DE1515799U
(OSRAM )
Seebacher et al.
2015
In-plant logistics efficiency valuation using discrete event simulation
WO2001027719B1
(en )
2001-11-08
Novel method and apparatus for repricing a reimbursement claim against a contract
CN1196542C
(zh )
2005-04-13
矫正错误读出附于邮件的码的邮件分拣处理方法
Kurniawati et al.
2025
Pengaruh Gaya Kepemimpinan dan Disiplin Kerja terhadap Kinerja Karyawan pada PT Sangwoo Indonesia
Nakamura et al.
1978
Group production scheduling for minimum total tardiness Part (I)
CN110282405B
(zh )
2024-06-21
用于复杂流水线的工件检测与智能识别方法及系统
Lestari et al.
2023
Pengaruh Economic Value Added (EVA) Dan Market Value Added (MVA) Terhadap Return Saham Pada Perusahaan Sub Sektor Otomotif Di Bursa Efek Indonesia (BEI)
CN119005891A
(zh )
2024-11-22
一种车间产品计数与mes对接的过站更新系统
CN117709785A
(zh )
2024-03-15
一种钢筋网片的质量分析方法及分析系统
EP1113376A2
(en )
2001-07-04
Method of calculating sorting costs for chargeback accounting for an incoming mail sorting apparatus
CN211469922U
(zh )
2020-09-11
用于复杂流水线的工件检测与智能识别系统
CN111937810A
(zh )
2020-11-17
一种提高家禽继代数据记录准确性的方法
Zielińska-Jankiewicz et al.
2005
OCCUPATIONAL EXPOSURE TO BIOLOGICAL AGENTS AND THE PROTECTION OF EXPOSED WORKERS ACCORDING TO THE NEW LEGAL REGULATIONS.
CN111737239B
(zh )
2021-07-02
一种表计值修正方法、装置及存储介质
JP5206583B2
(ja )
2013-06-12
検収装置
Figueiredo et al.
2016
Price Coupling of Regions: What changed in Western Europe?
Koch
2005
Weights for timings of minimum light of eclipsing binaries
DE1392186U
(OSRAM )
CN119558560A
(zh )
2025-03-04
流水线板料分配方法、计算机设备、存储介质及程序产品
DE1387556U
(OSRAM )
Keefer et al.
0
REACH CONVERSION RATES OF RADIO-TAGGED CHINOOK AND SOCKEYE SALMON AND STEELHEAD IN THE LOWER COLUMBIA RIVER, 2013-2014
CN120875401A
(zh )
2025-10-31
高频扰动下的装配产线动态重构与调度方法
DE1511872U
(OSRAM )
DE1404594U
(OSRAM )