DE1534859A1 - Improvements in construction - Google Patents

Improvements in construction

Info

Publication number
DE1534859A1
DE1534859A1 DE19651534859 DE1534859A DE1534859A1 DE 1534859 A1 DE1534859 A1 DE 1534859A1 DE 19651534859 DE19651534859 DE 19651534859 DE 1534859 A DE1534859 A DE 1534859A DE 1534859 A1 DE1534859 A1 DE 1534859A1
Authority
DE
Germany
Prior art keywords
lifting device
lifting
devices
column
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19651534859
Other languages
German (de)
Inventor
Felix-Max Adler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GB2978564A external-priority patent/GB1096827A/en
Application filed by Individual filed Critical Individual
Publication of DE1534859A1 publication Critical patent/DE1534859A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
    • E04G11/24Construction of lifting jacks or climbing rods for sliding forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3511Lift-slab; characterised by a purely vertical lifting of floors or roofs or parts thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Dr. Horst SchülerDr. Horst pupil

Patentanwalt 8 München 12, Rldlerttr.37 15348 59 24. Juli 1965Patent attorney 8 Munich 12, Rldlerttr. 37 15348 59 July 24, 1965

Angelder: Felix Max AdlerFunder: Felix Max Adler

Woodlands, Birds Hill Road Oxöhott Surrey (England)Woodlands, Birds Hill Road Oxöhott Surrey (England)

Verbesserungen liu BauwesenImprovements liu construction

ILt; vorliegende ärlimimf. bezieht sich auf unu ϋθΓΊΐβ ZMT i>urcfcfUhrunij o«r .,«..thoden.ILt; present ärlimimf. refers to unu ϋθΓΊΐβ ZMT i> urcfcfUhrunij o «r.,« .. thoden.

.in i.iel tier .;rfindtmg iat es, tit;e verbeai-erte . t.thiK■ *.= . owie Gtrllt· für die ^richtung von U eVuiü en zu Itufern, die beüontier» für uen -inantz bei Bauten ei ι ;».·,«: r U'ht n t iiinu, al« Fußbällen und - L-nober niie Oeton; latten haben, jeaoc.h auch bei Bauten mit anderen Funbövißn und l ecl'en ala Beton geeignet sind, wie z.i)· iJtahl, Bauholz o> er KpmWnntiüi) äieeer ^erltfit.in i.iel tier.; rfindtmg iat es, tit; e verbeai-erte. t.thiK ■ *. =. owie Gtrllt · for the direction from U eVuiü en to Itufern, the beüontier "for uen -inantz in buildings;". ·, ": r U'ht nt iiinu, al" footballs and - L-nober niie Oeton; have slats, jeaoc.h also for buildings with other Funbövißn and l ec l 'en ala concrete are suitable, such as zi) · iJtahl, Bauholz o> er KpmWnntiüi) äieeer ^ ertfit

lit r^inuung kann furner für den Bau e-es? i-achs oK-»ifich GebLMüe wit «·Β. flugzuii^sihuppen, turbinenii'luaer, ■ ut»u»; KUhlttlrnie und Inctuetrießohornstßino :-yne ewanutlit r ^ inuung can furner for building e-es? i-axis ok- »ifich GebLMüe wit « · Β. Flugzuii ^ sihuppen, turbinenii'luaer, ■ ut »u»; KUhlttlrnie and Inctuetrießohornstßino : -yn e ewanut

Inebeapnutre aielt tiioB« Lrflncutif; auf eine Methode zur■ i-rrichtun, von UebAuüen hin, hei denen c.vr üaupttell du ',rbelt. iü Verl^iltnlubtiniger aicliurhult in ßBrin^er Höh· un> unter vollem Schute «-.o^eu ßie > Ita.nintt: uroh^e wird , und -./ο ati*:i t;ut.'ie Aivbeltoverhiiltniet#j f ir c 1 eInebeapnutre aielt tiioB «Lrflncutif; to a method of directing, from exercises, called c.vr üaupttell du ', rbelt. iü Verl ^ iltnlubtiniger aicliurhult in ßBrin ^ er Höh · un> under full schute «-.o ^ eu ßie> Ita.nintt: uroh ^ e will, and -./ο ati *: i t ; ut.'ie Ai v beltoverhiiltniet # jf ir c 1 e

von ?lieflatni'<en buatehcm (wie a.il. in der fir .dl· Anluve und üie Auentattung ^ee OtbUudee ηIt nil on * rf ο rc. (urlli hen Leitungen und Armaturen. of? lieflatni '<s buatehcm (such a.il. in the fir .dl · Anluve and üie Auentattung ^ ee OtbUudee ηIt nil on * ο rf rc. (urlli hen lines and fittings.

'ΐ5ΐί. ." -. 909838/0087' ΐ5ΐί . . "-. 909838/0087

ίϊΐηβ yethoi'-e ssur 'Jrriohtung von nehrat iokigtn Bauwerken let liek.*-«n.tj. üIö « arin benteht, daß ein luüboden in i iod enh üb ο or ^r in Nil he der Boßenhtfhe gefertigt undίϊΐηβ yethoi'-e ssur 'Jrriohtung of nehrat iokigtn buildings let liek. * - «n.tj. üIö «arin needed that a luüboden in i iod enh über ο or ^ r made near the Boßenhtfhe and

σ> anec-hl-leOcnü angehoben wird, wonach Uarunter in der .^,„..· σ> anec-hl-leOcnü is raised, after which Uarunter in the. ^, ".. · ^ genannt en Höhe ein welt er«r Bqü en gefertigt und.«wischen^ Called s height a world he 's r Bque manufactured and. "Wipe

^2 dem Auf <-.hobbnen Boden und dem genannten »weiten Bot en DrucKlj^ crun; tin <iingobr«ioht werden, uie .atm, UeiJt einer zontraleii K«rn«truKtujr für. die Abstufung dea öebiiuden.-,,..,. un« Buit ,vnhtben. des genannten weiteren Bq4«iie jsuwiranen. eilt α en he reit α «arüber gefertigten £eil dee Gebiludeo , ^ 2 the Auf <-. Hobbnen Boden and the aforementioned "wide bot en DrucKlj ^ crun; tin <iingobr «ioht, uie .atm, ueiJt a zontraleii K« rn «truKtujr for. the gradation dea öebiiuden .- ,, ..,. un «Buit, vnhtben. of the mentioned further Bq4 «iie jsuwiranen. rushes α s hey riding α "arüber made £ eil dee Gebiludeo,

biluen, wonach u 1 eoer Vorgang wie,-erholt wird, bi», oi'intllohe Hecken unu.-o.ie as.üntxale- Kernetruktur gebaut vorden aind, wobei ij er .Mubvorgang mit hilf β von U-ubTorrl-chtun^en erfolgt, ale ν- erert '-»m;.oorunet·- tsJna, um α en bereits gebauten Teil iCörnistruktur anzuheben und daiiiroh auch die nach außen.; UQbiluen, after which u 1 eoer process like, -reholt, bi », oi'intllohe hedges unu.-o.ie as.üntxale- core structure built in front of the aind, where ij he. mub process with the help of β from U-ubTorrl-chtun ^ en takes place, ale ν- erert '- »m ; .oorunet · - tsJna, in order to raise a part of the granular structure that has already been built, and then also to the outside; UQ

Lie v-o rl 1 er unu β jjiriin'Hng iat eine Methode »uki VerlHngern eines aus eich axial und stufenweiee erstreckenden und a 11 ra & θ i tig i a ei nanci er eing r ei tma en Tel 1 en b ent ehenO en nithilie ein er Vorrlohtung, die üieeen ungibt undLie vo rl 1 er unu β jjiriin'Hng iat a method »uki lengthening of an axially and stepwise extending and a 11 ra & θ i tig ia a nanci er ein tma en Tel 1 en b ent ehenO en nithilie ein er Vorrlohtung, which are not given and

oiv;,rei f t.oiv;, ri f t.

1 ie vo rl Im eiuie Erfindung besieht eioh ferner auf eine1 The previous invention also refers to one »i-thode zur ;riichtuhg von GebKud«n, bestehend aue eich"I-method zur; riichtuhg von GebKud" n, consisting of aue calibration

und .stuf en »el »β erhebenden und st lrns el tig Ineinander ifenüon atiAhloiiuXen untor Anwendung von iiebtizeugen, dia d,!öö£- Uf ti neuen und e.ffreifen-»' vÄ>bisi um die 3;ΐΜΐβηββ11β hertui 1» atitllohen üwiacbcnriiiuaen asvrisehen den Hüben und ein*ir bbene die iieoke und äer Bo*,ea bew. Böden ^ e»autand .stuf en »el» β uplifting and sturns el tig intertwined ifenüon atiAhloiiuXen untor the application of advice, dia d,! öö £ - Uf ti new and e.ffreifen- »'vÄ> bisi around the 3; ΐΜΐβηββ11β hertui 1 »atitllohen üwiacbcnriiiuaen asvrisehen the strokes and a * ir bbene die iieoke and äer Bo *, ea bew. soils ^ e »aut

Il« 3ii al enkii rne sind einsei η cur »i 1< ung von Ut »iilbetone'iulen verkleidet »iw* v»rki«idet una gryppenweiee durch Il «3ii al enkii rne are one η cur» i 1 <ung of Ut »iilbetone'iulen disguised» iw * v »rki« idet una gryppenweiee through

kjBnnen;d| e£ Situ! enii :u rnec auf and ere e«re93ta»ijeigf ν niohtkjBnnen; d | e £ situ! enii : u rnec on other e «re93ta» ijeigf ν nioht

strukturelle) Weise verkleidet oder durch Baustahlverbände zur Bildung vertikaler Tragwerke in Säulengruppen zusammengefügt werden. structural) way clad or by structural steel associations can be joined together in column groups to form vertical structures.

Eine Ausftthrungsform der Erfindung wird an Hand eines Beispieles unter Hinweis auf die beiliegenden Zeichnungen nachstehend beschrieben. In diesen Zeichnungen ist Abb. 1 ein senkrechter Schnitt durch eine Pfahl-Kopfplatte; Abb. Z eine perspektivische und teilweise durchbrochene Ansicht zur Veranschaulichung der Lagerung der Bodenplatte eines Hebebocks;An embodiment of the invention is illustrated using an example with reference to the accompanying drawings. In these drawings is Fig. 1 is a vertical section through a pile head plate; Fig. Z is a perspective and partially broken view to illustrate the storage of the Bottom plate of a jack;

Abb. 5 ein Vertikalschnitt durch einen Hebebock; Abb. 4 ein Schnitt entlang der Linie IV - IV in Abb. 3 ϊ Abb. 5 ein Vertikalschnitt zur Veranschaulichung der Ausbildung einer Säulenve^kleidung und einer DeckeFig. 5 is a vertical section through a jack; Fig. 4 is a section along the line IV - IV in Fig. 3 ϊ Fig. 5 is a vertical section to illustrate the formation of a column cladding and a ceiling

bzw. eines Bodens;
Abb. 6 ein Vertikalschnitt zur Veranochaulichung der
or a floor;
Fig. 6 is a vertical section to illustrate the

Dach= und Bodenverachalung; Abb. 7 eine Veranschaulichung fiex* Aufstellung des fertigenRoof = and floor contraction; Fig. 7 an illustration of the fiex * listing of the finished

Gebäudes;
Abb. ö eine Ansicht nach Abb. 3 einer abgeänderten
Building;
Fig. Ö a view according to Fig. 3 of a modified one

Fora des Hebebocks;
Abb. 9 eine Ansicht durch eine Keilvorrichtung des in
Fora of the jack;
Fig. 9 is a view through a wedge device of the in

Abb. 8 gezeigten Hebehocks, Abb. 10 eine 3?eilansicht eines Säulenkerns, bei dem derFig. 8, Fig. 10 is a partial view of a column core, in which the

Hebebock nach Abb. 6 benutzt werden kann; Abb. 11 eine perspektivische Ansicht zur VeranschaulichungLifting jack according to Fig. 6 can be used; Fig. 11 is a perspective view for illustrative purposes

des in Abb. 8 dargestellten Hebebocks und Abb. 12 ein Schnitt entlang der Linie XII - XII in Abb.of the jack shown in Fig. 8 and Fig. 12 a section along the line XII - XII in Fig.

909838/0087909838/0087

se»se »

Unter Hinweis auf die Zeichnungen wird z.B. ein 21 stockiges Gebäude durch sich axial und stufenweise erbebende und stirnseitig ineinander eingreifende Stahlsäulenkernteile mit Hilfe von Hebezeugen gebaut, die diese umgeben und ergreifen, wonach um die Säulenkernteile herum zwischen den Hüben und in jeweils einem Niveau die Säulenverkleidung, die Hecke und die Buden gebaut werden.With reference to the drawings, e.g. a 21 stocky Building through axially and gradually shaking and frontal interlocking steel pillar core parts built with the help of hoists that surround and grasp, after which around the column core parts between the Lifts and the pillar cladding at one level each, the hedge and the stalls are built.

9098387008790983870087

Me Spulenkerne sind ssylind riech, und tiert-n unterote Abschnitt ο 20 sind n;aa.;iv. Pie nnnenm Aboohnitts .JnU er UHuIe sind jeüoeh hohl unü somLt rohrfi-irmiß mit eion nach obenhin verringernder Wand stärk«. Alle spulenkern ^. haben gleicheMe coil cores are ssylind odorous, and animal-n sub-sub Section ο 20 are n; aa.; Iv. Pie nnnenm Aboohnitts .JnU er UHuIe are jeüoeh hollow unü somLt rohrfi-irmiss with eion after at the top of the decreasing wall stronger «. All coil core ^. to have same

Die Bitulen eind zweckmäßig Über «iie Unuetüllo verteilt, <Jl und Je β wird rait hilf a eineo liöbCB-eu^ea ouor HebebocVrs 24 ^ au i.eg^bener Xeit errichtet, woböi GLe = übebocke synchronbfätHtigt und jeweils auf vier ^tahlbetonnockeln 2b i;olaf,vr eind, eile an den Spitzen eines Rechteck» an f.iner TBn.hl-Kopfplatte 26 angeordnet sind.The Bitules are appropriately distributed over the Unuetüllo, Jl and Je β, with the help of a liöbCB-eu ^ ea or HebebocVrs 24 ^ erected on the outside, whereby the GLe = over-jack works synchronously and each on four reinforced concrete bases 2b i; olaf, vr eing, rush at the tips of a rectangle on a TBn.hl head plate 26 are arranged.

Jer er Hebebock unfeßt eine ürunuplatteä 27 bus m?»neivern .i die auf vier Sockeln 2'j gelagert ist.Jer he jack unfeasst a ürunuplatteä 27 bus m? »Neivern .i which is mounted on four bases 2'j.

Liese sind mit je eineu «Ιη&ϋ&Οϋ» enen ..iaenring i>8 vergehen, In den eine ffiecorh-ilteeohruube 21) eingreift, die t'ureh eine vertikale hierfür vorgeoehene llohnuig in ufer Bodenplatte 27 et führt lot.These are each with a "Ιη & ϋ &Οϋ" enen ..iaenring i> 8, into which a ffiecorh-ilteeohruube 2 1 ) engages, which leads a vertical wage-paid in the base plate 27 et lot.

HivellierBchrauben 30 sind ebenfnllo durch Uewiru elUchor in dor Bodenplatte 27 in die Sockel geführt, unc; Libellen 3' f.irui in Abb. 2 £ie«eigt.Leveling screws 30 are also made by Uewiru elUchor out in the base plate 27 in the base, unc; Dragonflies 3 ' f.irui in Fig. 2 £ ie «eigt.

1 i.a Siiulenkernabecluriitte 20 weitien den "!ebebijokon in senkrechter Klohtung von unten ssugeführt, und f.Ur r.ieoen ii^eok elnd aie Bodenplatten 27 uit «t-ntrptl angeordneten, senkrechten ayliMriechen ü/inungcn 32 versehen, durch welche ein änulonkernabtsohnitt unbehindert ourohgeflhrt .erden kiinn, und unmittelbar aarunter weisen die l-'ftihl-Kopfpintten für1 ia Siiulenkernabecluriitte 20 extend the "! Ebebijokon in vertical Klohtung from below ssuguiert, and for Ur r.ieoen ii ^ eok elnd the floor plates 27 uit" t-ntrptl core arranged, vertical ayli-grooves o / inungcn 32 provided through which an änulon unhindered ourohgeflhrt. earth chins, and immediately below the l-'ftihl head pins for

^ üio iiilulenkernabi'Ohnitte i.ufuhrgruben y> auf, die Je avve ^ üio iiilulenkernabi'Ohnitte i.ufuhr pits y> on, the je avve

^ einem rohrförraifien vertilcftlen Teil 3j1 ßiit wesentlich OO grünere« j.urchmeeaer ala die Jiulent,ernabeohnitte und mit ο einur Lftngu, die gue'ltslleh uer L-ookelhBhe die r!.nßcn er^ a pipe förraifien vertilcftlen part 3 j1 ßiit much greener "j.urchmeeaer ala die Jiulent, ernabeohnitte and with ο einur Lftngu, die gue'ltslleh uer L-ookelhBhe the r ! .nßcn he

o> n;Miienkernabechnitte ein weni^ üborateif.t, sowie anti eineia Jncchubttiil 3ί>, tier tslch ueitlioh voi. rohrftlmicen Teil Bintral »«lachen ewol ο er üookel ertrnckt, wobei einto> n ; Miienkernabechnitte a little bit, as well as anti einia Jncchubttiil 3ί>, tier tslch ueitlioh voi. Rohrftlmicen part Bintral »« laugh ewol ο he drowns üookel, whereby unites

?nnd 3b ßegenüDer dew rolizf υ naiven Teil vorhanden iat, nie von ihrem oberen Knd* nach union und innen geneigt lot.? nnd 3b ßegenüDew rolizf υ naive part present iat, never inclined towards union and inward by your upper child lot.

Zu Jeder aHulenkerimbschnitt-Zufuhrgrtsbe gehöht einAttached to every handlebar cut-out feeder

^? ßufunruohlitton bestehend aus einem Paar parallel ^ anj>öorun»3ter .lJohimum 3? in I-frofil, die au£ dtr Pfnhl- Lr> Kopfplatte z\xi tberbrUokung U«β Oberteil» 4er Kufuhrgrube zwinehen utr ührungewnrui 3fr und der gegenüberliegend·^ .Seite er Grube angeordnet iat.^? ßufunruohlitton consisting of a pair of parallel ^ anj> öorun »3ter. l Johi mum 3? in I-frofil, the au £ dtr Pfnhl- Lr> headstock z \ xi tberbrUokung U "β shell" of 4 Kufuhrgrube zwinehen utr ührungewnrui 3fr and the opposite · ^ .page he pit located iat.

^uf t en chiβηυη ist auf diesen versohlebbar ein üehienenstuh 30 gelagert, uor mit Mvellieraohrftuben 3') Taraehen ißt» Uta su gew'ihrlulsten, t.an seine ober« Fluche 40 horiioiatml^ uf t en chiβηυη can be touched on these a üehienenstuh 30 stored, uor with Mvellieraohrftuben 3 ') Taraehen eats » Uta su gew'ihrlulsten, t. To his upper "curse 40 horiioiatml

ist.is.

Kerbtn 41 mit halbkreisförmigem uereehnitt sind an der oberen fluche U, zentral von seinen gegenüberliegenden leiten ναrt.oßehen, die parallel riit «en Schienen rerlaufen, v/o bei tile usheen «er Kerben aufelnan.. er fuiüseriöht* Λ oinci. Uieee iJLnkerbungön bilüen eine LapfenlH; eruntj für AchoBtlinpfe 42, die eich diametral vom Bund λ3 nach außen eratrecken, «er seitwoilig um einen in die Grube eingeführten Säulenktirnabüchnict »ingöbraoht^ist, um den Kornabsohnitt 20 einwendfrei axial auf üiu öffnung 32 in rl er Bodenplatte ausrichten zu können*Notches 41 with a semicircular undercut are seen on the upper curse U, in the center of its opposite lines ναrt., The parallel rit "en rails run down, v / o with tile usheen" he notches open to .. he fuiüseriöht * Λ oinci. Uieee iJLnkerbungön form a lapfenlH; eruntj for AchoBtlinpfe 42, the calibration diametrically λ federally eratrecken 3 outward, "he seitwoilig one in the pit introduced Säulenktirnabüchnict" is ingöbraoht ^, to be able to align einwendfrei axially on üiu opening 32 in rl he bottom plate to the Kornabsohnitt 20 *

PIe v^iulenkernabiiohnitte werden von oben in die Orufee eingeführt, und su utim Zeitpunkt wird ein Bund 43 um diese herwi mithilfe aymrietriach angeordneter KlemmsöhraubenPIe v ^ iulenkernabiiohnitte are from above into the Orufee introduced, and at the moment a covenant 43 will be made around them herwi with the help of aymrietrically arranged clamping eye hoods

^ angebracht, oo ύ&Β die welltnatUmpfe A2 in die Kerben 41^ attached, oo ύ & Β the welltnatUamps A 2 in the notches 41

co eingreifen, wenn ein Abschnitt um die richtige Dingeco intervene when a section is about the right things

OO ■OO ■

ω ge:, tnkt wo ro en let.ω ge :, tnkt wo ro en let.

OO "OO "

■^ Cine nchutskapp· 44, die ttöitweilig om unteren Ende einen■ ^ Cine nchutskapp · 44, which partly at the lower end a

ο in die C nib β- 33 eingeführten üä. ι lenkt» rna angebracht wird,ο üä introduced into the C nib β- 33. ι directs »rna is attached,

^ gloitct an der überflftohe der FUhrungawanü 36 der <irub«,^ gloitct at the overflow of the FUhrungawanü 36 the <irub ",

während üer Abeohnltt eingesenkt wird, bis die/ÄohufitUmpf© in «ie Kerben A% eingreifen. ;while the sinker is sunk in until the notches A% engage. ;

Dur Hchienenetuhl 38 wird dann öle Schienen 37 entlang geschoben, bis »er hernnbeclinitt sich in Deiner richtigen Lage für dl· Verbindung Bit den eich unmittelbar cßruber befindlichen und bereits tob Hebebock erfaßten Abschnitt S befindet. Abb. 3 «eißt, wie ein· typische Verbindung »wischenOil rails 37 are then passed through the Hchienenetuhl 38 pushed until "he hernnbeclinitt in your real one." Location for dl · connection bit the calibration immediately cßruber located and already covered tob lifting jack section S is located. Fig. 3 «eats like a · typical connection» wipe -J- dem Sfiulenkcmabaahnitten durch einen Gewinc? «fixieret* ft-J- the Sfiulenkcmabaahnitten through a thread? «Fixed * ft

^ hergestellt wird, der in eine feit Gewi nut η versehene^ is produced, which is provided in a feit Gewi groove η

axial int unteren Iod· de» oberen ütr beiden Abschnitte vorgesehene Uoee eingreift, wobei ein Knebel buk Eingriff in ein Loch 46 U genannten Stift benutet wird, und mit den dann der tinter· der beiden Abschnitte, der iu uieeeia Zweck ■it einer alt Axialgewinflen versehene Lose versehen ist,axial int lower iodine »upper over both sections provided uoee engages, with a gag buk engaging is used in a hole 46 U named pin, and with the then the tinter · of the two sections, the iu uieeeia purpose ■ it is provided with an old axial thread,

Yersehraubt wird.Yer is robbed. Die LaßerflUchen 47 und 46 der beiden Kernabsehnitte sindThe liner areas 47 and 46 of the two core sections are

aasohlnell glatt bearbeitet, eo daS sie eatt aneinanderCarcasses are processed smoothly so that they eat together anliegen·issue·

Kernabechnitte oben an den fertigen Säulen haben geschlossen·Kernabechnitte at the top of the finished columns are closed Enden, «ro die WandstUrken hinreichend elnd und die gleicheEnds, "for the wall thicknesses sufficiently and the same Terbindungemethode benutet wird.Bonding method is used. Bei geringeren Wandstärken wird jedoch eine Stnhlmuffe inWith smaller wall thicknesses, however, a steel socket in

die au verbindenden benachbarten Knden des Kern^bsohnltts elngebraeht, und die Abschnitte werden dann Miteinanderthe adjacent ends of the nucleus connecting them brewed, and the sections are then togetherness verschwelet.smoldered.

Mit beeonüereo Hinweis auf Abb. 3 besteht jeder HebebookWith beeonüereo reference to Fig. 3, every Hebebook exists

aus einem Zylinder 50 πit inneren und äußeren eylindrieohen WHnöen 51 be\r. 52, wodurch eine Ringkummer 53 gebllaet wird«from a cylinder 50 with inner and outer cylindrical WHnöen 51 be \ r. 52, whereby a ring sorrow 53 is blown «

co in der sich ein doppeltwirkender Kolben 54 befindet.co in which a double-acting piston 54 is located.

co Mn Säulenkern kann durch die durch die Innenwand St gebildeteco Mn pillar core can through the formed by the inner wall St

£j vertikale Bohrung gleiten.£ j vertical bore slide.

ο »er Zylinder 50 sitst auf eine« unteren iCeilgthäuee bb eito »the cylinder 50 sits on a« lower iCeilgthäuee bb eit

ο -ο -

ac einer nach unten und innen geneigten Innenfläche t>6 atif,ac an inner surface inclined downwards and inwards t> 6 atif, gegen die die nach unten und innen geneigte Außenfläc!:e 57against the outer surface inclined downwards and inwards: e 57

elnf.r Ktilvorri'htmi#r ',B nliert (eifi-e Abb. .'), w€loli< In BADelnf.r Ktilvorri'htmi # r ', B nliert (eifi-e Fig..'), w € loli < In BATHROOM

Umfangeriohtung hin- und hergehende Teilglieder 59 und Druckuntorlagen 60 aus elastonerea Werkstoff aufweist. LO Der Zylinder ist an sine» finde 61 doeenfüraig für äagsrsweckeCircumference direction reciprocating sub-links 59 and Has printing underlays 60 made of elastonerea material. LO The cylinder is on sine »find 61 doeenfüraig for äagswecke

-^r ausgebildet, und das Gehäuse 53 lagert in einer Fixierdoee LO in der Oberfläche der Bodenplatte 27, wobei die LngerfWtihe 63 der Dose 62 gekrümmt 1st. Ein oberesKellgehttu·· 64 lagert am oberen Xnde des Kolbens 54 und hat- eu diese« Zweok ein unteres dosenftfrmlgts Ende 65· Bas Gehäuse 64 ähnelt de» Gehäuse 55 und arbeitet mit einer Keilvorrichtung 66 sus&smen, die der Keilvorrichtung 56 entspricht«- ^ r formed, and the housing 53 is stored in a fixing box LO in the surface of the base plate 27, the length of which 63 of the can 62 is curved 1st. An upper cellar door 64 is stored at the upper end of the piston 54 and has these two functions lower dosenftfrmlgts end 65 · Bas housing 64 is similar to the » Housing 55 and works with a wedge device 66 sus & smen, which corresponds to the wedge device 56 "

Ringförmige Eruckunterlagen 67 und 66 aus elaetonerem Werkstoff liegen gegen die oberen Inde der Kellvorrichtungen 58 biw. 66 an, und iäLnstellautt ern 69 und 70 üben auf diese Unterlagen einen Druck aus.Ring-shaped eruck pads 67 and 66 made of elaetonerem Material lie against the upper indices of the cellar devices 58 biw. 66 on, and the normal number 69 and 70 exercise on them Documents a print out.

eehllti« 71 und 72 in Mantel 73 der Eyllnderwand bieten Zugang BU den Muttern 69 unA 70 und sind «it einem sich naoh unten erstreckenden peripheralen flansch 74 versehen, der mit einen Gewinde sum Eingriff mit eine» Gewinde an der oberen Außenseite der Wand des Gehäuses 64 versehen 1st· Bine Dichtung 75 aus elastoseren Material ist «wischen den Oberteil der Mutter 70 und dem durch den Hebebook gehenden Säulenabsohnitt vorgesehen*Eehllti «71 and 72 in coat 73 of the Eyllnderwand provide access BU the nuts 69 and 70 and are close to you extending peripheral flange 74 provided with a thread to engage a »thread on the upper outside of the wall of the housing 64 is provided. A seal 75 made of more elastic material is between the upper part of the nut 70 and the one passing through the lifting book Pillar submission planned *

Der doppeltwirkende Kolben 54 wird natürlich hydraulisch betätigt, und die hydraulischen Verbindungen und Kreise Q sind in den Kelchnungen nicht gezeigt.The double acting piston 54, of course, becomes hydraulic operated, and the hydraulic connections and circuits Q are not shown in the cups.

^ Bei Aufwärt«bewegung des Kolbens ergreift die obere KeIl-^ When the piston moves upwards, the upper wedge engages

-^ vorrichtung 66 den sioh sur Seit Im Hebebook befindenden- ^ device 66 den sioh sur Since in the Hebebook

ο .ο.

ο -ßäulenabschnitt, und die untere K ei !Vorrichtung wird auegeltSsto -pillar section, and the lower K ei! device is opened

"° und gibt den Kernabechiiitt frei, wie in Abb. 3 geeeigt. Entsprechend wird der Kernabschnitt angehoben, indem sich ο er Kolben nach obch bewegt. "° and releases the Kernabechiiitt, as inclined in Fig. 3. The core section is raised accordingly, in that ο the piston moves upwards.

Wenn α er Kolbtxi dae 2nd β «eine· Aufwartehubes erreichtWhen α er Kolbtxi dae 2nd β «reaches a waiting stroke

und «urUoklcthrt, «rfait da» untere Teil 58 der KellTorriohtungand "urUoklcthrt," rfait da "lower part 58 of the KellTorriohtung

4en Abschnitt derart, daß er in der Stellung festgehalten wird, στ LO In die »r angehoben wurde, und da· obere Seil 66 der Keil-4th section in such a way that it is held in the position στ LO into which »r was raised, and that the upper rope 66 of the wedge

^ vorrichtung löut aus und bewegt «ion alt den Kolben abwHrte.The device triggers and moves the piston.

*~~ Die Uruekunterlagen 67 und 68 ergeben eine «eltliehe Verlagerung swi*ohen dem Qreifvorgang dee einen Keilvorriohtungeteile lind dem Aualöeungevorgang dee anderen, so daß der Sfiulenkemabeohnitt nie gleichseitig Ton beiden Keilvorriohttujgsteilen* ~~ The original documents 67 and 68 result in a real relocation swi * without the clamping process dee a wedge device And the others are involved in the process of awakening, so that the sfiulenkemabeohnitt never simultaneously tones both parts of the wedge auegelöet wird.is auegelöet.

Das Anheben der Söulenkeinteile und oomit der ÜHulen erfoigtThe lifting of the pillar parts and oomit the ÜHulen takes place

■onit etufenweiee.■ onit etufenweiee.

Die Säulen «erden gleichzeitig mit dem Oieflen der ,eckeThe pillars earth at the same time as the outer corner

und Bödea verechnlt, wobei die Aggregate 80. 81, 82 und fUr den in Abb. 5 geseigten Zweck, wo ein OuSbett »4 angexeigt ist, un den Kern gelagert werden. Pas vorgenannte OuSbett wird eweckmäflig in seiner richtigen Lage abgestützt und ist mit Öffnungen für den Durehgnnß dar UAuIen vernehen, wie bei 85 angezeigt.and Bödea verechnlt, where the units 80, 81, 82 and for the purpose shown in Fig. 5, where an outer bed »4 is intended to be stored in the core. Pas the above OuSbett is supported in its correct position and is closed with openings for the passage of the outside, as indicated at 85.

In die öffnungen 8b ragen aollYorriohtungen 86 hinein, die gegen die Säulenrereohalung 80-83 anliegen, wobei in αen Rollenlagerungen bei 87 eine Vorkehrung «ur Ein»teilung uer Rollen 88 getroffen ist.AollYorriohtungen 86 protrude into the openings 8b, the against the Säulenrereohalung 80-83 abut, where in αen Roller bearings at 87 a precautionary «ur division» Roll 88 is hit.

Die ^g reg ate 80-83 paeeen aufeinander, so daß eie im i'uge der Hrriohtung uer JHuIen entfernt und wieder in ihrerThe ^ g reg ate 80-83 paeeen on each other, so that eie in the i'uge the direction of the JHuIen removed and back in theirs nioheten Stellung um die aftulen angebracht werden können. ^ Abb. 6 xelgt einen typischen Schnitt duroh eine I ecke odernioheten position around the aftules can be attached. ^ Fig. 6 xelgt a typical section duroh a corner or

^ einen Boden und die Verschalung hierfür auf einen OuBhett^ a floor and the boarding for this on an OuBhett

<=> wahrend uer Errichtung der Säulen und damit der g ego β s en en <=> during the erection of the pillars and thus the cast

~° Decke und den gegoaaenen Böden wie duroh den Pfeil A angezeigt iet. I i· i/ecken- und Bodenvejreohmlungen umfaeeen nachgiebig β~ ° Ceiling and the poured floors as indicated by arrow A. iet. The corner and floor contractions encompass resiliently β

3ü au« utahl und tfalsproftl in parallele« au kleinen Zwisohenräunen iwieohen benaeltbaften Holstlatten 31 , ^0^ denen eleh iiaoh oben winkelig3ü au “utahl and tfalsproftl in parallel“ au small interim troughs as well as needled wooden slats 31, ^ 0 ^ which eleh iiaoh angled above

etahltlnken 92 erheben, sind in den Zwi son ear Hu* en «wischen ^ den Trägern vor dem Qleften der Decke oder des Bodens 9$etahltlnken 92 rise, are in the between ear Hu * en "wipe ^ the girders before the ceiling or floor is laid 9 $

LO .LO.

r- angeordnet·r- arranged

vie ersichtlich, wird die Verschalung von JDeoke oder BodenAs can be seen, the shuttering is made by JDeoke or Boden gelöst, indem diese durch die elastischen Zugstangen 94,solved by this by the elastic tie rods 94, und 96 gehoben werden, die an ihren Enden alt den Verschalung»-and 96 are lifted up, the old cladding at their ends »- teilen %> und einer Verankerung 97 aus einest StUek alt <ieashare %> and an anchor 97 from one piece old <iea

Gußbett 34 verankert sind·Cast bed 34 are anchored Bei der Errichtung eines Oebtiudes werden die Pfahl»KopfplattenWhen an obituary is set up, the stake »head plates

26 mit ihren Bockein 25 sunäohst fixiert, wonach das Oufibett 26 fixed with her trestle in 25 sunäohst, after which the oufi bed hergerichtet wird.is prepared.

Anschließend werden Hebebock· 24 in ihrer richtigen LageThen the jack · 24 is in its correct position

aufgosteilt.divided.

I ie ersten B'lulenkernabschnitte 20 werden dann eingefügtI he first bulb core sections 20 are then inserted

und auf Leckenniveau angehoben, wonach eine «weokmäSlgeand raised to leak level, after which a «weokmäSlge

Verstärkung Eueamaen mit den Verschalungsaggregaten 80-85Reinforcement Eueamaen with the formwork units 80-85

und den lecken» und Fußbodenvereehaltungsgliedera 90 angebrachtand the lick and floor management members 90 attached wird.will.

J ie Bäulenkernabsohnltte werden vertikal gelotet, wonach dieThe pillar core descenders are plumbed vertically, after which the Hollen 88 richtig eingestellt werden.Hollen 88 should be set correctly. Anschließend wird Beton gegossen, üb die ääulenverschalungThen concrete is poured over the column cladding

und die Peoke ku bilden. Nach Aushärten des Betons wird altand form the Peoke ku. After the concrete has hardened it gets old den Heben angefangen, dna Vers haitungeaggrtgat 80 wird entfernt,the lifting started, dna vers haitungeaggrtgat 80 is removed,

cd und der erete Teil der Säulenverstärkung für das nUohstecd and the first part of the column reinforcement for the next

^ Stockwerk wird darunter sueamaen mit Aggregat 83 mul elnea ^ Heserveaggregat 82 befestigt.^ Floor is below it sueamaen with aggregate 83 mul elnea ^ Reserve unit 82 attached.

° .Vo die Kühe es rulHflt, können die Aggregate 82, 81 und 01°. Before the cows do it, the units 82, 81 and 01

Über dea Oußbett 84 entfernt werden. Vor dea Anheben auf die nächste ätookwcrkhuhe werden die Aggregate 81, 81 und 80 Bueaaaen mit üer verbleibenden VeretMrkung in ihre richtigeBe removed over the Oußbett 84. Before lifting on the The next equipment will be the units 81, 81 and 80 Bueaaaen with remaining reinforcement in their correct

SAD OSAD O

Lage gebracht»Brought in »

IMh αea Anheben auf Stoflkwerkhöh· wird da» Aggregat 83 entfernt» und die taulenrerkleidtiiig und der PuSboden werden C7) gegeesen. ImIi Aueharten diesen Beton· wird wieder mitIIIh αea lifting on Stoflkwerkhöh · since »unit 83 away" and the taulenrerkleidtiiig and PuSboden be C 7) gegeesen. ImIi Aueharten this concrete · is again with

co ae* Hebe» angefangen «sw«co ae * lifting "started" sw "

J^ 16 keine BtahlbetoaTerachaltung erforderlich let, werden *~ Ale lollTorriehtungen 86 derart eingeetellt, indirekt an der FlÄohe dt« Säulenkern« »neugreifen, und dieJ ^ 16 no BtahlbetoaTerachaltung required let, be * ~ Ale lollTorriehtungen 86 so set, indirect an der FlÄohe dt «column core« »grasp, and the fereohalungeeggregete tO-83 werden ausgelassen, Aneohlletend «erden Yereladttnteagcrefate an die Säulenkernefereohalungeggregete tO-83 are omitted, Aneohlletend "ground Yereladttnteagcrefate to the column cores aa«ekl«Bat oder alt öle»en rereohweiit, u» swangtaehlUeslg »1t d«r Fttlboden- oder Wandetruktur elniugrelfen.aa «ekl« Bat or old oils »en rereohweiit, u» swangtaehlUeslg Elniugrelfen »1t« r the floor or wall structure.

·3 Teranaohaalloht Torriehtungen 100 iur Ubtrtrftgung lewegmnfe«Mpllt«fien dee BtUiIenkerne an den Selten der Bedenplatt en 27 gelagerten Mete »nd em, von wo au· al· «u elaer taxtralwarta Übertragen werden* Ton der aua die BeUtlgumg der Heeeeöoke 24 eynohronieiert let.· 3 Teranaohaalloht gate directions 100 for delivery Moving "Mpllt" fied the business core to the rare Bedenplatten en 27 stored meters and em, from where au · al · «u elaer taxtralwarta will be transmitted * tone of aua die BeUtlgumg der Heeeeöoke 24 eynohronieiert let.

Bel« Eueejuienhaltett dee fertig errlohteten OebUudee (siehe Ae*, 7) werden Yereindmngeeohrauben etiftrereohweißt, t» den «Igel" 105 au bilden.Bel «Eueejuienhaltett dee finished blessed OebUudee (see Ae *, 7) are yereindmngeeohrauben etiftrereohweißt, t » to form the "hedgehog" 105 au.

Sann wird der btahlfcetonblook 102 gebildet, der den genannten "Igel" 103 TUlUg tmecklieflt.The steel-concrete block 102 is then formed, which has the aforementioned "Hedgehog" 103 TUlUg tmecklieflt.

Seltwelllge Unterettttmngen 101 werden eingerollt, «wange-Strangely wavy underlinings 101 are rolled up, «cheek-

aehlttealg fixiert und au den aeltwelllgen BetonetützblöokenFixed slightly and on the old-wave concrete support blocks hochgehoben.lifted up.

Die unteren Kernaaeohnltte 20 werden losgekuppelt und τοη denThe lower Kernaaeohnltte 20 are uncoupled and τοη den

°Hebebbcken abgeaogen.° Lifting jacks balanced.

Hebebockβ werden entfernt, Beton wird rub Auffüllen derJacks will be removed, concrete will rub backfill the

-^. β rub en 33 vergossen, und Utahlbetoiipf eiler weruen gefertigt,- ^. β rub en 33 potted, and Utahlbetoiipf eiler were made,

ouB die Pfahl -Kopf platt en alt den Blöcken 102 «u verbinden.ouB the pile-head plate and old to connect the blocks 102 «u.

OO .OO.

^Anschließend werden die Btüteen 101 entfernt. Bei oet.r hohen ^eb-muen rfind die unteren ^'4iilcnke-rne^ Then the bags 101 are removed. In the case of a high level, the lower level is found

und massiv 110. Sie anderen Abschnitte eines jeden Säulenkerns sind bei 111, 112 und 113 gezeigt» wobei die beiden letzteren breitgeflanschte Stützen sind.and solid 110. The other sections of each column core are shown at 111, 112 and 113 'being the two the latter are broadly flanged supports.

Die um die Säulen herum in einer Höhe gerade über den Fundierungen gebauten Decken und Böden können an diesen mit scharnierartigen Vorrichtungen befestigt werden» Wandplatten können an die Horizontale angebaut und derart angeordnet werden, daß sie fortschreitend bogenförmig nach unten schwingen» indem die Decke oder der Boden angehoben wird,bis -feie- die Wandabschnitte vertikal sind. Ein Aggregat um-faßt ein Teil, das sich während des Anhebens des Bodens bogenförmig nach oben bewegt, in einen hierfür im unteren Ende der unmittelbar darüberliegenden Wandplatte vorgesehenen Schlitz hineingedrückt und mit einer Schaum-Polystyrolmasse angefüllt wird, die duroh das eintretende Scharnierteil zerdrückt wird.The ones around the pillars at a height just above the Ceilings and floors built on foundations can be attached to these with hinge-like devices » Wall panels can be grown horizontally and arranged so that they are progressively arcuate swing downwards »by lifting the ceiling or floor until the wall sections are vertical. An aggregate comprises a part that moves during lifting of the floor moved upwards in an arc, in one for this purpose in the lower end of the wall plate immediately above it provided slot and with a foam polystyrene mass is filled, which is crushed duroh the entering hinge part.

Zum Schluß werden diagonale Dübel oder Bolzen duroh die obere Wandtafel und das Scharnierteil getrieben um eine bleibende Verbindung herzustellen.Finally, diagonal dowels or bolts through the upper wall panel and the hinge part are driven around one to establish a lasting connection.

Alle Abschnitte eines jeden Säulenkerns sind einander gleich, wobei die längeren Abmessungen des Rechtecks im Plan allmählich in Höhenrichtung der Säule abnehmen.All sections of each column core are equal to one another, with the longer dimensions of the rectangle im Gradually decrease the plan in the direction of the height of the column.

Die kurzen Abmessungen des Rechtecks im Plan eines jeden Säulenkerns verbleiben über die gesamte Höhe des Gebäudes gleich groß, d.h. gleich der kürzeren Abmessung eines jeden Rechtecks und der Breite der breitgeflanschten Stütze.The short dimensions of the rectangle in the plan of each Column cores remain the same size over the entire height of the building, i.e. equal to the shorter dimension of one each rectangle and the width of the wide-flanged column.

909838/00 8 7909838/00 8 7

Sie Hubvorrichtung der Abb. 8-12 ist so abgeändert um denThe lifting device in Fig. 8-12 has been modified to include the

Säulenkern entlang der beiden Flächen oder Seiten zu erfassen» die zu den Flächen mit gleichbleibend kürzerer Abmessung in rechten Winkeln stehen. Viele Merkmale der abgeänderten Hubvorrichtung sind ähnlich derjenigen, die unter Bezugnahme auf die Abb. 1-7 der Zeichnungen beschrieben ist, und sie haben die gleichen Bezugszeichen mit angefügtem großem A .To capture pillar core along both surfaces or sides » which are at right angles to the surfaces with consistently shorter dimensions. Many features of the modified elevator are similar to those described with reference to Figs. 1-7 of Figs Drawings and they have the same reference numerals with a capital A appended.

Me Greifbewegung wird durch kr&ftbetriebene Teile 120 bewerkstelligt. Die obere Greifvorrichtung 121 und die untere Greifvorrichtung.122 greifen, heben, lösen aus und werden gesenkt um nacheinander die vorgeschriebene Arbeitsfolge zu wiederholen und somit eine stufenweise Errichtung der Säule zu bewirken.The gripping movement is controlled by power operated parts 120 accomplished. The upper gripping device 121 and the lower gripping device 122 grip, lift, release and are lowered in order to repeat the prescribed work sequence one after the other and thus a step-by-step construction to effect the pillar.

Die hydraulichen Blöcke 123 werden durch Zugetangen 124 und Gabeln 125 in Blattstahlkonstruktion festgehalten. Stifte 126 kommen zur Verbindung der Gabelplatten und Ankerplatten zur Anwendung, um ein Zerlegen der Hubvorrichtungen nach Fertigstellung des Gebäudes zu ermöglichen.The hydraulic blocks 123 are tie rods 124 and forks 125 retained in sheet steel construction. Pins 126 are used to connect the fork plates and anchor plates to disassemble the lifting devices to enable after completion of the building.

Die beiden Greifer 121, 122, die die Hubvorrichtung bilden, werden durch massive Stahlplatten 127 abgestützt, um Zugang zur Säulenkemverbindung zu ermöglichen.The two grippers 121, 122, which form the lifting device, are supported by solid steel plates 127 to allow access to the column core connection.

Die Vorschub-, Verbindungs-, Führungs- und Verschalungsmethode für die Säulenkerne ähnelt der vorstehend unter Bezugnehme auf die Abbildungen 1 - 7 beschriebenen Methode*The method of advancing, connecting, guiding and shuttering the pillar cores is similar to the one above Refer to the method described in Figures 1 - 7 *

Der Mechanismus zum Freilassen der Keilvorriohtungen 120 umfaßt einen gehärteten Stahlstift 130, der durch einenThe mechanism for releasing the key devices 120 comprises a hardened steel pin 130 which is supported by a

9098 38/008 79098 38/008 7

hydraulischen Stempel 131 betätigt wird. Die Keilvorrichtungen werden durch einen drehbar gelagerten Hebel 132 betätigt, der durch einen Stempel 133 angetrieben wird. Die Säulenkerne können natürlich jeden gewünschten Querschnitt haben» wozu die anderen 1OiIe abgeändert werden, um Abb. 8 und 9 au entsprechen*hydraulic ram 131 is actuated. The wedge devices are actuated by a rotatably mounted lever 132 which is driven by a punch 133. The column cores can of course have any desired cross-section, for which purpose the other 1 olives are modified to correspond to Figs. 8 and 9.

Die Erfindung ist auch zur Verlängerung von Säulen in anderen als der vertikalen Richtung nach oben anwendbar, z.B. von oben nach unten wie beim Bohren,oder horizontal wie bei der Rohrverlegung.The invention is also applicable to the extension of columns in other than the vertical upward direction, e.g. from top to bottom as when drilling, or horizontally as with pipe laying.

9 09838/00879 09838/0087

Claims (1)

PATEMTAI8PRUOHBPATEMTAI8PRUOHB 1. Sine Methods sub Verlängern eines länglichen Bauteils unter Belastung, das aus eich axial und stufenweise erstreckenden und stirnscltlg ineinander eingreifenden fellen besteht» durch eine Vorrichtung, die diese urnfeBt und ergreift.1. Sine Methods sub Extending an elongated component below Load, which consists of axially and gradually extending skins that interlock at the end » by a device that envelops and grips them. 2. Sine Method· sur Errichtung Ton Gebäuden, bestehend aus sioh axial und stufenweise erhebenden und stimeeltig ineinander eingreifenden Stahlsäulen unter Anwendung Ton Hubvorrichtungen, die die leteteren umfassen und ergreifen, wobei üb die Säulenabeohnitte in Zwischenräumen zwischen Rüben und in einer Höhe die Decke und der Boden tosw. die2. Sine Method · sur erecting clay buildings, consisting of sioh axially and gradually uplifting and stimeeltig Interlocking steel pillars using clay Lifting devices that encompass and grasp the latter, whereby over the Säulenabeohnitte in gaps between Turnips and at one level the ceiling and the floor tosw. the BOden gebaut werden. 3» Eine Methode naoh Anspruch 2, wobei hand ab schnitt β aufFloors are built. 3 »A method according to claim 2, where hand from cut β on der Horlcontalen Bit dem Dach und Zwischenfußbüden gebaut und Bit diesen durch Seharnierrorriohtungen verbunden werden, die eine fortschreitends bogenförmige Bewegung der Waadabsehnitte Ton der Horizontalen rur Vertikalen ertnöflicht,the horlcontalen bit built the roof and intermediate footboards and bits are connected to them by hinge devices, the progressive arcuate movement of the Waadabsehnitte tone of the horizontal to the vertical sounded, indem dis Säulen erhöht werden. 4. Sins Methods naoh Anspruch 2 oder 3t dadurch ßekennseiehnet,by raising the pillars. 4. Sins Methods naoh claim 2 or 3t thereby ßekennseiehnet, dsJ SUulenabsohnitte jeder Hubvorrichtung von unten sugeflihrt und nacheinander Bit den sich jeweils in der Hubvorrichtung befindenden Abschnitt verbunden werden.The SUulenabsohnitte suggests each lifting device from below and one after the other bit each in the lifting device located section are connected. 5· Sine Methode nach dsn Ansprachen 2 bis 4, dadurch gekennzeichnet, dal seitweise Verschaltung en üb jede 3UuIe über eine !.engt oberhalb der Hubvorrichtung bis sur Höhe der jeweils su vergießenden Ueoke angebracht werden, und daß gleichseitig alt dem Gießen der Decke um jede Säule eine Verkleidung gegossen wird.5 · Sine method according to dsn speeches 2 to 4, characterized in that since lateral interconnection is over every 3UuIe via a! above the lifting device up to the height of each Ueoke potting su be attached, and that on the same side alt the casting of the ceiling around each pillar a cladding is poured. 6. Eine itethoäe nach Anspruch 5, dadurch ^ekennseiclmet, daß die zeitweise Verschaltung in iünheitd-'inßen anfüllt und entfernt wird und nach dem Aushärten der gegooeenen Verkleidung wieder angebracht wird, je naohäem der Aufhau d'fer oralen ob gestattet.6. An itethoäe according to claim 5, characterized in that the interconnection in the interior is temporarily filled and removed and again after the gooeenen panel has hardened is attached, the closer the Aufhau d'fer oral whether permitted. badbath 909838/008 7909838/008 7 7. Bine Methode nach Ansprüchen 2 bis 6, dadurch gekennzeichnet, daß die Decke und die Böden auf Verschalungen gegossen werden, die auf einem Gießbett angeordnet sind und in Zuge cn des Lit ulenauf baue Ton der hierauf gegossenen Decke abbiegbar Jt-* eind·7. Bine method according to claims 2 to 6, characterized in that the ceiling and the floors are poured onto formwork which is arranged on a pouring bed and in the course of the lit ulenauf build sound of the ceiling poured thereon bendable Jt- * a · ^ β. Eine Methode nach Anepruoh 5 bnr. Anepruoh 5, 6 orter 7f ^ β. A method according to Anepruoh 5 bnr. Anepruoh 5, 6 places 7 f dadurch gekennseiohnet, daß ein GebHude dadurch cusaamengehaltcncharacterized by the fact that a building thus contains a name wird, indem ein Block um jede Säule eum Umschließen der Verkleidung gegossen wird, wobei der genannte Block naoh der Aushärtung auf einer Stütevorrivhtung gelagert wird, da3 der sieh jeweils in der Hubvorrichtung befindende ßäulenabschnitt entfernt wird, dafl die letstere entfernt wird, der gegossene Block auf das Fundierungenireau gebraoht und die AbstUtftung entfernt wird.is done by placing a block around each pillar to enclose the Cladding is poured, said block naoh the hardening is stored on a storage rack, that the column section located in the lifting device is removed, that the last one is removed, the cast block is brewed on the foundation ridge and the stilting is removed. 9. Sine Methode nach Anspruch 8, dadurch gekennzeichnet, daß der entfernte uäulenabschnitt naoh den Entfernen der9. Sine method according to claim 8, characterized in that the removed column section after the removal of the Hubvorrichtung wieder angebracht wird.Lifting device is attached again. 10. Ein nach irgendwelchem der vorhergehenden Ansprüche10. One according to any one of the preceding claims errichtetes Oeb^üde.Established Oeb ^ üde. 11. Hebebook für die Anwendung in Vorrichtungen *u Durchführung einer der Methoden naoh Anepruoh 2 bis 9, bestehend aue einem doppeltwirkenden Kolben, dessen Zylinder its Gleitoite Über eine BtahleHuIβ paßt und aus zwei Keilrorrichtungtn ait gleiohen Innenquerochnitten wie der genannte Zylinder, die entsprechend dem I'olbenechub in beiden AxIr!bewegungen ftbwtoheelrid eine tiurohgefUhrte üäule greifen und loelaceen,11. Hebebook for use in devices * and implementation one of the methods described in Anepruoh 2 to 9, consisting of a double-acting piston, the cylinder of which is sliding Fits over a steel sleeve and consists of two wedge devices with the same internal cross-sections as the cylinder mentioned, corresponding to the piston stroke in both axial movements ftbwtoheelrid grab a tiurohgefUte column and loelaceae, <£><£> um eine axiale und stufenweise Erholung der Säule buan axial and gradual recovery of the column bu ^ ermöglichen*^ enable * ^ 12. Hebebock naoh Anepruoh 11, dadurch cel.enn&eiehnet, (IaQ uie^ 12. Lifting jack naoh Anepruoh 11, thereby cel.enn & eiehnet, (IaQ uie Q Keilrorrichtungen ,ruckunterlaßen aus' sl&sto;'<erorj .'erkßtoffQ wedge devices, let down from 'sl &sto;' <erorj .'erkßtoff oo aufweinen, die nine Vereögerung deo ': ei träume sswiechen demoo cry, the nine delay deo ': a dream sswiechen dem öreifvorgang (Ue eiJien KellsggregatP uiiö dem .Mnlöaevnrßanß dc-r; «meieren .*; i.regate "hewj γ^ιϊπ, bo cafi. Öle JKuIe ni r öreifvorgang (Ue eiJien KellsggregatP uiiö dem .Mnlöaevnrßanß dc-r; «meieren. *; i.regate" hewj γ ^ ιϊπ, bo cafi. Oils JKuIe ni r gleichseitig von beiden Keilvorriohtungen freigegeben wird. 13* Hebebock nach Anspruch 11 oder 12, dadurch gekennzeichnet, daft jede Keilvorrichtung sich peripheral hin- undis released at the same time by both wedge devices. 13 * lifting jack according to claim 11 or 12, characterized in that each wedge device reciprocates peripherally herbewegende Keilglieder und I ruckunterlagen auß cofloating wedge links and back pads co -4- elastomere» Werkstoff aufweist. cn -4- elastomeric »material. cn ^l H. Hebebook sur Anwendung in Vorrichtungen sur i&rlohtung von Oebtiuden, la wesentlichen wie vorstehend unter Hinweis auf ^ l H. Hebebook sur application in devices sur i & rlohtung von Oebtiuden, la essential as above with reference to Abb. 3 und 4 der beiliegenden Zeichnungen beschrieben.Figures 3 and 4 of the accompanying drawings. 15. Mne Hubvorrichtung 1st in den Abbildungen 8, 9 und 1015. Mne lifting device 1st in Figures 8, 9 and 10 beschrieben, die sich sum Heben von Kernen rechteckigen Querschnitts eignet·described, which are sum lifting of cores rectangular Cross-section suitable 16. Eine Hubvorrichtung nach Anspruch 15 mit kraftbetriebenen Kellen·16. A lifting device according to claim 15 with power-operated Trowels 17. Bine Hubvorrichtung nach Anspruch 15» deren Kelle durch den durch elastomere ruckunterlagen ausgeübten 3.-ruck in Eingriff kommen.17 Bine lifting device according to claim 15 "which trowel ruck-3 are engaged through the through elastomeric longitudinal jerk documents exerted. 18. Sine Hubvorrichtung nach Anspruch 15, 16 oder 17, wobei massive Stahlblöcke von einer Gabel- und Anker-Schichtkonstruktion mit geeigneten Stiften «um leiohten ? erlegen umschlossen werden.18. Sine lifting device according to claim 15, 16 or 17, wherein massive steel blocks from a fork and anchor layer construction with suitable pins. shoot be enclosed. 19. Eine Hubvorrichtung nach αen Ansprüchen 15, 16 oder 17, 18 auf massiver Stahlplettenlagerung, um Uugang sur Zuführung su gewähren und die Sliulenkerne zu verbinden.19. A lifting device according to claims 15, 16 or 17, 18 on massive steel platen bearings to Uugang sur feed su grant and connect the column cores. 20. Säulenkerne kreisförmigen oder rechtwinkeligen uersohnltta, die nach dieser Methode errichtet, in Stahlbeton eingeschalt20. Pillar cores circular or right-angled uersohnltta, built according to this method, encased in reinforced concrete oder durch Stehlbetonwände In Säulengruppen susammengefeJtor fixed together in groups of pillars by means of reinforced concrete walls 21. Säulenkern·, kreisförmig oder rechtwinkelig Im wueroohnltt, dl«21. Pillar core ·, circular or right-angled Im wueroohnltt, dl « ο durch Be.uetfcnlverstelfungen in Gruppen eur Bildung vonο through adjustment in groups and formation of ^ Trafwerken geordnet sind. Aufgeklemmte oder etiftversohweiete Yerbindunfsbolien werden sur Verbindung mit 3tahlbetonboden od< Itaklbetonbodenbalken benutst.^ Trafwerk are arranged. Clamped or etiftversohweiete Connection foils are used in connection with reinforced concrete floors Itakl concrete floor beams are used.
DE19651534859 1964-07-24 1965-07-24 Improvements in construction Pending DE1534859A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
GB2978564A GB1096827A (en) 1964-07-24 1964-07-24 Methods of building construction
GB3621764 1964-09-03
NL6514011A NL6514011A (en) 1964-07-24 1965-10-28

Publications (1)

Publication Number Publication Date
DE1534859A1 true DE1534859A1 (en) 1969-09-18

Family

ID=27258840

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19651534859 Pending DE1534859A1 (en) 1964-07-24 1965-07-24 Improvements in construction

Country Status (3)

Country Link
US (1) US3416284A (en)
DE (1) DE1534859A1 (en)
NL (1) NL6514011A (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3828513A (en) * 1971-02-11 1974-08-13 Research Corp Method of erecting a multi-story building and apparatus therefor
US3720034A (en) * 1971-03-10 1973-03-13 F Dawley Methods for constructing multi-story structures
SE354635B (en) * 1972-01-12 1973-03-19 N Ahlgren
USRE31206E (en) * 1972-01-12 1983-04-12 Method of lowering and raising loads by means of a jack assembly and lifting element
US4277051A (en) * 1978-04-24 1981-07-07 Marine Engineering Company, C. A. Tilt-up/jack-up off-shore drilling apparatus and method
DE3118449A1 (en) * 1981-05-09 1982-12-02 Sitema Gesellschaft für Sicherheitstechnik und Maschinenbau mbH, 7500 Karlsruhe "CLAMPING DEVICE"
US9556636B2 (en) * 2014-06-27 2017-01-31 Tindall Corporation Method and apparatus for erecting tower with hydraulic cylinders

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1398822A (en) * 1921-02-23 1921-11-29 Wilson John Hart Casing-pulling apparatus
US1923283A (en) * 1932-09-26 1933-08-22 John C Stokes Slip
US2756019A (en) * 1947-10-23 1956-07-24 Lindman Hydraulic or pneumatic form lifter
NL92619C (en) * 1953-06-30
US2976693A (en) * 1954-10-11 1961-03-28 De Long Corp Method of operating marine structures
US3040411A (en) * 1956-05-07 1962-06-26 Charles B Messenger Process of constructing a concrete support structure
DE1138208B (en) * 1959-04-02 1962-10-18 Paul Plueckebaum Method and device for setting up multi-storey buildings with a basement
NL278769A (en) * 1959-05-08
US3065573A (en) * 1959-08-13 1962-11-27 Goldberg Samuel Building construction
US3210903A (en) * 1960-05-07 1965-10-12 Erik G V Herolf Method of erecting building constructions and means for carrying out the method

Also Published As

Publication number Publication date
NL6514011A (en) 1967-05-02
US3416284A (en) 1968-12-17

Similar Documents

Publication Publication Date Title
EP2057328B1 (en) Arrangement for conveying concrete with a height-adjustable concrete-distributing mast
DE2158298A1 (en) Dismountable multi-storey building unit
DE2101084A1 (en) Procedure for erecting a structure
DE2040328A1 (en) Room formwork
DE1534859A1 (en) Improvements in construction
DE1138208B (en) Method and device for setting up multi-storey buildings with a basement
DE1284076B (en) Method of erecting a building
DE2361133A1 (en) FRAMEWORK CRANE
DE1808989A1 (en) Device for the production of monolithic, room-sized structures made of reinforced concrete, in particular prefabricated reinforced concrete garages
AT411079B (en) METHOD FOR THE CONSTRUCTION OF A CONSTRUCTION WITH A CONCRETE WALL CONTAINED IN A CIRCUMFERENCE
DE2400790C2 (en) Process and device for the production of room cells made of reinforced concrete, e.g. prefabricated garages
DE1963852A1 (en) Method of erecting a structure that is at least partially submerged in a body of water
DE2532964C2 (en) Method for producing and manipulating a large-format prefabricated wall component
DE2208911C3 (en) Device for distributing concrete in the course of erecting buildings
DE2322920C3 (en) Prefabricated component for the manufacture of buildings
DE3626169A1 (en) Foundation with pile support
DE1683876C2 (en) Device for producing room-sized structures made of reinforced concrete, which are open at least on one side, and in particular prefabricated garages
AT395742B (en) METHOD FOR ESTABLISHING BUILDING BODIES FROM POWABLE, CURABLE MATERIALS AND DEVICE FOR IMPLEMENTING THE METHOD
DE1784381C3 (en) Method for erecting building exterior wall panels
DE2128548C3 (en) Device for the point-by-point support of prefabricated prestressed concrete slabs. &lt;
DE3343808C2 (en)
DE2121503A1 (en) Enclosed building unit
DE2531284A1 (en) FORMWORK FOR THE PRODUCTION OF IN PARTICULAR FIVE-SIDED CLOSED, PREFERABLY SQUARE-SHAPED AND MONOLITHIC ROOMS MADE OF REINFORCED CONCRETE
DE3219943C2 (en) Device for introducing reinforcement in the manufacture of large-area reinforced concrete slabs
DE1534979C (en) Connection of prefabricated reinforced concrete prefabricated wall panels that are placed one on top of the other