Dorigo
2018
Blockchain technology for robot swarms: A shared knowledge and reputation management system for collective estimation
US10277417B2
(en )
2019-04-30
Control system, control apparatus and control method with input-only communication frame
US20130285589A1
(en )
2013-10-31
Electric motor control system and communication method
DE3942977A1
(de )
1991-06-27
Verfahren zum wiederherstellen der richtigen zellfolge, insbesondere in einer atm-vermittlungsstelle, sowie ausgangseinheit hierfuer
CN108462652A
(zh )
2018-08-28
一种报文处理方法、装置和网络设备
JPH1093591A
(ja )
1998-04-10
Atmセルを最適に伝送する方法
DE1533699U
(Direct )
EP0967828A3
(en )
2000-08-16
Switch control system in ATM switching system
WO2001035522A1
(en )
2001-05-17
Servo control system
Zhao et al.
2011
Fuzzy speed control and stability analysis of a networked induction motor system with time delays and packet dropouts
Liu et al.
2015
Optimal synchronized transfers in schedule-based public transport networks using online operational tactics
CN103777618B
(zh )
2017-02-01
半导体工艺的指令执行的控制方法及控制装置
CN108462653B
(zh )
2021-09-14
基于tte的协议控制帧快速发送方法
EP1132787A1
(en )
2001-09-12
Production facility control system
Sirjani et al.
2001
Compositional verification of an object-based model for reactive systems
CN106656852B
(zh )
2019-02-15
一种实现报文二选一的电路结构
CN106325217B
(zh )
2018-08-03
具有学习存储器切换功能的伺服控制系统
Bai et al.
2024
Efficient heuristic algorithm for precedence-constrained multi-robot task assignment
CN102280138B
(zh )
2013-07-24
具有累积写入特征的存储方法、存储器和存储系统
EP2178238A3
(en )
2012-12-26
Insuring proper communication with chosen implant among multiple implants in proximity to one another
Kersbergen et al.
2013
On implicit versus explicit max-plus modeling for the rescheduling of trains
EP1793314A3
(en )
2007-08-01
Data transfer operations and buffer memories
Мишин
2005
Optimality of decentralized hierarchy controlling non-connected technological network
하정훈
2018
Hybrid Genetic Algorithm for Integrated Process Planning and Scheduling Problem
Koike et al.
2008
Production scheduling system with dynamic lot size in case of considering set-up time