Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bohn & Kaehler Motoren und Mas
Original Assignee
Bohn & Kaehler Motoren und Mas
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bohn & Kaehler Motoren und MasfiledCriticalBohn & Kaehler Motoren und Mas
Priority to DE1953B0013503priorityCriticalpatent/DE1663647U/en
Publication of DE1663647UpublicationCriticalpatent/DE1663647U/en
--eibun- zurBeschreibung zur Gebrau. chssu. stersnmeldunÖlkühler-Konstruktion"Der in anliegenderSeichnusg dargestellte lkShIer miter-scheidet slmh Zegemüber den bluher bekannten zähUr-Kontruktiomdadulct, * an£ der zuaem=tei Endelanachen herze-stelltperä-enIcsBa Die Abdichtung j&er Bohrbodn egen enOüKsmabaiaMTdß* and. Ssamiiag o&eirJSrBiecrIng an em Bohrb&&en : &stjSsMSRMMKLRL.
Sie. &-alchtang e-asserxaums er£-olgt durch Deckel"e"und zu=l.*3j&g*f*' welcher ehs&LsmIan befestigt'ird-Der Vorteil dieser Eo=struktion fliegt darin da8 die SchweiS-arbeit an em xalermantel sn den Ende fortfällt, &o daß.
einVerziehen der Rohre nicht-eint-retm kamm und mxm aus diesem
G=n.e. eine r&ere Sasaigkeit is Bezug suf ie Bash-eit cLer
iajer&ältDie onstrsktionkannselbstverständlichaußer<alsStrahier asSr sndere Sedien als ärBeanstauscher Terwemdaag finden. --eibun- to Description of use. chssu. stersnmeldun Oil cooler construction " The lkShIer shown in the attached drawing Slmh Zegem separates from the bluher well-known tough construction dadulct, * an £ der zuaem = tei Endelanachen heart- stellperä-enIcsBa The sealing j & er Bohrbodn egen en OüKsmabaiaMTdß * and. Ssamiiag o & ei rJSrBiecrIng an em Bohrb && en: & stjSsMSRMMKLRL. She. & - alchtang e-asserxaums he £ -follows by cover "e" and zu = l. * 3j & g * f * 'which ehs & LsmIan is attached- The advantage of this construction is that the welding work on em xalermantel sn the end falls away, & o that. a Warping the pipes not-one-retm kamm and mxm from this G = n. e. A r & ere thing is reference to bash-eit cLer ia jer & eld The onstrsction can, of course, except as Sr find other sedia than Terwemdaag.
Claims (1)
Sc TitsanprScJ
1 S'ßrenstyaapen asre. k<saz&eae aS erjßeBMMM&NmMNJMßEILHlTm&aMMmal$ Seaa eaHeat eQra. e& itSs. Bea a. 3E) H3MTm-SwßiS-iMMMimItaTA<a<Ft ?erboi. tam an am zudem erf=ütrx.ass3ia. e aS 4ie-&ichtang zwibs. XSbleznMNel TmäImw : f) ereelzt.
Sc TitsanprScJ
1 S'ßrenstyaapen asre. k <saz & eae as er jßeBMMM & NmMNJMßEILHlTm & aMM times $ Seaa eaHeat eQra. e & itSs. Bea a. 3E) H3MTm-SwßiS- iMMMimItaTA <a < Ft? erboi. tam an am also erf = ütrx. ass3ia. e as 4ie- & ichtang zwibs. XSbleznMNel Tmä Imw: f) erelzt.