DE1946889A1 - Assembly line for making housing units and method for making those housing units - Google Patents
Assembly line for making housing units and method for making those housing unitsInfo
- Publication number
- DE1946889A1 DE1946889A1 DE19691946889 DE1946889A DE1946889A1 DE 1946889 A1 DE1946889 A1 DE 1946889A1 DE 19691946889 DE19691946889 DE 19691946889 DE 1946889 A DE1946889 A DE 1946889A DE 1946889 A1 DE1946889 A1 DE 1946889A1
- Authority
- DE
- Germany
- Prior art keywords
- frame
- ceiling
- assembly
- mounting
- floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims description 12
- 238000010276 construction Methods 0.000 claims description 16
- 238000009434 installation Methods 0.000 claims description 14
- 239000003292 glue Substances 0.000 claims description 10
- 238000005253 cladding Methods 0.000 claims description 7
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 6
- 239000003086 colorant Substances 0.000 claims description 3
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 238000005304 joining Methods 0.000 claims 2
- 238000003780 insertion Methods 0.000 claims 1
- 230000037431 insertion Effects 0.000 claims 1
- 235000015250 liver sausages Nutrition 0.000 claims 1
- 238000009966 trimming Methods 0.000 claims 1
- 238000004378 air conditioning Methods 0.000 description 4
- 238000010438 heat treatment Methods 0.000 description 4
- 239000004566 building material Substances 0.000 description 3
- 239000002131 composite material Substances 0.000 description 3
- 238000009413 insulation Methods 0.000 description 3
- 239000011120 plywood Substances 0.000 description 2
- 241000587161 Gomphocarpus Species 0.000 description 1
- 108010001267 Protein Subunits Proteins 0.000 description 1
- WYTGDNHDOZPMIW-RCBQFDQVSA-N alstonine Natural products C1=CC2=C3C=CC=CC3=NC2=C2N1C[C@H]1[C@H](C)OC=C(C(=O)OC)[C@H]1C2 WYTGDNHDOZPMIW-RCBQFDQVSA-N 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 238000010616 electrical installation Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 150000002500 ions Chemical class 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 210000004072 lung Anatomy 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 150000002739 metals Chemical class 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
- E04B1/34815—Elements not integrated in a skeleton
- E04B1/34838—Elements not integrated in a skeleton the supporting structure consisting of wood
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B15/00—General arrangement or layout of plant ; Industrial outlines or plant installations
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
- E04B1/34815—Elements not integrated in a skeleton
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
- E04B2001/34892—Means allowing access to the units, e.g. stairs or cantilevered gangways
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
DR. I. MAASDR. I. MAAS
8 MÜNCHEN 23 UNGERERSTR.2S-TEL. 3902888 MUNICH 23 UNGERERSTR.2S-TEL. 390288
760 103760 103
Stirling-Homex Corp., Avon N.J., V.St.A, Stirling-Homex Corp., Avon NJ, V.St.A ,
Montageband zum Herstellen von Wohneinheiten und Verfahren zum Herstellen dieser Wohneinheiten Assembly line for making residential units and method of making those residential units
Der Bau von Wohnungen ist relativ unfortschrittlich und insoweit sehr unökonomisch als er sich ungeschickter und arbeitsaufwendiger Verfahrensmaßnahmen im Freien an den jeweiligen Baustellen bedient. Bekannte Maßnahmen zum Herstellen von Wohnungen in Fabriken imitieren im allgemeinen die alten manuellen Methoden, die aufgrund der Notwendigkeit eines langsamen dem Wetter ausgesetzten Aufbaus entwickelt wurden. Zuerst wird dabei die Außenhaut gebaut, um den Bau vor dem Wetter abzuschirmen unä dann werden die inneren Installationen, die Isolation, die Zurichtung, das Anbringen der.Fußböden und dergleichen vorgenommen. Dies erfordert, daß viele Arbeiten von oben oder in ungeschickten Stellungen durchgeführt werden, da3 beträchtliche Materialmengen bewegt werden und daß im allge-The construction of apartments is relatively inaccessible and to that extent very uneconomical as he is clumsy and labor-intensive procedural measures in the open to the respective Served construction sites. Known measures for making apartments in factories generally imitate the old manual ones Methods developed due to the need for slow weather exposure. First the outer skin is built to shield the building from the weather and then the inner installations, the Isolation, finishing, attaching the floors and the like performed. This requires that much of the work be done from above or in awkward positions, da3 considerable amounts of material are moved and that in general
009819/0479009819/0479
meinen viel Zeit und-Arbeit-verschwendet wird. ' -.:■;,'.■.■ *r ,;.my time and work is wasted. '-.:■;,'.■.■ * r,;.
Die Erfindung weicht insofern von den alten'MäSnährneniib, als" sie die Wohneinheiten von innen nach'auSeri aufbaut, um.die *;1 Anbringung der Installationen zu erleichtern, wobei in jeder Kons trukt ions stufe in bequemen und zweckmäßigen Arbeit3steÜ>-"' lungen gearbeitet werden kann, so "daß' die· Arbeitsgsschwindigikeit erhöht und die Arbeitskosten verringert- werden. Geriiäß der Erfindung werden Montagegestelle verwendet,'die die Werkstücke während des Zusammensetzens der Untereinheiten halten. Die mei-.sten Elemente sind vorgeschnitten und so gelagert, daß sie nur minimal bewegt werden müssen. Alles wird in zweckmäßigsten und wirksamsten Arbeitsstellungeri vorgenommen. Die die Werkstücke"' haltenden Montagegestelle beseitigen das Messen, das Ablesen von Plänen, den Irrtum und die"Notwendigkeit hochqualifizierter Fachkräfte. Die Untereinheiten werden neben den i-lon-iageges τ eilen zusammengesetzt, so daß sie nur geringefügig transportiert werden müssen. Alle Betriebsweisen werden so koordiniert, daß das Montageband stetig weiterläuft. Die Konstruktion unter ' ".'. Dach hat den Vorteil der gleichförmigen Beleuchtung, der zweckmäßigen Energieversorgung für elektrische imd Druckluft-Werkzeuge, Leimspender, die von Leitungen gespeist werden und an- dere Vorteile, die nicht an der Baustelle erhältlich sind. Eine fertige Wohneinheit kann zu einer Baustelle verfrachtet werden, wo sie nur angeschlossen werden muß.The invention in that differs from the alten'MäSnährneniib as "it builds the units from the inside nach'auSeri, um.die * 1 mounting the installations to facilitate, in each Kons trukt ions stage in comfortable and convenient Arbeit3steÜ>-"' lungs can be worked so that 'the work speed is increased and the labor costs are reduced. According to the invention, mounting frames are used which hold the workpieces while the sub-units are being assembled. Most of the elements are precut and stored in such a way that that they only have to be moved minimally. Everything is done in the most expedient and most effective working position. The assembly frames holding the workpieces eliminate measuring, reading plans, errors and the "need for highly qualified specialists. The sub-units are next to the i-lon -iageges τ are put together so that they only have to be transported to a small extent coordinated so that the assembly line continues to run. The construction under the '".". Roof has the advantage of uniform lighting, the appropriate energy supply for electrical and compressed air tools, glue dispensers that are fed by cables and other advantages that are not available on the construction site. A finished residential unit can be shipped to a construction site where it only needs to be connected.
Eine kleine Anlage mit" einem "einzigen Montageband nach der Er-: findung mit einem 8-Stunden-Vorschub kann zwei komplette Wohnungen mit vier Wohneinheiten herstellen, von denen jede rne'ar als 1100 qPu'B hat und drei 'Schlafzimmer, zweieinhalb Bäder, ^ Küchen und Wohnräume enthält, sowie eine Zentralheizung und eine Klimatisierung aufweist.A small system with "a" single assembly line according to the invention with an 8-hour advance can produce two complete apartments with four residential units, each of which has more than 1100 qPu'B and three bedrooms, two and a half bathrooms includes, ^ kitchens and living rooms, as well as having a central heating and an air-conditioning.
9811/0 4799811/0 479
Die Vorteile der Erfindung sind Geschwindigkeit, Wirtschaft lichkeit, Wirksamkeit, verringerte Arbeitskosten, höhere Qua lität, 'gle ichmäßigere Konstruktion, geringerer Materialabfall, die Möglichkeit Tag und Nacht und bei jedem "Wetter zu arbeiten. The advantages of the invention are speed, economy, effectiveness, reduced labor costs, higher quality, more smooth construction, less material waste, the ability to work day and night and in any weather.
Gemäß der Erfindung wird ein Fußbodenrahmen hergestellt, in dem Fußbodendielen miteinander verbunden werden. -Dann v/ird der Fußbodenrahmen umgedreht und ein Unterboäen auf den Rahmen aufgebracht. Hierauf wird mit einem Wandnvontage gestell ein Wandriegelrahmen hergestellt und dieser Hiegelrahnen mit einer Wandinnenverkleidung beschichtet und auf dem Fußboden, aufge stellt. Auf einem Deckenmontagegestell wird ein Deckenrahmen über der Wohneinheit zusammengesetzt und dann das Deckenmon- tagegestell umgedreht und die Decke auf die. .Wände herabgelassen, wonach die Installationsanschlüsse mit" der. Riege !rahmen außerhalb der Innenwandverkleidung fest verbunden werden. Hierauf werden die Außenwandverkleidungen zugeschnitten, die Isolierung und die Außenwandverkleidung aufgebracht und die Wohneinheit abgedeckt. According to the invention, a floor frame is produced in which floor boards are connected to one another. -Then the floor frame is turned over and an undercoat is applied to the frame . This will be made with a frame Wandnvontage a wall bolt frame and coated with a wall of this Hiegelrahnen inner lining and situated on the floor. A ceiling frame is put together over the living unit on a ceiling mounting frame and then the ceiling mounting frame is turned over and the ceiling is placed on the. Walls lowered, after which the installation connections are firmly connected to the. Riege! Frame outside the inner wall cladding. The outer wall cladding is then cut to size, the insulation and the outer wall cladding are applied and the residential unit is covered.
Anhand der Zeichnungen wird die Erfindung beispielsweise erläutert. The invention is explained by way of example with the aid of the drawings.
Figur 1'zeigt eine schematische Ansicht eines Fließbandes für die Herstellung von Wohneinheiten nach der Erfindung. Figure 1 'shows a schematic view of an assembly line for the production of residential units according to the invention.
Figur 2 zeigt eine schematische Ansicht eines Montagegerüstes für die Decke. Figure 2 shows a schematic view of a mounting frame for the ceiling.
Figur 3 zeigt eine Draufsicht auf das in Figur 2 dargestellte Montagegerüst. FIG. 3 shows a plan view of the assembly frame shown in FIG.
009819/047009819/047
Figur 4 zeigt eine Ansicht eines Montagegerüstes für dia Wände.FIG. 4 shows a view of an assembly frame for the walls.
Figur 5 zeigt das in Figur 4 dargestellte Montagegerüst von hinten*FIG. 5 shows the assembly frame shown in FIG rear*
Figur 6 zeigt eine Draufsicht auf ein Montagegerüst zum Bedekken der Dächer von Wohneinheiten nach der Erfindung.FIG. 6 shows a plan view of an assembly frame for covering the roofs of residential units according to the invention.
Figur 7 zeigt einen Ausschnitt der Seitenansicht des in Figur 6 dargestellten Montagegerüstes.FIG. 7 shows a detail of the side view of the in FIG 6 assembly frame shown.
Figur 8 zeigt einen Ausschnitt einer Endansicht des in-Figur.6 dargestellten Montagegerüstes.FIG. 8 shows a section of an end view of the in FIG. 6 assembly frame shown.
Figur 9 zeigt in einer Seitenansicht einen Transportanhänger, mit dem Wohneinheiten nach der Erfindung an Ort und Stelle gebracht werden können.Figure 9 shows a side view of a transport trailer, brought in place with the residential units according to the invention can be.
Figur 10 zeigt einen Tei.lquerschnitt längs der linie 10-10 in Figur 9 undFigure 10 shows a partial cross-section along line 10-10 in Figure 9 and
Figur 11 zeigt einen Teilquerschnitt längs der Linie 11-11 in Figur 9. " -Figure 11 shows a partial cross-section along the line 11-11 in Figure 9. "-
Das in Figur 1 dargestellte Montageband hat eine Laufschiene- 10,-auf der die Wohneinheiten auf Paletten 11 vom Montagebeginn bis zum Montageende rollen. Kräne oder Heber bringen die Baustoffe oder. Untereinheiten zu den Wohneinheiten auf der Schiene TO und jeder Arbeitsbereich hat Anschlüsse an Druckluftleitungen für pneumatische Nagel- und Heftvorrichtungen, Leimsρend'er, die über Leimleitungen gespeist werden, und leicht zugängliche elektrische Anschlüsse für Werkzeuge und andere Einrichtungen.The assembly line shown in Figure 1 has a running rail 10, -auf of the residential units on pallets 11 from the start of assembly Roll to the end of assembly. Cranes or jacks bring the building materials or. Sub-units to the residential units on the TO rail and each work area has connections to compressed air lines for pneumatic nailing and stapling devices, glue lines, which are fed via glue lines, and easily accessible electrical connections for tools and other equipment.
0098197047900981970479
SADSAD
* ... Il* ... Il
• . » . it •. ». it
• » · 1*11) » · I• »· 1 * 11)» · I
194688a194688a
Die fertigen Einheiten sind vorzugsweise mit Hebebeschlägen ausgerüstet und werden von dem Ende des Fließbandes oder Hontagebandes abgehoben, zu einem Aufstellungsort transportiert, vorzugsweise mit mehreren Wohneinheiten unter Bildung einer einzigen Wohnung zusammengesetzt und zur Vollendung der Konstruktion mit den Hausanschlüssen verbunden. Teile eines solchen Gesamtaufbaus sind bekannt und werden nicht beschrieben. Lediglich die .erfindungswesentlichen Merkmale des Aufbaus und eine besondere Art und Weise, mit der dieser Aufbau hergestellt wird, werden unten näher erläutert.The finished units are preferably with lift fittings equipped and are from the end of the assembly line or honing line lifted off, transported to a place of installation, preferably with several residential units to form one single dwelling assembled and completing the construction connected to the house connections. Parts of such The overall structure is known and will not be described. Only the features of the structure that are essential to the invention and a special way in which this structure is produced will be explained in more detail below.
Das Montageband nach der Erfindung hat eine Fußbodenmontagestelle 12, eine Wandmontagestelle 13, eine Deckenmontagestelle 14 und weitere Montagestellen, die durch die Bereiche 15 und 16 angedeutet werden, für die Installation der Anschluß- und Versorgungselemente für das Anbringen von Isolationen, für. das Zurichten, für das Anbringen der Außenschalung, sowie des Daches und dgl. Jede dieser Montagestellen hat Bereiche längs der Schiene 11, in denen Untereinheiten hergestellt, Baustoffe bereitgestellt und Werkzeuge angebracht und betrieben werden.The assembly tape according to the invention has a floor mounting location 12, a wall mounting site 13, a ceiling mounting site 14 and other assembly points, which are indicated by the areas 15 and 16, for the installation of the connection and Supply elements for applying insulation, for. the Preparing for attaching the outer formwork and the roof and the like. Each of these mounting locations has areas along the rail 11 in which sub-units are made, building materials provided and tools attached and operated.
Die Montagestelle 12 für die Fußbodendielen weist ein .Montagegestell (nicht dargestellt) auf, mit Haltern für die richtige Anbringung der Fußbodendielen, die in dieser Stellung miteinander fest verbunden werden. Der zusammengesetzte Fußbodenrahmen 17 ist an sich bekannt und hat-2 χ 12 Dielen, die miteinander vernagelt sind. Der Rahmen 17 wird jedoch zuerst zusammengefügt und verbunden während seine Oberseite nach unten zu liegen kommt. Dann werden die Anschlußinstallationen vorgenommen, wie z.B. das Verlegen von Rohren, elektrischen leitungen und Leitungen für die Heizung und Klimatisierung. Diese Anschlüaae werden installiert und mit dem Rahmen 17, je nachThe assembly point 12 for the floorboards has a .Montagegestell (not shown) on, with brackets for the correct attachment of the floorboards, which are in this position with each other be firmly connected. The composite floor frame 17 is known per se and has 2 χ 12 boards that join together are nailed up. The frame 17 is, however, put together first and connected while its top comes down. Then the connection installations are carried out, such as laying pipes, electrical lines and lines for heating and air conditioning. These Connections are installed and with the frame 17, depending on
009819/0479009819/0479
• ·• ·
Bedarf fest verbunden. Diese Installation wird in Gegensatz zu der üblichen Reihenfolge bereits zu diesem Zeitpunkt vorgenommen und erfolgt zweckmäßigerweise, indem die "Anschlusse über den Rahmen 17 gebogen werden.Firmly connected to demand. This installation is in contrast to the usual sequence already made at this point in time and is expediently done by adding the "connections." be bent over the frame 17.
Der Rahmen 17 wird mit einem Hebegerät 18 umgedreht und auf'"'-die Balken 11 auf den Schienen 10 gelegt. Ein Unterbogenbelag 19, vorzugsweise aus Sperrholz, wird auf den Rahmen 17, vorzugsweise sowohl mit leim als auch Nägeln aufgebracht, um den Boden 17 zu vollenden. Ein Bodenbelag, wie z.B. Linoleum oder " ein Spannteppich, wird über den Boden 17 zu irgendeinem zweckmäßigen Zeitpunkt während des weiteren Aufbaus gelegt. The frame 17 is turned over with a lifting device 18 and on '"' - the Beam 11 placed on rails 10. A bottom arch covering 19, preferably made of plywood, is placed on the frame 17, preferably Applied with both glue and nails to complete the bottom 17. A floor covering such as linoleum or "A fitted carpet will be laid across the floor 17 at any convenient time during further construction.
Inzwischen werden die Wände an Montagestellen zusammengesetzt, die einen Teil des Wandmontagebereichs.ί3 bilden. Hierzu wird ein Wandmontagegerüst, wie es in den Figuren 4 und 5 dargestellt ist, verwendet. Die Oberflächen 21 sind gegenüber der Vertikalen geneigt und nehmen Riegel oder Bolzen mit einem Querschnitt von beispielsweise 5 x 10 cm (2 χ 4 inches) auf. Kalter 22 sind auf den Oberflächen 21■angeordnet, die die Riegel, die miteinander verbunden werden, aufnehmen und in bestimmten Stellungen festhalten. Ein Anschlag 23 trägt den untersten Balken · oder Riegel des Wandrahmens und vorher eingeschnittene Riegel oder Balken werden in die Halter 22, wie in Figur 4 dargestellt, eingelegt, wonach sie unter Bildung des Rahmens 26 miteinander verbunden werden. Jeder Halter 22 besteht aus einer ü-förmigen Klammer, die so geformt und angeordnet ist, daß sie den Rand eines Balkenriegels aufnimmt und für die Befestigungsarbeiten an Ort und Stelle dient.In the meantime, the walls are put together at assembly points, which form part of the wall mounting area. This is done a wall mounting frame as shown in Figures 4 and 5 is used. The surfaces 21 are opposite the Vertical inclined and take latches or bolts with a cross section for example 5 x 10 cm (2 4 inches). Colder 22 are arranged on the surfaces 21 ■ that the latches that be connected to each other, take up and in certain positions hold tight. A stop 23 carries the lowermost beam or latch of the wall frame and previously cut latches or bars are placed in the holder 22, as shown in Figure 4, inserted, after which they form the frame 26 together get connected. Each holder 22 consists of a U-shaped Bracket shaped and arranged to cover the edge a beam latch and serves for the fastening work on the spot.
Zwischen den Stützflächen 21 befindet sich ein Laufsteg 24, auf den man mit einer Leiter 25 kommt und auf dem ein ArbeiterBetween the support surfaces 21 there is a catwalk 24, on which one comes with a ladder 25 and on which a worker
009819/0479009819/0479
BADBATH
in einer entsprechenden Stellung die obersten Teile des Rahmens 26 zusammennageln oder verbinden kann. Ein Arbeiter auf dem Laufsteg 24 kann mit einer pneumatischen Nagelvorrichtung schnell die oberen Teile des Rahmens 26 verbinden. Ein anderer Arbeiter kann unten in dem Montagegestell 20 schnell die unteren* Teile des Rahmens 26 zusammenheften. · in a corresponding position, the uppermost parts of the frame 26 can be nailed together or connected. A worker on the catwalk 24 can quickly join the upper portions of the frame 26 with a pneumatic nailing device. Another worker can quickly stitch the lower * parts of the frame 26 together at the bottom of the jig 20. ·
Auf jeder Stützfläche 20 können vorzugsweise mehrere Wandrahmen 26 zusammengesetzt werden, wobei Halter 22 in verschiedenen Stellungen für verschiedene Rahmen vorgesehen sind. Bei einem solchen Mehrrahmenmontagegestell sind die Stellungen für die Balken oder Riegel und die entsprechenden Halter auf den Flächen 21 vorzugsweise mit verschiedenen Farben für die verschiedenen Rahmen, die auf jeder Stützfläche zusammengesetzt werden, gekennzeichnet. Der Arbeiter kann dann schnell die vorher ein geschnittenen Riegel wählen und sie auf der Stützfläche 21 so anordnen, daß alle Bereiche mit einer bestimmten Farbe, die einer bestimmten Wandanordnung entsprechen, bedeckt sind. ?ür Wände mit verschiedenen Konfigurationen muß der Arbeiter nur die entsprechenden Riegel über die entsprechend gefärbten Flächen und Halter legen. A plurality of wall frames 26 can preferably be assembled on each support surface 20 , with holders 22 being provided in different positions for different frames . In such a multi-frame assembly rack , the positions for the beams or latches and the corresponding brackets on the surfaces 21 are preferably marked with different colors for the different frames which are assembled on each support surface. The worker can then quickly select the previously cut bars and arrange them on the support surface 21 so that all areas are covered with a particular color corresponding to a particular wall arrangement. For walls with different configurations , the worker only needs to place the appropriate latches over the appropriately colored surfaces and brackets.
Nachdem'der Rahmen 26 zusammengefügt ist, wird er ir.it einem Innenwandbelag 27 belegt, der eine fertige innere Oberfläche bildet. Die Riegel des Rahmens 26 werden mit Leim aus einem Leimspender beschichtet und die Abdeckung 27 wird mit der. beleimten Riegel fest verbunden, bis der Leim hart ist. Dies kann beispielsweise dadurch erfolgen, indem einige Xü.jei 28 durch Klemmklötzchen 29 in den Rahmen 26 genagelt und nach dem Härten des Leims wieder entfernt werden, so daiE nur einige we nige" fast unauffällige Löcher in der Abdeckung 27 vorhanden sind. Dadurch wird das übliche Nageln und Versenken der Nägel, After the frame 26 has been assembled, it is covered with an inner wall covering 27 which forms a finished inner surface. The bars of the frame 26 are coated with glue from a glue dispenser and the cover 27 is with the. glued bars firmly connected until the glue is hard. This can be done, for example, by nailing some Xü.jei 28 through clamping blocks 29 in the frame 26 and removing them again after the glue has hardened, so that only a few "almost inconspicuous holes are present in the cover 27. This is the case usual nailing and countersinking of the nails,
009819/0479009819/0479
-■ 8 - .- ■ 8 -.
das Spachteln über den Nägelköpfen und das Nachmalen verhindert. Alternativ kann das Abdeckmaterial 27 mit Zwingen an dem Rahmen 26 befestigt werden, bis der Leim hart ist.prevents filling over the nail heads and repainting. Alternatively, the covering material 27 can be attached with clamps attached to frame 26 until the glue is hard.
Der abgedeckte, beschichtete Rahmen 26 wird mit einem Laufkran 30 in die richtige Stellung über dem zusammengesetzten Boden 17 gebracht und in aufrechter Stellung über dem Boden 17 festgenagelt. Zwei aufrechte'Wände sind in der Montagestelle 13 in Figur 1 gezeigt.The covered, coated frame 26 is attached to an overhead crane 30 placed in the correct position over the composite floor 17 and nailed in an upright position over the floor 17. Two upright walls are shown in the assembly point 13 in FIG.
Während der B'oden und die Wände zusammengesetzt werden, wird eine Decke auf dem Montagegestell 35, das am besten in Figur 2 dargestellt ist, aufgebaut. Ein Hauptelement 36 des Deckenmontagegerüstes 35 hat zwei Stützflächen 37 und 38, von denen jede Halter 22., welche oben für das Wandmontagegestell 20 beschrieben wurden, hat. Diese Halter dienen für die genaue Anordnung und zum Pesthalten der-Rahmenteile des Deckenrahmens 40. Die Halter 22 und die Stützflächen 37 und 38 3ind farbig angemalt, um die Anordnung von mehreren verschiedenen Deckenrahmen 40, je nach Wunsch zu kennzeichnen.While the floor and walls are being put together, a blanket on the mounting frame 35, best shown in Figure 2 is shown. A main element 36 of the ceiling mounting frame 35 has two support surfaces 37 and 38, each of which is holder 22, which is described above for the wall mounting frame 20 have been. These holders are used for the exact arrangement and for holding the frame parts of the ceiling frame 40. The holders 22 and the support surfaces 37 and 38 are painted in color to indicate the arrangement of several different ceiling frames 40, to be marked as desired.
Das Montagegerüst 35 ist unmittelbar über einem zweiten Boden 41 ausreichend hoch über der Schiene 10 und über den Wohneinheitenangeordnet, die Iäng3 der Schiene 10 verschoben werden. Ein Arbeiter, der auf dem Boden 41 steht, empfindet die obere Stützfläche 37 irc einer angenehmen Arbeitsaöfre für das Auflegen von vorher eingeschnittenen Dielen des Rahmens 40 in die Halter 22 und für das Verbinden des Rahmens 40.The mounting frame 35 is immediately above a second floor 41 arranged sufficiently high above the rail 10 and above the residential units, the length 3 of the rail 10 can be moved. A worker standing on the floor 41 feels the upper support surface 37 irc of a pleasant working area for laying on of previously cut boards of the frame 40 in the Holder 22 and for connecting the frame 40.
Anachlußleitungen, wie z.B. Abzugsleitungen 44, Heiz- oder Klimavorrichtungen werden dann mit dem Rahmen 40 fest verbunden und eine Decke 42, vorzugsweise aus Sperrholz wird mitConnection lines, such as drain lines 44, heating or Air conditioning devices are then firmly connected to the frame 40 and a blanket 42, preferably made of plywood, is provided with
009919/0479009919/0479
8AO ORIGINAL 8AO ORIGINAL
>i* .lit ι··> i * .lit ι ··
I Il Il AI Il Il A
dem Rahmen 40 verleimt und vernagelt. Hierauf wird ein inneres Deckenmaterial 43 auf die Deckenunterkonatruktion 42 aufgeheftet'. glued and nailed to the frame 40. An inner cover material 43 is then attached to the cover substructure 42.
Daa Montagegestell 35 kann um die Welle 45 mit einem Getriebe 46 und einem Motor 47 gedreht werden, ura das Hauptelement 3d des Montagegestells 35 umzudrehen. Klinken 48 halten das Element 36 in der Arbeitsstellung, die. in "Figur 2 dargestellt ist und der Motor 47 wird angetrieben, um das Element 36 um 180° zu drehen und damit die Stützflächen 37 und 38 umzukehren. Bevor diea geschieht, wird die zusammengesetzte Decke 40 mit dem Montagegestell 35 durch Klammern 49 fest verbunden. · Die Wohneinheiten auf der Schiene 10 werden weiter unter dem Montagegestell. 35 herausgeschoben, um einen freien Arbeitsbereich zu erhalten. Nach dem Umdrehen kann eine neue Decke auf der oberen Fläche des Montagegestells 35 aufgebaut werden, während eine fertige Decke bereit ist, von der Unterseite abgesenkt zu werden.Daa mounting frame 35 can around the shaft 45 with a gear 46 and a motor 47 are rotated, ura the main element 3d of the mounting frame 35 to turn. Pawls 48 hold the element 36 in the working position, the. in "Figure 2 shown is and the motor 47 is driven to move the element 36 around To rotate 180 ° and thus reverse the support surfaces 37 and 38. Before doing so, the composite ceiling 40 is fixedly connected to the mounting frame 35 by clips 49. · The residential units on rail 10 will continue under the Mounting frame. 35 pushed out to get a free work area. After turning it over, a new blanket can be put on the top surface of the rack 35 can be built while a finished ceiling is ready to be lowered from the bottom to become.
In Ausaparungen in den Längsrändern des Elementes 36 sind ein Paar Hafteln 50,auf die Gurte 51 aufgewickelt sind. Die Enden der Gurte 51 werden an den Deckenrahmen 40 angenagelt und wenn eine Wohneinheit mit Wänden bereit iat, eine Decke aufzunehmen' und sich unter dem Montagegestell 35 befindet, werden die Zwingen 49 gelöst und die Decke 40 mittels der Gurte 51 abgesenkt, was mit einem Motor (nicht dargestellt) gesteuert wird. Wenn die Decke 40 richtig auf eine Wohneinheit aufgesetzt ist, werden die Enden der Gurte 51 gelöst und die Decke 40 oben auf die Wände 26 aufgenagelt.In Ausaparungen in the longitudinal edges of the element 36 are a A pair of clips 50 on which straps 51 are wound. The ends of the straps 51 are nailed to the ceiling frame 40 and if a residential unit with walls ready to receive a ceiling 'and is located under the mounting frame 35, the clamps 49 released and the ceiling 40 lowered by means of the belts 51, what is controlled with a motor (not shown). When the ceiling 40 is properly placed on a residential unit, will the ends of the straps 51 loosened and the ceiling 40 nailed to the top of the walls 26.
Installationsanachlüaae, wie z.B. elektrische Anschlüsse 52 und 53» werden in dem Wandrahmen 26 von außen installiert, wie inInstallation attachments, such as electrical connections 52 and 53 »are installed in the wall frame 26 from the outside, as shown in FIG
009819/0479009819/0479
• · · J » i Aj » • · ♦ * · t * Il Jj . (• · · J »i Aj» • · ♦ * · t * Il Jj. (
19iV688919iV6889
- 10 -- 10 -
Figur 1 dargestellt. Dies ermöglicht ein zweckmäßiges -Arbeiten von der freien Außenseite der Wohneinheit in einer praktischen A'rbeitshöhe, so daß die elektrische Installation schnell und mit gutem Wirkungsgrad angebracht werden kann. Andere Anschlüsse, wie z.B. Wasserleitungen, Heizleitungen und leitungen für die Klimatisierung, werden in ähnlicher Weise aussen an der Wohneinheit oder den Untereinheiten angebracht.Figure 1 shown. This enables appropriate working from the free outside of the living unit at a practical working height, so that the electrical installation is quick and can be attached with good efficiency. Other connections, such as water pipes, heating cables and lines for air conditioning are connected outside in a similar way attached to the residential unit or the sub-units.
Hierauf werden die Isolation 54 und die Außenverkleidung 55 auf der Außenseite der Wände 26 befestigt. Innere Untereinheiten, wie z.B. Schranke, Kuchensehränke, Bäder, Treppenhäuser, werden zu beiden Seiten der Führungsschienen hergestellt und in den Wohneinheiten installiert. Ziergegenstände, wie z.3. Zierleisten, und Türen und Fensterrahmen werden zusammengesetzt undinstalliert.The insulation 54 and the outer cladding 55 are then applied attached to the outside of the walls 26. Inner sub-units, such as barriers, cupboards, bathrooms, stairwells, are made on both sides of the guide rails and installed in the residential units. Ornaments, such as 3. Moldings, and doors and window frames are put together and installed.
Dächer werden auf den obersten Wohneinheiten aufgesetzt und die Baustoffe, die von dem zweiten Boden 41 au3 verarbeitet werden, werden vorzugsweise .für die Dachkonstruktion verwendet. Nachdem die Träger und schrägen Dachflächen aufgebaut sind, wird das Dach mit Hilfe eines Montagegestells, das in den Figuren 6 bis 8 dargestellt ist, mit Schindeln belegt..-Roofs are placed on the uppermost residential units and the building materials processed from the second floor 41 au3 are preferably used for the roof construction. After the girders and sloping roof surfaces are built are, the roof is covered with shingles with the help of a mounting frame, which is shown in Figures 6 to 8 ..-
Schienen 60 und 61 werden parallel zueinander längs den Rändern des Daches 59 vpm First 58 bis zur Traufe 57 verlegt. Anschlagflachen 62, die sich unter den unteren Enden der Schienen 60 und 61 erstrecken, liegen an dem unteren Rand 57 des Daches 59 an und orten die Schienen 60 und 61 der Länge nach. Die oberen Enden der Schienen 60 und 61 erstrecken sich bis zum First 58. Wenn die Schienen 61 und 60 richtig gelegt sind, werden sie mit dem Dach 59 durch Nägel 63 durch Eisenwinkel 64 hinduroh 'befestigt,, die längs den äußeren Rändern der Schienen 60 und 61 angeordnet sind. .Rails 60 and 61 are laid parallel to one another along the edges of the roof 59 vpm ridge 58 up to the eaves 57. Stop surfaces 62, which extend below the lower ends of rails 60 and 61, lie on the lower edge 57 of the roof 59 and locate the rails 60 and 61 lengthwise. the upper ends of the rails 60 and 61 extend to the ridge 58. When the rails 61 and 60 are properly laid, are they are attached to the roof 59 by nails 63 through iron angles 64 hinduroh ', which run along the outer edges of the rails 60 and 61 are arranged. .
009819/0479009819/0479
It* t ·It * t
ι. / t t t I _t cι. / t t t I _t c
- 11 -- 11 -
Ein Querstück 64 paßt dicht zwischen die Schienen 60 und 61- und liegt auf dem Dach 59 auf. Fortsetzungen 66 sind oben auf jedem Ende des Querstücks 65 angeordnet und reichen über die Oberseiten der Schienen 60 und 61. Stelleinrichtungen 67 in Form von Blöcken sind auf den Oberseiten der Schienen'60 und 61 in einem Abstand voneinander angeordnet, der der Schindel-A cross piece 64 fits snugly between rails 60 and 61- and lies on the roof 59. Continuations 66 are on top each end of the crosspiece 65 and extend over the Upper sides of the rails 60 and 61. Actuators 67 in the form of blocks are on the upper sides of the rails 60 and 61 arranged at a distance from each other, which is the shingle
länge 68 entspricht. Diese Blöcke sind in parallelen ausgefluchteten Sätzen auf jeder Schiene 60 und 61 vorgesehen.length 68 corresponds. These blocks are aligned in parallel Sets are provided on each rail 60 and 61.
Wenn die Fortsätze 66 des Querstücks 65 zwischen jeweils einem Paar von Stelleinrichtungen 67 an den unteren Enden der Schienen 60 und 61 angeordnet sind, liegt das Querstück 65 so, daß die unterste Reihe der Schindeln 68 an das Querstück 65 angeschlagen und an dem Dach 59 befestigt werden kann. Dann wird das Querstück 65 auf den Schienen 60 und 61 bis 2ur nächsten Stelle zwischen zwei Stelleinrichtungen 67 verschoben, wo.es richtig liegt, so daß die zweite Reihe von Schindeln 68 an das Querstück 65 angelegt werden kann. Dieses Verfahren wird mit jeder Schindelreihe 6Θ wiederholt, bis das Dach bis zum First gedeckt ist.When the extensions 66 of the crosspiece 65 between each one Pair of actuators 67 at the lower ends of the rails 60 and 61 are arranged, the cross piece 65 is so that the bottom row of shingles 68 hinged on the cross piece 65 and can be attached to the roof 59. Then the crosspiece 65 is on the rails 60 and 61-2ur next Place moved between two adjusting devices 67, wo.es is correct, so that the second row of shingles 68 to the Cross piece 65 can be created. This process is repeated with each row of shingles 6Θ, up to the roof to the ridge is covered.
Die Ränder des Daches 59 unter den Kontageschienen 60 und 61 werden nicht gedeckt, bis die Einheiten an Ort und Stelle versetzt worden sind und die Dachverbindungen zwischen benachbarten Dachelementen ausgeführt worden sind.The edges of the roof 59 under the contour rails 60 and 61 are not covered until the units have been moved in place and the roof joints between adjacent ones Roof elements have been carried out.
Die Montagegestelle nach den Figuren 6 bis 8 gewährleisten, daß die Dachplattenreihen 68 genau parallel zu First 58 und im genauen Abstand voneinander verlegt sind, so daß die Dachplatten- oder Schindelreihen benachbarter Einheiten an Crt und Stelle genau ausgefluchtet sind und ein sauberes Aussehen haben und Zacken oder Schlangenlinien in den einzelnen Verbin-'The assembly frames according to Figures 6 to 8 ensure that the rows of roof panels 68 are laid exactly parallel to ridge 58 and at a precise distance from one another, so that the rows of roof panels or shingles of adjacent units at Crt and Are precisely aligned and have a clean appearance and have jagged or serpentine lines in the individual connections.
009819/0A79009819 / 0A79
* I ti* I ti
ι · f ■ ι · f ■
- 12 -- 12 -
dungsate11en zwischen benachbarten Dachelementen verhindert werden. Dies ist besonders wichtig, wenn mehrere Wohneinheiten nebeneinander unter Bildung eines gemeinsamen viele. Meter , langen Daches aufgestellt werden. Bei einer Konstruktion an Ort und Stelle wird ein solches Dach am Bau selbst aufgebaut und seine Dachplatten werden längs Schnurlinien ausgefluchtet. Mit dem Montagegestell nach der Erfindung kann jedoch schneller und genauer gearbeitet werden und das Problem der Ausfluchtung der Schindelreihen oder Dächplattenreihen von Einheiten mit ziemlich kurzen Dachlängen, die später miteinander verbunden werden, wird gelöst.This prevents damage from occurring between neighboring roof elements will. This is particularly important when several residential units are next to each other to form a common many. Meter , long roof. With an on-site construction, such a roof is built on the building itself and its roof panels are aligned along string lines. With the mounting frame according to the invention, however, can be faster and more precisely and the problem of alignment of the rows of shingles or tiling of units with fairly short roof lengths, which are later connected to each other, is solved.
In den Endstufen des Aufbaus von Wohneinheiten nach der Erfindung werden Hebebeschläge an jeder Einheit befestigt, urn diese für den Transport an die Baustelle-herzurichten. Vorzugsweise werden lange Ösenbolzen 69 für das Hebegestell verwendet, und diese Bolzen 69 erstrecken sich durch Öffnungen-in'dein. Bodenrahmen 17, wie am besten in den Figuren 9 bis 11. dargestellt ist. Ausnehmungen 70. werden vorzugsweise an der Unterseite des Bodenrahmens 17 vorzugsweise bevor dieser umgedreht wird, eingelassen und nehmen Platten 71 auf, die in den. .Rahmen 17 passen und die Köpfe 72 der Ösenbolzen 69 abstützen. Die ösenbolzen 69 erstrecken sich vorzugsweise, wie dargestellt, Über die Oberseiten der Wohneinheiten und die Wohneinheiten werden durch Kräne oder Hebevorrichtungen an den ösenbolzen aufgehoben.In the final stages of the construction of residential units according to the invention, lifting fittings are attached to each unit to prepare them for transport to the construction site. Long eyebolts 69 are preferably used for the lifting frame, and these bolts 69 extend through openings-in-one. Floor frame 17, as best shown in Figures 9-11. Recesses 70 are preferably made on the underside of the floor frame 17, preferably before it is turned over, let in and take plates 71, which are in the. .Frame 17 and support the heads 72 of the eyebolts 69. The eyebolts 69 preferably extend, as shown, The upper sides of the residential units and the residential units are attached to the eye bolts by cranes or lifting devices canceled.
Der Anhänger 80,, der in Figur 9 dargestellt i3t, wird vorzugsweise für den Transport fertiger Wohneinheicen zu einer-Baustelle verwendet. Der Anhänger 80 hat eine Kupplung 73 an seinem vorderen Ende, einen vorderen Rahmen 75, der sich nach hinten bis zu Rädern 74 in dem Mittelabschnitt erstreckt undThe trailer 80, which is shown in FIG. 9, is preferably used for the transport of finished residential units to a construction site. The trailer 80 has a hitch 73 at its front end, a front frame 75 which extends rearwardly to wheels 74 in the central portion and
009819/0479009819/0479
0^ ORIGINAL 0 ^ ORIGINAL
Ί9Α6889Ί9Α6889
einen hinteren Rahmen 76, der mit der Oberseite des vorderen Rahmens 75 verbunden ist und sich über den Rädern 74 und über diese hinaus erstreckt. Der vordere Rahmen 75 und der hintere Rahmen 76 bestehen vorzugsweise aus relativ leichten Konstruktionsmetallen. a rear frame 76 connected to the top of the front frame 75 and extending over the wheels 74 and over this extends beyond. The front frame 75 and the rear frame 76 are preferably made of relatively lightweight structural metals.
Wie am besten in Figur 10 zu sehen, werden Ankerschrauben 77 durch die Seitenträger 78 der Rahmen 75 und 76 unten in den Bodenrahmen 17 in Abständen von 1 m längs den Rahmen 75 und 76 geschraubt, um den Bodenrahmen 17 fest an den Anhängerrahmen 75 und 76 zu halten. Diese Befestigung steift und hält die Rahmen 75 und 76, die durch die starke und steife Konstruktion des Fußbodenrahmens 17· verstrebt werden. Durch diese Aussteifung kann der Anhänger 80 leicht gebaut und dennoch hinreichend stark sein, um schwere Wohneinheiten zu tragen.Dies bringt den Vorteil, daß nur einige wenige Räder 74 unmittelbar nebeneinander in den Mittelabschnitt des Anhängers 80 erforderlich sind und ein relativ langes Stück des Anhängers mit Wohneinheiten hinter den Rädern 74 auskragen kann. Die Gesamthöhe des bela- ·. denen Anhängers ist relativ gering und das Gesemtgewicht des Anhängers 80 sowie seiner Wohneinheiten ist relativ klein und genügt den Anforderungen des Gesetzgebers und der Autobahnen für Fahrzeuge.As best seen in Figure 10, anchor bolts 77 through the side supports 78 of the frame 75 and 76 down in the bottom frame 17 at intervals of 1 m along the frame 75 and 76 screwed to hold the floor frame 17 firmly to the trailer frames 75 and 76. This attachment stiffens and holds the Frames 75 and 76, which are braced by the strong and rigid construction of the floor frame 17 ·. Through this stiffening For example, the trailer 80 can be lightweight yet strong enough to support heavy living units. This brings the The advantage that only a few wheels 74 directly next to one another in the central section of the trailer 80 are required and a relatively long length of the trailer of housing units can cantilever behind the wheels 74. The total height of the bela- ·. which trailer is relatively low and the total weight of the trailer 80 and its housing units is relatively small and meets the requirements of the legislature and the motorways for vehicles.
Die bekannten Anhänger zum Ziehen schwerer Gegenstände müssen immer stark genug sein, um die Fracht allein zu tragen. Ein solcher Anhän-ger müßte, wenn er zum Transport von Wohneinheiten nach der Erfindung verwendet werden würde, ein Tieflader mit einer massiven Plattform sein, die zwischen der Anhängkupplung und einer Hinterachse mit vielen Rädern getragen werden müßte. Es könnten damit nur eine Wohneinheit.jeweils transportiert werden. Bei einem Anhänger nach der Erfindung ist derThe known trailers for pulling heavy objects must always be strong enough to carry the cargo alone. A Such a trailer, if it were to be used to transport residential units according to the invention, would have to be a low-loader be with a massive platform carried between the tow bar and a rear axle with many wheels would have to. Only one residential unit at a time could be transported with it will. In a trailer according to the invention is the
009819/0479009819/0479
-H--H-
vordere Rahmen 75 vor den Rädern 74 für den Transport von
Einheiten mit Dach gedacht und seine Länge 1st mit einem Tiefladeranhänger
vergleichbar, jedoch die leichte" Konstruktion
und die Aussteifung durch die Wohneinheit ermöglicht, daß eine zusätzliche Wohneinheit über den Rädern 74 befestigt wird, die
hinten auf dem Rahmen 76 auskragt.front frame 75 in front of wheels 74 for the transport of
Units conceived with a roof and its length is comparable to a low loader trailer, but the "light" construction
and the stiffening of the housing unit enables an additional housing unit to be secured over the wheels 74 which cantilever the rear of the frame 76.
009819/0479009819/0479
Claims (32)
(d) eine Vieleahl von Befeatigungseinrichtungen vorgesehen ist, .die» den Bodenrahmen fest mit dem Anhänger rahmen verbindet. -hängtrrahinena align and
(d) a variety of attachment devices are provided which firmly connect the floor frame to the trailer frame. -
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US76010368A | 1968-09-16 | 1968-09-16 | |
FR7039355A FR2110821A5 (en) | 1968-09-16 | 1970-10-26 |
Publications (1)
Publication Number | Publication Date |
---|---|
DE1946889A1 true DE1946889A1 (en) | 1970-05-06 |
Family
ID=30117044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19691946889 Pending DE1946889A1 (en) | 1968-09-16 | 1969-09-16 | Assembly line for making housing units and method for making those housing units |
Country Status (2)
Country | Link |
---|---|
DE (1) | DE1946889A1 (en) |
FR (1) | FR2110821A5 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2194202A2 (en) * | 2008-12-03 | 2010-06-09 | INDUO Gesellschaft zur Verwertung von Schutzrechten mbH & Co. KG | Method for producing an office module |
-
1969
- 1969-09-16 DE DE19691946889 patent/DE1946889A1/en active Pending
-
1970
- 1970-10-26 FR FR7039355A patent/FR2110821A5/fr not_active Expired
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2194202A2 (en) * | 2008-12-03 | 2010-06-09 | INDUO Gesellschaft zur Verwertung von Schutzrechten mbH & Co. KG | Method for producing an office module |
EP2194202A3 (en) * | 2008-12-03 | 2011-09-14 | INDUO Gesellschaft zur Verwertung von Schutzrechten mbH & Co. KG | Method for producing an office module |
Also Published As
Publication number | Publication date |
---|---|
FR2110821A5 (en) | 1972-06-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1245575B (en) | Method for producing a building made up of space boxes | |
DE1759915B2 (en) | METHOD OF MANUFACTURING ROOM BOXES FOR FABRIC HOUSES | |
DE4409829A1 (en) | Method and device for producing walls and walls, in particular for buildings | |
DE3014382A1 (en) | Multiple inter-storey service duct installation - involves U or C=sectioned sheet metal housing with ducts through multiple floor holes | |
DE1946889A1 (en) | Assembly line for making housing units and method for making those housing units | |
DE1609522C3 (en) | Residential unit made of metal prefabricated parts | |
DE2632590A1 (en) | Prefabricated unit assembled building - with double skinned internal cross walls at room cells abutment points | |
DE1459901C3 (en) | Building that has a front with loggias | |
DE19610450B4 (en) | Method for rehabilitating the flat roof of a prefabricated reinforced concrete garage with a rectangular plan and set of components for carrying out the method | |
EP0808238A1 (en) | Process for the production of heat insulation panels for large panel construction | |
DE1952031A1 (en) | Process for the production of prestressed concrete walls for buildings | |
DE1958964A1 (en) | Process and prefabricated components for the construction of buildings | |
DE962932C (en) | Process for the production of a ready-to-install tile partition | |
DE1924612U (en) | COMPONENT SET FOR SINGLE FAMILY HOUSES. | |
AT414256B (en) | METHOD FOR PRODUCING SMOKED COMPONENT ELEMENTS | |
DE102021115715A1 (en) | Apparatus and method for additive manufacturing of a component and method for providing an apparatus for additive manufacturing | |
DE2033514A1 (en) | Method and device for the construction of rooms, in particular for residential use | |
DE4423423A1 (en) | Transportable living unit with half-timbered structure | |
DE102022127810A1 (en) | Procedures for energy-efficient building renovation | |
DE831905C (en) | Process for the production of structures from large structural elements | |
DE102022127809A1 (en) | Procedures for energy-efficient building renovation | |
EP1260644A2 (en) | Roof element, building and method for assembling such a building | |
DE1559235C (en) | Process and assembly device for the series production of room box excretion from 1434760 | |
DE1534900A1 (en) | Method and device for the production of structural units and structural units produced by this method and application of the method | |
DE2930973A1 (en) | METHOD AND DEVICE FOR ASSEMBLING PRE-FABRICATED INTERMEDIATE BLOCKS WITH UPRIGHT UNITS |