netzbetreibers, anliegen soll, und/oder von einem Arbeits- oder Betriebspunkt der Energieerzeugungseinheit und/oder von einem Arbeits- oder Betriebspunkt der Anlage einstellen kann.
The invention proposes according to a first aspect of a renewable energy plant, in particular a wind turbine or photovoltaic system, before, comprising or comprising
  • - A power generation unit that can generate electrical alternating current, in particular three-phase current;
  • - An installation transformer with adjustable transmission ratio, the primary side is connected to the power generation unit and the secondary side can be connected to a power grid;
  • A plant control system connected to the plant transformer and arranged to provide the transformation ratio of the plant transformer as a function of a plant reactive power or current reactive power supplied by the plant, and / or of a plant reactive power demand or a predetermined reactive power which the plant, in particular according to a demand of a grid operator to supply power to the grid, and / or from a primary-side plant voltage or a current voltage applied to the primary side of the plant transformer, and / or from a primary-side plant voltage preset or a predetermined voltage at the primary side of Anlagentransformators should abut, and / or from a secondary-side system voltage or a current voltage applied to the secondary side of the plant transformer, and / or from a secondary-side plant voltage preset or a predetermined S voltage, which should be applied to the secondary side of the plant transformer, in particular according to a requirement of a network operator, and / or set by a working or operating point of the power generation unit and / or from a working or operating point of the system.

Die gemäß dem ersten Aspekt vorgeschlagene Anlage ermöglicht die Erfüllung strengerer oder verschärfter Netzanschlussregeln, insbesondere Blindleistungsvorgaben.The proposed system according to the first aspect allows the fulfillment of stricter or tightened grid connection rules, in particular reactive power specifications.

Das Anlagensteuersystem ist bevorzugt derart ausgebildet, dass es dieses Übersetzungsverhältnis in Abhängigkeit von dem Arbeits- oder Betriebspunkt der Energieerzeugungseinheit, der beispielsweise durch deren aktuelle Spannung, deren aktuelle Wirkleistung und deren aktuelle Blindleistung definiert ist, und/oder von dem Arbeits- oder Betriebspunkt der Anlage, der beispielsweise durch deren aktuelle Spannung, deren aktuelle Blindleistung und deren aktuelle Wirkleistung definiert ist, einstellen kann. Jeder dieser Betriebspunkte kann nach Bedarf auch anders definiert sein, beispielsweise durch die entsprechende aktuelle Spannung, die entsprechende aktuelle Wirkleistung und die entsprechende aktuelle Phasenverschiebung oder durch die entsprechende aktuelle Spannung, den entsprechenden aktuellen Strom und die entsprechende aktuelle Phasenverschiebung oder durch eine andere Kombination von Strom und/oder Spannung und/oder Phasenverschiebung und/oder Wirkleistung und/oder Blindleistung und/oder Scheinleistung.The plant control system is preferably designed such that it is this ratio as a function of the operating or operating point of the power generation unit, which is defined for example by their current voltage, their current active power and their current reactive power, and / or from the working or operating point of the system , which can be set, for example, by their current voltage, whose current reactive power and their actual active power is defined. Each of these operating points may also be differently defined as required, for example by the corresponding current voltage, the corresponding actual active power and the corresponding current phase shift or by the corresponding current voltage, the corresponding current and the corresponding current phase shift or by another combination of power and / or voltage and / or phase shift and / or active power and / or reactive power and / or apparent power.

Der Anlagentransformator kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise als Trockentransformator oder als Öltransformator. Seine Primärseite wird hier auch als Unterspannungsseite oder Generatorseite bezeichnet, und seine Sekundärseite wird hier auch als Oberspannungsseite oder Netzseite bezeichnet.The plant transformer can be configured as desired in any manner, for example as a dry transformer or as an oil transformer. Its primary side is also referred to here as undervoltage side or generator side, and its secondary side is also referred to here as the high-voltage side or the network side.

Das Stromnetz kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise als Parkstromnetz, an das mehrere Anlagen angeschlossen sind und das typischerweise eine Nennspannung im Mittelspannungsbereich, beispielsweise von 12 kV oder 24 kV oder 36 kV, hat, oder als Verbraucherstromnetz oder Verteilnetz oder Verbundnetz, das typischerweise eine Nennspannung im Mittelspannungsbereich, beispielsweise von 12 kV oder 24 kV oder 36 kV, oder im Hochspannungsbereich, beispielsweise von 110 kV oder 120 kV, hat. Vorzugsweise ist das Stromnetz das Parkstromnetz eines der gemäß dem zweiten Aspekt vorgeschlagenen Parks.The power grid can be configured as desired in any way, for example, as a park power network to which several systems are connected and typically has a rated voltage in the medium voltage range, for example 12 kV or 24 kV or 36 kV, or as a consumer power grid or distribution network or Composite network, which typically has a rated voltage in the medium voltage range, for example, 12 kV or 24 kV or 36 kV, or in the high voltage range, for example, 110 kV or 120 kV. Preferably, the power grid is the park power network of one of the parks proposed according to the second aspect.

Das Anlagensteuersystem kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise derart, dass es dieses Übersetzungsverhältnis einstellen kann, indem es den Anlagentransformator in Abhängigkeit von der Anlagenblindleistungsvorgabe derart ansteuern kann, dass er ein Übersetzungsverhältnis hat, mit dem die Anlage eine der Anlagenblindleistungsvorgabe entsprechende Blindleistung bereitstellen und/oder an das Stromnetz liefern kann.The plant control system can be configured as desired in any manner, for example, such that it can set this ratio by the plant transformer can drive in response to the plant blind output specification such that it has a gear ratio with which the system one of the plant blind output specification Provide reactive power and / or can supply to the power grid.

Es kann vorgesehen sein, dass jede der vorgeschlagenen Anlagen eine Windenergieanlage ist, wobei die Energieerzeugungseinheit umfasst

  • – einen Rotor;
  • – einen Generator, der an den Rotor gekoppelt ist und den elektrischen Wechselstrom erzeugen kann.
It can be provided that each of the proposed plants is a wind energy plant, wherein the energy generation unit comprises
  • A rotor;
  • - A generator which is coupled to the rotor and can generate the electrical alternating current.

Der Generator kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise als einphasiger oder mehrphasiger oder dreiphasiger Generator oder als Drehstromgenerator und/oder derart, dass er über ein Getriebe oder direkt an den Rotor gekoppelt ist.The generator can be designed as desired in any desired manner, for example as a single-phase or multi-phase or three-phase generator or as an alternator and / or in such a way that it is coupled via a gear or directly to the rotor.

Es kann vorgesehen sein, dass jede der vorgeschlagenen Anlagen umfasst einen Stromrichter, nämlich einen Umrichter, der an den Generator und die Primärseite angeschlossen ist. It can be provided that each of the proposed systems comprises a power converter, namely a converter which is connected to the generator and the primary side.

Da mithilfe des Anlagentransformators die Anlagenspannung nach Bedarf geändert werden kann, kann der Stromrichter im Vergleich zu bekannten Anlagen für eine kleinere Nennleistung ausgelegt und somit kostengünstiger sein.Since the system transformer can be used to change the system voltage as required, the converter can be designed for a lower rated power compared to known systems and thus be more cost-effective.

Der Stromrichter kann nach Bedarf auf beliebige Art und Weise ausgebildet sein und beispielsweise einen Gleichspannungszwischenkreis oder einen Gleichstromzwischenkreis oder keinen Zwischenkreis aufweisen oder ein Direktumrichter oder Matrixumrichter sein.The power converter can be designed as desired in any desired manner and, for example, have a DC intermediate circuit or a DC intermediate circuit or no intermediate circuit or be a cycloconverter or matrix converter.

Es kann vorgesehen sein, dass der Generator ein Synchrongenerator ist.It can be provided that the generator is a synchronous generator.

Somit ist die Primärseite über den Stromrichter an den Generator angeschlossen.Thus, the primary side is connected to the generator via the power converter.

Typischerweise erzeugt dieser Generator eine Spannung im Niederspannungsbereich, beispielsweise von 690 V.Typically, this generator generates a voltage in the low voltage range, for example of 690 V.

Es kann vorgesehen sein, dass

  • – der Generator ein doppeltgespeister Asynchrongenerator mit einem Ständer und einem Läufer, insbesondere Schleifringläufer ist;
  • – der Ständer an die Primärseite angeschlossen ist;
  • – der Läufer an den Stromrichter angeschlossen ist.
It can be provided that
  • - The generator is a double-fed asynchronous generator with a stator and a rotor, in particular slip ring rotor;
  • - the stand is connected to the primary side;
  • - The rotor is connected to the power converter.

Somit ist die Primärseite über den Stromrichter an den Generator angeschlossen.Thus, the primary side is connected to the generator via the power converter.

Typischerweise erzeugt dieser Generator am Ständer und am Läufer eine Spannung im Niederspannungsbereich, beispielsweise von 690 V, oder am Ständer eine Spannung im niedrigen Mittelspannungsbereich, beispielsweise von 6 kV, und am Läufer eine Spannung im Niederspannungsbereich, beispielsweise von 690 V.Typically, this generator generates a voltage in the low-voltage range, for example of 690 V, on the stator and on the rotor, or a voltage in the low medium-voltage range, for example of 6 kV, at the stator, and a voltage in the low-voltage range, for example of 690 V, at the rotor.

Es kann vorgesehen sein, dass der Anlagentransformator eine Primärwicklung oder je Phase eine Primärwicklung aufweist, die an den Ständer und an den Stromrichter angeschlossen ist.It can be provided that the plant transformer has a primary winding or a primary winding per phase, which is connected to the stator and to the power converter.

Somit ist die Primärwicklung über den Stromrichter an den Läufer angeschlossen.Thus, the primary winding is connected to the rotor via the power converter.

Es kann vorgesehen sein, dass der Anlagentransformator eine erste Primärwicklung oder je Phase eine erste Primärwicklung, die an den Ständer angeschlossen ist, und eine zweite Primärwicklung oder je Phase eine zweite Primärwicklung aufweist, die an den Stromrichter angeschlossen ist.It can be provided that the plant transformer has a first primary winding or per phase, a first primary winding which is connected to the stator, and a second primary winding or per phase, a second primary winding which is connected to the power converter.

Somit ist die zweite Primärwicklung über den Stromrichter an den Läufer angeschlossen.Thus, the second primary winding is connected via the power converter to the rotor.

Es kann vorgesehen sein, dass jede der vorgeschlagenen Anlagen eine Photovoltaikanlage ist, wobei die Energieerzeugungseinheit umfasst

  • – ein Solarmodul;
  • – einen Stromrichter, nämlich einen Wechselrichter, der an das Solarmodul angeschlossen ist und den elektrischen Wechselstrom erzeugen kann.
It can be provided that each of the proposed systems is a photovoltaic system, wherein the power generation unit comprises
  • A solar module;
  • - A power converter, namely an inverter, which is connected to the solar module and can generate the electrical alternating current.

Da mithilfe des Anlagentransformators die Anlagenspannung nach Bedarf geändert werden kann, kann der Stromrichter im Vergleich zu bekannten Anlagen für eine kleinere Nennleistung ausgelegt und somit kostengünstiger sein.Since the system transformer can be used to change the system voltage as required, the converter can be designed for a lower rated power compared to known systems and thus be more cost-effective.

Der Stromrichter kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise als einphasiger oder mehrphasiger oder dreiphasiger Stromrichter. Typischerweise erzeugt dieser Stromrichter eine Spannung im Niederspannungsbereich, beispielsweise von 230 V oder 690 V.The power converter can be designed as required in any desired manner, for example as a single-phase or multi-phase or three-phase power converter. Typically, this power converter generates a voltage in the low voltage range, for example of 230 V or 690 V.

Die Energieerzeugungseinheit kann nach Bedarf auf beliebige Art und Weise ausgebildet sein und beispielsweise wenigstens ein zusätzliches oder weiteres Solarmodul und/oder wenigstens einen zusätzlichen oder weiteren Stromrichter umfassen oder aufweisen.The energy generating unit can be designed as desired in any desired manner and, for example, comprise or have at least one additional or further solar module and / or at least one additional or further power converter.

Es kann vorgesehen sein, dass jede der vorgeschlagenen Anlagen umfasst

  • – einen Anlagenblindleistungssensor, der die Anlagenblindleistung erfassen und ein entsprechendes Anlagenblindleistungssignal erzeugen kann und der insbesondere an das Anlagensteuersystem angeschlossen ist;
wobei das Anlagensteuersystem derart ausgebildet ist, dass es das Übersetzungsverhältnis des Anlagentransformators in Abhängigkeit von dem Anlagenblindleistungssignal einstellen kann.It can be provided that includes each of the proposed facilities
  • A blind power sensor, which can detect the blind power and produce a corresponding blind power signal and which is in particular connected to the system control system;
wherein the plant control system is adapted to adjust the gear ratio of the plant transformer in response to the plant blank power signal.

Der Anlagenblindleistungssensor kann nach Bedarf auf beliebige Art und Weise ausgebildet sein und beispielsweise an die Primärseite und/oder die Sekundärseite des Anlagentransformators angeschlossen sein und/oder Sensoren für Spannung, Strom und Phasenverschiebung der Anlage umfassen und entsprechende Messsignale erzeugen, aus denen er oder das Anlagensteuersystem die Anlagenblindleistung und insbesondere auch die Anlagenwirkleistung ermitteln kann.The plant reactive power sensor may be formed as desired in any way and be connected for example to the primary side and / or the secondary side of the plant transformer and / or sensors for voltage, current and phase shift of the system and generate corresponding measurement signals from which he or the plant control system can determine the plant reactive power and in particular the effective plant performance.

Das Anlagensteuersystem kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise derart, dass es dieses Übersetzungsverhältnis in Abhängigkeit von dem Anlagenblindleistungssignal einstellen kann, indem es dieses Übersetzungsverhältnis in Abhängigkeit von einem Vergleich des Anlagenblindleistungssignals mit der Anlagenblindleistungsvorgabe oder indem es dieses Übersetzungsverhältnis durch einen solchen Vergleich einstellen kann.The plant control system may be designed as desired in any manner, for example, in such a way that it can set this transmission ratio as a function of the system reactive power signal by setting this transmission ratio as a function of a comparison of the system reactive power signal with the system reactive power specification or by setting this transmission ratio by such a comparison.

Es kann vorgesehen sein, dass jede der vorgeschlagenen Anlagen umfasst

  • – einen Anlagenspannungssensor, der die primärseitige Anlagenspannung erfassen und ein entsprechendes Anlagenspannungssignal erzeugen kann und der insbesondere an das Anlagensteuersystem angeschlossen ist; und/oder
  • – einen Anlagenspannungssensor, der die sekundärseitige Anlagenspannung erfassen und ein entsprechendes Anlagenspannungssignal erzeugen kann und der insbesondere an das Anlagensteuersystem angeschlossen ist;
wobei das Anlagensteuersystem derart ausgebildet ist, dass es das Übersetzungsverhältnis des Anlagentransformators in Abhängigkeit von wenigstens einem dieser Anlagenspannungssignale einstellen kann.It can be provided that includes each of the proposed facilities
  • A system voltage sensor which can detect the primary-side system voltage and generate a corresponding system voltage signal and which in particular is connected to the system control system; and or
  • A system voltage sensor which can detect the secondary side system voltage and generate a corresponding system voltage signal and which in particular is connected to the system control system;
wherein the plant control system is adapted to adjust the gear ratio of the plant transformer in response to at least one of these plant voltage signals.

Das Anlagensteuersystem kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise derart, dass es dieses Übersetzungsverhältnis in Abhängigkeit von wenigstens einem dieser Anlagenspannungssignale einstellen kann, indem es dieses Übersetzungsverhältnis in Abhängigkeit von einem Vergleich des primärseitigen Anlagenspannungssignals mit der primärseitigen Anlagenspannungsvorgabe oder indem es dieses Übersetzungsverhältnis durch einen solchen Vergleich einstellen kann und/oder indem es dieses Übersetzungsverhältnis in Abhängigkeit von einem Vergleich des sekundärseitigen Anlagenspannungssignals mit der sekundärseitigen Anlagenspannungsvorgabe oder indem es dieses Übersetzungsverhältnis durch einen solchen Vergleich einstellen kann.The plant control system may be configured as desired in any manner, for example, such that it can adjust this gear ratio as a function of at least one of these plant voltage signals, by making this ratio in response to a comparison of the primary-side plant voltage signal with the primary-side plant voltage specification or by this Ratio can adjust by such a comparison and / or by this transmission ratio in response to a comparison of the secondary-side system voltage signal with the secondary-side system voltage default or by this transmission ratio can be adjusted by such a comparison.

Es kann vorgesehen sein, dass das Anlagensteuersystem an ein Fernsteuersignale erzeugendes Fernsteuersystem angeschlossen werden kann und derart ausgebildet ist, dass es das Übersetzungsverhältnis des Anlagentransformators in Abhängigkeit von den Fernsteuersignalen einstellen kann.It can be provided that the plant control system can be connected to a remote control signal generating remote control system and is designed such that it can set the transmission ratio of the plant transformer in response to the remote control signals.

Das Fernsteuersystem kann nach Bedarf auf beliebige Art und Weise ausgebildet sein und beispielsweise das Parksteuersystem eines der gemäß dem zweiten Aspekt vorgeschlagenen Parks umfassen.The remote control system may be configured as desired in any manner and may include, for example, the parking control system of one of the parks proposed according to the second aspect.

Es kann vorgesehen sein, dass jede der vorgeschlagenen Anlagen umfasst einen Laststufenschalter zum Einstellen des Übersetzungsverhältnisses des Anlagentransformators.It can be provided that each of the proposed systems comprises an on-load tap changer for setting the transmission ratio of the system transformer.

Dieser Laststufenschalter kann nach Bedarf auf beliebige Art und Weise ausgebildet sein und beispielsweise an ein Gehäuse des Anlagentransformators, der insbesondere als Trockentransformator ausgebildet ist, angebaut oder in einem Gehäuse des Anlagentransformators, der insbesondere als Öltransformator ausgebildet ist, angeordnet. Vorzugsweise ist dieser Laststufenschalter für eine Transformatorleistung ausgelegt ist, mit der die Anlage an ein Mittelspannungsnetz angeschlossen werden kann, beispielsweise für eine Scheinleistung des Anlagentransformators von wenigstens 300 kVA und/oder höchstens 6 MVA oder von wenigstens 6 MVA und/oder für eine Netzspannung von 12 kV oder 24 kV oder 36 kV und/oder für einen Dauerstrom oder maximalen Bemessungsstrom von wenigstens 30 A oder wenigstens 100 A je Phase.This on-load tap-changer can be configured as desired in any desired manner and is arranged, for example, on a housing of the system transformer, which is designed in particular as a dry-type transformer, or in a housing of the system transformer, which is designed in particular as an oil transformer. Preferably, this on-load tap-changer is designed for a transformer power with which the system can be connected to a medium-voltage network, for example for an apparent power of the plant transformer of at least 300 kVA and / or at most 6 MVA or at least 6 MVA and / or for a mains voltage of 12 kV or 24 kV or 36 kV and / or for a continuous current or maximum rated current of at least 30 A or at least 100 A per phase.

Es kann vorgesehen sein, dass dieser Laststufenschalter wenigstens einen Schalter umfasst, der zum Umschalten zwischen Wicklungen oder Anzapfungen des Anlagentransformators dient und wenigstens eine Vakuumschaltröhre und/oder wenigstens einen Leistungshalbleiter umfasst.It can be provided that this on-load tap-changer comprises at least one switch which serves for switching between windings or taps of the system transformer and comprises at least one vacuum interrupter and / or at least one power semiconductor.

Es kann vorgesehen sein, dass

  • – der Stromrichter ein Stromrichter mit einstellbarer Phasenverschiebung zwischen dem von ihm gelieferten Strom und der von ihm gelieferten Spannung ist;
  • – das Anlagensteuersystem an den Stromrichter angeschlossen und derart ausgebildet ist, dass es die Phasenverschiebung des Stromrichters in Abhängigkeit von der Anlagenblindleistung und/oder von der Anlagenblindleistungsvorgabe und/oder von der primärseitigen Anlagenspannung und/oder von der primärseitigen Anlagenspannungsvorgabe und/oder von der sekundärseitigen Anlagenspannung und/oder von der sekundärseitigen Anlagenspannungsvorgabe und/oder von dem Betriebspunkt der Energieerzeugungseinheit und/oder von dem Betriebspunkt der Anlage einstellen kann.
It can be provided that
  • - The power converter is a power converter with adjustable phase shift between the current supplied by it and the voltage supplied by it;
  • - The system control system is connected to the power converter and is designed such that there is the phase shift of the power converter in dependence on the reactive power and / or the plant blind output specification and / or from the primary-side system voltage and / or from the primary-side system voltage specification and / or from the secondary-side system voltage and / or from the secondary-side system voltage specification and / or from the operating point of the energy-generating unit and / or from the operating point of the system.

Das Anlagensteuersystem kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise derart, dass es die Phasenverschiebung einstellen kann, indem es den Stromrichter in Abhängigkeit von der Anlagenblindleistungsvorgabe derart ansteuern kann, dass er eine Phasenverschiebung hat, mit der die Anlage eine der Anlagenblindleistungsvorgabe entsprechende Blindleistung bereitstellen und/oder an das Stromnetz liefern kann.The plant control system can be configured as desired in any manner, for example, such that it can adjust the phase shift by the converter can drive in response to the plant blind output specification such that it has a phase shift with which the system one of the plant blind output specification Provide reactive power and / or can supply to the power grid.

Die Erfindung schlägt gemäß einem zweiten Aspekt einen Erneuerbare-Energie-Park, insbesondere einen Windpark oder Solarpark oder Wind-und-Solar-Park, vor, umfassend oder aufweisend

  • – ein Parkstromnetz;
  • – wenigstens zwei Erneuerbare-Energie-Anlagen, von denen jede wie eine der gemäß dem ersten Aspekt vorgeschlagenen Anlagen ausgebildet ist und mit der Sekundärseite ihres Anlagentransformators an das Parkstromnetz angeschlossen ist;
  • – einen Parktransformator mit einstellbarem Übersetzungsverhältnis, dessen Primärseite an das Parkstromnetz angeschlossen ist und dessen Sekundärseite an ein Verbraucherstromnetz angeschlossen werden kann;
  • – ein Parksteuersystem, das an den Parktransformator angeschlossen und derart ausgebildet ist, dass es das Übersetzungsverhältnis des Parktransformators in Abhängigkeit von einer Parkblindleistung oder einer aktuellen Blindleistung, die der Park liefert, und/oder von einer Parkblindleistungsvorgabe oder einer vorbestimmten Blindleistung, die der Park, insbesondere gemäß einer Forderung eines Netzbetreibers, an das Verbraucherstromnetz liefern soll, und/oder von einer primärseitigen Parkspannung oder einer aktuellen Spannung, die an der Primärseite des Parktransformators anliegt, und/oder von einer primärseitigen Parkspannungsvorgabe oder einer vorbestimmten Spannung, die an der Primärseite des Parktransformators, insbesondere gemäß einer Forderung eines Netzbetreibers, anliegen soll, und/oder von einer sekundärseitigen Parkspannung oder einer aktuellen Spannung, die an der Sekundärseite des Parktransformators anliegt, und/oder von einer sekundärseitigen Parkspannungsvorgabe oder einer vorbestimmten Spannung, die an der Sekundärseite des Parktransformators, insbesondere gemäß einer Forderung eines Netzbetreibers, anliegen soll, und/oder von einem Arbeits- oder Betriebspunkt des Parks einstellen kann.
The invention proposes, according to a second aspect, a renewable energy park, in particular a wind farm or solar park or wind and solar park, before, comprising or comprising
  • - a park electricity network;
  • - at least two renewable energy installations, each of which is designed as one of the plants proposed according to the first aspect and is connected to the secondary side of its plant transformer to the park power network;
  • - A parking transformer with adjustable transmission ratio, whose primary side is connected to the park power network and whose secondary side can be connected to a load current network;
  • A parking control system which is connected to the parking transformer and is designed such that it determines the gear ratio of the parking transformer in dependence on a park blind power or a current reactive power that the park supplies, and / or on a parking blind demand or a predetermined reactive power which the park, in particular according to a demand of a network operator to deliver to the consumer power grid, and / or of a primary-side park voltage or a current voltage applied to the primary side of the park transformer, and / or of a primary-side Parkspannungsvorgabe or a predetermined voltage, on the primary side of the Parking transformer, in particular according to a requirement of a network operator, should lie, and / or by a secondary-side parking voltage or a current voltage applied to the secondary side of the parking transformer, and / or from a secondary-side Parkspannungsvor gabe or a predetermined voltage to be applied to the secondary side of the parking transformer, in particular according to a request of a network operator, and / or set from a working or operating point of the park.

Der gemäß dem zweiten Aspekt vorgeschlagene Park ermöglicht die Erfüllung strengerer oder verschärfter Netzanschlussregeln, insbesondere Blindleistungsvorgaben.The proposed according to the second aspect of the park allows the fulfillment of stricter or tightened grid connection rules, in particular reactive power specifications.

Das Parksteuersystem ist bevorzugt derart ausgebildet, dass es dieses Übersetzungsverhältnis in Abhängigkeit von dem Arbeits- oder Betriebspunkt des Parks, der beispielsweise durch dessen aktuelle Spannung, dessen aktuelle Blindleistung und dessen aktuelle Wirkleistung definiert ist, einstellen kann. Dieser Betriebspunkt kann nach Bedarf auch anders definiert sein, beispielsweise durch dessen aktuelle Spannung, dessen aktuelle Wirkleistung und dessen aktuelle Phasenverschiebung oder durch dessen aktuelle Spannung, dessen aktuellen Strom und dessen aktuelle Phasenverschiebung oder durch eine andere Kombination von Strom und/oder Spannung und/oder Phasenverschiebung und/oder Wirkleistung und/oder Blindleistung und/oder Scheinleistung.The parking control system is preferably designed such that it can set this transmission ratio as a function of the operating or operating point of the park, which is defined, for example, by its current voltage, its current reactive power and its actual active power. This operating point can also be defined differently as required, for example by its current voltage, its actual active power and its current phase shift or by its current voltage, its current and current phase shift or by another combination of current and / or voltage and / or Phase shift and / or active power and / or reactive power and / or apparent power.

Der gemäß dem zweiten Aspekt vorgeschlagene Park kann nach Bedarf auf beliebige Art und Weise ausgebildet sein und beispielsweise wenigstens einen zusätzlichen oder weiteren Parktransformator und/oder wenigstens ein zusätzliches oder weiteres Parksteuersystem umfassen oder aufweisen.The park proposed in accordance with the second aspect can be designed as desired in any desired manner and can comprise or comprise, for example, at least one additional or further parking transformer and / or at least one additional or further parking control system.

Der Parktransformator kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise als Trockentransformator oder als Öltransformator. Seine Primärseite wird hier auch als Unterspannungsseite oder Anlagenseite bezeichnet, und seine Sekundärseite wird hier auch als Oberspannungsseite oder Netzseite bezeichnet.The parking transformer can be designed as desired in any desired manner, for example as a dry transformer or as an oil transformer. Its primary side is also referred to here as undervoltage side or plant side, and its secondary side is referred to here as the high-voltage side or network side.

Das Verbraucherstromnetz kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise als Verteilnetz oder Verbundnetz, das typischerweise eine Nennspannung im Mittelspannungsbereich, beispielsweise von 12 kV oder 24 kV oder 36 kV, oder im Hochspannungsbereich, beispielsweise von 110 kV, hat. Vorzugsweise ist das Parkstromnetz das Stromnetz der gemäß dem ersten Aspekt vorgeschlagenen Anlagen.The consumer power network can be configured as desired in any manner, for example, as a distribution network or network, which typically has a rated voltage in the medium voltage range, for example 12 kV or 24 kV or 36 kV, or in the high voltage range, for example, 110 kV. Preferably, the park power grid is the power grid of the plants proposed according to the first aspect.

Das Parksteuersystem kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise derart, dass es dieses Übersetzungsverhältnis einstellen kann, indem es den Parktransformator in Abhängigkeit von der Parkblindleistungsvorgabe derart ansteuern kann, dass er ein Übersetzungsverhältnis hat, mit dem der Park eine der Parkblindleistungsvorgabe entsprechende Blindleistung bereitstellen und/oder an das Verbraucherstromnetz liefern kann.The parking control system can be configured as desired in any manner, for example, such that it can set the transmission ratio by the parking transformer in response to the Parkindindleistungsvorgabe can drive such that it has a gear ratio with which the park one of the Parkblindleistungsvorgabe corresponding Provide reactive power and / or can deliver to the consumer power grid.

Es kann vorgesehen sein, dass das Parksteuersystem an die Anlagensteuersysteme angeschlossen ist und derart ausgebildet ist, dass es das Übersetzungsverhältnis jedes Anlagentransformators in Abhängigkeit von der Parkblindleistung und/oder von der Parkblindleistungsvorgabe und/oder von der primärseitigen Parkspannung und/oder von der primärseitigen Parkspannungsvorgabe und/oder von der sekundärseitigen Parkspannung und/oder von der sekundärseitigen Parkspannungsvorgabe und/oder von dem Betriebspunkt des Parks einstellen kann.It can be provided that the parking control system is connected to the plant control systems and is designed such that it the gear ratio of each plant transformer in dependence on the Parkblindleistung and / or the Parkblindleistungsvorgabe and / or the primary-side park voltage and / or the primary-side Parkspannungsvorgabe and / or from the secondary-side parking voltage and / or from the secondary-side parking voltage specification and / or from the operating point of the park.

Das Parksteuersystem kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise derart, dass es das Übersetzungsverhältnis jedes Anlagentransformators einstellen kann, indem es die Anlagentransformatoren in Abhängigkeit von der Parkblindleistungsvorgabe und insbesondere von den entsprechenden Anlagenblindleistungsvorgaben derart ansteuern kann, dass sie jeweils ein Übersetzungsverhältnis haben, mit dem die Anlagen gemeinsam eine der Parkblindleistungsvorgabe entsprechende Blindleistung bereitstellen und/oder an das Verbraucherstromnetz liefern können.The parking control system can be configured as desired in any manner, for example, such that it can set the gear ratio of each plant transformer by the plant transformers depending on the Parkindindleistungsvorgabe and in particular by the corresponding plant blind output specifications such that they each one Have ratio ratio with which the plants can jointly provide a reactive blind power corresponding to the parking blind demand and / or can deliver to the consumer power grid.

Es kann vorgesehen sein, dass jeder der vorgeschlagenen Parks umfasst einen Parkblindleistungssensor, der die Parkblindleistung erfassen und ein entsprechendes Parkblindleistungssignal erzeugen kann und der insbesondere an das Parksteuersystem angeschlossen ist;
wobei das Parksteuersystem derart ausgebildet ist, dass es das Übersetzungsverhältnis des Parktransformators in Abhängigkeit von dem Parkblindleistungssignal einstellen kann.
It can be provided that each of the proposed parks comprises a parking sensor which can detect the parking blind power and generate a corresponding parking blind power signal and which is in particular connected to the parking control system;
wherein the parking control system is adapted to adjust the gear ratio of the parking transformer in response to the park blind power signal.

Der Parkblindleistungssensor kann nach Bedarf auf beliebige Art und Weise ausgebildet sein und beispielsweise an die Primärseite und/oder die Sekundärseite des Parktransformators angeschlossen sein und/oder Sensoren für Spannung, Strom und Phasenverschiebung des Parks umfassen und entsprechende Messsignale erzeugen, aus denen er oder das Parksteuersystem die Parkblindleistung und insbesondere auch die Parkwirkleistung ermitteln kann.The park blind power sensor may be formed as desired in any manner and connected, for example, to the primary side and / or the secondary side of the park transformer and / or include sensors for voltage, current and phase shift of the park and generate corresponding measurement signals from which he or the parking control system determine the Parkblindleistung and in particular the Parkwirkleistung.

Das Parksteuersystem kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise derart, dass es dieses Übersetzungsverhältnis in Abhängigkeit von dem Parkblindleistungssignal einstellen kann, indem es dieses Übersetzungsverhältnis in Abhängigkeit von einem Vergleich des Parkblindleistungssignals mit der Parkblindleistungsvorgabe oder indem es dieses Übersetzungsverhältnis durch einen solchen Vergleich einstellen kann.The parking control system can be configured as desired in any manner, for example, such that it can set this transmission ratio in dependence on the park blind power signal by this gear ratio depending on a comparison of the park blind power signal with the park blind power setting or by this gear ratio by such Can adjust comparison.

Es kann vorgesehen sein, dass jeder der vorgeschlagenen Parks umfasst

  • – einen Parkspannungssensor, der die primärseitige Parkspannung erfassen und ein entsprechendes Parkspannungssignal erzeugen kann und der insbesondere an das Parksteuersystem angeschlossen ist; und/oder
  • – einen Parkspannungssensor, der die sekundärseitige Parkspannung erfassen und ein entsprechendes Parkspannungssignal erzeugen kann und der insbesondere an das Parksteuersystem angeschlossen ist;
wobei das Parksteuersystem derart ausgebildet ist, dass es das Übersetzungsverhältnis des Parktransformators in Abhängigkeit von wenigstens einem dieser Parkspannungssignale einstellen kann.It can be provided that each of the proposed parks includes
  • A parking voltage sensor capable of detecting the primary side parking voltage and generating a corresponding parking voltage signal, and in particular connected to the parking control system; and or
  • A parking voltage sensor capable of detecting the secondary side parking voltage and generating a corresponding parking voltage signal, and in particular connected to the parking control system;
wherein the parking control system is configured such that it can set the transmission ratio of the parking transformer in response to at least one of these Park voltage signals.

Das Parksteuersystem kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise derart, dass es dieses Übersetzungsverhältnis in Abhängigkeit von wenigstens einem dieser Parkspannungssignale einstellen kann, indem es dieses Übersetzungsverhältnis in Abhängigkeit von einem Vergleich des primärseitigen Parkspannungssignals mit der primärseitigen Parkspannungsvorgabe oder indem es dieses Übersetzungsverhältnis durch einen solchen Vergleich einstellen kann und/oder indem es dieses Übersetzungsverhältnis in Abhängigkeit von einem Vergleich des sekundärseitigen Parkspannungssignals mit der sekundärseitigen Parkspannungsvorgabe oder indem es dieses Übersetzungsverhältnis durch einen solchen Vergleich einstellen kann.The parking control system can be configured as desired in any manner, for example, such that it can set this ratio as a function of at least one of these Parkspannungssignale by this ratio depending on a comparison of the primary-side parking voltage signal with the primary-side Parkspannungsvorgabe or by this Ratio can adjust by such a comparison and / or by this gear ratio in dependence on a comparison of the secondary-side parking voltage signal with the secondary-side Parkspannungsvorgabe or by setting this ratio by such a comparison.

Es kann vorgesehen sein, dass das Parksteuersystem an ein Fernsteuersignale erzeugendes Fernsteuersystem angeschlossen werden kann und derart ausgebildet ist, dass es das Übersetzungsverhältnis des Parktransformators in Abhängigkeit von den Fernsteuersignalen einstellen kann.It can be provided that the parking control system can be connected to a remote control signal generating remote control system and is designed such that it can set the transmission ratio of the parking transformer in dependence on the remote control signals.

Es kann vorgesehen sein, dass jeder der vorgeschlagenen Parks umfasst einen Laststufenschalter zum Einstellen des Übersetzungsverhältnisses des Parktransformators.It can be provided that each of the proposed parks comprises an on-load tap changer for setting the transmission ratio of the parking transformer.

Dieser Laststufenschalter kann nach Bedarf auf beliebige Art und Weise ausgebildet sein und beispielsweise an ein Gehäuse des Parktransformators, der insbesondere als Trockentransformator ausgebildet ist, angebaut oder in einem Gehäuse des Parktransformators, der insbesondere als Öltransformator ausgebildet ist, angeordnet.This on-load tap changer can be configured as desired in any desired manner and is arranged, for example, on a housing of the parking transformer, which is designed in particular as a dry transformer, or arranged in a housing of the parking transformer, which is designed in particular as an oil transformer.

Es kann vorgesehen sein, dass dieser Laststufenschalter wenigstens einen Schalter umfasst, der zum Umschalten zwischen Wicklungen oder Anzapfungen des Parktransformators dient und wenigstens eine Vakuumschaltröhre und/oder wenigstens einen Leistungshalbleiter umfasst.It can be provided that this on-load tap-changer comprises at least one switch which serves for switching between windings or taps of the parking transformer and comprises at least one vacuum interrupter and / or at least one power semiconductor.

Es kann vorgesehen sein, dass

  • – jeder Stromrichter ein Stromrichter mit einstellbarer Phasenverschiebung zwischen dem von ihm gelieferten Strom und der von ihm gelieferten Spannung ist;
  • – das Parksteuersystem an die Stromrichter angeschlossen und derart ausgebildet ist, dass es die Phasenverschiebung jedes Stromrichters in Abhängigkeit von der Parkblindleistung und/oder von der Parkblindleistungsvorgabe und/oder von der primärseitigen Parkspannung und/oder von der primärseitigen Parkspannungsvorgabe und/oder von der sekundärseitigen Parkspannung und/oder von der sekundärseitigen Parkspannungsvorgabe und/oder von dem Betriebspunkt des Parks einstellen kann.
It can be provided that
  • - Each power converter is a power converter with adjustable phase shift between the current supplied by it and the voltage supplied by it;
  • - The parking control system is connected to the power converters and is designed such that there is the phase shift of each converter depending on the Parkblindleistung and / or the Parkblindleistungsvorgabe and / or the primary-side parking voltage and / or the primary-side Parkspannungsvorgabe and / or the secondary-side Park voltage and / or from the secondary-side parking voltage specification and / or from the operating point of the park.

Das Parksteuersystem kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise derart, dass es die Phasenverschiebung jedes Stromrichters einstellen kann, indem es die Stromrichter in Abhängigkeit von der Parkblindleistungsvorgabe und insbesondere von den entsprechenden Anlagenblindleistungsvorgaben derart ansteuern kann, dass sie jeweils eine Phasenverschiebung haben, mit der die Anlagen gemeinsam eine der Parkblindleistungsvorgabe entsprechende Blindleistung bereitstellen und/oder an das Verbraucherstromnetz liefern können.The parking control system can be configured as desired in any manner, for example, such that it can adjust the phase shift of each power converter by the Converter in response to the Parkblindleistungsvorgabe and in particular of the corresponding blind power requirements can control such that they each have a phase shift, with which the plants together provide one of the Parkblindleistungsvorgabe corresponding reactive power and / or can deliver to the load current network.

Die Erfindung schlägt gemäß einem dritten Aspekt ein Verfahren zum Betreiben einer Erneuerbare-Energie-Anlage vor, wobei

  • – die Anlage umfasst
  • • eine Energieerzeugungseinheit, die elektrischen Wechselstrom erzeugen kann;
  • • einen Anlagentransformator mit einstellbarem Übersetzungsverhältnis, dessen Primärseite an die Energieerzeugungseinheit angeschlossen ist und dessen Sekundärseite an ein Stromnetz angeschlossen werden kann;
  • – das Übersetzungsverhältnis des Anlagentransformators in Abhängigkeit von einer Anlagenblindleistung und/oder von einer Anlagenblindleistungsvorgabe und/oder von einer primärseitigen Anlagenspannung und/oder von einer primärseitigen Anlagenspannungsvorgabe und/oder von einer sekundärseitigen Anlagenspannung und/oder von einer sekundärseitigen Anlagenspannungsvorgabe und/oder von einem Arbeits- oder Betriebspunkt der Energieerzeugungseinheit und/oder von einem Arbeits- oder Betriebspunkt der Anlage eingestellt wird.
The invention proposes, according to a third aspect, a method for operating a renewable energy plant, wherein
  • - includes the plant
  • • a power generation unit that can generate AC electrical power;
  • • an adjustable transformation ratio system transformer whose primary side is connected to the power generation unit and whose secondary side can be connected to a mains supply;
  • - The transmission ratio of the plant transformer in response to a plant reactive power and / or a plant blind output specification and / or from a primary-side plant voltage and / or from a primary-side plant voltage specification and / or a secondary-side system voltage and / or secondary-side system voltage specification and / or by a working - or operating point of the power generation unit and / or is set from a working or operating point of the system.

Das gemäß dem dritten Aspekt vorgeschlagene Verfahren ermöglicht die Erfüllung strengerer Netzanschlussregeln, insbesondere Blindleistungsvorgaben.The method proposed according to the third aspect enables the fulfillment of stricter grid connection rules, in particular reactive power specifications.

Das Einstellen dieses Übersetzungsverhältnisses erfolgt bevorzugt in Abhängigkeit von dem Arbeits- oder Betriebspunkt der Energieerzeugungseinheit, der beispielsweise durch deren aktuelle Spannung, deren aktuelle Wirkleistung und deren aktuelle Blindleistung definiert ist, und/oder von dem Arbeits- oder Betriebspunkt der Anlage, der beispielsweise durch deren aktuelle Spannung, deren aktuelle Blindleistung und deren aktuelle Wirkleistung definiert ist. Jeder dieser Betriebspunkte kann nach Bedarf auch anders definiert sein, beispielsweise durch die entsprechende aktuelle Spannung, die entsprechende aktuelle Wirkleistung und die entsprechende aktuelle Phasenverschiebung oder durch die entsprechende aktuelle Spannung, den entsprechenden aktuellen Strom und die entsprechende aktuelle Phasenverschiebung oder durch eine andere Kombination von Strom und/oder Spannung und/oder Phasenverschiebung und/oder Wirkleistung und/oder Blindleistung und/oder Scheinleistung.The setting of this transmission ratio is preferably carried out as a function of the operating or operating point of the power generation unit, which is defined for example by their current voltage, their current active power and their reactive power, and / or from the working or operating point of the system, for example by their current voltage whose current reactive power and its actual active power are defined. Each of these operating points may also be differently defined as required, for example by the corresponding current voltage, the corresponding actual active power and the corresponding current phase shift or by the corresponding current voltage, the corresponding current and the corresponding current phase shift or by another combination of power and / or voltage and / or phase shift and / or active power and / or reactive power and / or apparent power.

Das Einstellen dieses Übersetzungsverhältnisses kann nach Bedarf auf beliebige Art und Weise erfolgen, beispielsweise indem der Anlagentransformator in Abhängigkeit von der Anlagenblindleistungsvorgabe derart angesteuert wird, dass er ein Übersetzungsverhältnis hat, mit dem die Anlage eine der Anlagenblindleistungsvorgabe entsprechende Blindleistung bereitstellen und/oder an das Stromnetz liefern kann.The setting of this ratio can be done as needed in any way, for example by the plant transformer is driven in response to the plant blind output specification such that it has a gear ratio with which provide the plant a reactive power corresponding to the plant blind output specification and / or deliver to the power grid can.

Die Anlage kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise wie eine der gemäß dem ersten Aspekt vorgeschlagenen Anlagen.The system may be designed as desired in any manner, such as one of the systems proposed according to the first aspect.

Es kann vorgesehen sein, dass

  • – der Stromrichter ein Stromrichter mit einstellbarer Phasenverschiebung zwischen dem von ihm gelieferten Strom und der von ihm gelieferten Spannung ist;
  • – die Phasenverschiebung des Stromrichters in Abhängigkeit von der Anlagenblindleistung und/oder von der Anlagenblindleistungsvorgabe und/oder von der primärseitigen Anlagenspannung und/oder von der primärseitigen Anlagenspannungsvorgabe und/oder von der sekundärseitigen Anlagenspannung und/oder von der sekundärseitigen Anlagenspannungsvorgabe und/oder von dem Betriebspunkt der Energieerzeugungseinheit und/oder von dem Betriebspunkt der Anlage eingestellt wird.
It can be provided that
  • - The power converter is a power converter with adjustable phase shift between the current supplied by it and the voltage supplied by it;
  • - The phase shift of the converter as a function of the reactive power and / or the plant blind output specification and / or from the primary-side system voltage and / or from the primary-side system voltage specification and / or the secondary-side system voltage and / or the secondary-side system voltage specification and / or from the operating point the power generation unit and / or from the operating point of the system is set.

Das Einstellen der Phasenverschiebung kann nach Bedarf auf beliebige Art und Weise erfolgen, beispielsweise indem der Stromrichter in Abhängigkeit von der Anlagenblindleistungsvorgabe derart angesteuert wird, dass er eine Phasenverschiebung hat, mit der die Anlage eine der Anlagenblindleistungsvorgabe entsprechende Blindleistung bereitstellen und/oder an das Stromnetz liefern kann.The adjustment of the phase shift can be carried out as required in any desired manner, for example by the converter being controlled in dependence on the plant reactive power specification such that it has a phase shift, with which the plant provide reactive power corresponding to the plant reactive power specification and / or deliver it to the power grid can.

Die Erfindung schlägt gemäß einem vierten Aspekt ein Verfahren zum Betreiben eines Erneuerbare-Energie-Parks vor, wobei

  • – der Park umfasst
  • • ein Parkstromnetz;
  • • wenigstens zwei Erneuerbare-Energie-Anlagen, von denen jede wie eine der gemäß dem ersten Aspekt vorgeschlagenen Anlagen ausgebildet ist und mit der Sekundärseite ihres Anlagentransformators an das Parkstromnetz angeschlossen ist;
  • • einen Parktransformator mit einstellbarem Übersetzungsverhältnis, dessen Primärseite an das Parkstromnetz angeschlossen ist und dessen Sekundärseite an ein Verbraucherstromnetz angeschlossen werden kann;
  • – das Übersetzungsverhältnis des Parktransformators in Abhängigkeit von einer Parkblindleistung und/oder von einer Parkblindleistungsvorgabe und/oder von einer primärseitigen Parkspannung und/oder von einer primärseitigen Parkspannungsvorgabe und/oder von einer sekundärseitigen Parkspannung und/oder von einer sekundärseitigen Parkspannungsvorgabe und/oder von einem Arbeits- oder Betriebspunkt des Parks eingestellt wird.
The invention proposes a method for operating a renewable energy park according to a fourth aspect, wherein
  • - the park includes
  • • a park electricity network;
  • At least two renewable energy plants, each of which is designed as one of the plants proposed according to the first aspect and connected to the secondary side of its plant transformer to the park power network;
  • • an adjustable ratio parking transformer whose primary side is connected to the park current network and whose secondary side can be connected to a load current network;
  • - The transmission ratio of the parking transformer in response to a park blind power and / or a parking blind power setting and / or from a primary-side Park voltage and / or from a primary-side Parkspannungsvorgabe and / or from a secondary-side parking voltage and / or from a secondary-side Parkspannungsvorgabe and / or from a working or operating point of the park is set.

Das gemäß dem vierten Aspekt vorgeschlagene Verfahren ermöglicht die Erfüllung strengerer Netzanschlussregeln, insbesondere Blindleistungsvorgaben.The method proposed according to the fourth aspect enables the fulfillment of stricter grid connection rules, in particular reactive power specifications.

Das Einstellen dieses Übersetzungsverhältnisses erfolgt bevorzugt in Abhängigkeit von dem Arbeits- oder Betriebspunkt des Parks, der beispielsweise durch dessen aktuelle Spannung, dessen aktuelle Blindleistung und dessen aktuelle Wirkleistung definiert ist. Dieser Betriebspunkt kann nach Bedarf auch anders definiert sein, beispielsweise durch dessen aktuelle Spannung, dessen aktuelle Wirkleistung und dessen aktuelle Phasenverschiebung oder durch dessen aktuelle Spannung, dessen aktuellen Strom und dessen aktuelle Phasenverschiebung oder durch eine andere Kombination von Strom und/oder Spannung und/oder Phasenverschiebung und/oder Wirkleistung und/oder Blindleistung und/oder Scheinleistung.The setting of this transmission ratio is preferably carried out as a function of the working or operating point of the park, which is defined for example by its current voltage, its current reactive power and its actual active power. This operating point can also be defined differently as required, for example by its current voltage, its actual active power and its current phase shift or by its current voltage, its current and current phase shift or by another combination of current and / or voltage and / or Phase shift and / or active power and / or reactive power and / or apparent power.

Das Einstellen dieses Übersetzungsverhältnisses kann nach Bedarf auf beliebige Art und Weise erfolgen, beispielsweise indem der Parktransformator in Abhängigkeit von der Parkblindleistungsvorgabe derart angesteuert wird, dass er ein Übersetzungsverhältnis hat, mit dem der Park eine der Parkblindleistungsvorgabe entsprechende Parkblindleistung bereitstellen und/oder an das Verbraucherstromnetz liefern kann.The setting of this transmission ratio can be done in any desired manner, for example by the parking transformer is driven in response to the Parkindindleistungsvorgabe such that it has a gear ratio with which the Park provide the Parkblindleistungsvorgabe corresponding park blind power and / or deliver to the load power grid can.

Der Park kann nach Bedarf auf beliebige Art und Weise ausgebildet sein, beispielsweise wie einer der gemäß dem zweiten Aspekt vorgeschlagenen Parks.The park may be formed as desired in any manner, such as one of the parks proposed according to the second aspect.

Jede Anlage kann nach Bedarf auf beliebige Art und Weise ausgebildet sein und beispielsweise durch eines der gemäß dem dritten Aspekt vorgeschlagenen Verfahren zum Betreiben einer Erneuerbare-Energie-Anlage betrieben werden oder betrieben werden können.Each plant may be designed as desired in any manner and may be operated or operated by, for example, one of the methods proposed by the third aspect for operating a renewable energy plant.

Es kann vorgesehen sein, dass das Übersetzungsverhältnis jedes Anlagentransformators in Abhängigkeit von der Parkblindleistung und/oder von der Parkblindleistungsvorgabe und/oder von der primärseitigen Parkspannung und/oder von der primärseitigen Parkspannungsvorgabe und/oder von der sekundärseitigen Parkspannung und/oder von der sekundärseitigen Parkspannungsvorgabe und/oder von dem Betriebspunkt des Parks eingestellt wird.It can be provided that the transmission ratio of each plant transformer in dependence on the park blind power and / or the Parkblindleistungsvorgabe and / or the primary-side park voltage and / or the primary-side Parkspannungsvorgabe and / or the secondary-side parking voltage and / or the secondary-side Parkspannungsvorgabe and / or is set from the operating point of the park.

Das Einstellen des Übersetzungsverhältnisses jedes Anlagentransformators kann nach Bedarf auf beliebige Art und Weise erfolgen, beispielsweise indem die Anlagentransformatoren in Abhängigkeit von der Parkblindleistungsvorgabe und insbesondere von den entsprechenden Anlagenblindleistungsvorgaben derart angesteuert werden, dass sie jeweils ein Übersetzungsverhältnis haben, mit dem die Anlagen gemeinsam eine der Parkblindleistungsvorgabe entsprechende Blindleistung bereitstellen und/oder an das Verbraucherstromnetz liefern können.The setting of the transmission ratio of each plant transformer can be done as needed in any manner, for example by the plant transformers are driven in response to the Parkindindleistungsvorgabe and in particular by the corresponding plant reactive power specifications such that they each have a gear ratio with which the plants together one of the Parkblindleistungsvorgabe provide appropriate reactive power and / or can deliver to the consumer power grid.

Es kann vorgesehen sein, dass

  • – jeder Stromrichter ein Stromrichter mit einstellbarer Phasenverschiebung zwischen dem von ihm gelieferten Strom und der von ihm gelieferten Spannung ist;
  • – die Phasenverschiebung jedes Stromrichters in Abhängigkeit von der Parkblindleistung und/oder von der Parkblindleistungsvorgabe und/oder von der primärseitigen Parkspannung und/oder von der primärseitigen Parkspannungsvorgabe und/oder von der sekundärseitigen Parkspannung und/oder von der sekundärseitigen Parkspannungsvorgabe und/oder von dem Betriebspunkt des Parks eingestellt wird.
It can be provided that
  • - Each power converter is a power converter with adjustable phase shift between the current supplied by it and the voltage supplied by it;
  • - The phase shift of each converter as a function of the park blind power and / or the Parkblindleistungsvorgabe and / or the primary-side parking voltage and / or from the primary-side Parkspannungsvorgabe and / or the secondary-side parking voltage and / or from the secondary-side Parkspannungsvorgabe and / or from the operating point of the park.

Das Einstellen der Phasenverschiebung jedes Stromrichters kann nach Bedarf auf beliebige Art und Weise erfolgen, beispielsweise indem die Stromrichter in Abhängigkeit von der Parkblindleistungsvorgabe und insbesondere von den entsprechenden Anlagenblindleistungsvorgaben derart angesteuert werden, dass sie jeweils eine Phasenverschiebung haben, mit der die Anlage eine der Parkblindleistungsvorgabe entsprechende Blindleistung bereitstellen und/oder an das Stromnetz liefern können.The setting of the phase shift of each converter can be done as required in any way, for example by the converters are controlled in dependence on the Parkblindleistungsvorgabe and in particular by the corresponding blind power requirements such that they each have a phase shift with which the system one of the Parkblindleistungsvorgabe corresponding Provide reactive power and / or can deliver to the power grid.

Mit jeder der vorgeschlagenen Anlagen und Parks kann beispielsweise eines der vorgeschlagenen Verfahren durchgeführt werden.For example, one of the proposed methods can be carried out with each of the proposed systems and parks.

Es kann vorgesehen sein, dass jede der vorgeschlagenen Anlagen und Parks derart ausgebildet ist und/oder dazu dient und/oder geeignet ist, dass sie eines der vorgeschlagenen Verfahren ausführt und/oder ausführen kann.It can be provided that each of the proposed systems and parks is designed and / or serves and / or is suitable for carrying out and / or executing one of the proposed methods.

Die Ausführungen und Erläuterungen zu einem der Aspekte der Erfindung, insbesondere zu einzelnen Merkmalen dieses Aspektes, gelten entsprechend auch analog für die anderen Aspekte der Erfindung.The statements and explanations concerning one of the aspects of the invention, in particular regarding individual features of this aspect, apply correspondingly also analogously to the other aspects of the invention.

Im Folgenden werden Ausführungsformen der Erfindung beispielhaft anhand der beigefügten Zeichnungen näher erläutert. Die daraus hervorgehenden einzelnen Merkmale sind jedoch nicht auf die einzelnen Ausführungsformen beschränkt, sondern können mit weiter oben beschriebenen einzelnen Merkmalen und/oder mit einzelnen Merkmalen anderer Ausführungsformen verbunden und/oder kombiniert werden. Die Einzelheiten in den Zeichnungen sind nur erläuternd, nicht aber beschränkend auszulegen. Die in den Ansprüchen enthaltenen Bezugszeichen sollen den Schutzbereich der Erfindung in keiner Weise beschränken, sondern verweisen lediglich auf die in den Zeichnungen gezeigten Ausführungsformen. Die Zeichnungen zeigen inEmbodiments of the invention will now be described by way of example with reference to the accompanying drawings. However, the resulting individual features are not limited to the individual embodiments, but may be connected and / or combined with individual features described above and / or with individual features of other embodiments. The details in the drawings are to be interpreted as illustrative, but not restrictive. The reference signs contained in the claims are not intended to limit the scope of the invention in any way, but merely refer to the embodiments shown in the drawings. The drawings show in

1 eine erste Ausführungsform einer Erneuerbare-Energie-Anlage, nämlich eine Windenergieanlage mit Synchrongenerator und Vollumrichter; 1 a first embodiment of a renewable energy plant, namely a wind turbine with synchronous generator and full converter;

2 eine zweite Ausführungsform einer Erneuerbare-Energie-Anlage, nämlich eine Windenergieanlage mit Asynchrongenerator, Teilumrichter und Anlagentransformator mit einer Primärwicklung; 2 a second embodiment of a renewable energy plant, namely a wind turbine with asynchronous generator, partial converter and plant transformer with a primary winding;

3 eine dritte Ausführungsform einer Erneuerbare-Energie-Anlage, nämlich eine Windenergieanlage mit Asynchrongenerator, Teilumrichter und Anlagentransformator mit zwei Primärwicklungen; 3 a third embodiment of a renewable energy plant, namely a wind turbine with asynchronous generator, partial converter and plant transformer with two primary windings;

4 eine vierte Ausführungsform einer Erneuerbare-Energie-Anlage, nämlich eine Photovoltaikanlage mit Wechselrichter; 4 a fourth embodiment of a renewable energy plant, namely a photovoltaic system with inverter;

5 eine bevorzugte Ausführungsform eines Erneuerbare-Energie-Parks; 5 a preferred embodiment of a renewable energy park;

6 ein U-Q-Kennfeld einer Windenergieanlage für eine mittlere Wirkleistung. 6 a UQ map of a wind turbine for a mean effective power.

In 1 ist eine erste Ausführungsform einer Erneuerbare-Energie-Anlage 10, die hier beispielhaft eine Windenergieanlage ist, schematisch dargestellt.In 1 is a first embodiment of a renewable energy plant 10 , which is an example of a wind turbine here, shown schematically.

Diese Anlage 10 umfasst eine Energieerzeugungseinheit 11, die elektrischen Wechselstrom erzeugen kann, einen Anlagentransformator 12 mit einstellbarem Übersetzungsverhältnis, ein Anlagensteuersystem 13, einen Stromrichter 14, einen Anlagenblindleistungssensor 15 und einen in den Anlagentransformator 12 integrierten Laststufenschalter 16 zum Einstellen des Übersetzungsverhältnisses des Anlagentransformators 12.This plant 10 includes a power generation unit 11 that can generate AC electrical power, a plant transformer 12 with adjustable gear ratio, a plant control system 13 , a power converter 14 , a plant reactive power sensor 15 and one into the plant transformer 12 integrated on-load tap-changer 16 for setting the transmission ratio of the plant transformer 12 ,

Bei dieser Ausführungsform umfasst die Energieerzeugungseinheit 11 einen durch Wind antreibbaren Rotor 17 und einen Generator 18, der an den Rotor 17 gekoppelt ist und den elektrischen Wechselstrom erzeugen kann. Der Generator 18 ist hier beispielhaft ein Drehstrom-Synchrongenerator, der direkt, also ohne Getriebe an den Rotor 17 gekoppelt ist.In this embodiment, the power generation unit includes 11 a rotor drivable by wind 17 and a generator 18 that is attached to the rotor 17 is coupled and can generate the electrical alternating current. The generator 18 Here is an example of a three-phase synchronous generator, the direct, so without gearbox to the rotor 17 is coupled.

Bei dieser Ausführungsform ist der Stromrichter 14 ein Umrichter, der mit seinem Eingang an den Generator 18 und mit seinem Ausgang an die Primärseite des Anlagentransformators 12, die auch als Unterspannungsseite oder Generatorseite bezeichnet wird, angeschlossen ist.In this embodiment, the power converter is 14 an inverter, with its input to the generator 18 and with its output to the primary side of the plant transformer 12 , which is also referred to as undervoltage side or generator side, is connected.

Bei dieser Ausführungsform weist der Anlagentransformator 12 je Phase eine Primärwicklung 19 auf, die an den Ausgang des Stromrichters 14 angeschlossen ist. Folglich ist die Primärseite über den Stromrichter 14 an die Energieerzeugungseinheit 11 angeschlossen. Der Anlagentransformator 12 kann mit seiner Sekundärseite, die auch als Oberspannungsseite oder Netzseite bezeichnet wird, an ein Stromnetz angeschlossen werden, das beispielhaft ein Parkstromnetz 20 (5) eines Windparks 25 (5) ist.In this embodiment, the plant transformer 12 one primary winding per phase 19 on, connected to the output of the power converter 14 connected. Consequently, the primary side is above the power converter 14 to the power generation unit 11 connected. The plant transformer 12 can be connected with its secondary side, which is also referred to as the high-voltage side or network side, to a power grid, the example of a park power network 20 ( 5 ) of a wind farm 25 ( 5 ).

Bei dieser Ausführungsform ist das Anlagensteuersystem 13 an den Laststufenschalter 16 und somit an den Anlagentransformator 12, sowie an den Stromrichter 14 und den Anlagenblindleistungssensor 15 angeschlossen.In this embodiment, the plant control system is 13 to the on-load tap-changer 16 and thus to the plant transformer 12 , as well as to the power converter 14 and the plant reactive power sensor 15 connected.

Bei dieser Ausführungsform umfasst der Anlagenblindleistungssensor 15 nicht dargestellte Sensoren für die Spannung, den Strom und die Phasenverschiebung der Anlage 10 auf der Primärseite des Anlagentransformators 12, die entsprechende Messsignale erzeugen können, aus denen er die Anlagenblindleistung QWEA ermitteln und ein entsprechendes Anlagenblindleistungssignal erzeugen und zusammen mit den Messsignalen an das Anlagensteuersystem 13 senden kann. Diese Spannung wird hier auch als primärseitige Anlagenspannung bezeichnet.In this embodiment, the plant reactive power sensor comprises 15 not shown sensors for the voltage, the current and the phase shift of the system 10 on the primary side of the plant transformer 12 which can generate corresponding measurement signals from which he determine the system reactive power Q WEA and generate a corresponding blind power signal and, together with the measurement signals to the plant control system 13 can send. This voltage is also referred to here as the primary-side system voltage.

Bei dieser Ausführungsform ist das Anlagensteuersystem 13 derart ausgebildet, dass es das Übersetzungsverhältnis des Anlagentransformators 12 in Abhängigkeit von dem Anlagenblindleistungssignal und somit von der Anlagenblindleistung und in Abhängigkeit von einer Anlagenblindleistungsvorgabe einstellen kann. Die Anlagenblindleistungsvorgabe ist als Kennlinie in einem Speicher des Anlagensteuersystems 13 hinterlegt. Falls die Anlage 10 die Anlagenblindleistungsvorgabe nicht erfüllen kann, so kann das Anlagensteuersystem 13 beispielsweise das Übersetzungsverhältnis so einstellen, dass die primärseitige Anlagenspannung auf einen Wert sinkt, bei dem die Anlage 10 ausreichend Anlagenblindleistung liefern kann.In this embodiment, the plant control system is 13 designed such that it is the transmission ratio of the plant transformer 12 depending on the system reactive power signal and thus set by the plant reactive power and in dependence on a plant blind output specification. The plant reactive power specification is a characteristic in a memory of the plant control system 13 deposited. If the plant 10 can not meet the plant blind output specification, so can the plant control system 13 For example, set the transmission ratio so that the primary-side system voltage drops to a value at which the system 10 can supply sufficient reactive power.

In 2 ist eine zweite Ausführungsform einer Erneuerbare-Energie-Anlage 10 schematisch dargestellt. Diese zweite Ausführungsform ähnelt der ersten Ausführungsform, sodass im Folgenden vor Allem die Unterschiede näher erläutert werden.In 2 is a second embodiment of a renewable energy plant 10 shown schematically. This second embodiment is similar to the first embodiment, so that below all the differences are explained in more detail below.

Bei dieser Ausführungsform ist der Generator 18 beispielhaft ein doppeltgespeister Drehstrom-Asynchrongenerator mit einem Ständer 21 und einem Läufer 22, der hier beispielhaft ein Schleifringläufer ist. Der Generator 18 ist über ein Getriebe 23 an den Rotor 17 gekoppelt. Der Ständer 21 ist an die Primärseite angeschlossen, und der Läufer 22 an den Stromrichter 14. Somit ist die Primärseite über den Stromrichter 14 an den Generator 18 angeschlossen.In this embodiment, the generator 18 For example, a double-fed three-phase asynchronous generator with a stator 21 and one runner 22 which exemplifies a slip ring rotor here. The generator 18 is about a gearbox 23 to the rotor 17 coupled. The stand 21 is connected to the primary side, and the runner 22 to the power converter 14 , Thus, the primary side is above the power converter 14 to the generator 18 connected.

Die Primärwicklung 19 ist zum Einen direkt an den Ständer 21 und zum anderen an den Ausgang des Stromrichters 14 und somit über den Stromrichter 14 an den Läufer 22 angeschlossen.The primary winding 19 is on the one hand directly to the stand 21 and on the other hand to the output of the power converter 14 and thus via the power converter 14 to the runner 22 connected.

Bei dieser Ausführungsform umfasst der Anlagenblindleistungssensor 15 nicht dargestellte Sensoren für die Spannung, den Strom und die Phasenverschiebung der Anlage 10 auf der Sekundärseite des Anlagentransformators 12, die entsprechende Messsignale erzeugen können, aus denen er die Anlagenblindleistung QWEA ermitteln und ein entsprechendes Anlagenblindleistungssignal erzeugen und zusammen mit den Messsignalen an das Anlagensteuersystem 13 senden kann. Diese Spannung wird hier auch als sekundärseitige Anlagenspannung bezeichnet.In this embodiment, the plant reactive power sensor comprises 15 not shown sensors for the voltage, the current and the phase shift of the system 10 on the secondary side of the plant transformer 12 which can generate corresponding measurement signals from which he determine the system reactive power Q WEA and generate a corresponding blind power signal and, together with the measurement signals to the plant control system 13 can send. This voltage is also referred to here as the secondary-side system voltage.

In 3 ist eine dritte Ausführungsform einer Erneuerbare-Energie-Anlage 10 schematisch dargestellt. Diese dritte Ausführungsform ähnelt der zweiten Ausführungsform, sodass im Folgenden vor Allem die Unterschiede näher erläutert werden.In 3 is a third embodiment of a renewable energy plant 10 shown schematically. This third embodiment is similar to the second embodiment, so that below the differences are explained in more detail below.

Bei dieser Ausführungsform weist der Anlagentransformator 12 je Phase eine erste Primärwicklung 19' und eine zweite Primärwicklung 19'' auf. Die erste Primärwicklung 19' ist direkt an den Ständer 21 angeschlossen. Die zweite Primärwicklung 19'' ist an den Ausgang des Stromrichters 14 und somit über den Stromrichter 14 an den Läufer 22 angeschlossen.In this embodiment, the plant transformer 12 each phase a first primary winding 19 ' and a second primary winding 19 '' on. The first primary winding 19 ' is right on the stand 21 connected. The second primary winding 19 '' is to the output of the power converter 14 and thus via the power converter 14 to the runner 22 connected.

In 4 ist eine vierte Ausführungsform einer Erneuerbare-Energie-Anlage 10, die hier beispielhaft eine Photovoltaikanlage ist, schematisch dargestellt. Diese vierte Ausführungsform ähnelt der ersten Ausführungsform, sodass im Folgenden vor Allem die Unterschiede näher erläutert werden.In 4 is a fourth embodiment of a renewable energy plant 10 , which is an example of a photovoltaic system here, shown schematically. This fourth embodiment is similar to the first embodiment, so that below the differences are explained in more detail below.

Bei dieser Ausführungsform umfasst die Energieerzeugungseinheit 11 ein Solarmodul 24 und ist der Stromrichter 14 ein Wechselrichter, der an das Solarmodul 24 angeschlossen ist und den elektrischen Wechselstrom erzeugen kann.In this embodiment, the power generation unit includes 11 a solar module 24 and is the power converter 14 an inverter attached to the solar panel 24 is connected and can generate the electrical alternating current.

In 5 ist eine bevorzugte Ausführungsform eines Erneuerbare-Energie-Parks 25, der hier beispielhaft eine Windpark ist, schematisch dargestellt.In 5 is a preferred embodiment of a renewable energy park 25 , which is an example of a wind farm here, shown schematically.

Bei dieser Ausführungsform umfasst der Park 25 ein Parkstromnetz 20, zwei Erneuerbare-Energie-Anlagen 10, einen Parktransformator 26 mit einstellbarem Übersetzungsverhältnis, ein Parksteuersystem 27, einen Parkblindleistungssensor 28 und einen in den Parktransformator 26 integrierten Laststufenschalter 29 zum Einstellen des Übersetzungsverhältnisses des Parktransformators 26.In this embodiment, the park includes 25 a park electricity network 20 , two renewable energy plants 10 , a park transformer 26 with adjustable gear ratio, a parking control system 27 , a park blind power sensor 28 and one in the park transformer 26 integrated on-load tap-changer 29 for setting the gear ratio of the parking transformer 26 ,

Die Anlagen 10 sind gemäß der ersten Ausführungsform ausgebildet und mit der Sekundärseite ihres Anlagentransformators 12 an das Parkstromnetz 20 angeschlossen. Der Parktransformator 26 ist mit seiner Primärseite, die hier auch als Unterspannungsseite oder Generatorseite bezeichnet wird, an das Parkstromnetz 20 angeschlossen und kann mit seiner Sekundärseite, die hier auch als Oberspannungsseite oder Netzseite bezeichnet wird, an ein Verbraucherstromnetz 30 angeschlossen werden.The facilities 10 are formed according to the first embodiment and with the secondary side of their plant transformer 12 to the park power network 20 connected. The park transformer 26 is with its primary side, which is also referred to here as the low voltage side or generator side, to the park power network 20 connected and can with its secondary side, which is also referred to here as the high-voltage side or network side, to a load current network 30 be connected.

Bei dieser Ausführungsform ist das Parksteuersystem 27 an den Laststufenschalter 29 und somit an den Parktransformator 26, sowie an die Anlagensteuersysteme 13 der Anlagen 10 und den Parkblindleistungssensor 28 angeschlossen.In this embodiment, the parking control system is 27 to the on-load tap-changer 29 and thus to the park transformer 26 , as well as to the plant control systems 13 the plants 10 and the park blind power sensor 28 connected.

Bei dieser Ausführungsform ist der Parkblindleistungssensor 28 ähnlich wie der Anlagenblindleistungssensor 15 ausgebildet und umfasst nicht dargestellte Sensoren für die Spannung, den Strom und die Phasenverschiebung des Parks 25 auf der Sekundärseite des Parktransformators 26, die entsprechende Messsignale erzeugen können, aus denen er die Parkblindleistung QWP ermitteln und ein entsprechendes Parkblindleistungssignal erzeugen und zusammen mit den Messsignalen an das Parkblindleistungssensor 28 senden kann. Diese Spannung wird hier auch als sekundärseitige Parkspannung bezeichnet.In this embodiment, the park blind power sensor 28 Similar to the plant reactive power sensor 15 formed and includes sensors, not shown, for the voltage, the current and the phase shift of the park 25 on the secondary side of the park transformer 26 , which can generate corresponding measurement signals, from which he determine the park blind power Q WP and generate a corresponding parking blind power signal and together with the measurement signals to the parking sensor 28 can send. This voltage is also referred to here as secondary-side park voltage.

Bei dieser Ausführungsform ist das Parksteuersystem 27 derart ausgebildet, dass es das Übersetzungsverhältnis des Parktransformators 26 in Abhängigkeit von dem Parkblindleistungssignal und somit von der Parkblindleistung und in Abhängigkeit von einer Parkblindleistungsvorgabe einstellen kann. Die Parkblindleistungsvorgabe ist als Kennlinie in einem Speicher des Parksteuersystems 27 hinterlegt. Falls der Park 25 die Parkblindleistungsvorgabe nicht erfüllen kann, so kann das Parksteuersystem 27 beispielsweise das Übersetzungsverhältnis des Parktransformators 26 so einstellen, dass die sekundärseitige Parkspannung auf einen Wert sinkt, bei dem der Park 25 ausreichend Anlagenblindleistung liefern kann.In this embodiment, the parking control system is 27 designed so that it is the gear ratio of the parking transformer 26 depending on the park blind power signal and thus of the park blind power and depending on a Parkblindleistungsvorgabe can set. The Parkblindleistungsvorgabe is as a characteristic in a memory of the parking control system 27 deposited. If the park 25 can not meet the Parkblindleistungsvorgabe, so the parking control system 27 for example, the gear ratio of the parking transformer 26 adjust so that the secondary side park voltage drops to a value at which the park 25 can supply sufficient reactive power.

Bei dieser Ausführungsform ist das Parksteuersystem 27 derart ausgebildet, dass es das Übersetzungsverhältnis jedes Anlagentransformators 12 in Abhängigkeit von dem Parkblindleistungssignal und von der Parkblindleistungsvorgabe einstellen kann. Das Parksteuersystem stellt das Übersetzungsverhältnis jedes Anlagentransformators 12 ein, indem es die Anlagentransformatoren 12 mithilfe der zugeordneten Anlagensteuersysteme 13 in Abhängigkeit von der Parkblindleistungsvorgabe derart ansteuert, dass sie jeweils ein Übersetzungsverhältnis haben, mit dem die Anlagen 10 gemeinsam die Parkblindleistungsvorgabe bereitstellen und an das Verbraucherstromnetz 30 liefern können.In this embodiment, the parking control system is 27 designed such that it is the gear ratio of each plant transformer 12 depending on the park blind power signal and the parking blind power setting. The parking control system sets the gear ratio of each plant transformer 12 one by using the plant transformers 12 with the help of associated asset control systems 13 in response to the Parkblindleistungsvorgabe such that they each have a gear ratio with which the facilities 10 together provide the parking dummy power setting and to the load power grid 30 can deliver.

In 6 ist ein U-Q-Kennfeld 31 beispielhaft für eine mit dem Index i bezeichnete Anlage 10 des Parks 25 dargestellt, in dem für eine mittlere Anlagenwirkleistung PWEAi dieser Anlage 10 die sekundärseitige Anlagenspannung UWEAi über der Anlagenblindleistung QWEAi aufgetragen ist. Das zugeordnete Anlagensteuersystem 13 kann selbständig und/oder auf Anweisung des Parksteuersystems 27 das Übersetzungsverhältnis des jeweiligen Anlagentransformators 12 durch entsprechendes Ansteuern des Laststufenschalters 16 derart einstellen, dass die Anlagenspannung UWEAi sinkt und der aktuelle Betriebspunkt 116 dieser Anlage 10 nach 116a verschoben wird. Da bei diesem neuen Betriebspunkt 116a eine größere kapazitive Anlagenblindleistung QWEAi möglich ist, kann kann nun das Anlagensteuersystem 13 den Stromrichter 14 derart ansteuern, dass er eine höhere Blindleistung liefert.In 6 is a UQ map 31 by way of example for an installation designated by the index i 10 of the park 25 represented, in which for a mean system active power P WEAi this Appendix 10 the secondary-side system voltage U WEAi is plotted against the system reactive power Q WEAi . The assigned asset control system 13 can be self-employed and / or at the direction of the parking tax system 27 the transmission ratio of the respective plant transformer 12 by appropriate activation of the on-load tap-changer 16 set so that the system voltage U WEAi decreases and the current operating point 116 this plant 10 to 116a is moved. Because at this new operating point 116a a larger capacitive system reactive power Q WEAi is possible, can now the system control system 13 the power converter 14 such that it delivers a higher reactive power.

Die Steuerung der Anlagentransformatoren 12 durch die Anlagensteuersystems 13 und das Parksteuersystem 27 kann beispielsweise analog zu der in der DE 10 2008 048 258 A1 beschrieben Steuerung des Parktransformators 26 erfolgen.The control of the plant transformers 12 through the asset control system 13 and the parking control system 27 For example, analogous to that in the DE 10 2008 048 258 A1 described control of the park transformer 26 respectively.

Ein ähnliches U-Q-Kennfeld kann auch für einen Park 25 vorgesehen und beispielsweise in dessen Parksteuersystem 27 hinterlegt oder abgespeichert sein.A similar UQ map can also be used for a park 25 provided and for example in its parking control system 27 deposited or stored.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

1010
Anlageinvestment
1111
EnergieerzeugungseinheitPower generation unit
1212
Anlagentransformatorplant transformer
1313
AnlagensteuersystemPlant control system
1414
Stromrichterpower converters
1515
AnlagenblindleistungssensorPlant reactive power sensor
1616
Laststufenschalter von 12 On-load tap-changer of 12
1717
Rotorrotor
1818
Generatorgenerator
1919
Primärwicklungprimary
2020
Stromnetz, ParkstromnetzElectricity network, park electricity network
2121
Ständerstand
2222
Läuferrunner
2323
Getriebetransmission
2424
Solarmodulsolar module
2525
Parkpark
2626
ParktransformatorPark transformer
2727
ParksteuersystemParking control system
2828
ParkblindleistungssensorPark reactive power sensor
2929
Laststufenschalter von 26 On-load tap-changer of 26
3030
VerbraucherstromnetzConsumer power grid

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • DE 102008018748 A1 [0002] DE 102008018748 A1 [0002]
  • DE 102008048258 A1 [0004, 0121] DE 102008048258 A1 [0004, 0121]
  • DE 102008018748 [0006] DE 102008018748 [0006]

Zitierte Nicht-PatentliteraturCited non-patent literature

  • BDEW-Richtlinie „Erzeugungsanlagen am Mittelspannungsnetz”, Ausgabe Juni 2008 (MSR 2008) [0010] BDEW Guideline "Generation Plants on the Medium-Voltage Grid", issue June 2008 (MSR 2008) [0010]
  • ”Vierten Ergänzung” von Januar 2013 (4. Ergänzung zur MSR 2008) [0010] "Fourth supplement" of January 2013 (4th amendment to the MSR 2008) [0010]
  • VDEW-Richtlinie „Eigenerzeugungsanlagen am Niederspannungsnetz” [0010] VDEW guideline "Self-Generating Systems on the Low-Voltage Grid" [0010]
  • 4. Ergänzung zur MSR 2008 mit Wirkung zum Januar 2013 [0011] 4. Supplement to the MSR 2008 with effect from January 2013 [0011]

Claims (13)

Erneuerbare-Energie-Anlage (10), umfassend – eine Energieerzeugungseinheit (11), die elektrischen Wechselstrom erzeugen kann; – einen Anlagentransformator (12) mit einstellbarem Übersetzungsverhältnis, dessen Primärseite an die Energieerzeugungseinheit (11) angeschlossen ist und dessen Sekundärseite an ein Stromnetz (20) angeschlossen werden kann; – ein Anlagensteuersystem (13), das an den Anlagentransformator (12) angeschlossen und derart ausgebildet ist, dass es das Übersetzungsverhältnis des Anlagentransformators (12) in Abhängigkeit von einer Anlagenblindleistung und/oder von einer Anlagenblindleistungsvorgabe und/oder von einer primärseitigen Anlagenspannung und/oder von einer primärseitigen Anlagenspannungsvorgabe und/oder von einer sekundärseitigen Anlagenspannung und/oder von einer sekundärseitigen Anlagenspannungsvorgabe und/oder von einem Betriebspunkt der Energieerzeugungseinheit (11) und/oder von einem Betriebspunkt der Anlage (10) einstellen kann.Renewable Energy Plant ( 10 ), comprising - a power generation unit ( 11 ), which can generate AC electrical power; - a plant transformer ( 12 ) with adjustable transmission ratio whose primary side to the power generation unit ( 11 ) and its secondary side to a power grid ( 20 ) can be connected; - a plant control system ( 13 ) connected to the plant transformer ( 12 ) is connected and designed such that it the transmission ratio of the plant transformer ( 12 ) as a function of a system reactive power and / or of a plant reactive power specification and / or of a primary-side plant voltage and / or of a primary-side plant voltage specification and / or of a secondary-side plant voltage and / or of a secondary-side plant voltage specification and / or of an operating point of the energy production unit ( 11 ) and / or from an operating point of the installation ( 10 ). Anlage (10) nach Anspruch 1, nämlich Windenergieanlage, wobei die Energieerzeugungseinheit (11) umfasst – einen Rotor (17); – einen Generator (18), der an den Rotor (17) gekoppelt ist und den elektrischen Wechselstrom erzeugen kann.Investment ( 10 ) according to claim 1, namely wind energy plant, wherein the power generation unit ( 11 ) comprises - a rotor ( 17 ); A generator ( 18 ) connected to the rotor ( 17 ) is coupled and can generate the electrical alternating current. Anlage (10) nach einem der vorigen Ansprüche, umfassend einen Stromrichter (14), nämlich einen Umrichter, der an den Generator (18) und die Primärseite angeschlossen ist.Investment ( 10 ) according to one of the preceding claims, comprising a power converter ( 14 ), namely an inverter connected to the generator ( 18 ) and the primary side is connected. Anlage (10) nach Anspruch 1, nämlich Photovoltaikanlage, wobei die Energieerzeugungseinheit (11) umfasst – ein Solarmodul (24); – einen Stromrichter (14), nämlich einen Wechselrichter, der an das Solarmodul (24) angeschlossen ist und den elektrischen Wechselstrom erzeugen kann.Investment ( 10 ) according to claim 1, namely photovoltaic system, wherein the energy generating unit ( 11 ) - a solar module ( 24 ); - a power converter ( 14 ), namely an inverter connected to the solar module ( 24 ) is connected and can generate the electrical alternating current. Anlage (10) nach einem der vorigen Ansprüche, umfassend – einen Anlagenblindleistungssensor (15), der die Anlagenblindleistung erfassen und ein entsprechendes Anlagenblindleistungssignal erzeugen kann; wobei das Anlagensteuersystem (13) derart ausgebildet ist, dass es das Übersetzungsverhältnis des Anlagentransformators (12) in Abhängigkeit von dem Anlagenblindleistungssignal einstellen kann.Investment ( 10 ) according to one of the preceding claims, comprising - a plant reactive power sensor ( 15 ), which can detect the system reactive power and generate a corresponding blind power signal; the asset control system ( 13 ) is designed such that it the transmission ratio of the plant transformer ( 12 ) depending on the plant blind power signal. Anlage (10) nach dem vorigen Anspruch, umfassend – einen Anlagenspannungssensor, der die primärseitige Anlagenspannung erfassen und ein entsprechendes Anlagenspannungssignal erzeugen kann; und/oder – einen Anlagenspannungssensor, der die sekundärseitige Anlagenspannung erfassen und ein entsprechendes Anlagenspannungssignal erzeugen kann; wobei das Anlagensteuersystem (13) derart ausgebildet ist, dass es das Übersetzungsverhältnis des Anlagentransformators (12) in Abhängigkeit von wenigstens einem dieser Anlagenspannungssignale einstellen kann.Investment ( 10 ) according to the previous claim, comprising - a plant voltage sensor capable of detecting the primary-side plant voltage and generating a corresponding plant voltage signal; and / or a system voltage sensor capable of detecting the secondary side system voltage and generating a corresponding system voltage signal; the asset control system ( 13 ) is designed such that it the transmission ratio of the plant transformer ( 12 ) in response to at least one of these plant voltage signals. Anlage (10) nach einem der vorigen Ansprüche, wobei das Anlagensteuersystem (13) an ein Fernsteuersignale erzeugendes Fernsteuersystem (27) angeschlossen werden kann und derart ausgebildet ist, dass es das Übersetzungsverhältnis des Anlagentransformators (12) in Abhängigkeit von den Fernsteuersignalen einstellen kann.Investment ( 10 ) according to any one of the preceding claims, wherein the asset control system ( 13 ) to a remote control signal generating remote control system ( 27 ) and is designed such that it the transmission ratio of the plant transformer ( 12 ) depending on the remote control signals. Anlage (10) nach einem der vorigen Ansprüche, umfassend einen Laststufenschalter (16) zum Einstellen des Übersetzungsverhältnisses des Anlagentransformators (12).Investment ( 10 ) according to one of the preceding claims, comprising an on-load tap-changer ( 16 ) for setting the transmission ratio of the plant transformer ( 12 ). Anlage (10) nach einem der vorigen Ansprüche, wobei – der Stromrichter (14) ein Stromrichter mit einstellbarer Phasenverschiebung zwischen dem von ihm gelieferten Strom und der von ihm gelieferten Spannung ist; – das Anlagensteuersystem (13) an den Stromrichter (14) angeschlossen und derart ausgebildet ist, dass es die Phasenverschiebung des Stromrichters (14) in Abhängigkeit von der Anlagenblindleistung und/oder von der Anlagenblindleistungsvorgabe und/oder von der primärseitigen Anlagenspannung und/oder von der primärseitigen Anlagenspannungsvorgabe und/oder von der sekundärseitigen Anlagenspannung und/oder von der sekundärseitigen Anlagenspannungsvorgabe und/oder von dem Betriebspunkt der Energieerzeugungseinheit (11) und/oder von dem Betriebspunkt der Anlage (10) einstellen kann.Investment ( 10 ) according to one of the preceding claims, wherein - the power converter ( 14 ) is a power converter with adjustable phase shift between the current supplied by it and the voltage supplied by it; - the plant control system ( 13 ) to the power converter ( 14 ) is connected and designed such that it the phase shift of the power converter ( 14 ) as a function of the reactive power of the plant and / or of the plant reactive power specification and / or of the primary-side plant voltage and / or the primary-side plant voltage specification and / or the secondary-side plant voltage and / or the secondary-side plant voltage specification and / or the operating point of the energy production unit ( 11 ) and / or from the operating point of the installation ( 10 ). Erneuerbare-Energie-Park (25), umfassend – ein Parkstromnetz (20); – wenigstens zwei Erneuerbare-Energie-Anlagen (10), von denen jede gemäß einem der vorigen Ansprüche ausgebildet ist und mit der Sekundärseite ihres Anlagentransformators (12) an das Parkstromnetz (20) angeschlossen ist; – einen Parktransformator (26) mit einstellbarem Übersetzungsverhältnis, dessen Primärseite an das Parkstromnetz (20) angeschlossen ist und dessen Sekundärseite an ein Verbraucherstromnetz (30) angeschlossen werden kann; – ein Parksteuersystem (27), das an den Parktransformator (26) angeschlossen und derart ausgebildet ist, dass es das Übersetzungsverhältnis des Parktransformators (26) in Abhängigkeit von einer Parkblindleistung und/oder von einer Parkblindleistungsvorgabe und/oder von einer primärseitigen Parkspannung und/oder von einer primärseitigen Parkspannungsvorgabe und/oder von einer sekundärseitigen Parkspannung und/oder von einer sekundärseitigen Parkspannungsvorgabe und/oder von einem Betriebspunkt des Parks (25) einstellen kann.Renewable Energy Park ( 25 ), comprising - a parking grid ( 20 ); - at least two renewable energy installations ( 10 ), each of which is designed according to one of the preceding claims and with the secondary side of its plant transformer ( 12 ) to the parking grid ( 20 ) connected; A parking transformer ( 26 ) with adjustable transmission ratio whose primary side is connected to the park power network ( 20 ) and its secondary side to a load current network ( 30 ) can be connected; A parking control system ( 27 ) connected to the parking transformer ( 26 ) and is designed such that it the gear ratio of the parking transformer ( 26 ) depending on one Park blind power and / or from a parking dummy power setting and / or from a primary-side parking voltage and / or from a primary-side parking voltage specification and / or from a secondary-side parking voltage and / or from a secondary-side parking voltage specification and / or from an operating point of the park ( 25 ). Park (25) nach dem vorigen Anspruch, wobei das Parksteuersystem (27) an die Anlagensteuersysteme (13) angeschlossen ist und derart ausgebildet ist, dass es das Übersetzungsverhältnis jedes Anlagentransformators (12) in Abhängigkeit von der Parkblindleistung und/oder von der Parkblindleistungsvorgabe und/oder von der primärseitigen Parkspannung und/oder von der primärseitigen Parkspannungsvorgabe und/oder von der sekundärseitigen Parkspannung und/oder von der sekundärseitigen Parkspannungsvorgabe und/oder von dem Betriebspunkt des Parks (25) einstellen kann.Park ( 25 ) according to the previous claim, wherein the parking control system ( 27 ) to the plant control systems ( 13 ) and is designed such that it the transmission ratio of each plant transformer ( 12 ) as a function of the parking blind power and / or the parking blind power setting and / or the primary side parking voltage and / or the primary-side parking voltage preset and / or the secondary-side parking voltage and / or the secondary-side parking voltage preset and / or the operating point of the park ( 25 ). Park (25) nach einem der vorigen Ansprüche, wobei das Parksteuersystem (27) an ein Fernsteuersignale erzeugendes Fernsteuersystem angeschlossen werden kann und derart ausgebildet ist, dass es das Übersetzungsverhältnis des Parktransformators (26) in Abhängigkeit von den Fernsteuersignalen einstellen kann.Park ( 25 ) according to one of the preceding claims, wherein the parking control system ( 27 ) can be connected to a remote control signal generating remote control system and is designed such that it the gear ratio of the parking transformer ( 26 ) depending on the remote control signals. Park (25) nach einem der vorigen Ansprüche, wobei – jeder Stromrichter (14) ein Stromrichter mit einstellbarer Phasenverschiebung zwischen dem von ihm gelieferten Strom und der von ihm gelieferten Spannung ist; – das Parksteuersystem (27) an die Stromrichter (14) angeschlossen und derart ausgebildet ist, dass es die Phasenverschiebung jedes Stromrichters (14) in Abhängigkeit von der Parkblindleistung und/oder von der Parkblindleistungsvorgabe und/oder von der primärseitigen Parkspannung und/oder von der primärseitigen Parkspannungsvorgabe und/oder von der sekundärseitigen Parkspannung und/oder von der sekundärseitigen Parkspannungsvorgabe und/oder von dem Betriebspunkt des Parks (25) einstellen kann.Park ( 25 ) according to one of the preceding claims, wherein - each power converter ( 14 ) is a power converter with adjustable phase shift between the current supplied by it and the voltage supplied by it; - the parking control system ( 27 ) to the power converters ( 14 ) is connected and designed such that it the phase shift of each power converter ( 14 ) as a function of the parking blind power and / or the parking blind power setting and / or the primary side parking voltage and / or the primary-side parking voltage preset and / or the secondary-side parking voltage and / or the secondary-side parking voltage preset and / or the operating point of the park ( 25 ).
DE202015101806.1U 2015-04-14 2015-04-14 Renewable Energy Plant and Renewable Energy Park Expired - Lifetime DE202015101806U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE202015101806.1U DE202015101806U1 (en) 2015-04-14 2015-04-14 Renewable Energy Plant and Renewable Energy Park

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE202015101806.1U DE202015101806U1 (en) 2015-04-14 2015-04-14 Renewable Energy Plant and Renewable Energy Park

Publications (1)

Publication Number Publication Date
DE202015101806U1 true DE202015101806U1 (en) 2015-04-27

Family

ID=53058938

Family Applications (1)

Application Number Title Priority Date Filing Date
DE202015101806.1U Expired - Lifetime DE202015101806U1 (en) 2015-04-14 2015-04-14 Renewable Energy Plant and Renewable Energy Park

Country Status (1)

Country Link
DE (1) DE202015101806U1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3457417A1 (en) * 2017-09-15 2019-03-20 General Electric Company Control method for protecting transformers
EP3456959A1 (en) * 2017-09-13 2019-03-20 General Electric Company Control method for protecting primary windings of wind turbine transformers
DE102020134772A1 (en) 2020-12-22 2022-06-23 Sma Solar Technology Ag METHOD OF OPERATING AN ENERGY SUPPLY PLANT, PLANT CONTROLLER FOR AN ENERGY SUPPLY PLANT, AND ENERGY SUPPLY PLANT
DE102022110668A1 (en) 2022-05-02 2023-11-02 Maschinenfabrik Reinhausen Gmbh METHOD FOR ADJUSTING A SET VALUE VOLTAGE FOR CONTROLLING A TAPPING TRANSFORMER AND DEVICE FOR ADJUSTING A SET VOLTAGE FOR CONTROLLING A TAPPING TRANSFORMER

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008018748A1 (en) 2008-04-14 2009-10-15 Repower Systems Ag Wind energy plant with connection protection device
DE102008048258A1 (en) 2008-09-22 2010-04-01 Repower Systems Ag Windpark operating method for generation of electricity, involves determining electrical load of wind turbine of windpark, and adjusting transmission ratio depending on electrical load of wind turbine

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008018748A1 (en) 2008-04-14 2009-10-15 Repower Systems Ag Wind energy plant with connection protection device
DE102008048258A1 (en) 2008-09-22 2010-04-01 Repower Systems Ag Windpark operating method for generation of electricity, involves determining electrical load of wind turbine of windpark, and adjusting transmission ratio depending on electrical load of wind turbine

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
"Vierten Ergänzung" von Januar 2013 (4. Ergänzung zur MSR 2008)
4. Ergänzung zur MSR 2008 mit Wirkung zum Januar 2013
BDEW-Richtlinie "Erzeugungsanlagen am Mittelspannungsnetz", Ausgabe Juni 2008 (MSR 2008)
VDEW-Richtlinie "Eigenerzeugungsanlagen am Niederspannungsnetz"

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3456959A1 (en) * 2017-09-13 2019-03-20 General Electric Company Control method for protecting primary windings of wind turbine transformers
US10958066B2 (en) 2017-09-13 2021-03-23 General Electric Company Control method for protecting primary windings of wind turbine transformers
EP3457417A1 (en) * 2017-09-15 2019-03-20 General Electric Company Control method for protecting transformers
US10886726B2 (en) 2017-09-15 2021-01-05 General Electric Company Control method for protecting transformers
DE102020134772A1 (en) 2020-12-22 2022-06-23 Sma Solar Technology Ag METHOD OF OPERATING AN ENERGY SUPPLY PLANT, PLANT CONTROLLER FOR AN ENERGY SUPPLY PLANT, AND ENERGY SUPPLY PLANT
DE102022110668A1 (en) 2022-05-02 2023-11-02 Maschinenfabrik Reinhausen Gmbh METHOD FOR ADJUSTING A SET VALUE VOLTAGE FOR CONTROLLING A TAPPING TRANSFORMER AND DEVICE FOR ADJUSTING A SET VOLTAGE FOR CONTROLLING A TAPPING TRANSFORMER

Similar Documents

Publication Publication Date Title
EP2245717B1 (en) Wind energy plant having a double-energized asynchronous generator and converter control
EP2333926B1 (en) Wind farm and method for operating a wind farm
DE102017127311A1 (en) Apparatus and method for biasing a power transformer in a power converter system
EP3039764B1 (en) System for transmitting electrical power
EP2463980B1 (en) Operation of an energy producer in an energy supply network
EP2275674A2 (en) Method for operating a wind park
DE102005038558A1 (en) Method for operating a wind energy plant park and wind energy plant park
EP3968483A1 (en) Method for operating a combined cycle power plant, and combined cycle power plant
EP2826121A1 (en) Method for controlling an arrangement for supplying electric current to a power supply system
DE102018105483A1 (en) Method for operating a power generation plant and inverter for a power generation plant
WO2014166694A1 (en) Wind turbine having an expanded voltage range
EP2465192A2 (en) Asynchronous generator system and wind turbine having an asynchronous generator system
DE102013222452A1 (en) Method for operating a wind energy plant
DE202015101806U1 (en) Renewable Energy Plant and Renewable Energy Park
DE102011000459B4 (en) Method for supplying reactive current with a converter and converter arrangement and energy supply system
DE102009037523A1 (en) Wind park system, has wind turbines including generator i.e. self-excited synchronous generator, with adjustable excitation that is indirectly adjusted depending upon reactive power requirement of wind park controlling device
DE102012101928A1 (en) Power grid decentralized stabilizing method, involves minimizing feed-in power of power grid decentralized stabilizing system in relation to actual maximum generator power according with requirements for feed-in power
DE102012012401A9 (en) METHOD FOR CURRENT CONTROL
DE102011122580B4 (en) Method for operating an electrical supply network and associated control unit
WO2015004034A2 (en) Electrical arrangement comprising a power inverter and intermediate device for the electrical arrangement
WO2013152788A1 (en) Electric device, and method for controlling an electric energy generator
EP3046204B1 (en) Wind energy system
DE102012024791B4 (en) Decentralized power generator and island network
EP2580834B1 (en) Predictable feeding of reactive powers
EP3780305A1 (en) Inverter arrangement for wind turbines and photovoltaic installations

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20150603

R156 Lapse of ip right after 3 years