DE1925961A1 - Tubbing - Google Patents

Tubbing

Info

Publication number
DE1925961A1
DE1925961A1 DE19691925961 DE1925961A DE1925961A1 DE 1925961 A1 DE1925961 A1 DE 1925961A1 DE 19691925961 DE19691925961 DE 19691925961 DE 1925961 A DE1925961 A DE 1925961A DE 1925961 A1 DE1925961 A1 DE 1925961A1
Authority
DE
Germany
Prior art keywords
tubbing
profile
mountains
profiles
parts adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19691925961
Other languages
German (de)
Other versions
DE1925961B2 (en
Inventor
Auf Nichtnennung Antrag
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wayss and Freytag AG
Original Assignee
Wayss and Freytag AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wayss and Freytag AG filed Critical Wayss and Freytag AG
Priority to DE19691925961 priority Critical patent/DE1925961B2/en
Publication of DE1925961A1 publication Critical patent/DE1925961A1/en
Publication of DE1925961B2 publication Critical patent/DE1925961B2/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

Tübbing Die erfindung betrifft einen Tübbing für eine einschalige Tunnelauskleidung, bestehend aus einem im vuerschnitt wellenförmigen Walzstahlprofil, dessen nach außen offene Wellentäler auf ihre ganze Höhe mit Beton gefüllt sind. Tubbing The invention relates to a tubbing for a single-shell Tunnel lining, consisting of a rolled steel profile with an undulating cross-section, the outwardly open wave troughs of which are filled with concrete over their entire height.

Die Vorteile der einschaligen Tunnelauskleidung erfahren aeit einiger Zeit erhöhte Beachtung: aie erlaubt gegenüber der zweischaligen Ausführung mit außenliegender Betontübbingschale, die den Gebirgsdruck aufnimmt, der an deren Innenseite aufgeklebten Dichtungshaut und der inneren Ortbetonschale, die die Diohtung abstützt und den sfasserdruek aufnimmt, einen größeren Arbeitsfortschritt und benötigt einen geringeren Ausbruchsquerschnitt.Some have experienced the advantages of the single-shell tunnel lining Time increased attention: aie allowed compared to the double-shell design with an external one Concrete segment shell that absorbs the rock pressure that is glued to the inside Sealing skin and the inner in-situ concrete shell, which supports the Diohtung and the sfasserdruek picks up a greater work progress and requires less Excavation cross-section.

Tübbings für eine einschalige Tunnelauskleidung wurden bisher meistens in Gußstahl hergestellt. Sie bestanden aus einer dem Gebirge zugewandten gewölbten Platte mit am Rand umlaufendem Flansch und inneren Rippen. Da die Rippenränder bei einer Besnspruchung der Tunnelauskleidung auf Biegung erhebliche Spannungen aufweisen, ist man in letzter Zeit dazu übergegangen, diese Tübbings im Querachnitt wellenförmig herzustellen. Die dem Gebirge zugewandte Tübbingfläche soll Jedoch glatt sein, so daß die zum Gebirge hin offenen ellentäler auf ihre ganze Höhe mit Beton ausgefüllt wurden.Tubbings for a single-shell tunnel lining have mostly been used up to now made in cast steel. They consisted of an arched one facing the mountains Plate with flange running around the edge and internal ribs. Since the ribs at when the tunnel lining is exposed to bending stresses, Lately one has gone over to this, these segments are wavy in cross-section to manufacture. However, the tubbing area facing the mountains should be smooth, so that the ellen valleys open to the mountains are filled with concrete to their full height became.

weiterhin sind wellenförmige Tübbinge bekanntgeworden, die aus zwei nebeneinander angeordneten und zusammengeschweißten Stahlspundbohlen hergestellt und deren zum Gebirge hin offene Wellentäler ebenfalls mit Beton ausgefüllt wurden.Furthermore, wave-shaped segments have become known, which consist of two steel sheet piles arranged side by side and welded together and whose wave troughs, which are open towards the mountains, were also filled with concrete.

Bei den wellenförmigen Gußstahltübbings werden die seitlichen.In the case of the wave-shaped cast steel segments, the lateral.

Wellenbegrenzungen aus Herstellungsgründen schräg hergestellt.Shaft limits made at an angle for manufacturing reasons.

Dadurch ist die Gefahr gegeben, daß beim Vortrieb des Schildes dessen hydraulische Pressen sich gegen die Tubbingauskleidung abstützen, die Betonfüllungen infolge Keilwirkung nach außen gedrückt wurden und damit die Tübbings zerstört werden können.This means that there is a risk that when the shield is propelled hydraulic presses are supported against the tubing lining, the concrete fillings due to the wedge effect to the outside were pressed and thus the tubbings can be destroyed.

Daaselbe Problem tritt auoh bei den aus Spundwandprofilen zu sammengesetzten Tübbings auf.The same problem also occurs with those composed of sheet piling profiles Tubbings on.

Die wellenförmigen Gußstahltübbings sind weiterhin relativ teuer. Die preislich günstigeren Tübbings aus Spundwandprofi len führen jedoch zu anderen Schwierigkeiten: da bei ihnen die Flansche fehlen, können sie nach dem Versetzen nicht miteinander verschraubt, sondern müssen verschweißt werden. Das Aufbringen der Schweißnaht kann Jedoch aus Platz- und arbeitstechnischen Gründen nicht sofort nach dem Versetzen des Tübbinge, sondern erst nach dem Einbringen mehrerer Tübbingringe erfolgen.The wave-shaped cast steel segments are still relatively expensive. However, the cheaper segments made of sheet pile wall profiles lead to different ones Difficulties: since they have no flanges, they can after moving not screwed together, they have to be welded. The application However, due to space and work-related reasons, the weld seam cannot immediately after the segment has been moved, but only after several segment rings have been introduced take place.

Das Festhalten der Tübbings in ihrer Lage vor dem Verschweißen erfordert besondere Vorkehrungen; durch die Tübbingfugen kann von außen her Verpreßmörtel eindringen oder auch gegebenenfalls Druckluft entweichen.It is necessary to hold the segments in their position before welding special precautions; Grouting mortar can be injected from the outside through the segment joints penetrate or, if necessary, compressed air escape.

Der Erfindung liegt die Aufgabe zugrunde, die vorgenannten Bachteile der bekannten wellenförmigen Tübbings zu vermeiden und einen Tübbing zu schaffen, der preisgünstig ist, dessen Betonfüllung nicht durch Keilwirkung herausgedrückt werden kann und der leicht einzubauen ist. Diese Aufgabe wird dadurch gelöst, daß bei einem Tübbing der eingangs genannten Art das Stahlprofil aus einrachen rechtwinkligen handelsüblichen Walzprofilen zusammengesetzt ist. Diese Walzprofile werden vorzugsweise durch Schweißen miteinander verbunden. Ein derartiger Tübbing ist preisgünstig, da er keine Spezialanfertigung erfordert.The invention is based on the object of the aforementioned stream parts avoiding the well-known wave-shaped segments and creating a segment, which is inexpensive, the concrete filling of which is not pushed out by wedge effect and which is easy to install. This object is achieved in that In the case of a segment of the type mentioned at the outset, the steel profile is made from a right-angled rake Commercially available rolled sections is composed. These rolled sections are preferred connected to each other by welding. Such a segment is inexpensive, as it does not require custom manufacture.

Durch die rechtwinklige Begrenzung der Walzprofile kann der eingebrachte Füllbeton nicht durch Keilwirkung herausgedrückt werden. Die Profile werden zweckmäßigerweise so gewillt werden daß ein am Rand umlaufender Plansch entsteht, so daß benachbarte Tübbings miteinander verschraubt werden können, womit das Versetzen wesentlich erleichtert und eine vorläufige Dichtung erreicht wird. Die am Gebirge anliegenden Profilteile können einen Überstand gegenüber dem anschließenden Wellensteg erhelten, eo daß ein Ausbrechen der Betonfüllung sicher vermieden wird. Da die eingebauten Tübbinge durch die hydraulischen Vortrlebspressen in Tunnellängsrichtung auf Druck beansprucht werden, müssen die zum Tunnelinnern offenen Wellentäler mit entsprechenden Aussteifungbrippen versehen werden. Die am Gebirge anliegenden Profilteile sind besonders korrosionsgefährdet Diese werden deshalb entweder mit einem Zinküberzug versehen oder aus rostfreiem Stahl hergestellt oder in einer solchen Dicke eingebaut, daß das abrosten einer gewissen Schicht unbedenklich bleibt.Due to the right-angled delimitation of the rolled profiles, the introduced The filling concrete cannot be pushed out by wedges. The profiles are expedient be so willed that a splash around the edge is created, so that neighboring Tubbings can be screwed together, which makes relocation much easier and a preliminary seal is achieved. The profile parts adjacent to the mountains can get a protrusion over the adjoining corrugated web, eo that breaking out of the concrete filling is reliably avoided. Because the built-in segments by the hydraulic pre-pressure presses in the longitudinal direction of the tunnel are subjected to pressure, the wave troughs open to the inside of the tunnel must also be appropriate stiffening ribs are provided. The profile parts adjacent to the mountains are particularly at risk of corrosion. They are therefore either coated with zinc provided or made of stainless steel or built into such a thickness, that the rusting off of a certain layer remains harmless.

Zur Verdeutlichung werden in der Zeichnung einige mögliche Formen des erfindungsgemäßen Tübbings dargestellt.For clarity, some possible shapes are shown in the drawing of the tubbing according to the invention shown.

Fig. 1 zeigt einen Tübbingsquerschnitt, der aus einem [ -Profil und zwei ungleichschenkligenL-Profilen gebildet iet, Fig. 2 einen solchen, der aus zwei E-Profilen und einem Flachstahl gebildet ist, Fige 3 einen solchen, der aus vier ungleichschenkligenL-Profi len gebildet ist und Fig, 4 einen solchen, der aus drei [-Profilen zusammengesetzt ist.Fig. 1 shows a tubbing cross-section, which consists of a [profile and two unequal L-profiles formed, Fig. 2 one which consists of two E-profiles and a flat steel is formed, Fig. 3 one that consists of four unequal-sided L-profiles and FIG. 4 shows one which is made up of three [Profiles is composed.

Der in Fig. 1 dargestellte, zum drei Walzstahlprofilen gebildete Tübbingquerschnitt wird in einer Werkstatt zusammengeschweißt.The tubbing cross-section shown in Fig. 1, formed for three rolled steel profiles is welded together in a workshop.

Die später am Gebirge anliegenden Schenkel der äußeren Profile 1 stehen etwas über die kurzen Schenkel des mittleren [ -Profils 2 über, so daß bei einer Druckbeanspruchung durch die hydraulischen Vortriebspressen die Betonfüllung 3 nicht ausbrechen kanno Die senkrechten Schenkel der äußeren Profile 1 bilden einen am Rand umlaufenden Flansch, der eine Schraubverbindung 4 mit den benachbarten Tübbings ermöglicht, wodurch ein schnelles Versetzen ermöglicht wird. Zur Übertragung der in Tunnellängsrichtung wirkenden Vortriebskräfte werden Aussteifungsrippen 5 in die zum Tunnelinnern offenen Wellentäler eingeschweißt. Die am Gebirge anliegenden Flächen der äußeren Profile 1, die besonders korrosionsgefährdet sind, können entweder mit einem ueberzug aus Zink oder ähnlichem versehen oder aus rostfreiem Material hergestellt werden. Die Schenkel können aber uuch so dick gewählt werden, daß ein gewisses Abrosten unbedenklioh ist. Die zum Tunnelinnern weisenden Stahlflächen können einen normalen iichutzanstrich erhalten, während die vom Füllbeton 3 bedeckten Innenflächen des Profile 2 keiner weiteren Behandlung bedürfen. Zur Verminderung des Aufwandes für den Korrosionsschutz der Profile 1 kann angestrebt werden, die am Gebirge anliegenden Flächen möglichst klein zu halten.The legs of the outer profiles 1 that will later rest against the mountains are standing something over the short legs of the middle [profile 2 over, so that at one The concrete filling 3 is not subjected to compressive stress from the hydraulic jacking presses The vertical legs of the outer profiles 1 form an am Edge circumferential flange, which has a screw connection 4 with the adjacent segments allows, whereby a quick relocation is made possible. To transfer the Driving forces acting in the longitudinal direction of the tunnel become stiffening ribs 5 in the wave troughs open to the inside of the tunnel are welded in. Those lying on the mountains Areas of the outer profiles 1 that are particularly at risk of corrosion can either provided with a coating of zinc or similar or made of rustproof material getting produced. The legs can be chosen so thick that a a certain amount of rusting is harmless. The steel surfaces facing the inside of the tunnel can be given a normal protective coating, while the from Filling concrete 3 covered inner surfaces of the profile 2 do not require any further treatment. To reduce the effort for the corrosion protection of the profiles 1 can be aimed at to keep the areas adjacent to the mountains as small as possible.

Der in Fig. 3 gezeigte Querschnitt weist gegenüber Fig. 1 keine wesentlichen Unterschiede auf.The cross section shown in FIG. 3 does not have any essential features compared to FIG Differences on.

Die äußeren Profile 1 der Tübbingquerschnitte nach Fig. 2 und 4 weisen keine Überstände auf, so daß die Betonfüllung 3 hier zweckmäßig durch Bügel 6 gehalten wird, die an das mittlere Prbfil 2 angeschweißt sind.The outer profiles 1 of the tubbing cross-sections according to FIGS. 2 and 4 have no overhangs, so that the concrete filling 3 is suitably held by bracket 6 here welded to the middle Prbfil 2.

Claims (1)

Patentansprüche Claims 1. Tübbing für eine einschalige Tunnelauskleidung, bestehend aus einem im Querschnitt wellenförmigen Stahlprofil, dessen nach außen offene Wellentäler auf ihre ganze Höhe mit Beon gefüllt sind, dadurch gekennzeichnet, daß das Stahlprofil aus einfachen rechtwinkligen handelsüblichen Walzprofilen (1,2) zusammengesetzt ist, 2. Tübbing nach anspruch 1, dadurch gekennzeichnet, daß die walzprofile (1, 2) durch Schweißen miteinander verbunden werden.1. Tubbing for a single-shell tunnel lining, consisting of one The cross-section of the steel profile is wavy and its troughs open to the outside are filled to their full height with Beon, characterized in that the steel profile composed of simple right-angled commercially available rolled profiles (1,2) is, 2. Tubbing according to claim 1, characterized in that the rolled profiles (1, 2) be connected to each other by welding. 3. Tübbing nach Anspruch 1 und 2, dadurch gekennzeichnet, daß am Tübbingrand ein umlaufender Flansch gebildet wirdO 40 Tübbing nach den Ansprüchen 1 bis 3, dadurch gekennzeichnet, daß die am Gebirge anliegenden Profilteile der äußeren Profile (1) gegenüber dem anschließenden Wellensteg des mittleren Profils (2) einen Überstand aufweisen, 5. Tübbing nach den Ansprüchen 1 bis 4, dadurch gekennzeichnet, daß die zum Tunnelinnern offenen Wellentäler mit Aussteifungsrippen (5) in Tunnellängsrichtung versehen sind. 3. Tubbing according to claim 1 and 2, characterized in that on Tubbing edge a circumferential flange is formed O 40 tubbing according to the claims 1 to 3, characterized in that the profile parts adjacent to the mountains outer profiles (1) opposite the adjoining corrugated web of the middle profile (2) have a protrusion, 5. tubbing according to claims 1 to 4, characterized in that that the wave troughs open to the inside of the tunnel with stiffening ribs (5) in the longitudinal direction of the tunnel are provided. 6. Tübbing nach den Ansprüchen 1 biß 5, dadurch gekennzeichnet, daß die am Gebirge anliegenden Profilteile mit einem Über-Zug aus Zink oder ähnlichem versehen sind. 6. Tubbing according to claims 1 to 5, characterized in that the profile parts adjacent to the mountains with an over-train made of zinc or the like are provided. 70 Tübbing nach den Ansprüchen 1 bis 5, dadurch gekennzeichnet, daß die am Gebirge anliegenden Profilteile aus rostfreiem Stahl bestehen. 70 Tubbing according to Claims 1 to 5, characterized in that the profile parts adjacent to the mountain are made of stainless steel. 6. Tübbing nach den Ansprüchen 1 bis 5, dadurch gekennzeichnet, daß die am Gebirge anliegenden Profilteile eine um ein solches Maß größere, als die statisch erforderliche Dicke erhalten, daß damit eine Rostwirkung ausgeglichen wird. 6. Tubbing according to Claims 1 to 5, characterized in that the profile parts adjacent to the mountains one by such a degree larger than that statically required thickness obtained so that a rust effect is compensated for. L e e r s e i t eL e r s e i t e
DE19691925961 1969-05-21 1969-05-21 TUEBBING Pending DE1925961B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19691925961 DE1925961B2 (en) 1969-05-21 1969-05-21 TUEBBING

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19691925961 DE1925961B2 (en) 1969-05-21 1969-05-21 TUEBBING

Publications (2)

Publication Number Publication Date
DE1925961A1 true DE1925961A1 (en) 1970-11-26
DE1925961B2 DE1925961B2 (en) 1973-08-30

Family

ID=5734827

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19691925961 Pending DE1925961B2 (en) 1969-05-21 1969-05-21 TUEBBING

Country Status (1)

Country Link
DE (1) DE1925961B2 (en)

Also Published As

Publication number Publication date
DE1925961B2 (en) 1973-08-30

Similar Documents

Publication Publication Date Title
WO2013064246A2 (en) Method for a multi-stage joint protection system for wall elements made of concrete components
DE2808387B2 (en) Steel-concrete composite lining for manholes
DE2225659A1 (en) TUNNEL LINING
DE1932107B2 (en)
DE1925961A1 (en) Tubbing
DE2241697A1 (en) PROCEDURE FOR SECURING THE MOUNTAIN DURING MECHANICAL TUNNEL DRIVING WITH THE TUNNEL CUTTER
DE2642104A1 (en) Flexible tunnel lining system - uses curved segments with gaps between them and connections through resilient edges
EP0794318B1 (en) Tunnel lining
CH656429A5 (en) Arched installation element of steel and its use
DE1016206B (en) Armored reinforced concrete sling
DE2435559A1 (en) Curved metal tubbing for mine galleries - is flanged all round, with cut-out in centre of each flanged side
DE1534628A1 (en) Reinforced concrete slab for tunnel construction
CH686198A5 (en) Method of erecting supporting tunnel wall lining with integral insulation
DE950519C (en) Penstock
AT328968B (en) ARMOR FOR WATER PRESSURE DUCT
DE10051597B4 (en) Tunnel tubbing, as well as pipe section made from such tubbing
DE1203214B (en) Watertight shaft lining
DE2936820C2 (en) Nuclear power plant with a nuclear part surrounded by a containment
DE2800222C2 (en) Shaft lining from corrugated pipe sections
DE3129643C2 (en) Concrete ring lining for manholes and the use of such a lining for repairing manholes that have already been built
AT225118B (en) Lining for pressure shafts of hydropower plants
DE2461863A1 (en) Thin wall pipe construction - has three members of low wall thickness jointed to resist internal and external loads
DE977416C (en) Composite manhole pipes
DE2516723A1 (en) Tunnel rock consolidation system - support mats with flanges bolted to rock round excavation and concreted in
DE219524C (en)