Movable track construction machineInfo
- Publication number
- DE20112865U1 DE20112865U1 DE20112865U DE20112865U DE20112865U1 DE 20112865 U1 DE20112865 U1 DE 20112865U1 DE 20112865 U DE20112865 U DE 20112865U DE 20112865 U DE20112865 U DE 20112865U DE 20112865 U1 DE20112865 U1 DE 20112865U1
- Authority
- DE
- Germany
- Prior art keywords
- ballast
- construction machine
- track
- track construction
- machine according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title claims description 20
- 238000000926 separation method Methods 0.000 claims description 20
- 239000012530 fluid Substances 0.000 claims description 19
- 238000009412 basement excavation Methods 0.000 claims description 10
- 238000004140 cleaning Methods 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 8
- 239000000463 material Substances 0.000 claims description 8
- 239000002245 particle Substances 0.000 claims description 8
- 239000007788 liquid Substances 0.000 claims description 6
- 239000002699 waste material Substances 0.000 claims description 6
- 239000007921 spray Substances 0.000 claims description 5
- 239000012459 cleaning agent Substances 0.000 claims description 3
- 239000000126 substance Substances 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 239000002689 soil Substances 0.000 claims 2
- 230000015572 biosynthetic process Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 238000012216 screening Methods 0.000 description 2
- 239000000654 additive Substances 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/06—Renewing or cleaning the ballast in situ, with or without concurrent work on the track
- E01B27/10—Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Description
Bremen, den 1. August 2001Bremen, 1 August 2001
Unser Zeichen: W 2425 WWR/cmuOur reference: W 2425 WWR/cmu
Anmelder/Inhaber: Hermann Wiebe Grundstücks-Applicant/Owner: Hermann Wiebe Property-
Amtsaktenzeichen: NeuanmeldungOfficial reference number: New registration
Patentanwälte
European Patent Attorneys
Dipl.-Ing. Günther Eisenführ
Dipl.-Ing. Dieter K. Speiser
Dr.-lng.WernerW. Rabus
Dipl.-Ing. Jürgen Brügge
Dipl.-Ing. Jürgen Klinghardt
Dipl.-Ing. Klaus G. Göken
Jochen Ehlers
Dipl.-Ing. Mark Andres
Dipl.-Chem. Dr. Uwe Stilkenböhmer
Dipl.-Ing. Stephan Keck
Dipl.-Ing. Johannes M. B. Wasiljeff
Patentanwalt
Dr.-Ing. Stefan SassePatent attorneys
European Patent Attorneys
Dipl.-Ing. Günther Eisenführ
Dipl.-Ing. Dieter K. Speiser
Dr.-lng.WernerW. Rabus
Dipl.-Ing. Jürgen Brügge
Dipl.-Ing. Jürgen Klinghardt
Dipl.-Ing. Klaus G. Göken
Jochen Ehlers
Dipl.-Ing. Mark Andres
Dipl.-Chem. Dr. Uwe Stilkenböhmer
Dipl.-Ing. Stephan Keck
Dipl.-Ing. Johannes MB Wasiljeff
Patent Attorney
Dr.-Ing. Stefan Sasse
Rechtsanwälte
Ulrich H. Sander
Christian Spintig
Sabine RichterLawyers
Ulrich H. Sander
Christian Spintig
Sabine Richter
D-28195 BremenD-28195 Bremen
Tel. +49-(0)421-36 35 0Phone +49-(0)421-36 35 0
Fax +49(0)421-337 8788 (G3)Fax +49(0)421-337 8788 (G3)
Fax +49-10)421 -328 8631 (G4)Fax +49-10)421 -328 8631 (G4)
mail@eisenfuhr.commail@eisenfuhr.com
http://www.eisenfuhr.comhttp://www.eisenfuhr.com
PatentanwaltPatent Attorney
European Patent AttorneyEuropean Patent Attorney
Dipl.-Phys. Frank MeierDipl.-Phys. Frank Meier
Rechtsanwalt Rainer BöhmAttorney Rainer Böhm
MünchenMunich
PatentanwältePatent attorneys
European Patent AttorneysEuropean Patent Attorneys
Dipl.-Phys. Heinz NöthDipl.-Phys. Heinz Nöth
Dipl.-Wirt.-!ng. Rainer FntscheDipl.-Wirt.-!ng. Rainer Fntsche
Lbm.-Chem. Gabriele Leißler-Gsrs:Lbm.-Chem. Gabriele Leißler-Gsrs:
Dipl.-Ing. Olaf UngererDipl.-Ing. Olaf Ungerer
PatentanwaltPatent Attorney
Dipl.-Chem. Dr. Peter SchulerDipl.-Chem. Dr. Peter Schuler
BerlinBerlin
Patentanwälte European Patent Attorneys Dipl.-Ing. Henning Christiansen Dipl.-Ing. Joachim von Oppen Dipl.-Ing. Jutta Kaden Dipl.-Ing. Mathias KarlhuberPatent Attorneys European Patent Attorneys Dipl.-Ing. Henning Christiansen Dipl.-Ing. Joachim von Oppen Dipl.-Ing. Jutta Kaden Dipl.-Ing. Mathias Karlhuber
AlicanteAlicante
European Trademark Attorney Dipl.-Ing. Jürgen KlinghardtEuropean Trademark Attorney Dipl.-Ing. Jürgen Klinghardt
Hermann Wiebe Grundstücks- und Maschinenanlagen GmbH & Co. KG
Bahnhofstraße 45, 27313 DörverdenHermann Wiebe Real Estate and Machinery GmbH & Co. KG
Bahnhofstrasse 45, 27313 Dörverden
Verfahrbare GleisbaumaschineMobile track construction machine
Die Erfindung betrifft eine verfahrbare Gleisbaumaschine zur Erneuerung der Schotterbettung von Gleisen, insbesondere mit Gleishebeeinrichtungen, mindestens einer ersten Aushubeinrichtung zur Aufnahme von kontaminiertem oder verschmutztem Schotter unter dem angehobenen Gleis, Bearbeitungseinrichtungen zum Bearbeiten des kontaminierten Schotters, Einbaueinrichtungen zum Einbauen des bearbeiteten Schotters unter dem angehobenen Gleis, und mit einer ersten Förderanlage von der ersten Aushubeinrichtung zu den Bearbeitungseinrichtungen und einer zweiten Förderanlage von den Bearbeitungseinrichtungen zu den Einbaueinrichtungen.The invention relates to a movable track construction machine for renewing the ballast bedding of tracks, in particular with track lifting devices, at least one first excavation device for receiving contaminated or dirty ballast under the raised track, processing devices for processing the contaminated ballast, installation devices for installing the processed ballast under the raised track, and with a first conveyor system from the first excavation device to the processing devices and a second conveyor system from the processing devices to the installation devices.
Derartige Gleisbaumaschinen sind beispielsweise aus der DE 297 03 454.3 bekannt und werden eingesetzt, wenn der Unterbau oder die Schotterbettung von Gleisen erneuert oder saniert werden soll. Mit einer ersten Aushubeinrichtung wird - unter dem angehobenen Gleis - der verschmutzte und stumpfe Schotter aufgenommen, dann in der Maschine einer Bearbeitungseinrichtung, beispielsweise einerSuch track construction machines are known, for example, from DE 297 03 454.3 and are used when the substructure or ballast bed of tracks is to be renewed or renovated. The dirty and blunt ballast is picked up with a first excavation device - under the raised track - and then in the machine of a processing device, for example a
Trennanlage zugeführt. Dort wird der kontaminierte Schotter mittels einer Siebanlage von kleinteiligem Abraum, verschmutztem Sand oder anderen Schmutzteilchen etc. befreit. Dieser kleinteilige Abraum (Feinmaterial) wird dann zu Verladewagen transportiert, welche zur Aufnahme dieses hoch kontaminierten Materials vorgesehen sind. Der gereinigte Schotter wird anschließend wieder - in der Maschine - Einbaueinrichtungen zugeführt, welche den gereinigten Schotter dann wieder unter den Schwellen des angehobenen Gleises abgeben und verdichten. Zusätzlich wird gegebenenfalls noch frischer Schotter zugeführt und zusammen mit dem gereinigten Schotter eingebaut. Es hat sich dabei gezeigt, dass der Siebevorgang, durchgeführt beispielsweise von einem Rüttelsieb, die an dem Schotter fest anhaftenden Schmutzteilchen nicht oder nur unvollkommen löst. Bei dieser bekannten Gleisbaumaschine ist daher die Reinigung des kontaminierten oder verschmutzten Schotters nicht immer vollständig befriedigend.The ballast is fed into a separation plant. There, the contaminated ballast is freed of small debris, dirty sand or other dirt particles, etc. using a screening system. This small debris (fine material) is then transported to loading wagons, which are designed to take up this highly contaminated material. The cleaned ballast is then fed back into the machine to installation devices, which then place the cleaned ballast under the sleepers of the raised track and compact it. In addition, fresh ballast may be fed in and installed together with the cleaned ballast. It has been shown that the screening process, carried out for example by a vibrating screen, does not or only incompletely remove the dirt particles firmly adhering to the ballast. With this well-known track construction machine, the cleaning of the contaminated or dirty ballast is therefore not always completely satisfactory.
Aufgabe der Erfindung ist es, eine Gleisbaumaschine der eingangs genannten Art derart weiterzubilden, dass eine wirksame Reinigung des kontaminierten Schotters in einfacher Weise möglich ist.The object of the invention is to further develop a track construction machine of the type mentioned at the beginning in such a way that an effective cleaning of the contaminated ballast is possible in a simple manner.
Diese Aufgabe wird bei der Gleisbaumaschine der eingangs genannten Art erfindungsgemäß gelöst durch mehrere Fluiddüsen an oder über der Trennanlage, welche über Fluidleitungen von einem Fluidtank unter Hochdruck stehendes Fluid erhalten und gegen den in der Trennanlage bearbeiteten Schotter unter Hochdruck sprühen.This object is achieved according to the invention in the track construction machine of the type mentioned at the outset by a plurality of fluid nozzles on or above the separation system, which receive high-pressure fluid from a fluid tank via fluid lines and spray it under high pressure against the ballast processed in the separation system.
Die Vorteile der Erfindung liegen insbesondere darin, dass der in der Trennanlage befindliche Schotter zusätzlich mit einem Hochdruckfluid bearbeitet wird, wobei die Sprühstrahlen am Schotter anhaftende Schmutzteilchen so besser lösen.The advantages of the invention lie in particular in the fact that the ballast in the separation system is additionally treated with a high-pressure fluid, whereby the spray jets better loosen dirt particles adhering to the ballast.
Besonders bevorzugt wird als Fluid eine Reinigungsflüssigkeit, insbesondere Wasser, verwendet, um die Reinigungswirkung der unter Hochdruck aufgestrahlten Reinigungsflüssigkeit zu verbessern, werden in einer besonders bevorzugtenParticularly preferably, a cleaning liquid, in particular water, is used as the fluid in order to improve the cleaning effect of the cleaning liquid jetted under high pressure. In a particularly preferred
Ausführungsform der Erfindung noch chemische Reinigungsmittel der Flüssigkeit zugesetzt, damit insbesondere ölhaltige Schmutzschichten vom Schotter besser entfernt werden können.In an embodiment of the invention, chemical cleaning agents are added to the liquid so that oily dirt layers in particular can be better removed from the ballast.
Gemäß einer bevorzugten Ausführungsform der Erfindung sind mehrere Fluiddüsen über die Bearbeitungsfläche der Trennanlage verteilt angeordnet und mit ihren Fluid-Sprühstrahlen gegen den in der Trennanlage befindlichen Schotter gerichtet.According to a preferred embodiment of the invention, several fluid nozzles are arranged distributed over the processing surface of the separation system and their fluid spray jets are directed against the ballast in the separation system.
Die Trennanlage enthält bevorzugt mindestens ein Schwingsieb und/oder mindestens ein Rüttelsieb. Vor oder nach der Trennanlage lässt sich bevorzugt noch eine Brecheranlage zum Zerkleinern des Schotters vorsehen, die den Schotter zerbricht und dadurch wieder scharfkantig macht.The separation system preferably contains at least one vibrating screen and/or at least one vibrating screen. Before or after the separation system, a crushing system for crushing the ballast can preferably be provided, which breaks the ballast and thereby makes it sharp-edged again.
Vorteilhafte Weiterbildungen der Erfindung sind durch die Merkmale der Unteransprüche gekennzeichnet.Advantageous developments of the invention are characterized by the features of the subclaims.
Im folgenden wird ein Ausführungsbeispiel der Erfindung anhand der Zeichnungen näher erläutert.In the following, an embodiment of the invention is explained in more detail with reference to the drawings.
Die Figur zeigt eine schematische Seitenansicht des zentralen Bereichs einerThe figure shows a schematic side view of the central area of a
erfindungsgemäßen Gleisbaumaschine.track construction machine according to the invention.
Dargestellt sind eine zentrale Arbeitsmaschine 1a mit einer Brücke 2, deren Enden auf gleisverfahrbaren Drehgestellen 5 ruhen. Die Brücke 2 kann zweigeteilt sein, an der Stoßstelle der beiden Teile 2a, 2b ist in der dargestellten Ausführungsform ein mittleres Drehgestell 5b vorgesehen, welches gegebenenfalls während eines Arbeitsvorganges zusammen mit dem Gleis anhebbar ist, um Freiraum unter dem Gleis für die Schotterbearbeitung zu schaffen. An der Brücke sind außerdem Gleishebeeinrichtungen 3 vorgesehen, welche zum Anheben des Gleises unterhalb der Brücke dienen und unter dem Gleis ausreichend Raum für die Bearbeitungsgeräte erzeugen. An die Arbeitsmaschine 1a ist mindestens ein Arbeitswagen 1bShown is a central work machine 1a with a bridge 2, the ends of which rest on track-moving bogies 5. The bridge 2 can be split in two, at the point where the two parts 2a, 2b meet, in the embodiment shown, a central bogie 5b is provided, which can be lifted together with the track during a work process if necessary, in order to create space under the track for ballast processing. The bridge is also provided with track lifting devices 3, which serve to lift the track beneath the bridge and create sufficient space under the track for the processing equipment. At least one work carriage 1b is connected to the work machine 1a.
angekoppelt, der ebenfalls auf gleisverfahrbaren Drehgestellen verfahrbar ist und mehrere Schotterbearbeitungseinrichtungen aufweist. An den Schotterbearbeitungswagen 1 b sind vorn an der Gleisbaumaschine noch Verladewagen 100 angekoppelt. Außerdem lassen sich auch hinter der Arbeitsmaschine 1a verschiedene Bearbeitungswagen (nicht dargestellt) und/oder Verladewagen (nicht dargestellt) ankoppeln.which can also be moved on track-moving bogies and has several ballast processing devices. Loading wagons 100 are also coupled to the ballast processing wagon 1b at the front of the track construction machine. In addition, various processing wagons (not shown) and/or loading wagons (not shown) can also be coupled behind the work machine 1a.
Die Arbeitsmaschine 1 a und der Schotterbearbeitungswagen 1 b enthalten mehrere Einrichtungen, welche bei den verschiedenen Arbeitsschritten zur Erneuerung oder zur Sanierung des Gleisunterbaus zum Einsatz kommen. Mittels der Gleishebeeinrichtungen 3 wird das Gleis 20, auf welchem die Gleisbaumaschine fährt, und dessen Unterbau saniert werden soll, im Bereich der Brücke 2 angehoben. Eine erste Aushubeinrichtung 4 ist an der Brücke 2 angebracht und dient zur Aufnahme einer ersten oberen Materialschicht, die im wesentlichen aus Schotter und zwischen sowie unter dem Schotter befindlichem kleinteiligen Abraum oder Schmutzpartikel, und ggf. auch noch in geringem Umfang aus unmittelbar darunter befindlichen Teilen der Planumsschutzschicht besteht.The work machine 1 a and the ballast processing car 1 b contain several devices which are used in the various work steps for renewing or renovating the track substructure. The track 20, on which the track construction machine is traveling and whose substructure is to be renovated, is raised in the area of the bridge 2 by means of the track lifting devices 3. A first excavation device 4 is attached to the bridge 2 and serves to pick up a first upper layer of material which essentially consists of ballast and small-scale waste or dirt particles located between and under the ballast, and possibly also to a small extent of parts of the subgrade protection layer located directly underneath.
Vorgesehen ist ferner eine zweite Aushubeinrichtung 6, welche die Planumsschutzschicht abräumt. Auf dem Schotterbearbeitungswagen Ib befindet sich eine Brecheranlage 25 zum Zerkleinern des Schotters. Außerdem ist eine Trennanlage 24 vorgesehen, die beispielsweise ein Schwingsieb oder ein Rüttelsieb enthält, welches Schotter unterschiedlicher Größe trennt, insbesondere jedoch auch den kleinteiligen Abraum, wie beispielsweise kontaminierten Sand etc. absiebt. An bzw. hinter der Brücke sind auch noch Einbaueinrichtungen 10 vorgesehen, welche unter Zufuhr von frischem Sand eine neue Planumsschutzschicht einbauen bzw. auf die neue Planumsschutzschicht Schotter ablegen, wobei die von den Bearbeitungseinrichtungen 24, 25 angelieferte Schotter wieder unter das Gleis 20 gelegt wird, wobei ggf. auch noch frischer Schotter zugesetzt wird. Eine erste Förderanlage 30 verläuft von der ersten Aushubeinrichtung 4 zu dem Schotterbearbeitungswagen 1b und dort durch die Brecheranlage 25 hindurch, in welcher der SchotterA second excavation device 6 is also provided, which removes the formation protection layer. On the ballast processing carriage 1b there is a crusher system 25 for crushing the ballast. In addition, a separation system 24 is provided, which contains, for example, a vibrating screen or a vibrating screen, which separates ballast of different sizes, but in particular also screens out small-sized waste, such as contaminated sand, etc. On or behind the bridge, installation devices 10 are also provided, which install a new formation protection layer by supplying fresh sand or lay ballast on the new formation protection layer, with the ballast supplied by the processing devices 24, 25 being laid back under the track 20, with fresh ballast also being added if necessary. A first conveyor system 30 runs from the first excavation device 4 to the ballast processing carriage 1b and there through the crusher system 25, in which the ballast
• ··
• ··
gebrochen wird. Die erste Förderanlage 30 führt den gebrochenen Schotter anschließend zu einer Trennanlage 24, die beispielsweise übereinander unterschiedlich großmaschige Rüttelsiebe oder Schwingsiebe enthält, um Schotter unterschiedlicher Größe zu trennen, und um insbesondere auch den kieinteiligen Abraum, wie kontaminierten Sand etc., von dem Schotter zu entfernen.is broken. The first conveyor system 30 then leads the broken gravel to a separation system 24, which contains, for example, vibrating screens or vibrating screens with different mesh sizes one above the other in order to separate gravel of different sizes and, in particular, to remove the small-particle waste, such as contaminated sand, etc., from the gravel.
In der Trennanlage 24 sind mehrere Fluiddüsen 26 vorgesehen, die von einem Fluidtank (nicht dargestellt) unter Hochdruck stehendes Fluid zugeführt erhalten und gegen den in der Trennanlage 24 befindlichen Schotter unter Hochdruck abstrahlen, um an dem Schotter anhaftende Schmutzpartikel abzulösen. Das unter Hochdruck stehende Fluid ist bevorzugt eine Flüssigkeit. Besonders bevorzugt wird Wasser eingesetzt, welches zur Verbesserung der Reinigungswirkung auch noch chemische Reinigungsmittelzusätze aufweisen kann.The separation system 24 is provided with a number of fluid nozzles 26 which receive high-pressure fluid from a fluid tank (not shown) and spray it against the ballast in the separation system 24 under high pressure in order to remove dirt particles adhering to the ballast. The high-pressure fluid is preferably a liquid. Water is particularly preferably used, which can also contain chemical cleaning agent additives to improve the cleaning effect.
Der von der Trennanlage 24 abgegebene gereinigte Schotter wird über eine zweite Förderanlage 40 wieder zurückgeführt und zu diesem Zweck mittels verschiedener Förderbänder über der Brücke 2 zu den Schottereinbaueinrichtungen 1 2 geführt und dort wieder unter dem Gleis, ggf. unter Zugabe von frischem Schotter, eingebaut.The cleaned ballast delivered by the separation system 24 is returned via a second conveyor system 40 and for this purpose is guided by means of various conveyor belts over the bridge 2 to the ballast installation devices 1 2 and there installed again under the track, if necessary with the addition of fresh ballast.
Eine dritte Förderanlage 50 nimmt unter der Trennanlage 24 den kieinteiligen Abraum, Schmutzpartikel sowie ggf, die beim Brechen entstandenen zu kleinen Schotterteile auf. Die dritte Förderanlage 50 fördert diesen Abraum in Verladewagen 100 (nicht dargestellt).A third conveyor system 50 receives the small-sized waste, dirt particles and, if applicable, the small pieces of gravel created during crushing under the separation system 24. The third conveyor system 50 conveys this waste into loading wagons 100 (not shown).
Vorgesehen ist ferner noch eine vierte Förderanlage, welche das von der zweiten Aushubeinrichtung 6 aufgenommene Material der Planumsschutzschicht in einen Verladewagen 100 abfördert.Furthermore, a fourth conveyor system is provided, which transports the material of the formation protection layer taken up by the second excavation device 6 into a loading wagon 100.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE20112865U DE20112865U1 (en) | 2001-08-02 | 2001-08-02 | Movable track construction machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE20112865U DE20112865U1 (en) | 2001-08-02 | 2001-08-02 | Movable track construction machine |
Publications (1)
Publication Number | Publication Date |
---|---|
DE20112865U1 true DE20112865U1 (en) | 2001-10-04 |
Family
ID=7960113
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE20112865U Expired - Lifetime DE20112865U1 (en) | 2001-08-02 | 2001-08-02 | Movable track construction machine |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE20112865U1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202006019143U1 (en) * | 2006-12-18 | 2008-04-30 | Wiebe Holding Gmbh & Co. Kg | Track construction machine for track restoration |
DE202007011501U1 (en) | 2007-08-16 | 2008-12-24 | Wiebe Holding Gmbh & Co. Kg | Track rehabilitation machine with triple separated excavation |
DE102019206841A1 (en) * | 2019-05-10 | 2020-11-12 | Jörg Frenzel | Process for impregnation and further processing of bulk goods |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE531681C (en) | 1930-05-20 | 1931-09-01 | Gewerk Eisenhuette Westfalia | Cleaning trolley for old track beds |
FR1065732A (en) | 1952-09-16 | 1954-05-28 | Sncf | Method and device for purifying ballast, between railway sleepers |
DE2550820A1 (en) | 1974-11-15 | 1976-05-20 | Plasser Bahnbaumasch Franz | METHOD AND DEVICE FOR WASHING BED BALL OF RAILWAY TRACKS |
DE29703454U1 (en) | 1997-02-27 | 1998-06-25 | Hermann Wiebe Grundstücks- und Maschinenanlagen KG, 27313 Dörverden | Movable track construction machine |
-
2001
- 2001-08-02 DE DE20112865U patent/DE20112865U1/en not_active Expired - Lifetime
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE531681C (en) | 1930-05-20 | 1931-09-01 | Gewerk Eisenhuette Westfalia | Cleaning trolley for old track beds |
FR1065732A (en) | 1952-09-16 | 1954-05-28 | Sncf | Method and device for purifying ballast, between railway sleepers |
DE2550820A1 (en) | 1974-11-15 | 1976-05-20 | Plasser Bahnbaumasch Franz | METHOD AND DEVICE FOR WASHING BED BALL OF RAILWAY TRACKS |
DE29703454U1 (en) | 1997-02-27 | 1998-06-25 | Hermann Wiebe Grundstücks- und Maschinenanlagen KG, 27313 Dörverden | Movable track construction machine |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202006019143U1 (en) * | 2006-12-18 | 2008-04-30 | Wiebe Holding Gmbh & Co. Kg | Track construction machine for track restoration |
DE202007011501U1 (en) | 2007-08-16 | 2008-12-24 | Wiebe Holding Gmbh & Co. Kg | Track rehabilitation machine with triple separated excavation |
EP2025810A1 (en) | 2007-08-16 | 2009-02-18 | Wiebe Holding GmbH & Co.KG | Railway renewing machine with triple separated spoil |
DE102019206841A1 (en) * | 2019-05-10 | 2020-11-12 | Jörg Frenzel | Process for impregnation and further processing of bulk goods |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0629744B1 (en) | Method and arrangement for the subgrade-rehabilitation of a ballast for a track | |
DE69604478T2 (en) | DEVICE AND RELATED METHOD FOR FILLING A TRENCH | |
EP2025810B1 (en) | Railway renewing machine with triple separated spoil | |
EP0349789B1 (en) | Method and device for the sanitation of contaminated sites | |
DE4237712C2 (en) | Plant for the production of a formation protection layer | |
AT4464U2 (en) | CLEANING MACHINE FOR CLEANING THE GRAVEL BED OF A TRACK | |
EP1253247B1 (en) | Railway ballast cleaning machine | |
EP1253248B1 (en) | Ballast cleaning machine and method | |
EP3755842B1 (en) | Cleaning machine | |
EP1179634B1 (en) | Railway track renewal machine | |
DE19807677B4 (en) | Mobile track construction machine | |
DE20112865U1 (en) | Movable track construction machine | |
DE102010045068B3 (en) | Rehabilitation process for the multi-layered substructure on railway lines and overhead work carts | |
EP2166152B1 (en) | Method and device for improving or repairing track systems | |
EP2166157B1 (en) | Method and device for improving or repairing track systems | |
EP3412827B1 (en) | Railway vehicle for track construction remediation | |
EP3721012B1 (en) | System for cleaning ballast of a track | |
EP2559812B1 (en) | Method and device for improving or repairing track systems | |
AT513248B1 (en) | Method and machine for cleaning ballast of a track | |
DE102020129000B3 (en) | Device for collecting sediments in bodies of water | |
DE4102405C2 (en) | Process for manufacturing a landfill and landfill site | |
EP2374931A2 (en) | Refurbishment method for multi-layer substructure of rail sections | |
EP2787121B1 (en) | Method for processing the substructure located under the track of a railway section | |
DE20317211U1 (en) | System for renovating track ballast comprises a star sieve with spray nozzles arranged in a water collection vessel, and a clarification plant having a screw conveyor running in the longitudinal direction | |
DE102019134265A1 (en) | System and process for the preparation of a riding surface |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R207 | Utility model specification |
Effective date: 20011108 |
|
R021 | Search request validly filed |
Effective date: 20011011 |
|
R163 | Identified publications notified |
Effective date: 20020628 |
|
R081 | Change of applicant/patentee |
Owner name: WIEBE HOLDING GMBH & CO. KG, DE Free format text: FORMER OWNER: HERMANN WIEBE GRUNDSTUECKS- UND MASCHINENANLAGEN GMBH & CO. KG, 27313 DOERVERDEN, DE Effective date: 20040816 |
|
R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 20041108 |
|
R151 | Utility model maintained after payment of second maintenance fee after six years |
Effective date: 20070927 |
|
R152 | Utility model maintained after payment of third maintenance fee after eight years |
Effective date: 20090925 |
|
R071 | Expiry of right | ||
R071 | Expiry of right |