DE1731732U - BOARD MANAGER FOR SCAFFOLDING FROM PRE-FABRICATED PARTS. - Google Patents
BOARD MANAGER FOR SCAFFOLDING FROM PRE-FABRICATED PARTS.Info
- Publication number
- DE1731732U DE1731732U DEV6561U DEV0006561U DE1731732U DE 1731732 U DE1731732 U DE 1731732U DE V6561 U DEV6561 U DE V6561U DE V0006561 U DEV0006561 U DE V0006561U DE 1731732 U DE1731732 U DE 1731732U
- Authority
- DE
- Germany
- Prior art keywords
- ladder
- scaffolding
- wooden
- screw
- crossbars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/28—Scaffolds primarily resting on the ground designed to provide support only at a low height
- E04G1/30—Ladder scaffolds
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ladders (AREA)
Description
PA.3617S3-276.C8PA.3617S3-276. C 8
Köln-Mülheim, den 25· Juni 1956Cologne-Mülheim, June 25, 1956
Hans Y ο 1 1 m a r , Architekt und Bauingenieur, K ö In- Mülheim, Augustastr. 9 'Hans Y ο 1 1 m a r, architect and civil engineer, K ö In- Mülheim, Augustastr. 9 '
Standleiter für Gerüste aus FertigteilenStand ladder for scaffolding made from prefabricated parts
Bekanntlich sind die Ans chafftings- und Betriebskosten hölzerner Gerüste wesentlich geringer als die der Rohrgerüste· Dagegen sind sie wegen mangelnder Übersichtlichkeit der Konstruktion und Anfälligkeit der Konstruktionsglieder, insbesondere der Verbindungsmittel stärker gefährdet als diese, was besonders auf die Stangengerüste zutrifft} es sei denn, dass es sich um handwerksmässig verzimmerte oder ingenieurmässig verbundene Gerüste handelt, die aber ebenfalls der hohen Kosten wegen allgemein nur für schwerste Belastungen Anwendung finden· Erhöhte Windanfälligkeit gegenüber Rohrgerüsten und die Elastizität der Verbindungen bei den gebräuchlichen hölzernen Gerüsten haben Schwankungen bei der Arbeiteausführung zur Folge, die oft genug zu Gerüsteinstürzen geführt haben, weil die im allgemeinen nur dem Fachmann erkennbaren notwendigen Sicherungen gegen auftretende Nebenkräfte fehlten·As is well known, the acquisition and operating costs of wooden scaffolding are significantly lower than those of tubular scaffolding · On the other hand, due to the lack of clarity of the construction and the susceptibility of the structural members, especially the connecting means, they are more at risk than these, which is particularly true of the pole scaffolding} unless that it is craft moderately verzimmerte or engineering practice related frameworks, but also have high costs because generally found only for the heaviest loads application · Increased wind susceptibility to tubular structures and the elasticity of the compounds in the usual wooden scaffolding fluctuations in the work execution result, often have led enough to the collapse of the scaffolding because the necessary safeguards against secondary forces, which are generally only recognizable to a person skilled in the art, were missing
Es besteht daher ein dringendes Bedürfnis für eine hölzerne Gerüstkonstruktion, bei der diese Mängel weitestgehend behoben sind und die durch eine übersichtliche Konstruktion, insbesondere Gefahren dieser Art ausschliesst, die allein durch die Unkenntnis der Ausführenden über die vielen bestehenden TJnfallgefahren eintreten können· Demgemäss besteht das erfindungsgemässe Gerüst aus Holzstäben, vorzugsweise Derbstangen und verschraubbaren Knotenelementen· Die Letzteren sind durch awei biegesteif hergestellte, durch hölzerne Querriegel eben-There is, therefore, an urgent need for a wooden scaffolding structure that addresses these shortcomings to the greatest possible extent have been remedied and which by means of a clear construction, in particular excludes dangers of this kind, which are solely caused by the ignorance of those carrying out the work about the many existing dangers of accidents can arise Scaffolding made of wooden rods, preferably tie rods and screwable node elements · The latter are through two rigidly manufactured, leveled by wooden crossbars
falls biegesteif verbundene Gelenke gekennzeichnet, deren beide Enden als Anschluss-Stutzen zur Aufnahme der Holzstäbe ausgebildet sind. Ihre Befestigung erfolgt mittels Verschraubung, Da der Querriegel gleichzeitig als Belagträger verwandt wird, ist seine Länge durch die Gerüstbreite bestimmt.if rigidly connected joints are identified, their both ends as connecting pieces to hold the wooden sticks are trained. They are fastened by means of a screw connection, since the crossbar is also used as a covering carrier its length is determined by the scaffold width.
Auf weitere Einzelheiten der Erfindung -wird bei der nachfolgenden Beschreibung des in der Zeichnung veranschaulichten Ausführungsbeispieles hingewesen.Further details of the invention are provided in the The following description of the exemplary embodiment illustrated in the drawing has been noted.
Ss zeigt:Ss shows:
Abb· 1 die Seitenansicht eines Kopfendes des Khotenelementes mit den erfindungsgemässen Gelenk in verspanntem Zustande, Fig. 1 is a side view of a head end of the khoten element with the joint according to the invention in a clamped state,
Abb» 2 eine Ansicht der Rückseite des Gelenkes, Abb, 3 einen Querschnitt eines Anschluss-Stutzens des Gelenkes nach der Linie A-B,Fig. 2 shows a view of the rear of the joint, Fig. 3 shows a cross section of a connecting piece of the joint after the line A-B,
Abb. 4 eine Teilansicht auf die Kopfseite des Gelenkes, Abb. 5 einen Längsschnitt durch den Gegenstand der Abb. 4 Abb. 6 eine Draufsicht auf die erfindungsgemässe iEragplatte·Fig. 4 is a partial view of the head side of the joint, Fig. 5 is a longitudinal section through the subject of Fig. 4 Fig. 6 is a plan view of the slab according to the invention.
Erfindungsgemäss handelt es sich um Gelenke aus segmentfönaig gebogenen Laschen 1 mit profiliertem Querschnitt, die zum Zwecke des Anschlusses der Holzstäbe an der Hohlseite mit Schraubenmuttern 3 versehene Spannbolsen 4 aufweisen, wobei die Verspannung mittels einer ebenfalls segmentförmig gebogenen am Bolzenschaft entlang gleitenden Druckplatte 5 erfolgt. Um eine möglichst gleichmässig Kraftverteilung in den. Anschlüssen zu gewährleisten, sind die Holzstäbe 2 an den Enden gleichmässig gerundet und die einklemmenden Wandteile der Lasche 1 und Druckplatten 5 der Rundling angeglichen· Auf etwaige, ein Mitdrehen der Druckplatten 5 verhindernde Massnahmen während des Verspannungsvorganges kann verzichtetAccording to the invention, these are joints made of segmented hair curved tabs 1 with a profiled cross-section, which for the purpose of connecting the wooden rods to the hollow side with Have screw nuts 3 provided clamping bolts 4, the bracing by means of a likewise segment-shaped curved on the bolt shaft along sliding pressure plate 5 takes place. In order to distribute the force as evenly as possible in the. To ensure connections, the wooden bars 2 are evenly rounded at the ends and the clamping wall parts the flap 1 and pressure plates 5 of the round are aligned On any preventing the pressure plates 5 from rotating at the same time Measures during the tensioning process can be waived
werden, da das Ausrichten derselben beim Einbringen der Holzstäbe 2 mühelos von Hand erfolgen kann·because the alignment of the same when inserting the wooden rods 2 can easily be done by hand
frotz des unvermeidharen Quellens des Holzes genügen nur wenige Umdrehungen der Schraubenmutter 3 zum Anschliessen und Lösen der Holzstäbe 2 , sodass das Gewinde 6 des Spannbolzens 4 kurz sein kann. Zum Schütze desselben gegen Beschädigung und Verschmutzen ist es zweckmässig, die Schraubenmutter 3 um das Mass des Gewindeüberstandes zu verlängern· Das Ablaufen derselben beispielsweise während des Transportes wird durch Sperren des Gewindes 6 verhindert, indem das Gewinde der Schraubenmutter 3 nur über eine Teillänge durchgeführt ist und der übrige (Peil der Mutter eine grössere Bohrung 7 erhält·In spite of the inevitable swelling of the wood, it is only enough a few turns of the nut 3 to connect and Loosen the wooden sticks 2 so that the thread 6 of the clamping bolt 4 can be short. To protect it against damage and soiling, it is advisable to keep the nut 3 to to lengthen the amount of thread protrusion · The same for example during transport is prevented by locking the thread 6 by removing the thread of the screw nut 3 is only carried out over part of the length and the rest (bearing in the nut has a larger hole 7)
Zum Zwecke der Anbringung der Gelenke am Querriegel 8 sind Stahlbänder 9 vorgesehen» die die Laschen 1 schlaufenförmig umfassen und mit diesen zweckmäs3ig verschweisst sind· Die vorgesehenen Abbiegungen 10 der Stahlbänder 9 dienen der Lüftung des Anschlussholzes und gleichzeitig der Lagerung der {[tragplatte 11, die mittels Klauen 12 die Bandenden in den Schlitzen 13 zusammenschliesst und wesentlich zu ihrer Versteifung beiträgt. Ihre gleichzeitige Einlagerung in das Anschlussholz dient ebenso wie der Schraubenbolzen 14 der Befestigung der Stahlbänder am Querriegel 8 , nobel eine Aufspaltung des Holzes durch die quergerichteten Spannschrauben 15 verhindert wird·For the purpose of attaching the joints to the crossbar 8, steel straps 9 are provided which encircle the straps 1 in the form of loops and are appropriately welded to them by means of claws 12 the tape ends together in the slots 13 and contributes significantly to their stiffening. Their simultaneous storage in the connecting timber serves as well as the screw bolt 14 to attach the steel straps to the crossbar 8, noble splitting of the timber is prevented by the transversely directed tensioning screws 15
Durch die Anordnung der Tragplatte 11 ist aber vor allem die Möglichkeit gegeben, die Gerüstlasten unmittelbar auf die abstützenden Holzstäbe 2 aufzulagern. Damit entfällt der beispielsweise bei den Klemmschelleη der Bohrgerüste entstehende gefährliche Gleitdruck vollständig, wodurch sich die Klemmwirkung der erfindungsgemässen Gelenke auf die Sicherung dieserDue to the arrangement of the support plate 11, however, there is above all the possibility of applying the scaffolding loads directly to store the supporting wooden rods 2. This eliminates the one that occurs, for example, with the clamps of the drilling frames dangerous sliding pressure completely, whereby the clamping effect of the inventive joints on the securing of these
Art Gerü3te gegenüber Wind- und Stossiasten beschränkt. Dieser Umstand bedeutet aber eine wesentliche Erhöhung der Standsicherheit, insbesondere gegenüber den bekannten hölzernen Gerüsten· Sin weiterer Vorteil der Tragplatte 11 besteht noch darin, dass der Auf- und Abbau der Gerüste müheloser vor sich geht·Type of scaffolding limited against wind and shock loads. However, this fact means a significant increase in stability, There is a further advantage of the support plate 11 in particular over the known wooden scaffolding that the erection and dismantling of the scaffolding is more effortless
Die Anordnung der Spannbolzen 4· macht die Anordnung von Schlitzen an den Kopfenden der Hoizstäbe 2 erforderlich, die jedoch für ihre !Tragfähigkeit ohne Bedeutung ist, da die Knickbeanspruchung der Holzstäbe ausschlaggebend ist·The arrangement of the clamping bolts 4 makes the arrangement of slots at the head ends of the hoiz sticks 2 required, but this is of no importance for their load-bearing capacity, since the Buckling of the wooden bars is decisive
Da die vorbeschriebenen Fertigteile in erster linie für den Zusammenbau von Standleitern ähnlich denen der bekannten Leitergerüste bestimmt sind, können zur Aufnahme der waagerechten Kräfte ebenso vorteilhaft die bei dieser Gerüstart üblichen und bewährten Kreuz- und Querstreben aus vorgefertigten Brettern Verwendung finden. Ihre Befestigung erfolgt wie bei dieser durch eine lose Verschraubung 16 am Stahlband 9 » \7odurch alle Stabkräfte des Knotenpunktes in statisch vorteilhafter Weise zusammengeschlossen sind· Wie aus der Abb. 4 hervorgeht, ist zu diesem Zwecks eine an der Kopfseite des Gelenkes durch Abv/inkelung des Stahlbandes 9 entstandene und mit einer Lochung 17 zum Einbringen des Schraubenkopfes versehene Tasche 18 angeordnet· Für die Verschraubung sind Schlosschrauben mit kurzem Vierkantansatz des Schaftes besonders geeignet, da diese hierdurch am Mitdrehen gehindert sind. Um ein Ausspringen des Schraubenkopfes durch Stoss o.dgl. au verhindern, ist die Lochung 17 in dem Masse abgeflacht, dass der Bolzenkopf nur bei geneigter Lage der Verschraubung 16 eingebracht werden kann.Since the prefabricated parts described above are primarily for the assembly of ladder frames similar to those of the known ladder scaffolding are intended to accommodate the horizontal Forces, the usual and proven cross and cross struts made from prefabricated boards are used with this type of scaffolding. Your attachment is done as with this one by a loose screw connection 16 on the steel band 9 »\ 7o by all bar forces of the node in static are advantageously connected together · As can be seen from Fig. 4, for this purpose there is one on the head side of the joint created by bending the steel strip 9 and a pocket 18 provided with a perforation 17 for inserting the screw head · For the Screw connections are lock screws with a short square neck of the shaft, as this prevents them from rotating. About a popping out of the screw head by push or the like. au prevent, the perforation 17 is flattened to the extent that the bolt head is only inclined the screw connection 16 can be introduced.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEV6561U DE1731732U (en) | 1956-06-27 | 1956-06-27 | BOARD MANAGER FOR SCAFFOLDING FROM PRE-FABRICATED PARTS. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEV6561U DE1731732U (en) | 1956-06-27 | 1956-06-27 | BOARD MANAGER FOR SCAFFOLDING FROM PRE-FABRICATED PARTS. |
Publications (1)
Publication Number | Publication Date |
---|---|
DE1731732U true DE1731732U (en) | 1956-10-11 |
Family
ID=32694207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DEV6561U Expired DE1731732U (en) | 1956-06-27 | 1956-06-27 | BOARD MANAGER FOR SCAFFOLDING FROM PRE-FABRICATED PARTS. |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE1731732U (en) |
-
1956
- 1956-06-27 DE DEV6561U patent/DE1731732U/en not_active Expired
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE820963C (en) | Scaffolding with stands made of tubes | |
DE1731732U (en) | BOARD MANAGER FOR SCAFFOLDING FROM PRE-FABRICATED PARTS. | |
DE826971C (en) | Work platform for the construction of factory chimneys | |
DE1982057U (en) | DEVICE FOR WEDGING THE PARTS OF A SCAFFOLDING IN PARTICULAR FROM WOODEN CONSTRUCTION ELEMENTS FOR BUILDING PURPOSES (SCAFFOLDING BOLTS). | |
DE468382C (en) | Method and device for replacing defective ladder rungs | |
DE1731733U (en) | LOCAL MANAGER FOR EQUIPPED FROM FINISHED PARTS | |
DE8022729U1 (en) | Holding device for single props | |
DE7008866U (en) | ANCHORING FOR FREE-HANGING FASTENING OF PREFABRICATED WALL OR FAÇADE PANELS. | |
DE869859C (en) | Framework that can be assembled from individual parts | |
DE451794C (en) | Catch dam in the manner of a needle weir and method for its production | |
AT328168B (en) | TENSIONING ELEMENT FOR FASTENING, CONNECTING AND / OR ALIGNING FORMWORK PARTS | |
DE802189C (en) | Composable work frame | |
DE804250C (en) | Work scaffolding for building purposes | |
DE261288C (en) | ||
AT214127B (en) | Suspended scaffolding for concrete work | |
DE1274319B (en) | Detachable clamp on reinforcement stirrups or the like. | |
DE1575144C (en) | ||
DE102020120127A1 (en) | Decking ledger for system scaffolding | |
DE202023100314U1 (en) | scaffolding | |
AT107697B (en) | Pillar framework. | |
DE817806C (en) | Armament and formwork element | |
DE1973139U (en) | PIPE FRAMEWORK. | |
DE1807169U (en) | Dismountable ladder. | |
AT250652B (en) | framework | |
DE227576C (en) |