DE1765517C3 - Process and system for heating metallic workpieces in induction furnaces - Google Patents

Process and system for heating metallic workpieces in induction furnaces

Info

Publication number
DE1765517C3
DE1765517C3 DE19681765517 DE1765517A DE1765517C3 DE 1765517 C3 DE1765517 C3 DE 1765517C3 DE 19681765517 DE19681765517 DE 19681765517 DE 1765517 A DE1765517 A DE 1765517A DE 1765517 C3 DE1765517 C3 DE 1765517C3
Authority
DE
Germany
Prior art keywords
temperature
furnace
slab
heating
induction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19681765517
Other languages
German (de)
Other versions
DE1765517B2 (en
DE1765517A1 (en
Inventor
Nicholas V. Youngstown; Logan. John A. Canfield; Ohio Ross (V.St.A.)
Original Assignee
Ajax Magnethermic Corp., Warren, Ohio (V.StA.)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ajax Magnethermic Corp., Warren, Ohio (V.StA.) filed Critical Ajax Magnethermic Corp., Warren, Ohio (V.StA.)
Publication of DE1765517A1 publication Critical patent/DE1765517A1/en
Publication of DE1765517B2 publication Critical patent/DE1765517B2/en
Application granted granted Critical
Publication of DE1765517C3 publication Critical patent/DE1765517C3/en
Expired legal-status Critical Current

Links

Description

....»w v·»«/ tun Euuc einer vorbestimmten, für alle Ofenstufen gleichen. Zeitspanne Gemessen wird..... »wv ·» «/ do Euuc a predetermined one, the same for all oven levels. Time span is measured.

2. Verfahren nach Anspruch 1, dadurct gekennzeichnet, daß die Leistung jeder Ofenstufe (A bzw. B, C) zur Berücksichtigung von Wartezeiten durch Ab- und Wiedereinschalten im Sinne der Einhaltung der vorgegebenen Mitteltemperatur des Werkstücks (10) geregelt wird.2. The method according to claim 1, characterized in that the performance of each furnace stage (A or B, C) is regulated to take into account waiting times by switching off and on again in the sense of maintaining the predetermined mean temperature of the workpiece (10).

3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Leistungszufuhr zu den Ofenstufen (A, B, C) während des gleichzeitigen Austrarens der Werkstücke (10) und des gleichzeitigen Eintrages der nächsten Werkstücke (10) abgeschaltet wird.3. The method according to claim 1 or 2, characterized in that the power supply to the furnace stages (A, B, C) is switched off during the simultaneous Ausarens the workpieces (10) and the simultaneous entry of the next workpieces (10).

4. Verfahren noch eär;m der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Werkstücke (10) aus der letzten Ofenstufe (C) mit einer TemperatU' ausgetragen werden, welche die Einführung der Werkstücke (10) ohne Zwischenerwärmung in ein Warmwalzwerk gestattet.4. The method still eär; m of the preceding claims, characterized in that the workpieces (10) are discharged from the last furnace stage (C) at a temperature 'which allows the workpieces (10) to be introduced into a hot rolling mill without intermediate heating.

5. Anlage zum stufenweisen, jeweils statischen „ __ Erwärmen metallischer Werkstücke in benachbarten, mit ihren Induktionsspulen lotrecht verkaufenden und von orten her beschickbaren Induktionsöfen, insbesondere nach dem Verfahren gemäß einem der Ansprüche 1 bis 3, die unter den Ofenstufen eine waagerechte Fördereinrichtung und ein Hubwerk zum Eintragen der hochkant liegenden Werkstücke in die Ofenstufen und zum Wiederaustragen der Werkstücke nach unten aufweist, dadurch gekennzeichnet, daß die Fördereinrichtung bei einer an sich bekannten Anordnung der Induktionsöfen in einer Reihe und der ortsfesten Anordnung je eines Hubwerkes (50) *n jedemOfen einen Wagen (T) mit einer die Zsiii der Gfensiuren (A, B, C) um 1 übersteigenden Anzahl von die Werkstücke (10) im Abstand der Ofenstiifen (A, B, C) hochkant haltenden Fächern aufweist5. System for the step-by-step, static heating of metallic workpieces in neighboring induction furnaces that sell vertically with their induction coils and can be loaded from locations, in particular according to the method according to one of claims 1 to 3, which includes a horizontal conveyor and a hoist under the furnace steps for entering the edgewise workpieces into the furnace steps and for discharging the workpieces downwards again, characterized in that the conveying device in a known arrangement of the induction furnaces in a row and the stationary arrangement of a lifting mechanism (50) * in each furnace has a carriage (T) with a number of the workpieces (10) at a distance of the furnace pins (A, B, C) on edge holding the compartments (A, B, C) in excess of 1

, 6. Anlage nach Anspruch 5, dadurch gekennzeichnet* daß die Induktionsspulen der Ofen- i*iuten(A,B,C) einen etwa rechteckigen Win-, -(äungEquerschnitt aufweisen, dessen Längsseiten «Jeine der längsten Abmessung einer das Werkstück (lö) bildenden Bramme angepaßte Länge und ll&ggett Qusrseiien eise der kürzestes Abmessung dieser Bramme angepaßte Länge aufweisen, und .daß die Fächer des Wagens (T) im Sinne der Auf- 6. Plant according to claim 5, characterized in that the induction coils of the furnace (A, B, C) have an approximately rectangular cross-section, the long sides of which are one of the longest dimensions of the workpiece (lo matched) forming the slab length and ll & ggett Qusrseiien else the shortest dimension of the slab have matched length, and .that the compartments of the carriage (T) in the sense of up

Die Erfindung bezieht sich auf ein Verfahren zum as stufenweisen Erwärmen großer, zunächst kalter oder von einem Gießvorgang her noch warmer metallischer Werkstücke, wie Brammen, in benachbarten Induktionsöfen in welche die Werkstücke gleich-. zeitig eingetragen und aus welchen sie nach jeweils statischer Erwärmung auch gleichzeitig wieder ausgetragen werden, wobei die Größe der zugeführten Heizenergie von Stufe zu Stufe abnimmt, sowie auf eine Anlage zum Durchführen des Verfahrens.The invention relates to a method as gradual heating of large, first cold or still warm from a metallic casting forth workpieces, such as slabs, in adjacent induction furnaces in which at the same workpieces. entered in time and from which they are also discharged again at the same time after each static heating, the size of the supplied heating energy decreasing from step to step, as well as to a system for carrying out the process.

Bei einem solchen bekannten, in der deutschem as Auslegeschrift ΐ 019 412 beschriebenen Verfahren ist bei der abgestuften Leistungszufuhr zu den öfen davon ausgegangen, daß ein industrielle? Dreiistromnetz möglichst symmetrisch belastet werden soll, wobei beispielsweise bei insgesamt drei Ofenstufen die erste Ofenstufe aus der Phase „ bzw. Phase II mit der Leistung P0 und die beiden weiteren Ofenstufen aus der Phase III mit einer Gesamtleistung gespeist werden sollen, die angenähert = P„ sein soll. Ein solches Verfahren gibt Jedoch noch keine Gewähr für eine optimale Leistungsausbeute, die insbesondere bei großen Werkstücken, wie Brammen, einen entscheidenden Einßuß auf die Wirtschaftlichkeit des Verfahrens hat.In such a known method, described in the German as Auslegeschrift ΐ 019 412, it is assumed that an industrial? The three-current network should be loaded as symmetrically as possible, for example, with a total of three furnace stages, the first furnace stage from phase "or phase II with the power P 0 and the two further furnace stages from phase III with a total power that is approximately = P" should be. Such a process is however no guarantee for optimal power yield, which has especially with large workpieces, such as slabs, a decisive Einßuß to the economics of the process.

Der Erfindung liegt die Aufgabe zugrunde, das eingangs genannte Verfahren so zu verbessern, daß nicht nur am Ende der Aufhetzung eine weitestgehend gleichmäßige Durchheizung des Werkstückes auf eine gewünschte Mitteltemperatur erreicht wird, sondern diese stufenweise Aufheizung unabhängig davon, obThe invention is based on the object of improving the method mentioned at the outset in such a way that not only at the end of the heating up a largely uniform heating of the workpiece to a desired mean temperature is reached, but this step-by-step heating regardless of whether

sie an «!S«» kSÜSZ WsfkStÜSk SU™ SB 6£i<äü geradethey to «! S« » kSÜSZ WsfkStÜSk SU ™ SB 6 £ i <äü straight

erst gegossenen, noch entsprechend warmen Werkstück begonnen wird, mit einem miniinalen Leistungsaufwand erzielt wird.only started with a cast and still warm workpiece, with minimal effort is achieved.

Die gestellt= Aufgabe wird erfindungsgsmäö da- e° durch gelöst, daß die Leistung; jeder Ofenstufe im Sinne des Erreichens einer für die betreffende Öfenstufe vorgegebenen mittleren Temperatur und zugleich entsprechend der jeweiligen Ausgangstemptratur im Sinne des Erreichens einer zugeordneten Differenz 6S zwischen Oberfiächentemperaiür und Temperatur in der Mitte des Werkstücks am Ende einer vorbestimmten, für alle Ofenstufen gleichen Zeitspasne bemessen wird.The set object is achieved erfindungsgsmäö = DA e ° by that the power; Each furnace stage is measured in the sense of reaching a predetermined mean temperature for the furnace stage in question and at the same time in accordance with the respective starting temperature in the sense of reaching an assigned difference 6 S between surface temperature and temperature in the middle of the workpiece at the end of a predetermined time span that is the same for all furnace stages .

I 765 517
3
I 765 517
3

Bei einer solchen Bemessung der den einzelnen jeweils nur einer einzelnen Bramme zugeordnet zuWith such a dimensioning, each assigned to only one single slab

Ofenstufen zugeführten Leistung hat man es auf sein brauchen, läßt sich ein solcher Wagen auch leichtWhen the power supplied to the oven is used up, such a car can also be easily moved

Grund der zusätzlichen Berücksichtigung dar jeweils so anwenden, daß bei seiner Weiterbewegung um eineThe reason for the additional consideration should be used in such a way that when it moves forward by one

vorhandenen Differenztemperatur zwischen Ober- Ofenstufe zugleich eine neue Bramme mit unter dieexisting difference temperature between upper furnace stage at the same time a new slab with under the

fläche und Mitte des Werkstückes in der Hand, die 5 erste Ofenstufe gebracht wird, während am anderensurface and center of the workpiece in the hand, the 5 first oven level is brought, while on the other

Leistungszufuhr so zu steuern, daß im Interesse einer Ende des Wagens die fertig aufgeheizte Bramme soTo control power supply so that in the interest of one end of the car the finished heated slab so

optimalen Leistungsausbeute während des Aufhei- neben die letzte Ofenstufe gelangt, daß sie von dortoptimal power output during the heating next to the last furnace stage that it arrives from there

zungsvorganges zunächst beträchtliche Differenztem- leicht entnommen werden kann,Initially considerable differences can easily be taken from the

persturen zwischen Oberfläche und Mitte des Werk- Durch die deutsche Patentschrift 1215 187 ist zwarpersturen between the surface and the center of the work- By the German patent specification 1215 187 is

Stückes zugelassen werden, trotzdem aber am Ende io bereits die Anordnung mehrerer Induktionsöfen inPiece can be allowed, but in the end the arrangement of several induction ovens is already ok

der letzten Ofenstufe die gewünschte gleichmäßige einer Reihe und die ortsfeste Anordnung je einesthe last furnace stage the desired uniform one row and the stationary arrangement one each

Durchheizung des Werkstückes auf seine Spitzen- Hubwerkes an jedem Ofen bekannt. Abgesehen da-Through heating of the workpiece on its top hoist known on each furnace. Apart from that-

temperatur gesichert wird. Dabei ist es ohne weiteres von, daß es sich hier lediglich um eine einmaligetemperature is secured. It is obvious that this is only a one-off

möglich, die entsprechend prog, "-nierte stufenweise Aufheizung mehrerer Werkstücke in nebeneinanderpossible, the appropriately programmed, step-by-step heating of several workpieces next to one another

Erwärmung der Braainien st': vttätig durch einen 15 befindlichen Induktionsöfen handelt, besteht die För-Heating of the Braainien st ' : is active by a 15 located induction furnace, the conveying

Rechner steuern zu lassen. sv.Lti wird man sich zur dereinrichtung lediglich aus einer Rollbahn und ausTo control computers. sv.Lti you only get out of a taxiway and out of the facility

induktiven Erwärnsaat, f~, Erammen aus wirtschaft- den einzelnen öfen zugeordneten Kippeinrichtungen,inductive heating seed, f ~, harvesting from tilting devices assigned to the individual furnaces,

liehen Gründen eines -veehselstromes geeigneter Fre- durch welche die auf der Rollbahn ankommendenlent reasons of a -veehselstromes suitable Fre- by which the arriving on the taxiway

quenz bedienen Werkstücke in eine schräg nach oben gerichtete Lagequenz serve workpieces in an upward sloping position

Da sich bei der ...« die Aufheizung anschließenden ao geschwenkt und dan-i nach oben in die Öfen einge-Since with the ... «the heating swiveled ao and then upwards into the ovens.

Weiterverarbeitung der Werkstücke, d.h. beispiels- schoben werden, und d-rch welche die WerkstückeFurther processing of the workpieces, i.e. which the workpieces are to be pushed, for example

weise beim anschließenden Auswalzen der Brammen nach ihrer Absenkung auch wieder auf die Rollbahnwisely when the slabs are subsequently rolled out again after they have been lowered onto the roller conveyor

zu Platten oder Blechen, unvorhergesehene Aufent- zurückgeschwenkt werden müssen. Eine solche Föi-to plates or sheets, unforeseen stops have to be swiveled back. Such a foi-

halte nicht immer vermeiden lassen, liegt der Erfin- dereinrichtung eignet sich nicht für die hier betrof-hold can not always be avoided, the inventor is not suitable for the here concerned

dung weiterhin die Aufgabe zugrunde, die \ufheizung 25 fenen großen Werkstücke und würde mit den zu-The task of heating up large workpieces continues to be the basis for the

der Werkstücke auch so steuern zu können, daß die sätzlichen Schwenkeinrichtungen auch sehr teuer aus-to be able to control the workpieces in such a way that the additional swivel devices are also very expensive.

gewünschte Spitzentemperatur am Ende der Auf- fallen. Die nunmehr vorgeschlagene Ausbildung derDesired peak temperature at the end of the notice. The now proposed training of the

heizung auch bei auftretenden Wartezeiten mit einem Fördereinrichtung mit einem Wagen, au." dem dieheating even when waiting times occur with a conveyor with a carriage, including the

minimalen zusätzlichen Leistungsaufwand eingehalten Brammen in gleichbleibenden Lagen gehalten werden,minimal additional work required slabs are kept in constant layers,

werden kann. Dies wird gemäß einer Ausgestaltung 3» konnte durch diesen Stand der Technik auch nichtcan be. According to one embodiment, this was also not possible with this prior art

des erfindungsgemäßen Verfahrens dadu.ch erreicht, nahegelegt werden.achieved by the dadu.ch method according to the invention.

daß die Leistung jeder Ofen *ufe zur Berücksichti- Im Bedarfsfall können auch mehrere, beispiels-that the output of each furnace should be taken into account - If necessary, several, for example

gung von Wartezeiten durch Ab- und wieder Ein- weise sechs Ofenreihen nebeneinander angeordnetWaiting times by dismissing and re-instructing six rows of ovens arranged side by side

schalten im Sinne der Einhaltung der vorgegebenen sein, um eine anschließende Walzenstraße, der inswitch to a subsequent roller train, which is in

Mitteltemperatur des Werkstücks geregelt wird. 35 diesem Falle beispielsweise alle drei Minuten eh.eMean temperature of the workpiece is regulated. 35 in this case, for example, every three minutes eh.e

Bei der eingangs genannten bekannten Anlage zum neue Bramme zugeführt werden kann, optimal aus-In the known system mentioned at the beginning, the new slab can be fed in, optimally

stufenweisen Erwärmen metallischer Werkstücke sind nutzen zu können.Step-by-step heating of metallic workpieces can be used.

die einzelnen Ofenstufen mit jeweils lotrechten In- Andere Ausgestaltungen der Erfindung betreffe^the individual furnace stages with each vertical In- Other embodiments of the invention concern ^

duktionsspulen entlang einem waagerechten Kreis- weitere Einzelheiten des erfindungsgemäßen Verfah-duction coils along a horizontal circle- more details of the method according to the invention

bogen verteilt angeordnet, während die Werkstück«1 40 rens und der zu dessen Durchführung dienendenarcs are arranged in a distributed manner, while the workpiece « 1 40 rens and the one used to carry it out

unter den Ofenstufen jeweils hochkant und in ent- Anlage.under the oven steps in each case upright and in ent- system.

sprechender Verteilung auf einem DrelJ'ch ange- In der Zeichnung ist die Erfindung beispielsweiseIn the drawing, the invention is for example

ordnet sind, der zugleich pneumatisch gehoben und veranschaulicht. Es zeigtare arranged, which is pneumatically lifted and illustrated at the same time. It shows

gesenkt werden kann. Während eine solche Anordnung Fig. 1 eine Draufsicht auf einen der Induktions-can be lowered. While such an arrangement Fig. 1 is a plan view of one of the induction

bei kleineren, entsprechend leichten Werkstücken 45 öfen einer Anlage nach der Erfindung,for smaller, correspondingly light workpieces 45 ovens of a system according to the invention,

noch möglich ist, würde sie bei hier in erster Linie F i g. 2 eine Seitenansicht des Traggestells diesesis still possible, here it would primarily be F i g. 2 is a side view of the support frame of this

betroffenen großen Brammen mit Längen von bei- Induktionsofens,affected large slabs with lengths of at- induction furnace,

spielsweise 6 m und einem Einzelgewicht von vielen F i g. 3 einen Schnitt nach der Linie 3-3 der F i g. 2, Tonnen zu eü»er praxtiscu kaum noch herstellbaren Fig. 4A, 4B und 4C schematisch gehaltene Seiüberschweret Drehtischkonstruktion führen. Dem- 50 tenansichten einer aus mehreren in einer Reihe neg,sgenübsr umfaßt die vorliegende Erfindung auch beneinander angeordneten öfen bestehende Anlage, eine Anlage zum stufenweisen, jeweils statischen Er- aus denen der Transportweg von Brammen durch die wärmen metallischer Werkstücke in benachbarten, Anlage ersichtlich ist,for example 6 m and an individual weight of many F i g. 3 shows a section along line 3-3 of FIG. 2, Tons to your practically hardly producible Fig. 4A, 4B and 4C schematically held overweight Guide turntable construction. Dem- 50 tenant views one of several in a row neg, sgenübsr the present invention also includes juxtaposed furnaces, a system for the step-by-step, static calculation of the transport route of slabs through the warming of metallic workpieces in the neighboring system can be seen,

jiüi ίπϊέϋ üüduktiGrsspulcn lotrecht verlaufenden <ιηά Fig.5 ?'" SchaUhild einer Ausf rungsform derjiüi ίπϊέϋ üüduktiGrsspulcn perpendicularly running <ιηά Fig. 5? '"Show an embodiment of the

von unten her beschickbaren Induktionsöfen, ins- 55 Anlage,induction ovens that can be loaded from below,

besondere nach einem der vorgenannten Verfahren, Fig. 6 Kennlinien des Temperaturverlaufs beimin particular according to one of the aforementioned methods, FIG. 6 characteristics of the temperature profile in

die unter den Ofenstufen eine waagerechte Förder- stu'inweisen Erwärmen einer Bramme, die unmittel-which indicate a horizontal conveying stage under the furnace steps, heating a slab, the immediate

ejnrichtung und ein Hubwerk zum Eintragen der bar von einer Gießanlage angeliefert wurde,equipment and a hoist for entering the bar was delivered from a casting plant,

hochkant liegenden Werkstücke in die Ofenstufen Fig.7 Kennlinien des Temperaturverlaufs beimWorkpieces lying on edge in the oven steps Fig. 7 Characteristic curves of the temperature profile for

undzumWiederaustragenfdef Werkstücke nach unten 5o> stufenweisen'' Erwärmen einer mit Raumtemperaturand for re-ejecting the workpieces downwards 5o> gradual '' heating one to room temperature

aufweist, deren Fördereinrichtung erfindungsgemäß angelieferten Bramme.has, the conveyor device delivered according to the invention slab.

bei einer an sich bekannten Anordnung der Induk- Bei der dargestellten Anlage nimmt jeder der vor-in a known arrangement of the induction In the system shown, each of the

tionsöfcn in einer Reihe und der ortsfesten Anord- gesehenen dr&i Induktionsöfen 15 eine Bramme 10In one row, the three induction furnaces 15, which are fixed in position, have a slab 10

nung je eines Hubwerkes an jedem Ofen einen Wagen auf. Jeds von einem sie vollständig umgebenden Ge-With one hoist unit on each furnace, one car is installed. Each from a completely surrounding

mit einer die Zahl der Ofenstufen um 1 übersteigen- 65 stell F mit lotrechter Achsrichtung getragene Induk-with an induction that exceeds the number of furnace stages by 1 - 65 stell F

den Anzahl von die Werkstücke im Abstand der tionsspule 15 hat eine rechteckige Gestalt und weistthe number of the workpieces in the distance of the tion coil 15 has a rectangular shape and has

Ofenstufer hochkant haltenden Fächern aufweist. an der einen Seite Klemmen 28 zum Anschluß derOven step has compartments holding upright. on one side terminals 28 for connecting the

Während die hierbei benötigten Hubeinrichtungen Netzleitung auf, während an ihrer anderen Seite jeWhile the lifting devices required here power line on, while on their other side each

ein Einlaß 26 und ein Auslaß 27 für eine die Induk- men in den öfen erwärmt werden, ist ein Regelkreisan inlet 26 and an outlet 27 for the inductions in the furnaces to be heated is a control circuit

tionsspule durchströmende Kühlflüssigkeit vorgesehen vorgesehen, dessen Meßwerk aus einem die Bram-tion coil flowing through cooling liquid provided, whose measuring mechanism consists of a Bram-

ist. Das gemäß F i g. 3 aus I-Balken 23 und Platten mentemperatur messenden »Proximitye-Thermcele-is. According to FIG. 3 from I-beam 23 and plate temperature measuring »Proximitye-Thermcele-

24 bestehende Gestell F trägt lameliierte Magnetjoche ment 102 besteht, das durch die Spule und die Aus-24 existing frame F carries laminated magnetic yokes element 102 , which is made by the coil and the

22. die ihrerseits Träger 30 tragen, an denen die ein- 5 kleidung der Oienkammer hindurchragt und die Ober-22. who in turn wear straps 30 on which the clothing of the Oienkammer protrudes and the upper

zclnen Windungen der Induktionsspule 15 befestigt fläche der Bramme beim Erwärmen berührt, umTwo turns of the induction coil 15 attached to the surface of the slab when heated

sind. Dabei leiten die Magnetjoche 22 den Kraftfluß deren Temperatur zu messen. Dieses Thermoelementare. The magnet yokes 22 guide the flow of force to measure their temperature. This thermocouple

auf der Außenseite der Induktionsspule 15 und halten ist auf einem Drückluftzylindei' 101 durch' einen Hai- on the outside of the induction coil 15 and hold is on a compressed air cylinder ' 101 by' a shark

ihn vom Gestell F fern. terlOl' derart angebracht, daß es während des An-him away from the frame F. terlOl 'attached in such a way that it

Die von der Induktionsspule 15 umgebene Heiz- to hebens und Senkens der Bramme 10 im Öfen zurück- ί Surrounded by the induction coil 15 heating to raising and lowering the slab 10 back in furnaces ί

kammer ist mit einer feuerfesten Auskleidung 16 aus gezogen und'vordem Einschalten des Stroms an dieChamber is drawn out with a refractory lining 16 and 'before switching on the current to the

Isolierstoff oder einem anderen geeigneten Werkstoff Bramme angedrückt werden kann. Das Thcr'moelc-Insulating material or another suitable material slab can be pressed. The Thcr'moelc-

versehen, die vorzugsweise aus vorgefertigten, einzeln ment 102 ist an ein zum Aufzeichnen und Regein derprovided, which is preferably made of prefabricated, individually element 102 is to a for recording and Regein the

ersetzbaren Tonerdziegeln besieht. Temperatur dienendes Gerät 40 (F i g. 5) angeschlos-replaceable clay bricks. Temperature serving device 40 (Fig. 5) connected

In der induktionsspule 15 nimmt eine Bramme 10 15 sen. das die Leistung der Induktionsspule steuert, wahrend des Krwärmens eine solche Lage ein. daß Außerdem ist vorzugsweise ein zweites Thermoeleder im Werkstuck induzierte Heizstrom in dessen ment an ein Anzeigegerät angeschlossen das nicht waagerechter Längsrichtung verläuft, wie der Pfeil X dargestellt ist und die oberste Grenztemperatur an-(Fig. 1) angibt. Die Richtung der etwa rechtwinklig zeigt. Dieses Instrument tritt in Tätigkeit, wenn das zur Langsachse des Werkstücks verlaufenden magne- 20 erstgenannte Thermoelement 102 oder das angetischcn Kraftlinien ist durch den Pfeil y (Fi g. 2) an- schlosscnc Steuergerät ausfällt. Am besten wird jeder 8e°eutf ·, . . . . . Ofen m't zwei Thermoelementen ausgerüstet, die so Die Anlage des beschriebenen Ausführungsbeispiels angeordnet sind, daß ein Warnzeichen gegeben wird, enthalt drei Induktionsöfen A, B und C, die im glei- wenn der von diesen Thermoelementen gemessene chen Abstand voneinander und in einer Reihe neben- 25 Temperaturunterschied eine bestimmte Größe übereinander angeordnet sind (vgl. F ί g. 4 A, 4B und 4C). schreitet. Denn das würde bedeuten daß eines der Ferner enthalt die Anlage einen Förderer, der die Geräte gestört ist. Die beiden Thermoelemente wer-Werkstucke von einem Ofen zum nächsten über- den durch je einen Druckluftzylinder 101 unabhängig fuhrt und sie auch gegenüber den öfen ausrichtet. voneir ,nder vorgeschoben und zurückgezogen Dieser Forderer besteht aus einem Wagen T mit ent- 30 Die Induktionsspulen 15 der in einer Reihe nebensprechenden Blockhaltern. Sind die Brammen gegen- einander angeordneten Induktionsöfen A, B und C über den öfen ausgerichtet, so werden sie durch Hub- sind alle übereinstimmend und gemäß Fi e 3 ausgewerke 60 senkrecht angehoben und dadurch in die bildet, so daß sie untereinander austauschbar sind. Heizkammern der Öfen eingeführt. Die Hubwerke 60 In ihnen können Brammen verschiedener Breite erkonnen auf einem gemeinsamen auf- und abbeweg- 35 wärmt werden. Dabei wird die Breite einer Bramme lichen Balken abgestützt sein. Jede Bramme 10 vor deren Einschieben in den Ofen vorzugsweise in steht dabei mit ihrer unteren Längsseite 11 hochkant der bereits erwähnten Weise abgefühlf so daß durch auf einer vom Hubwerk getragenen Isolierplatte 51. eine Fernsteuerung dafür gesorgt werden kann daß Um eine Bramme bis in die gewünschte Lage in eine die Höhenabmessung der Spule zur Bramme paßt, der He.zkammcrn anzuheben, in dieser Lage zu hai- 40 Die »Höhe« der Bramme entspricht hier derjenigen ten und nach Erwärmung abzusenken, können auch Dimension, die gemeinhin als »Breite« bezeichnet andere Einrichtungen vorgesehen sein. wird, weil ja die Bramme in jeder Induktionsspule aufIn the induction coil 15 takes a slab 10 15 sen. that controls the power of the induction coil, during the warming up such a situation. that also a second thermocouple in the workpiece is preferably induced heating current in its element connected to a display device that does not run in a horizontal longitudinal direction, as the arrow X is shown and indicates the uppermost limit temperature (Fig. 1). The direction that points approximately at right angles. This instrument comes into operation when the magnetic thermocouple 102, which runs along the longitudinal axis of the workpiece, or the control device connected to the line of force indicated by the arrow y (FIG. 2) fails. It is best to do 8 e ° eut f ·,. . . . . Furnace with two thermocouples equipped, which are arranged in such a way that a warning sign is given, contains three induction furnaces A, B and C which are at the same distance from each other and in a row if the measured by these thermocouples In addition to the temperature difference, a certain size are arranged one above the other (see Fig. 4 A, 4B and 4C). strides. Because that would mean that one of the moreover the system contains a conveyor, which is disturbed by the devices. The two thermocouples independently guide workpieces from one furnace to the next via a compressed air cylinder 101 each and also align them with respect to the furnace. voneir, nder advanced and withdrawn This conveyor consists of a carriage T with corresponding block holders in a row. If the slabs are aligned with the induction furnaces A, B and C , which are arranged opposite one another, then they are lifted vertically by means of lifts, all of which correspond to FIG. Furnace heating chambers introduced. The hoists 60 In them, slabs of different widths can be heated up and down on a common device. The width of a slab will be supported union bar. Each slab 10 before it is inserted into the furnace preferably stands with its lower longitudinal side 11 upright in the manner already mentioned so that a remote control can be used on an insulating plate 51 carried by the hoist to ensure that a slab is in the desired position The height dimension of the coil matches the slab, the height of the coil is to be raised, in this position to be held Facilities may be provided. because yes the slab in each induction coil is on

Die Anlage soll sich fur Brammen verschiedener ihrer Längsseite stehtThe plant is supposed to stand for slabs of different length along its length

Größe eignen Aus diesem Grunde ist ein von Hand Um die an jede Induktionsspule angeschlossene oder selbsttätig betriebenes Meßwerk 56 vorgesehen 45 elektrische Leistung bestmöglich auszunutzen, hat der (Fig. 5), das die Dimensionen der Brammen 10 erste Induktionsofen A die höchste elektrische Nennmißt, also auch ihre Hohe bevor sie in die Heiz- leistung, der zweite Induktionsofen ff beispielsweise kammer vorgeschoben werden, und der elektrischen die Hälfte und der dritte Induktionsofen C beispiels-Steuerung der Induktionsspulen 15 ein Signal liefert, weise ein Viertel dieser Nennleistung. Man kann die das dafür sorgt, daß diesen die erforderliche elek- 50 einzelnen Nennleistungen der aufeinande-Oleenden irische Leistung zugeführt wird Induktionsöfen auch anders stufenweise abrahmen.Size are suitable for this reason is a manual order, connected to each induction coil or automatically operated measuring unit 56 is provided to take advantage of 45 electric power as possible, has the (Fig. 5), which the dimensions of the slabs 10 first induction furnace A, the highest electric nominal measures so also their height before they are advanced into the heating power, the second induction furnace ff, for example, chamber, and the electrical half and the third induction furnace C, for example, control of the induction coils 15 deliver a signal, wise a quarter of this nominal power. It is possible to ensure that the necessary electrical power is supplied to these induction furnaces in different stages.

Wie Fig 3 zeigt, sind die Abmessungen der In- Es sind Vorkehrungen Setroffen, verhältnismäßigAs shown in Fig. 3, the dimensions of the In- There precautions S taken are proportionate

duktionsspulenl5und derBrammen lOso aufeinander große Brammen entweder vom kalten Zustand, d. h.Induction coils 5 and the slabs 10 slabs that are large on top of one another either from the cold state, i.e. H.

abgestimmt daß die Brammen in einer Lage im In- von Raumtemperatur, ausgehend oder unmittelbarcoordinated that the slabs are in a position in- from room temperature, starting or immediately

neren der Heizkammer abgestützt werden können, 55 nach Verlassen einer GieBanlage, insbesondere einerneren of the heating chamber can be supported, 55 after leaving a casting system, in particular a

in der sie sich oberhalb der untersten und unterhalb Stranggießanlage, fortschreitet zu erwärme*.. Im erstenin which it is located above the lowest and below the continuous caster, progresses to heat * .. In the first

der obersten Wmdung der Induktionsspule befinden Induktionsofen A kann beispielsweise eine vorherthe top wall of the induction coil induction furnace A can, for example, one before

und mit Abstand von den Windungen der Spule um- kalte Bramme 10 bis auf eine bestimmte Durchgeben werden Vorzugsweise ist die Heizkammer Schnittstemperatur erwärmt werden, wobei die Ofcer-and at a distance from the windings of the coil, slabs 10 that are cold down to a certain level are passed. Preferably, the heating chamber cutting temperature is heated, the furnace

wahrend des Erwärmens durch einen abnehmbaren 60 fläche der Bramme heißer wird als ihr Inneres. Im und isolierenden Deckel 18 abgeschlossen, während zweiten Induktionsofen B wird sie bis auf eine Durchdic Induktionsspule 15 unten durch feuerfeste Boden- schnitLstemperatur erwärmt, die etwas höher als-die platten 19 und 20 abgeschirmt ist. Jede sich in der beim Verlassen des ersten Ofens ist. Im zweiten Langsnchtung einer Bramme erstreckende Windung Induktionsofen B nimmt dann dsr Unterschied derDuring the heating through a removable surface, the slab becomes hotter than its interior. Closed in and insulating cover 18, during the second induction furnace B it is heated up to a diameter induction coil 15 at the bottom by a refractory floor cut temperature which is somewhat higher than the plates 19 and 20 are shielded. Everyone is in when they leave the first oven. In the second longitudinal direction of a slab, the winding of the induction furnace B then takes the difference

der Induktionsspule 15 ist von den benachbarten 65 Oberflächentemperatur von der im Inneren herr-the induction coil 15 depends on the neighboring 65 surface temperature from the inside

Windungcn vorzugsweise durch eine Epoxydhülle sehenden Temperatur ab. Im dritten Induktionsofen CWindingscn, preferably through an epoxy shell, from temperature. In the third induction furnace C

jsohcrl wird die Spitzentemperatur an der Oberfläche weiterjsohcrl will continue the peak temperature on the surface

Um die Temperatur /u regeln, auf die die Bram- erhöht, während der Unterschied zwischen denanderTo regulate the temperature / u to which the bram- increases, while the difference between denander

7 87 8

Oberfläche und im Inneren der Bramme 10 hcrr- ist der erste Ofen unentbehrlich: Aus diesem1 Grunde sehenden Temperaturen weiter verringert wird. wird die Anlage vorzugsweise'mit'drei' öfen je »ReiheHcrr- surface and in the interior of the slab 10 of the first furnace is indispensable: For this reason, 1 sighted temperatures is further reduced. the system will preferably have 'three' ovens per row

Die F ί g. 6 und 7 zeigen beispielsweise Temperatur- ausgerüstet. - ' " ' "J τ /*'■'ν ."■"<·«The F ί g. 6 and 7 show, for example, temperature-equipped. - '"'" J τ / * '■' ν. "■"<· «

kennlinien, die beim stufenweisen Erwärmen der Wird die Bramme'dem Induktionsofen Ά in kaltem Brammen in den drei Induktionsöfen A, B und C 5 Zustand zugeführt,"Wobei sich'der-Temperaiurverlauf mit folgenden Nennleistungen auftraten: die des In- der Fig. 7 ergibtj dann wird sie irKder 'ersteirHeizduktionaofcns A betrug 20 00OkW, die des Induk- periode auf eine' Durchschnittstemperatur^ von fetwa tionsofcns B 10 000 kW und die des Ofens C 8200C erwärmt.'Die'vorbestinimjt&f Bndtemperatur 5000 kW. der Oberfläche "am Ende der ersten Heizperiode*?'alsoCharacteristic curves that occur during the gradual heating of the induction furnace Ά in cold slabs in the three induction furnaces A, B and C 5 state, "The temperature curve with the following nominal powers occurred: that of the In- Fig. 7 ergibtj then it is irKder 'ersteirHeizduktionaofcns a was 20 00OkW, the induction period of a' ^ mean temperature of Fetwa tionsofcns B 10 000 kW and that of the furnace 820 C 0 C &erwärmt.'Die'vorbestinimjt f Bndtemperatur 5000 kW. the surface " at the end of the first heating season *? '

Wie Fig. 7 zeigt, steigt die Oberflächentemperatur1 to beim Abschälten<des*'Ofensf'eiwai'1150o;Sund-dielin der in den Induktionsofen A eingetragenen kalten der Brammenmitte ' herrschende'"Temperatur''etwa Bramme schnell an, und es ergibt sich auch schnell 480°UBei dernin den Fig.6 und<7 veranschaulichten' am Ende der ersten Heizstufe aus dem Unterschied ;Befcpiel waren dieJ E rammen'7800 ϊηπΓ lang"und der Oberflächentemperatur von der im Inneren der 300 mm dick. Sie wurden >n jedem der drei Induk-Bramrne herrschenden Temperatur eine mittlere Tem- 15 tio.isöfen A, B und C siebzehn Minuten laag erperatur, die ungefähr der Temperatur (860 C) einer wärmt, und eine Minute wurde zum Überführen der Bramme entspricht, die unmittelbar aus der Gießerei Brammen von dem einen Ofen zum nächsten und k"nimt. Beim Erwärmen einer »kalten«, d.h.. einer zur Aufnahme neuer und zum Austragen fertig erbt. 1 Raumtemperatur in den Induktionsofen A tinge- wärmter Brammen aus dem InduktionsofenC vorgeinipenen bramme entsteht ein größerer Unterschied 20 sehen. Die elektrischen Leistungen der einzelnen öfen /wischen der an der Oberfläche und der im Inneren und die Länge der Heizperioden können für je^e der Bramme herrschenden Temperatur, als es der gewünschte Brammengröße, den jeweiligen Ausbrin-FaII ist, wenn die eingetragene Bramme noch warm gungserfordernissen, angepaßt werden. Die als Beiaus der Gießerei kommt (F i g. 6). spiel aufgeführten Temperaturen und Zeiten beziehenAs FIG. 7 shows, the surface temperature rises 1 to when the furnace is peeled off f 'eiwai'1150 o; And in the cold of the middle of the slab entered in the induction furnace A, the 'prevailing''temperature'' about the slab quickly rises, and 480 ° U quickly results in the case of those illustrated in FIGS. 6 and 7' at the end of the first heating stage from the Difference ; Befcpiel were the J E rammen'7800 ϊηπΓ long "and the surface temperature of the inside of the 300 mm thick. They were> n each of the three-Induk Bramrne prevailing temperature an average tem- 15 tio.isöfen A, B and C seventeen minutes laag erperatur that warms about the temperature (860 C) a, and one minute corresponds to transfer the slab selected from the casting slab of the nimt directly an oven to the next and k ". Upon heating of a" cold, "that is, a new for receiving and discharging finished inherits. 1 room temperature in the induction furnace a tinge--heated slabs from the induction furnace C pre-machined slab results in a greater difference 20. The electrical outputs of the individual furnaces / wipers on the surface and inside and the length of the heating periods can vary for each temperature of the slab than is the case with the desired slab size, the respective output -FaII is when the entered slab still needs to be adapted to warming requirements. It comes from the foundry as part of the process (Fig. 6) pull

Gemäß F i g. 7 wird bei den zweiten und dritten 25 sich demgemäß auf einen bestimmten Fall, in dem F nviirmungsstufen der Bramme, also in den Induk- die Größe der Brammen, ihre Endtemperaturen uad fionsofcnß und C, dieser Temperaturunterschied ver- die Ausbringung vorgegeben waren. Ändern sich ringcrt, bis am Ende der stufenweisen Erwärmung diese Erfordernisse, dann kann dadurch eine Andebfi der gewünschten maximalen Spitzen temperatur rung der Heizleistungen und der Dauer der HeIzcin Ausgleich erfolgt. Diese letztgenannte Temperatur 30 perioden geboten sein, um die Ausbringung je Ofencntspncht im dargestellten Ausführungsbeispiel einer reihe zu beschleunigen oder zu verzögern. Der Heizgewünschten Walztemperatur. Gemäß F i g. 6 wird energiebedarf pro Bramme hängt wertgehend von der Temperaturunterschied zwischen der Oberfläche ihrer Dicke ab. Sind die Brammen dicker als im be- und dem Inneren der Bramme bei der zweiten Er- schriebenen Beispiel, dann würde eine längere Heizwärmungsstufe im Induktionsofen B vergrößert und 35 periode erforderlich werden.According to FIG. In the case of the second and third 25, the reference will accordingly be made to a certain case in which the slab's size, its final temperatures and the temperature difference relative to the output were specified in the insulation stages of the slab. If these requirements change slightly until the end of the step-by-step heating, this can result in an increase in the desired maximum peak temperature of the heating output and the duration of the heating compensation. This last-mentioned temperature must be required for 30 periods in order to accelerate or delay the output per furnace time in the illustrated embodiment of a series. The desired rolling temperature for heating. According to FIG. 6 The energy requirement per slab depends on the temperature difference between the surface and its thickness. If the slabs are thicker than in the load and the interior of the slab in the second example described, then a longer heating stage in induction furnace B would be increased and a period would be required.

bei der dritten Erwärniungsstufe im Induktionsofen C Die Branünen werden in die drei öfen der AnlageDuring the third heating stage in the induction furnace C, the branches are placed in the three furnaces of the plant

verringert. Ist die in den ersten Ofen eingetragene gleichzeitig eingetragen und auch gleichzeitig ausBramme noch etwa so heiß, wie sie aus der Gießerei getragen. Im Falle des Auftretens unvorhergegckommen ist, dann wird dieser Ofen auf diese sehener Wartezeiten wird durch das TenHyenrtur-Temperatur als Festwert unter Steuerung durch den v> regelgerät 40 in jedem der öfen der Strom dsr-Warmefühler 102 durch Ein- und Ausschalten ein- art ein- und ausgeschaltet, daß in .1er Bramme geregelt, so daß die Bramme mit der gewünschten der am Ende der Heizperiode erreichte voieingestellte mittleren Temperatur in den zweiten Induktions- Durchschnittswert der Temperatur aufrechterhalten ofen B eingetragen wird. Die Brammen verbleiben wird. Die Ein- und Ausschaltung des Stroms für während ihrer Erwärmung in den öfen im Ruhezu- 45 Förderer und Hubwerke sowie deren Steuerung erstand. Bei den in den Kennlinien dargestellten Bei- folgt bei allen öfen gleichzeitig oder der Reihe nach, spielen beträgt jede Heizperiode, während welcher wobei die Schaltung von Hand oder selbsttätig gedie Bramme im Ruhezustand erwärmt wird, siebzehn steuert wird (vgl. Fig.5), um zu gewährleisten, daß Minuten, während die zu ihrer Überführung in den sich die Brammen mit Bezug auf sämtliche öfen jeweils nächsten Ofen erforderlichen Zeit eine Minute 5° gleichzeitig oder der Reihe nach bewegen,
beträgt. Die Heizperiode verlängert sich indessen, Während der Überführung einer Bramme vom
decreased. Is the one entered in the first furnace at the same time entered and at the same time from the slab is still about as hot as it was carried out of the foundry. In the case of occurrence unvorhergegckommen, then the furnace is in this overlooked waiting times through the TenHyenrtur-temperature control device as a fixed value under control of v> 40 in each of the 102 ovens the power dsr-heat sensor through turning on and off once an art - and switched off that in .1er slab regulated so that the slab with the desired preset mean temperature reached at the end of the heating period in the second induction mean value of the temperature is maintained furnace B entered. The slabs will remain. The switch-on and switch-off of the electricity for conveyors and hoists and their controls during their heating in the furnaces in the rest area. With the following shown in the characteristic curves for all ovens at the same time or one after the other, each heating period, during which the circuit is heated manually or automatically, the slab is heated in the idle state, is controlled seventeen (see Fig. 5), to ensure that minutes during the time required to transfer them into the slabs with respect to all the furnaces next furnace move one minute 5 ° simultaneously or in sequence,
amounts to. The heating season, however, is extended during the transfer of a slab from the

wenn die Brammen auf Abruf warten miirsen, ersten zum zweiten und vom zweiten zum dritten etwa infolge am Walzwerk auftretender Verzögerun- Ofen sinkt ihre Oberflacheniemperatur, also ihre gen. Spifzentemperatur. Beim veranschaulichten Ausfüh-when the slabs have to wait to be called, first to second and from second to third as a result of delays occurring at the rolling mill, for example, the surface temperature of the furnace, i.e. its surface, drops gen. tip temperature. In the illustrated embodiment

Der erste Induktionsofen könnte offenbar fort-55 rungsbeispiel fallt die Spitzesteinperatur der Bramme fallen, wenn die angelieferten Brammen eine Tem- bei der Überführung vom ersten Ofen von etwa peratur von etwa 820° aufweisen würden, wie es der 1150° C auf etwa 1080° C ab. Irr zweiten Ofen Fall ist, wenn sie unriittelbar aus der Gießerei korn- wird die Brammentemperatur an der Oberfläche auf men. Die in der Anlage nach der Erfindung wieder etwa 1245° C angehoben, wobei die im Inneren der aufzuwärmenden und unmittelbar von einer Strang- 60 Bramme herrschende Temperatur auf etwa -1000° C gießanlage gelieferten Brammen haben gewöhnlich steigt. Das ergibt eine Durchschnittstemperatur von eine Oberflächentemperatur von etwa 705° und im etwa 1120° C. Bei der Überführung vom zweiten zum/ Inneren eine Temperatur von etwa 985°, wobei der dritten Of*n sinkt die OberSMchentempeiatur der Temperaturabfall ungefähr geradlinig verläuft Das Bramme etwas, während die im Icneren der Bramme ergibt einen Durchschnittswert der Brammentempe- 65 herrschende Temperatur etwas steigt Im dritten Öfen ratur von etwa 820° (vgl. Fig. 6). Würden die Bram- beträgt die Spitzentemperatur I29ÖL C imd die im men im kalten Zustand eingehen oder eine Durch- Inneren der Bramme herrschende Temperatur schnittstemperatur von unter 820° aufweisen, dann 1160° C, was einem Mittelwert von etwa 12200CThe first induction furnace could evidently continue if the peak temperature of the slab fell if the slabs delivered had a temperature of around 820 ° C when they were transferred from the first furnace, like the 1150 ° C to around 1080 ° C away. In the second furnace case, if it is directly grained from the foundry, the slab temperature on the surface will increase. The in the plant according to the invention again increased to about 1245 ° C, the inside of the slab to be heated and directly from a continuous slab prevailing temperature to about -1000 ° C casting plant usually have rises. This results in an average temperature of a surface temperature of about 705 ° C and about 1120 ° C. During the transfer from the second to the inside a temperature of about 985 °, with the third furnace, the surface temperature drops, the temperature drop runs roughly in a straight line , while the temperature inside the slab gives an average value of the slab temperature, rising somewhat in the third furnace temperature of about 820 ° (cf. FIG. 6). Would the Bram is the peak temperature I29Ö L C IMD received in men or in the cold state a transit inside have the slab temperature prevailing average temperature of less than 820 °, then to 1160 ° C, a mean of about 1220 0 C

ίοίο

entspricht. Der maximale Temperaturunterschied zwischen dem Inneren und der Oberfläche der Bramme liegt iai dritten Ofen bei etwa 120° C. Verfließt zwischen dem Austragen der Bramme ^uS dem letzten Ofen .und- ihrer Anlieierung beim Walzwerk eine; Frist von etwa vier Minuten, dann gleichen} sich die Temperaturunterschiede aus, und es rird,. eine gleichmäßige Temperaturverteilung in der Bramme erreicht.is equivalent to. The maximum temperature difference between the interior and the surface of the The slab is usually at around 120 ° C in the third furnace. Flows between the discharge of the slab ^ and the last furnace. and - its alignment with the rolling mill one; Time of about four minutes, then} each other the temperature differences out, and it rird. an even temperature distribution in the slab achieved.

ein- und auszuschalten, sei es durch das Temperaturregelgerät 40 oder durch den Zeitschalter 41.on and off, be it through the temperature control device 40 or by the timer 41.

Ein Rechner 32 kann dazu verwendet werden,.den Betrieb der Anlage zu überwachen, aufzuzeichnen, anzuzeigen, zu steuern Und selbsttätig zu betreiben. Der Rechner kann dabei an einer von den Induktions- öfen A, B und C entfernten Stelle angeordnet sein. Außer den Meßwerken 56 zum Messen der Äbmessungen der Brammen und deren Stellung im den Öfen kö h Übhirih fdiA computer 32 can be used to monitor, record, display, control and automatically operate the operation of the system. The computer can be arranged at a location remote from the induction furnaces A, B and C. In addition to the measuring units 56 for measuring the dimensions of the slabs and their position in the furnace kö h Übhirih fdi

ret g g de Öfenret g g de stoves

In Fig.5 ist eine Schallctelle31 angedeutet, die ίο können noch Überwachungseinrichtungen für-die mit Steuereinrichtungen für die Heizperioden: und Stromstärke, difi Spannung, die, Temperaturen, die Haltezeiten verschen ist, einschließlich, einer Tempe- verlangte Ausbringung und die Phasenbelastung soraturregelungf durch Ein- und 'Ausschalten des Heiz- wie etwaige Schutzeinrichtungen vorgesehen werden. Stroms sowie einem in Abhängigkeit von der Breite Diese Einrichtungen geben der Bedienung der Ander Bramme einstellbaren Wählerschalter. Durch 15 lage und dem Rechner entsprechende Signale, am diese Einrichtungen wird die programmierte Folge dadurch die erforderlichen Einstellungen und Bevon Verfahrensschriiien, wie sie oben beschrieben wegungen herbeizuführen.In Figure 5, a Schallctelle31 is indicated, the ίο can still monitor devices for-the with control devices for the heating periods: and amperage, difi voltage, die, temperatures, die Holding times is given away, including a temperature-demanded output and the phase load temperature controlf by switching the heating on and off, such as any protective devices. Stroms as well as one depending on the width these facilities give the operation of the others Slab adjustable selector switch. By 15 position and signals corresponding to the computer, am these facilities will be the programmed sequence thereby making the required settings and bevel Procedural steps as described above to bring about movements.

wurde, von Hand oder selbsttätig herbeigeführt. Die Fordert das Walzwerk eine erwärmte Bramme an,was brought about by hand or automatically. If the rolling mill requests a heated slab,

Steuerung erfolgt dabei entweder durch das Tempe- dann betätigt die Bedienung vorzugsweise einen raturregeJgerät 40 oder durch Zeitschalter 41 od. dgl., so Druckknopfschalter 45. Haben die Brammen ihre wie in Fig.5 dargestellt Die Temperatur der Bram- Solltemperaturen erreicht, so werden die Induktionsme wird dabei in jedem Ofen erst mit Hilfe eines spulen ausgeschaltet und die Hubwerke 60 in Gang Einstellhebels festgelegt und dann durch die Steue- gesetzt, die die Brammen absenken und sie in entrung aufrechterhalten. Die Steuerung und eine etwa sprechende Schlitze des Wagens T absetzen. Dann vorgesehene Aufzeichnung der gesteuerten Größen 35 wird die aus dem letzten Induktionsofen C ausgetrakann dabei selbsttätig erfolgen. gene Bramme zum Walzwerk überführt, während dieControl takes place either through the temperature, then the operator preferably actuates a temperature control device 40 or by means of a timer 41 or the like, so push-button switch 45. When the slabs have reached their target temperatures as shown in Induction meter is first switched off in each furnace with the aid of a coil and the lifting mechanisms 60 are set in gear setting levers and then set by the control, which lower the slabs and keep them in motion. The control and a roughly speaking slots of the carriage T drop off. The planned recording of the controlled variables 35 is then provided, which can then take place automatically from the last induction furnace C. gene slab is transferred to the rolling mill while the

Wie das Schaltbild der Fig. 5 erkennen läßt, sind B d Idkiöf A dAs the circuit diagram of FIG. 5 shows, B d Idkiöf A d

die zur stufenweisen Brasimenerwännung dienenden induktioasöfsa an ein dreiphasiges Drehstromnetz angeschlossen, das vorzugsweise die Induktionsspulen der drei Ofen A, B und C je mit einem Emphasenstrom mit einer Nennwertleistung von 2000OkW bzw. 10 000 kW bzw. 5000 kW beliefert. Jede Induk-the induktioasöfsa, which are used for gradual bracing, are connected to a three-phase three-phase network that preferably supplies the induction coils of the three ovens A, B and C each with an emphasis current with a nominal output of 2000 kW or 10 000 kW or 5000 kW. Every induc-

tionsspule ist dabei an Schalter £ angeschlossen, da- g g pThe operation coil is connected to switch £, da- g g p

mit die Spulen entweder einzela oder, wie es durch 35 Planung und durch Steuerung mittels eines Rechners gestrichelte Linien angedeutet ist, gleichzeitig ein- IMSt sich erreichen, daß die Spitzenwerte der von der ucd ausgeschaltet werden können. Bei den Schaltern Anlage geforderten Produktion saf ein Mindestmaß j handelt es sich vorzugsweise um Siükongleichrich- sinken. Ein einzelner Bedienungsmanc kann mühelos terschalter. Es können jedoch auch andere Schalter, mehrere Reihen von Öfen von einem einzigen Steuerz. B. Handschalter verwendet werden, am die Ofen 40 pult aus steuern.with the coils either individually or, as indicated by dashed lines in planning and control by means of a computer, at the same time an IMSt can be achieved so that the peak values of the ucd can be switched off. The switches required for production saf a minimum dimension j are preferably Siükongleichrich- sink. A single operator can effortlessly switch. However, other switches, multiple rows of ovens from a single control z. B. Hand switch can be used to control the furnace 40 from the console.

gene Bramme erk überführt, während diegene slab Erk transferred while the

Brammen aus den Induktionsöfen A und B zu den Ofen B und C wandern und eine neue Bramme dem Induktionsofen A zugeführt wird.Slabs move from induction furnaces A and B to furnaces B and C and a new slab is fed to induction furnace A.

Man kann mehrere Ofenreihen für die schrittweise Erwärmung der Brammen verwenden und so programmiereu, daß diese Anlage eine größere Anzahl von Brammen nacheinander dem Walzwerk zu liefern vermag als eine einzige Reihe. Durch entsprechende Pl d dh St il i RYou can use several rows of ovens for the gradual Use the heating of the slabs and program that this plant can deliver a larger number of slabs one after the other to the rolling mill capable of being a single row. By corresponding Pl d ie St il i R

Hierzu 5 Blatt ZeichnungenIn addition 5 sheets of drawings

'vM-.***ä'vM -. *** ä

'~-zrl'~ -zrl

Claims (8)

; Patentansprüche: ; Patent claims: ,. !-.,Verfahren zum stufenweisen Erwärmen großer, zunächst kalter oder von einem Gießvorgang her igQch warmer metallischer Werkstücke, wie Brammen, in benachbarten Induktionsöfen, in,. ! -., Process for the step-by-step heating of large, initially cold, or from a casting process Her igQch warm metallic workpieces, such as slabs, in neighboring induction furnaces, in -welche die Werkstück gleichzeitig eingetragen und aus welchen sie nach jeweils statischer Er--which the workpiece is entered at the same time and from which they are based : wannung auch gleichzeitig" wieder ausgetragen -werden, wobei die Größe der zugeführten Heizenergie vpmStufe zuStufe annimmt, dad-ureh l^kennizeichiret, daß die Leistung ieder Ofenstufe (A bzw. B, C) im Sinne des Erreichens einer fur dte betreffende Ofenstufe vorgegebenen !notieren Temperatur und zugleich entsprechend der jeweiligen Aüsgangstemperatur im Sinne desThe amount of heat supplied will also be discharged again at the same time, with the amount of heating energy supplied assuming step by step, because it indicates that the output of each furnace step (A or B, C) is specified in the sense of reaching a furnace step in question ! note the temperature and at the same time according to the respective outlet temperature in the sense of the '-lEÜiT emer ^S^neten Differenz zwischen'-lEÜiT emer ^ S ^ Neten difference between Erreichens einer zugeordneten Differenz zwischen Öberflächentemperatur und Temperatur in· der fdiiis des Werkstückes {iö) am Ende einer vorbestimmten für all Off nahme jeweils einer Bramme auf einer ihrer Längsseiten hochkant stellend ausgebildet sind.Achieving an associated difference between the surface temperature and the temperature in which the surface of the workpiece (iö) at the end of a predetermined for all take one slab are formed on one of their long sides upright. 7. Anlage''nwh^Anspruch S oder 6, dadurch gekennzeichnet, daß Meßwerke (Thermoelement 102) zum Messen der Temperatur der Werkstücke (10) in den Ofensrufen; (Λ, B, C) vorgesehen sind und daß die Energiezufuhr zu den verschiedenen Ofenstufen durch diese Meßwerke in Abhängig, keit von der gemessenen Werkstücktemperatur regelbar ist7. Anlage''nwh ^ claim S or 6, characterized in that measuring mechanisms (thermocouple 102) for measuring the temperature of the workpieces (10) in the furnace calls; (Λ, B, C) are provided and that the energy supply to the various furnace stages can be regulated by these measuring units as a function of the measured workpiece temperature 8. Anlage nach einem der Ansprüche 5 bis?, α gekennzeichnet durch eine die lotrechte Abmes- J sung des in eine Ofenstufe (A bzw. B, C) einzutragenden Werkstücks (10) messende und den Hub des Hubwe/ks(60) im Sinne eines vollständigen Eintauchens des Werkstücks (10) in die Induktionsspule anpassende Einstellvorrichtung.8. plant according to one of claims 5 to ?, α by the perpendicularity of the solution dimen- J entered in a stage furnace (A or B, C) the workpiece (10) be measured and the stroke of the Hubwe / ks (60) Adjusting device that adapts the induction coil in the sense of a complete immersion of the workpiece (10).
DE19681765517 1967-09-25 1968-05-31 Process and system for heating metallic workpieces in induction furnaces Expired DE1765517C3 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US67002767A 1967-09-25 1967-09-25
US67002767 1967-09-25

Publications (3)

Publication Number Publication Date
DE1765517A1 DE1765517A1 (en) 1972-04-13
DE1765517B2 DE1765517B2 (en) 1973-04-05
DE1765517C3 true DE1765517C3 (en) 1977-04-21

Family

ID=

Similar Documents

Publication Publication Date Title
DE3201417C2 (en) Solid metal roller for transporting hot material
DE102006005635A1 (en) Roller hearth furnace for heating and / or temperature compensation of continuous casting products made of steel or steel alloy and its arrangement in front of a hot strip finishing train
DE69736208T2 (en) Method and device for producing hot-rolled steel strip
EP3025799B1 (en) Rolling mill and longitudinal field inductor for use in such a rolling mill
EP2516079B1 (en) Method for hot-rolling a slab and hot-rolling mill
DE2923067C2 (en) Temperature holding hood for a strand cutting device
DE102011004245A1 (en) Method and device for producing a metal strip by casting rolls
DE69818512T2 (en) DEVICE AND METHOD FOR PRODUCING STEEL STRIP
DE2907960C3 (en) Method and device for the continuous heat treatment of isolated, elongated metallic material
DE2623667A1 (en) PROCESS AND EQUIPMENT FOR PRODUCING CONTINUOUS CAST PROFILES
DE2607141A1 (en) PROCESS FOR HEAT TREATMENT OF OBJECTS MADE OF ZIRCONALIZATION AND DEVICE FOR CARRYING OUT THE PROCESS
DE1765517C3 (en) Process and system for heating metallic workpieces in induction furnaces
DE60310081T2 (en) METALLBANDSTRANGGIESSANLAGE
EP0319808B1 (en) Continuous-casting plant for strip
AT396559B (en) SLAM CONTINUOUS CASTING MILL WITH SUBordinate ROLLING MILL
EP3100803B1 (en) Method and apparatus for manufacturing metal foam composite bodies
DE1964052C3 (en) Device for electroslag remelting of metals, in particular steels
DE1765517B2 (en) PROCESS AND SYSTEM FOR HEATING METALLIC WORKPIECES IN INDUCTION FURNACE
EP0334200B1 (en) Process for heating elongated stock
DE1019412B (en) Induction furnace system for the heating of larger magnetic objects in two stages
DE1010211B (en) Method and device for electrical resistance heating of metallic semi-finished products for the purpose of an immediately subsequent hot forming
DE908502C (en) Method and device for heat treatment of metal bodies
DE4335263A1 (en) Device for the continuous casting of thin objects between rolls
DE2321447A1 (en) Electroslag remelting plant with consumable electrodes - arranged for uniform current distribution and uniform melting
DE4213686A1 (en) Reheating and keeping warm a continuously cast strip - with the strip cut into sections and supported on edge in the furnace